an equal opportunity employer Hazeltine Gates, Suite 400 1107 Hazeltine Boulevard Minneapolis, MN 55318-1041 952/448-9393 FAX 952/448-9572 CORPORATE HEADQUARTERS OFFICE LOCATIONS Minneapolis, MN Chicago, IL Dallas, TX Denver, CO Duluth, MN Indianapolis, IN Los Angeles, CA Miami, FL Milwaukee, WI New York, NY Salt Lake City, UT San Antonio, TX H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006 September 1, 2004 Mr. Ted Sherman St. Paul Public Schools District Headquarters 360 Colborne Avenue St. Paul, MN 55102 RE: AIR MONITORING REPORT FIRST FLOOR WEST HALLWAY MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova Consulting Group, Inc. (Nova) provided on-site air monitoring during the removal of asbestos-containing materials at the Maxfield Elementary project site. Attached is the report detailing the Maxfield Elementary asbestos abatement project. If you have any questions regarding this report, please contact me at your convenience. Sincerely, NOVA CONSULTING GROUP, INC. Charles E. Easley, CHMM Operations Manager CEE:law Attachment

Upload: others

Post on 12-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

an equal opportunity employer

Hazeltine Gates, Suite 400 1107 Hazeltine Boulevard Minneapolis, MN 55318-1041952/448-9393 FAX 952/448-9572

CORPORATE HEADQUARTERS OFFICE LOCATIONSMinneapolis, MN Chicago, IL

Dallas, TXDenver, CODuluth, MNIndianapolis, INLos Angeles, CA

Miami, FLMilwaukee, WINew York, NYSalt Lake City, UTSan Antonio, TX

H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006

September 1, 2004

Mr. Ted ShermanSt. Paul Public SchoolsDistrict Headquarters360 Colborne AvenueSt. Paul, MN 55102

RE: AIR MONITORING REPORTFIRST FLOOR WEST HALLWAYMAXFIELD ELEMENTARY380 NORTH VICTORIA ST.ST. PAUL, MN 55104NOVA PROJECT NO: H04-1493

Dear Mr. Sherman:

Nova Consulting Group, Inc. (Nova) provided on-site air monitoring during the removal ofasbestos-containing materials at the Maxfield Elementary project site.

Attached is the report detailing the Maxfield Elementary asbestos abatement project.

If you have any questions regarding this report, please contact me at your convenience.

Sincerely,

NOVA CONSULTING GROUP, INC.

Charles E. Easley, CHMMOperations Manager

CEE:lawAttachment

Page 2: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

AIR MONITORINGREPORT

First Floor West HallwayMaxfield Elementary380 North Victoria St.St. Paul, MN 55104

August 2 – 16, 2004

Nova Client No.: STPAU006/Project No: H04-1493

Page 3: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

AIR MONITORING REPORT

First Floor West HallwayMaxfield Elementary380 North Victoria St.

St. Paul, MN 55104

Nova Client No.: STPAU006Project No.: H04-1493

August 2 – 16, 2004

Prepared For:

St. Paul Public SchoolsDistrict Headquarters360 Colborne AvenueSt. Paul, MN 55102

Prepared By:

Charles E. Easley, CHMM, Operations ManagerMegan Broberg and Michael Muff, Air Monitoring Specialists

Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400

Chaska, MN 55318

Page 4: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Maxfield Elementary, St. Paul, MN H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006Page i August 2 – 16, 2004

TABLE OF CONTENTS

Section Page

1.0 INTRODUCTION ....................................................................................................................1

2.0 ENCLOSURE SUMMARY .....................................................................................................2

3.0 AIR MONITORING AND SAMPLE ANALYSIS..................................................................4

4.0 WASTE TRACKING ...............................................................................................................5

APPENDICES

A: Air Sample Results SummaryB: Air Sample Results DetailC: Sample Location MapsD: Daily Log ReportsE: Personnel Certification FormF: Negative Air VerificationG: Waste TrackingH: Daily Microscope ChecklistI: Personnel Certifications

Page 5: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Maxfield Elementary, St. Paul, MN H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006Page 1 August 2 – 16, 2004

1.0 INTRODUCTION

Nova Consulting Group, Inc. (Nova) provided on-site air monitoring during the removal ofasbestos-containing materials located in the First Floor West Hallway at the MaxfieldElementary building, 380 North Victoria St., St. Paul, MN 55104.

Removal was conducted using full enclosure and glove bag asbestos abatement techniques. Allasbestos-related work was performed in accordance with Federal, State, and Local asbestosregulations.

Asbestos-related work began on August 2, 2004 and was completed on August 16, 2004. MavoSystems, License #AC200, conducted the asbestos abatement.

Sample collection and analysis was completed by Megan Broberg, License #AS8988, andMichael Muff, License #AS8372, of Nova Consulting Group, Inc., 1107 Hazeltine Boulevard,Suite #400, Chaska, MN 55318.

Page 6: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Maxfield Elementary, St. Paul, MN H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006Page 2 August 2 – 16, 2004

2.0 ENCLOSURE SUMMARY

The following enclosure summary describes each enclosure including location of the enclosure andmaterials removed. Also identified is the clearance date and whether destructive means were usedto access ACM located in interstitial spaces or other inaccessible areas.

