District Heating. Typical range of power 500 kWth – 20 MWth Optimum size about 1 MWth Consumption about 1.000 tons/year compatible with local availability Reduced impact Repeatability Contained costs. Boiler. Chips cost 40 – 60 Euro/tons Heat cost 6 - 8 cEuro/kWh. District heating pipe. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: District Heating

District Heating• Typical range of power 500 kWth –

20 MWth

Optimum size about 1 MWth

• Consumption about 1.000 tons/year compatible with local availability

• Reduced impact• Repeatability• Contained costs

District heating pipe

Boiler

Chips cost 40 – 60 Euro/tonsHeat cost 6 - 8 cEuro/kWh

Page 2: District Heating

CHPCombined production of Electric and Thermal power from biomass

Technologies– Steam (classical Rankine Cycle)

Power range 5 MWe 20 MWeAnnual use of wood higher than 50.000 tons/yearEfficiency about 15-25%

– Organic Rankine CyclePower range 450 kWe 1.5 MWeAnnual use of wood from 5.000 to 15.000 tons/yearEfficiency about 15%

Green CertificateTo improve the production of electricity from renewable energy source GREEN CERTIFICATES (about 10 c€ per kWh)

ORC Turbogenerator

Page 3: District Heating

Pellets boiler – Typical installations

• 8-10 kWth– Domestic heating– Production of hot air– Consumption: 0,6 – 2,1 Kg/h– Cost: 2.000 – 4.000 Euro

• 25 kWth– Small houses– Production of hot water and hot air– Consumption about 5 kg/h– Cost 5.000 – 10.000 Euro

• 110 kWth– Buildings– Production of hot water– Consumption about 20 kg/h– 35.000 – 50.000 Euro– It needs place to store Pellets boiler

Page 4: District Heating

E. Logistic systems

• Chainsaw• Transportation system with mobile

engine• Timberjack (less used)• Tractors (in most of cases)

SUPPLY CHAIN

Page 5: District Heating

Cut off using chainsaw

Measurement and section

Transportation with tractor

Supply chain - 1

Page 6: District Heating

Supply chain - 2Transportation system with

mobile engine

Transportation with track trailer

Truck loading

Heavy mobilechips machine

Page 7: District Heating

Next deliverables (short term)

• List of regional stakeholder• Analysis of wood resources and energy• Demand Catalogue of technologies and

logistic systems

Page 8: District Heating

Proposals for next deliverables

• Common template for deliverables• Set deadlines for deliverables• Next study tour: where ? when ? focus on: technologies ? Logistic

systems ?