DDHC Paper No. 4/2016
(for discussion on 1.2.2016)
District Development and Housing Committee, Southern District Council
Progress Report on Planning Works in Southern District
Annex 1
Matters discussed at previous meetings that required follow-up actions
(Progress as at 18.1.2016)
Annex 2
Planning Department-Progress Report on Planning Works in Southern District
(Progress as at 31.12.2015)
Annex 3
Highways Department-Progress Report on Road Works in Southern District
(Progress as at 31.12.2015)
Annex 4
Civil Engineering and Development Department-Progress Report on Other Works in Southern District
(Progress as at 31.12.2015)
Annex 5
Housing Department-Progress Report on Public Housing Works in Southern District
(Progress as at 31.12.2015)
Annex 6
Food and Environmental Hygiene Department-Progress Report on FEHD District Minor Works in Southern District
(Progress as at 30.12.2015)
Annex 7
Lands Department-Progress Report on Lands Department Temporary Government Lands Allocation in Southern District
(Progress as at 31.12.2015)
Annex 8
Follow-up on the Land Use upon MTRC Handing Back the Lands Currently Used as Work Sites
(Progress as at 31.12.2015)
2
Abbreviations for government departments in this report: (in alphabetical order)
ArchSD Architectural Services Department
CEDD Civil Engineering and Development Department
DSD Drainage Services Department
EPD Environmental Protection Department
FEHD Food and Environmental Hygiene Department
HD Housing Department
HyD Highways Department
LandsD Lands Department
LCSD Leisure and Cultural Services Department
MTR Corporation Mass Transit Railway Corporation Limited
PlanD Planning Department
WSD Water Supplies Department
3
Annex 1
Matters discussed at previous meetings that required follow-up actions
(Progress as at 18.1.2016)
Latest Progress on Matters Date of First Discussion
(Date of updates)
1. Ex- Shek O Quarry
PlanD/HyD/MTR Corporation
The ex-Shek O Quarry site falls within an area zoned “Undetermined” on the Tai Tam and Shek O Outline Zoning Plan.
The then Civil Engineering Department in 1994 undertook rehabilitation works with the concept of developing the
rehabilitated quarry site for recreation-related uses, such as water sports centre. The site is temporarily used as a
casting basin for Shatin to Central Link by MTR Corporation and will be handed-over to LandsD in 2019. PlanD will
review the zoning of the subject site and consult the District Council when appropriate.
30.11.2009
(10.11.2014)
2. Request to Improve the Drainage System of the Villages in Southern District
(I) On Pokfulam Village
DSD met Mr. Chu Ching-hong, District Councillor, and the Pokfulam Village Sewerage Concern Group on 2 December
2015 and discussed the latest progress of the project. Trial pit excavation within Pokfulam Village was completed in
November 2015; house connection survey and manhole survey was commenced in November 2015, and that the
groundwater monitoring works at the proposed SPS site will be completed in January 2016. At present, DSD is
refining the sewer alignments within Pokfulam Village and the design of the proposed sewage pumping station. In
addition, DSD would shortly carry out more trial pit excavations along Pok Fu Lam Road in the vicinity of Pokfulam
Village to investigate the condition of underground utilities.
16.5.2011
(18.1.2016)
4
(II) On Shek O Village, Wong Chuk Hang San Wai Village, Kau Wai Village and Tai Hau Wan Village
FEHD advised that LandsD consulted relevant government departments for comments on application of the land
allocation for construction of Wong Chuk Hang San Wai Village Public Toilet on 9.12.2015. FEHD is still pending the
reply from LandsD. MTRCL expected that the site concerned will be tentatively returned to LandsD on 1.7.2016. FEHD
is still pending Minor Building Works Committee of ArchSD to approve the funding application for construction of the
Wong Chuk Hang San Wai Village Public Toilet.
(18.1.2016)
3. Short-term and Long-term Uses of the Site of Former Aberdeen Fire Station (AFS)
PlanD advised that the site is zoned “Other Specified Uses” annotated “Business(2)” (“OU(B)2”) on the Approved
Aberdeen & Ap Lei Chau Outline Zoning Plan No. S/H15/29. According to the Notes of the “OU(B)2” zone, ‘Place of
Recreation, Sports or Culture’ use, including arts and cultural facilities, is always permitted in new ‘business’ building.
The Home Affairs Bureau (HAB) is studying the feasibility of reserving about 20,000 square feet of usable floor area in
the future development of the site to provide space for supporting arts development through the Hong Kong Arts
Development Council (ADC). Under the initial plan, there will be facilities including a number of arts studios for lease
to visual artists and media artists at affordable rent, as well as ancillary facilities such as exhibition gallery, arts
information centre/multi-purpose activity room, etc. Separately, it is also planned to set up the office of ADC in the
site.
26.3.2012
(7.9.2015)
4. Planning Application for the “Comprehensive Development Area” Site in Wong Chuk Hang
Updates on the item will be reported when there is further progress.
26.11.2012
5. Provision of Facilities in the Convenience of Residents at the Government Land Adjacent to Jumbo Pier
Proposal 2: Construction of public lavatory
FEHD advised that there is no updating for the suggested construction of a public toilet near Jumbo Pier.