Specific details relating to enclosure construction and removal details can be found in the daily logslocated in the appendices.

Enclosure Number: 1Enclosure Type: Full EnclosureArea: First FloorLocation: West HallwayClearance Date: 8/16/04Destructive Means Used: YesMaterial Identification Subcategory Description Quantity Unit4-8 Aircell Pipe Insulation White Canvas 600 LF

Enclosure Number: 2Enclosure Type: Glove BagArea: First FloorLocation: North End Outside Full EnclosureRoom Number: West HallwayClearance Date: 8/9/04Destructive Means Used: YesMaterial Identification Subcategory Description Quantity Unit0-4 Fibrous Pipe Insulation White Canvas 20 LF

Enclosure Number: 3Enclosure Type: Glove BagArea: Floor 02Location: ClassroomRoom Number: 206Clearance Date: 8/12/04Destructive Means Used: NoMaterial Identification Subcategory Description Quantity UnitCaulk Gray 7 LF

Page 7: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Maxfield Elementary, St. Paul, MN H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006Page 3 August 2 – 16, 2004

Enclosure Number: 4Enclosure Type: Glove BagArea: Floor 02Location: ClassroomRoom Number: 201Clearance Date: 8/12/04Destructive Means Used: NoMaterial Identification Subcategory Description Quantity UnitCaulk Gray 7 LF

Enclosure Number: 5Enclosure Type: Glove BagArea: First FloorLocation: West Hallway Near North StairsClearance Date: 8/12/04Destructive Means Used: NoMaterial Identification Subcategory Description Quantity Unit0-4 Fibrous Pipe Insulation White Canvas 18 LF

Page 8: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Maxfield Elementary, St. Paul, MN H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006Page 4 August 2 – 16, 2004

3.0 AIR MONITORING AND SAMPLE ANALYSIS

On-site air monitoring was provided by Megan Broberg, License #AS8988, and Michael Muff,License #AS8372. PCM sample collection and analysis was completed in accordance withNIOSH Method 7400. Quality control procedures were followed as required by this method.Air sample analysis results can be found on the air sample summary table located in theappendices.

Page 9: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Maxfield Elementary, St. Paul, MN H04-1493R.001-CEE/2004 Projects/Chaska/STPAU006Page 5 August 2 – 16, 2004

4.0 WASTE TRACKING

All asbestos waste containers were labeled with the required EPA, DOT, and OSHA labels. Thefollowing waste containers were removed from the project site:

Date Qty Waste Container Type ofTransport

ImmediateDestination

8/12/2004 67.0 6 Mil Poly Bags Dumpster Mavo Office8/12/2004 22.0 6 Mil Packages Dumpster Mavo Office8/16/2004 30.0 6 Mil Poly Bags Dumpster Mavo Office

Waste was transported to the SKB Industrial Waste Facility located at 13425 Courthouse Blvd.,Rosemount, MN 55068.

A waste tracking table is located in the appendices.

Page 10: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX A

AIR SAMPLE RESULTS SUMMARY

Page 11: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Air Sample Results by EnclosureNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address: 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Enclosure Number Area Sample Number Date Type of Sub-Type ResultLocation Sample Location Collected Sample of Sample

Room Number

Enclosure # 1 First Floor 001-0001 8/10/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Bagout EnclosureEnclosure # 1 First Floor 001-0002 8/10/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Decon EnclosureEnclosure # 1 First Floor 001-0003 8/10/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Bagout EnclosureEnclosure # 1 First Floor 001-0004 8/10/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Decon EnclosureEnclosure # 1 First Floor 001-0005 8/11/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Bagout EnclosureEnclosure # 1 First Floor 001-0006 8/11/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Decon EnclosureEnclosure # 1 First Floor 001-0007 8/11/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Bagout EnclosureEnclosure # 1 First Floor 001-0008 8/11/04 Negative Pressure Adjacent <0.01Full Enclosure West Hallway Decon EnclosureEnclosure # 2 First Floor 002-0001 8/9/04 Glove Bag Adjacent 0.01Glove Bag North End Outside Full Enclosure Near North Hatch

DoorWest Hallway

Enclosure # 2 First Floor 002-0002 8/9/04 Glove Bag Adjacent 0.01Glove Bag North End Outside Full Enclosure Near North Hatch

DoorWest Hallway

Enclosure # 3 Floor 02 003-0001 8/12/04 Glove Bag Adjacent <0.01Glove Bag Classroom Chalkboard

206Enclosure # 3 Floor 02 003-0002 8/12/04 Glove Bag Adjacent <0.01Glove Bag Classroom Desk

206Enclosure # 4 Floor 02 004-0001 8/12/04 Glove Bag Adjacent <0.01Glove Bag Classroom Left

201

Thursday, August 26, 2004 Page 1 of 2© Nova Consulting Group, Inc.

Page 12: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Air Sample Results by EnclosureNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address: 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Enclosure Number Area Sample Number Date Type of Sub-Type ResultLocation Sample Location Collected Sample of Sample

Room Number

Enclosure # 4 Floor 02 004-0002 8/12/04 Glove Bag Adjacent <0.01Glove Bag Classroom Right

201Enclosure # 5 First Floor 005-0001 8/12/04 Glove Bag Adjacent <0.01Glove Bag West Hallway Near North Stairs East

Enclosure # 5 First Floor 005-0002 8/12/04 Glove Bag Adjacent <0.01Glove Bag West Hallway Near North Stairs West

Thursday, August 26, 2004 Page 2 of 2© Nova Consulting Group, Inc.

Page 13: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX B

AIR SAMPLE RESULTS DETAIL

Page 14: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Air Sample Results DetailNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Collection Information Analysis InformationDate Sample Type of Sub-Type Calibrated Date Number Graticule Total Blank Fiber Concen-

Collected Collected By Volume Analyzed Analyzed By Fibers Density tration

8/9/04 002-00 Glove Bag Adjacent Michael Muff 14.12 2047.4 8/9/04 Michael Muff 100 0.00785 50 0 63.69 0.0101

8/9/04 002-00 Glove Bag Adjacent Michael Muff 14.12 2033.2 8/9/04 Michael Muff 100 0.00785 45.5 0 57.96 0.0102

8/9/04 B-0001 Blank Adjacent Michael Muff 0 0 8/9/04 Michael Muff 100 0.00785 0 0 0 0 fibers8/10/04 001-00 Negative Adjacent Michael Muff 10.49 2265.8 8/10/04 Michael Muff 100 0.00785 8.5 0 10.83 <0.01

01 PressureEnclosure

8/10/04 001-00 Negative Adjacent Michael Muff 10.15 2212.7 8/10/04 Michael Muff 100 0.00785 6.5 0 8.28 <0.0102 Pressure

Enclosure

8/10/04 001-00 Negative Adjacent Michael Muff 14.99 1349.1 8/10/04 Michael Muff 148 0.00785 5 0 4.3 <0.0103 Pressure

Enclosure

8/10/04 001-00 Negative Adjacent Michael Muff 10.49 975.57 8/10/04 Michael Muff 205 0.00785 6.5 0 4.04 <0.0104 Pressure

Enclosure

8/11/04 001-00 Negative Adjacent Michael Muff 15.05 2739.1 8/11/04 Michael Muff 100 0.00785 9 0 11.46 <0.0105 Pressure

Enclosure

Thursday, August 26, 2004 Page 1 of 3© Nova Consulting Group, Inc.

Page 15: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Air Sample Results DetailNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Collection Information Analysis InformationDate Sample Type of Sub-Type Calibrated Date Number Graticule Total Blank Fiber Concen-

Collected Collected By Volume Analyzed Analyzed By Fibers Density tration

8/11/04 001-00 Negative Adjacent Michael Muff 10.49 1940.6 8/11/04 Michael Muff 103 0.00785 11 0 13.6 <0.0106 Pressure

Enclosure

8/11/04 001-00 Negative Adjacent Michael Muff 14.99 2638.2 8/12/04 MCB 100 0.00785 5 0 6.37 <0.0107 Pressure

Enclosure

8/11/04 001-00 Negative Adjacent Michael Muff 14.76 2538.7 8/12/04 MCB 100 0.00785 10 0 12.74 <0.0108 Pressure

Enclosure

8/11/04 P-0001 Personal - TWA Work Area Mavo 2 450 8/12/04 MCB 100 0.00785 44.5 0 56.69 0.048/11/04 P-0002 Personal - STEL Work Area Mavo 2 60 8/12/04 MCB 100 0.00785 8 0 10.19 0.068/11/04 P-0003 Personal - TWA Work Area Mavo 2 310 8/12/04 MCB 100 0.00785 11.5 0 14.65 0.018/12/04 003-00 Glove Bag Adjacent Megan Broberg 13.68 2202.4 8/13/04 MCB 100 0.00785 13 0 16.56 <0.01

018/12/04 003-00 Glove Bag Adjacent Megan Broberg 13.48 2156.8 8/13/04 MCB 100 0.00785 19 0 24.2 <0.01

028/12/04 004-00 Glove Bag Adjacent Megan Broberg 13.75 2145 8/13/04 MCB 100 0.00785 26.5 0 33.76 <0.01

018/12/04 004-00 Glove Bag Adjacent Megan Broberg 13.46 2086.3 8/13/04 MCB 100 0.00785 22.5 0 28.66 <0.01

02

Thursday, August 26, 2004 Page 2 of 3© Nova Consulting Group, Inc.

Page 16: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Air Sample Results DetailNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Collection Information Analysis InformationDate Sample Type of Sub-Type Calibrated Date Number Graticule Total Blank Fiber Concen-

Collected Collected By Volume Analyzed Analyzed By Fibers Density tration

8/12/04 005-00 Glove Bag Adjacent Megan Broberg 13.1 2082.9 8/13/04 MCB 100 0.00785 23.5 0 29.94 <0.0101

8/12/04 005-00 Glove Bag Adjacent Megan Broberg 12.52 1990.6 8/13/04 MCB 100 0.00785 17 0 21.66 <0.0102

8/12/04 B-0002 Blank Megan Broberg 0 0 8/12/04 MCB 100 0.00785 0 0 0 0 fibers8/12/04 P-0004 Personal Work Area Mavo 2 250 8/12/04 MCB 100 0.00785 6.5 0 8.28 0.018/12/04 P-0005 Personal Work Area Mavo 2 280 8/12/04 MCB 100 0.00785 2 0 2.55 <0.018/13/04 B-0003 Blank Megan Broberg 0 0 8/13/04 MCB 100 0.00785 0 0 0 0 fibers

Thursday, August 26, 2004 Page 3 of 3© Nova Consulting Group, Inc.

Page 17: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX C

SAMPLE LOCATION MAPS

Page 18: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Enclosures 1 & 2Maxfield Elementary380 North Victoria StreetSt. Paul, MN 55104 H04-1493

August2004

1 & 2Consulting Group, Inc.

EnvironmentalArchitectureEngineering

Entrance

Main Office Gymnasium

Men's Room

LadiesRoom

Cust.Room

B

S

H

H

G G G G

X1X2

StaffLounge

Engineer

Hallway

Courtyard

3 StageBagout

Decon with Shower Unit

KEY

G GloveBag Location

H HEPA Filter

Glove Bag AdjacentSamples:

X1 = 002-0001X2 = 002-0002

(Above Ceiling)

Adjacent Samples:

X3 =001-0001, 001-0003, 001-0005, 001-0007

X4= 001-0002, 001-0004, 001-0006, 001-0008

X3

Enclosure Boundary

X4

M

M Manometer

Page 19: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Enclosure 3Maxfield Elementary380 North Victoria StreetSt. Paul, MN 55104 H04-1493

August 2004

3Consulting Group, Inc.

EnvironmentalArchitectureEngineering

001-0001

206

205

204

203

202

201

Stairs

Other Rooms

Key

Sample Location

Glovebag LocationG

G 003-0001003-0002

Page 20: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Enclosure 4Maxfield Elementary380 North Victoria StreetSt. Paul, MN 55104 H04-1493

August 2004

4Consulting Group, Inc.

EnvironmentalArchitectureEngineering

Key

Sample Location

Glovebag LocationG

001-0001

206

205

204

203

202

201

Other Rooms

Stairs

G 004-0001004-0002

Page 21: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Enclosure 5Maxfield Elementary380 North Victoria StreetSt. Paul, MN 55104 H04-1493

August 2004

5Consulting Group, Inc.

EnvironmentalArchitectureEngineering

Key

Sample Location

Glovebag LocationG

001-0001

106

105

104

103

102

101

Other Rooms

StairsG

005-0001005-0002

Entry

Page 22: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX D

DAILY LOG REPORTS

Page 23: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/2/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 8.57:00 AM 3:30 PM 0.0 1 8.5 7:00 AM 3:30 PM 0.5 3 8.0 Contractor 24.0

Log EntriesTime Description7:00 AM Nova arrives on site.7:15 AM Mavo arrives with a crew of three, not including Mavo owner Larry Reese, who is also on site.7:30 AM Nova is shown the scope of work in the West Hallway. Approximately 600 LF of aircell insulation is to be either

abated or wrapped and cut or abated. Two dead lines will be wrapped and cut. The lines run above a plasterceiling with 1 X 1 ceiling tile. There are nine access panels in the ceiling along the hallway. They plan toconstruct criticals below the ceiling along half the hallway, with additional criticals above the ceiling in the

8:00 AM The crew is constructing 2 X 4 posts to support the ceiling along the hallway where they will be crawling.9:00 AM A freestanding critical along the middle of the hallway is being constructed.10:00 AM Nova points out to the supervisor that the ceiling tile inside the full enclosure will have to be criticaled.11:00 AM The crew has nearly completed construction of the freestanding critical along the length of the hallway.11:30 AM The crew takes lunch.12:30 PM The crew returns from lunch, continuing to put up criticals.1:30 PM HEPAs are being attached on the south end of the hallway and will be vented externally out an inner courtyard.2:00 PM A poly floor for the change area is being laid down.3:00 PM The crew is working on putting up the inside wall on the containment below the ceiling.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 1 of 12

© Nova Consulting Group, Inc.

Page 24: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/3/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 7.58:00 AM 3:30 PM 0.0 1 7.5 7:00 AM 3:30 PM 0.5 3 8.0 Contractor 24.0

Log EntriesTime Description8:00 AM Nova arrives on site. Mavo is on site with the same crew of three. They are completing the construction of the

inside wall and taping the seams where the freestanding critical along the length of the hall meets the ceiling.8:30 AM The crew has nearly completed the inside wall. They are beginning to set up to lay the first floor.9:00 AM The Mavo supervisor surveys a checklist of previously damaged items such as carpet stains and broken ceiling

tiles. Nova signs off on the list.9:15 AM The supervisor states that there will be plywood laid above the black iron above the ceiling for additional support

to prevent ceiling plaster damage.9:30 AM Two decon cubes have been constructed, but not connected.10:30 AM All decon cubes, including the shower unit, have been constructed and attached to the containment.11:00 AM The first poly floor has been completed. The crew takes lunch.12:00 PM The crew returns from lunch. They begin laying the second poly floor.2:00 PM The portion of the containment below the plaster ceiling is completed. The crew is now opening the hatches

and will begin precleaning debris above the ceiling. They will then begin cutting plywood planks across the2:30 PM The supervisor is unloading plywood for the planks above the ceiling while the crew continues precleaning.3:00 PM The crew begins cleanup of the work area.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 2 of 12

© Nova Consulting Group, Inc.

Page 25: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/4/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 8.07:00 AM 3:30 PM 0.5 1 8.0 7:00 AM 3:30 PM 0.5 3 8.0 Contractor 24.0

Log EntriesTime Description7:00 AM Mavo and Nova arrive on site. Mavo brings the same crew of three.7:15 AM Two of the crew don Tyveks and respirators before entering the area above the ceiling. They are planning to

complete precleaning, following by stringing up some lighting.7:45 AM The crew is now stringing up the lighting above the ceiling.8:15 AM The Mavo supervisor is cutting and fitting plywood over the sections above the ceiling that have been

precleaned as the other two continue precleaning, working from North to South.11:00 AM The crew takes lunch break. The supervisor estimates they will be precleaning and fitting plywood above the

ceiling well into tomorrow.12:00 PM The crew returns from lunch, resuming precleaning and laying plywood.1:15 PM The containment above the ceiling is now precleaned. Two of the crew are now beginning to put up criticals on

one side while the supervisor continues to lay plywood.3:15 PM The crew continues criticaling and laying plywood. The supervisor informs Nova that various pipe runs that are

horizontal to the hallway will also be abated. Much of this will be outside of the containment and will abatedwith glove bags. Approximately half the plywood has now been laid. The crew begins cleaning up the area.

3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 3 of 12

© Nova Consulting Group, Inc.

Page 26: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/5/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 8.57:00 AM 3:30 PM 0.0 1 8.5 7:00 AM 3:30 PM 0.5 3 8.0 Contractor 24.0

Log EntriesTime Description7:00 AM Mavo and Nova arrive on site. Mavo brings the same crew of three.7:15 AM The supervisor resumes cutting and fitting plywood above the ceiling, while the other two don Tyveks and

respirators before climbing above the ceiling in the containment to continue criticaling.10:15 AM The crew is nearly half completed with criticaling the west side of the containment where the hallway meets the

west rooms above the ceiling.10:30 AM No official count of the extra linear footage for the horizontal runs of pipe insulation across the hall have yet

been performed, but Nova estimates it to be at least another 100 LF.11:00 AM The crew takes lunch.12:00 PM The crew returns from lunch. Two of the crew resuit up with Tyveks and respirators to continue criticaling.

The supervisor now estimates that it may be Tuesday until they can begin abatement.2:00 PM The laying of the plywood above the ceiling is nearly complete. Critcaling of the west side of the containment

continues.2:45 PM The supervisor informs Nova that abatement of the pipe runs perpendicular to the hallway will be flush with the

hallway itself. Due to construction of the ceiling, separate containments would be needed to go beyond thesepoints.

3:15 PM The crew begins cleaning up.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 4 of 12

© Nova Consulting Group, Inc.

Page 27: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/6/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 8.57:00 AM 3:30 PM 0.0 1 8.5 7:00 AM 3:30 PM 0.5 3 8.0 Contractor 24.0

Log EntriesTime Description7:00 AM Mavo and Nova arrive on site. Mavo brings the same three crew persons.7:15 AM The supervisor is fitting in the last couple of pieces of plywood above the ceiling while the crew suits up to

continue criticaling the walls above the ceiling.8:00 AM All plywood has now been fitted for the floor above the ceiling.9:00 AM The crew is approximately half done with the wall criticals above the ceiling. The supervisor informs Nova that

he is to receive two new crewpersons on Monday.10:00 AM A three stage bagout is being attached to the south side of the containment.11:00 AM The crew takes lunch. They have mostly completed the inside and freestanding criticals above the ceiling.12:00 PM The crew returns from lunch. They continue working on the criticals.2:00 PM The crew has finished the wall criticals above the ceiling and is beginning to lay the floor critical.3:00 PM The floor critical is nearly half laid. The crew begins to clean up.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 5 of 12

© Nova Consulting Group, Inc.

Page 28: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/9/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 8.07:30 AM 3:30 PM 0.0 1 8.0 7:00 AM 3:30 PM 0.5 5 8.0 Contractor 40.0

Log EntriesTime Description7:30 AM Nova arrives on site. Mavo now has a crew of five, with two new people. They are continuing to prep the

containment. The first floor above the ceiling is approximately half completed. One person is constructing glovebags above the ceiling on the north end of the hallway.

8:00 AM Tubing is being hooked up to the HEPA filters to exhaust externally into in inner courtyard on the north side of the containment.

8:30 AM Five glove bags are being constructed above the ceiling on the north side of the containment, outside of thecontainment proper. All are in the same proximity. Nova sets up equipment to run adjacent samples.

9:00 AM The five glove bags are inspected by Nova. The corner of one was found to have fallen and was asked to berepaired. This was done. Adjacent samples are started and a crew person begins abatement. Poly flooringhas already been laid below the glove bag areas. The crew person working on the abatement is donning aTyvek and respirator. The decon unit is now fully functional.

9:15 AM Nova requests a danger sign posting for the hatch entrance to the glove bags. This is done.11:15 AM All five glove bags have been completed. Nova inspects each, with no problem found.11:25 AM Adjacent samples for the glove bags are pulled.11:30 AM The crew takes lunch. Approximately half of the first floor for the enclosure area above the ceiling has been12:30 PM The crew returns from lunch. The glove bag adjacent samples are analyzed, with both reading at .01 f/cc.1:00 PM The Mavo supervisor reports that the first poly floor above the ceiling has been laid. They have now started

laying the second poly floor.3:00 PM One personal sample of Mavo's was analyzed and returned. The crew has completed laying the second floor

and is now putting in the walls on both sides above the hallway.3:15 PM The supervisor predicts they will be ready to begin abatement around noon tomorrow. The crew completes

final cleaning.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 6 of 12

© Nova Consulting Group, Inc.

Page 29: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/10/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 5.57:00 AM 3:30 PM 3.0 1 5.5 7:00 AM 3:30 PM 0.5 5 8.0 Contractor 40.0

Log EntriesTime Description7:00 AM Mavo and Nova arrive on site. Mavo arrives with the same crew of five.7:15 AM The crew suits up, donning Tyveks and respirators.8:00 AM The crew is working on criticaling of the ceiling tile. A manometer and viewing window have been attached.9:15 AM Nova is informed the containment is ready for the pre-abatement visual. No problem is found.9:30 AM The manometer is activated, along with the two HEPAs. The initial reading is -.033. The crew begins abatement.9:45 AM Nova is asked to look at some window sill insulation and caulk on the second floor of the west wing. They

were told that these do constitute suspect materials. The window insulation, located under metal frames,contains black tar paper pieces with a brown wooly material attached. They decide not to install any windowsuntil the suspect materials are analyzed.

10:00 AM Bulk samples of the caulk and window insulation are taken by Nova and processed as bulk samples to besubmitted.

10:15 AM The first set of adjacent samples is started.10:30 AM Ted Sherman of St. Paul Schools arrives on site. He is told about the window installers and suspect materials.

He states that he cannot remember if the materials were analyzed. He approves a rush analysis at the Novalaboratory.

10:45 AM Nova leaves site to deliver the bulk samples to the laboratory.11:00 AM The crew takes lunch.12:00 PM The crew returns from lunch. Resuming pipe abatement.1:45 PM Nova arrives back on site. The crew has already removed all the wrap and cut piping from the containment.1:50 PM The first set of adjacent samples is pulled and replaced with a second set.2:15 PM The crew begins bagging out waste. It is observed to be double-sealed, wet, and goosenecked. They have

decided to store the waste in the gymnasium on top of poly sheeting. The supervisor states that at the end ofthe day, they will also put poly over the bags.

2:45 PM The first set of adjacents is analyzed, with both reading at under .01 f/cc.3:20 PM The crew begins cleaning up. They reportedly have about half the pipes abated. Nova pulls the second set of

adjacents.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 7 of 12

© Nova Consulting Group, Inc.

Page 30: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/11/04Environmental Specialist Michael MuffLicense Number AS8372

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 8.57:00 AM 3:30 PM 0.0 1 8.5 7:00 AM 3:30 PM 0.5 5 8.0 Contractor 40.0

Log EntriesTime Description7:00 AM Mavo and Nova arrive on site. Mavo brings the same crew of five.7:15 AM The crew suits up to reenter the containment, donning respirators and Tyveks. They discover that some of the

criticals have fallen overnight, with the manometer dropping to -.018.7:30 AM The second set of adjacents is analyzed, both with very low fiber counts, close to the level of detection.7:40 AM Repair continues on the fallen criticals. The manometer now reads -.020.7:45 AM The first set of adjacent samples is started.8:30 AM Repair of the criticals is now complete.9:00 AM The crew now continues bagging out waste.9:30 AM Gross removal has been completed. All waste is being stored on top of poly sheeting in the gymnasium until

tomorrow. The crew begins final cleaning.10:00 AM A meeting is held on site involving Ted Sherman of St. Paul Schools, Nova Project Manager Brian Meyer, and the

window contractor representatives. The three window caulk bulk samples submitted the previous day takenfrom the second floor of the west wing were found to contain asbestos. The cellulose and tar paper insulationinside the window frames was found, however, to be negative.

10:30 AM The Mavo supervisor was asked by Ted Sherman if they could take out four corner strips of caulking on the first and second floors of the west wing. This was agreed to. An additional bulk sample is being submitted oflinoleum and mastic on top of the perimeter vents near the windows. If this tests positive, they may have to beremoved under full containment.

10:45 AM Meeting personnel leave site. The first set of adjacent samples are pulled.11:00 AM The crew changes out for lunch. The supervisor states that they will not be ready for a final visual until well

after lunch, and thus will not have time to run finals until tomorrow morning.11:15 AM The crew takes lunch. The first set of adjacent samples are analyzed, with both reading at well under .01 f/cc.12:15 PM The crew returns from lunch. The second set of adjacent samples is started.2:00 PM Mavo indicates they are ready for a final visual.2:10 PM Nova enters the containment for the final visual.2:30 PM Asbestos splatter is found on the ceiling on the north end of the containment. The crew immediately sets upon

cleaning it up. Debris was also pointed out at many spots along the length of the containment above and belowthe ceiling on the floors. A few holes in the walls and floors were also pointed out and repaired. A few pipethreads were also found to need further cleaning.

Thursday, August 26, 2004 Page 8 of 12

© Nova Consulting Group, Inc.

Page 31: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary3:00 PM All areas needing further cleaning have been addressed. The containment passes final visual. The crew

begins encapsulation.3:15 PM Nova begins packing up equipment.3:30 PM Mavo and Nova leave site.

Thursday, August 26, 2004 Page 9 of 12

© Nova Consulting Group, Inc.

Page 32: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/12/04Environmental Specialist Megan BrobergLicense Number AS8988

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 5.07:00 AM 12:00 PM 0.0 1 5.0 7:00 AM 11:00 AM 0.0 1 4.0 Contractor 20.0

7:00 AM 11:30 AM 0.0 2 4.57:00 AM 9:00 AM 0.0 1 2.07:00 AM 12:00 PM 0.0 1 5.0

Log EntriesTime Description7:00 AM Nova and Mavo are onsite. Nova will unload equipment to start TEM finals in the enclosure. Mavo will prep three

areas for glovebag removal.8:20 AM Five samples are started inside the enclosure.8:25 AM Five samples are started outside the enclosure.8:45 AM Six adjacent samples are started for the three glovebag areas.10:00 AM Adjacent samples 1-7 and 1-8 from yesterday afternoon were read and passed at <0.01 f/cc. Yesterday's

personal samples from Mavo were also read.10:40 AM The inside and outside TEM samples are removed.11:30 AM The glovebag adjacent samples are removed.12:00 PM Mavo's personal samples from today were read. Nova leaves to go to another St. Paul school.

Thursday, August 26, 2004 Page 10 of 12

© Nova Consulting Group, Inc.

Page 33: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/13/04Environmental Specialist Megan BrobergLicense Number AS8988

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 7.27:00 AM 4:00 PM 1.8 1 7.2 7:00 AM 1:00 PM 0.5 2 5.5 Contractor 11.0

Log EntriesTime Description7:00 AM Nova and Mavo are onsite. Mavo will reclean the enclosure since a TEM sample failed.8:45 AM Yesterday's six glovebag samples were read and all passed at <0.01 f/cc. Nova leaves to go to another St.

Paul school.10:30 AM Nova returns. Mavo continues to clean the enclosure.1:05 PM Ten TEM samples are started for the enclosure. Mavo left the site.3:30 PM The TEM samples were removed.4:00 PM Nova leaves the site.

Thursday, August 26, 2004 Page 11 of 12

© Nova Consulting Group, Inc.

Page 34: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily LogNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Consultant Name Nova Consulting Group, Inc.Project Description TSI Abatement Consultant License Number AC420Client Name St. Paul Public Schools Contractor Name Mavo SystemsClient Number STPAU006 Contractor License Number AC200Building Number N/ABuilding Name Maxfield Elementary

Daily Log Date 8/16/04Environmental Specialist Megan BrobergLicense Number AS8988

Consultant Time Sheet Contractor Time Sheet Total Worker HoursCrew Shift Crew Shift

Start Time End Time Breaks Hours Start Time End Time Breaks Hours Consultant 3.07:00 AM 3:00 PM 5.0 1 3.0 7:00 AM 3:00 PM 0.5 2 7.5 Contractor 15.0

Log EntriesTime Description7:00 AM Nova and Mavo are onsite. The TEM samples passed on Saturday, and so Mavo will tear down the enclosure.8:30 AM Mavo and Nova inspected the first floor rooms (that had been behind the enclosure) for fibrous pipe insulation

and caulking. There was fiberglass insulation, but no evidence of the caulking that was on the second floor.Nova leaves to go to another St. Paul school.

1:30 PM Nova returns to the site. The crew is cleaning up tape residue and packing up equipment.3:00 PM Nova and Mavo leave the site.

Thursday, August 26, 2004 Page 12 of 12

© Nova Consulting Group, Inc.

Page 35: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX E

PERSONNEL CERTIFICATION FORM

Page 36: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Personnel Certification ReportNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Client Number: STPAU006Project Number: H04-1493Client Name: St. Paul Public SchoolsProject Location: First Floor West Hallway

I hereby certify that this project was completed by me or under my supervision.Air Monitoring/Sampling Professional Certification Number Expiration Date

EPA / StateMegan Broberg AM-056Michael Muff AM-046

Asbestos Consultant Certification Number Expiration DateEPA / State

Megan Broberg AS8988 5/11/05 5/11/05Michael Muff AS8372 1/20/05 1/20/05

Asbestos Contractor/Supervisor Certification Number Expiration DateEPA / State

Delray L Kezar AS2609 5/20/05 5/20/05

Asbestos Worker Certification Number Expiration DateEPA / State

Armando P Montalvo AW4266 9/7/04 9/7/04Constantino Martinez AW9426 9/6/04 9/6/04Luis A Soriano AW9257 5/22/05 5/22/05Luis O Martinez AW8175 11/15/04 11/15/04

Building Inspector Certification Number Expiration DateEPA / State

Michael Muff AI8372 9/10/04 9/10/04

NIOSH 582E Certification Number Expiration DateEPA / State

Megan Broberg 582-072Michael Muff 582-081

Thursday, August 26, 2004© Nova Consulting Group, Inc.

Page 37: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX F

NEGATIVE AIR VERIFICATION

Page 38: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Negative Air VerificationNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Enclosure Number 1 Area First FloorEnclosure Type Full Enclosure Location West Hallway

Room Number

Type of Pressure Verified ByDate Time Verification Differential Verified By License#

8/10/04 9:30 AM Manometer -0.033 Michael Muff AS83728/10/04 11:25 AM Manometer -0.024 Michael Muff AS83728/10/04 1:25 PM Manometer -0.015 Michael Muff AS8372During bagout.8/10/04 3:25 PM Manometer -0.009 Michael Muff AS8372During bagout.8/11/04 7:15 AM Manometer -0.018 Michael Muff AS8372Criticals have fallen overnight. The crew is working on repair.8/11/04 7:45 AM Manometer -0.02 Michael Muff AS8372The crew continues repair of the criticals.8/11/04 9:45 AM Manometer -0.031 Michael Muff AS83728/11/04 11:45 AM Manometer -0.024 Michael Muff AS83728/11/04 1:45 PM Manometer -0.029 Michael Muff AS83728/11/04 2:45 PM Manometer -0.021 Michael Muff AS83728/12/04 7:15 AM Manometer -0.023 Megan Broberg AS89888/12/04 9:15 AM Manometer -0.024 Megan Broberg AS89888/12/04 11:15 AM Manometer -0.022 Megan Broberg AS89888/12/04 12:00 PM Manometer -0.022 Megan Broberg AS8988Nova leaves to go to another school.8/13/04 2:45 AM Manometer -0.026 Megan Broberg AS89888/13/04 7:15 AM Manometer -0.028 Megan Broberg AS89888/13/04 8:45 AM Manometer -0.024 Megan Broberg AS8988Nova leaves to go to another school.8/13/04 10:45 AM Manometer -0.025 Megan Broberg AS89888/13/04 12:45 PM Manometer -0.024 Megan Broberg AS89888/13/04 4:00 PM Manometer -0.024 Megan Broberg AS8988TEM final clearance samples passed on Saturday.

Thursday, August 26, 2004 Page 1 of 1© Nova Consulting Group, Inc.

Page 39: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX G

WASTE TRACKING

Page 40: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Waste Tracking ReportNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address: 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Removal Date Immediate Destination Final Destination Type of Transport Note8/12/04 Mavo Office SKB Dumpster

Container 6 Mil Packages Quantity 22 Note Wet, Sealed, Labeled.Container 6 Mil Poly Bags Quantity 67 Note Wet, Double-Sealed, Goose-Necked, Labeled.

8/16/04 Mavo Office SKB DumpsterContainer 6 Mil Poly Bags Quantity 30 Note Wet, Double-Sealed, Goose-Necked, Labeled.

Thursday, August 26, 2004 Page 1 of 1© Nova Consulting Group, Inc.

Page 41: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX H

DAILY MICROSCOPE CHECKLIST

Page 42: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

Daily Microscope ReportNova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318

Project Number H04-1493 Building Number N/AProject Description TSI Abatement Building Name Maxfield ElementaryClient Name St. Paul Public Schools Building Address 380 North Victoria St.Client Number STPAU006 St. Paul, MN 55104

Date Microscope Calibration Focus Center Adjust Focus Environmental NIOSH Cert.Identifier Date Condenser Phase Interocular Individual Specialist Number

Rings Distance Oculars

8/10/04 01715 11/20/04 Check Check Check Check Michael Muff 582-0818/11/04 01715 11/20/04 Check Check Check Check Michael Muff 582-0818/12/04 PCM27 3/16/04 Check Check Check Check Megan Broberg 582-0728/13/04 PCM27 3/16/04 Check Check Check Check Megan Broberg 582-072

Thursday, August 26, 2004 Page 1 of 1© Nova Consulting Group, Inc.

Page 43: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova

APPENDIX I

PERSONNEL CERTIFICATIONS

Page 44: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 45: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 46: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 47: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 48: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 49: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 50: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova
Page 51: District Headquarters 360 Colborne Avenue FIRST FLOOR WEST ...€¦ · MAXFIELD ELEMENTARY 380 NORTH VICTORIA ST. ST. PAUL, MN 55104 NOVA PROJECT NO: H04-1493 Dear Mr. Sherman: Nova