4.2.2013
(18.1.2016)
5
Annex 2
District Development and Housing Committee, Southern District Council
Progress Report on Planning Works in Southern District
(As at 31.12.2015)
I. Outline Zoning Plan
District
Plan No. Project Description Remarks
Aberdeen &
Ap Lei Chau S/H15/30
The Town Planning Board (TPB) on 24.12.2015 gazetted the draft Aberdeen & Ap
Lei Chau Outline Zoning Plan (OZP) No. S/H15/30 under section 5 of the Town
Planning Ordinance for public inspection for two months. The OZP amendments
mainly involve the rezoning of a site at Lee Nam Road, Ap Lei Chau, from “Other
Specified Uses” annotated “Cargo Handling Area” (“OU(Cargo Handling Area)”),
“Government, Institution or Community” and “Industrial” (“I”) to “Residential
(Group A)4” for residential development; rezoning of a strip of land fronting Ap Lei
Chau West Industrial Area from “OU(Cargo Handling Area)” to “Open Space”; and
rezoning the Ap Lei Chau West Industrial Area from “I” to “OU” annotated
“Business(3)” and “Business(4)” to enhance the transformation of the area to
business uses. Any person may make written representation in respect of the
amendments to the Secretary of the TPB on or before 24.2.2016.
Details of the amendments
please refer to DDEC Paper
No. 2/2016.
6
II. Planning Application
Application submitted for Town Planning Board’s Consideration (1.11.2015 to 31.12.2015)
District
Application No. Applied Use Location Consideration / Result Remarks
Pok Fu
Lam A/H10/89
Proposed Minor
Relaxation of
Site Coverage
Restriction for
Permitted
House Use and Proposed House
Use
No. 138-138A,
Pok Fu Lam Road,
Pok Fu Lam
On 4.12.2015, the Metro Planning Committee (MPC)
of the Town Planning Board (TPB) agreed to defer a
decision on the application as requested by the
applicant.
Pok Fu
Lam A/H10/90 Proposed School
(Kindergarten
and Nursery)
Shop No. 101, Chi
Fu Landmark, Chi
Fu Fa Yuen, Pok
Fu Lam,
Hong Kong
On 6.11.2015, the MPC of TPB agreed to defer a
decision on the application as requested by the
applicant.
Wong
Chuk Hang A/H15/263 Proposed Shop
and Services
Storage Unit, G/F,
Union Industrial
Building, 48 Wong
Chuk Hang Road,
Hong Kong
On 20.11.2015, the MPC of TPB decided to approve
the planning application subject to the following
conditions:
(a) the submission and implementation of the proposal
for fire safety measures, including the provision of
a means of escape completely separated from the
industrial portion and fire service installations in
the application premises, to the satisfaction of the
Director of Fire Services or of the TPB before
operation of the use; and
(b) if the above planning condition is not complied
with before the operation of the use, the approval
hereby given shall cease to have effect and shall on
the same date be revoked without further notice.
During the first three
weeks of the statutory
publication period
which ended on
28.8.2015, no public
comment was received.
7
District
Application No. Applied Use Location Consideration / Result Remarks
Wong
Chuk Hang A/H15/264 Proposed Hotel 43 Heung Yip
Road, Wong Chuk
Hang
On 6.11.2015, the MPC of TPB agreed to defer a
decision on the application as requested by the
applicant.
Wong
Chuk Hang A/H15/265 Proposed Hotel 41-43 Wong Chuk
Hang Road,
Aberdeen, Hong
Kong
On 6.11.2015, the Metro Planning Committee (MPC)
of the Town Planning Board (TPB) decided to approve
the planning application subject to the following
conditions:
(a) the proposed hotel development is subject to a
maximum gross floor area (GFA) of 7,969m2. Any
floor space that is constructed or intended for use
as additional plant rooms and back of house
facilities as specified under Regulation 23A(3)(b)
of the Building (Planning) Regulations shall be
included in the GFA calculation;
(b) the design and provision of parking facilities,
loading/unloading spaces and lay-bys for the
proposed development to the satisfaction of the
Commissioner for Transport or of TPB;
(c) the submission of a Sewerage Impact Assessment
(SIA) to the satisfaction of the Director of
Environmental Protection or of TPB;
(d) the implementation of the local sewerage
upgrading/sewerage connection works identified in
the SIA to the satisfaction of the Director of
Drainage Services or of TPB;
(e) the submission and implementation of a landscape
proposal to the satisfaction of the Director of
Planning or of TPB; and
(f) the provision of fire service installations and water
supplies for fire-fighting being provided to the
satisfaction of the Director of Fire Services or of
TPB.
During the first three
weeks of the statutory
public inspection
period, which ended on
23.10.2015, no public
comment was received.
8
III. Hotel Developments in Wong Chuk Hang Business Area Approved by Town Planning Board with Planning Permission Still Valid
Location Remarks
1. 39 Wong Chuk Hang Road
Planning permission valid until Sep 2017.
[The previous lease modification application for non-industrial use (including hotel) was
withdrawn by the applicant in 11/2012. The existing lease is for industrial use and hotel is
not permitted.]
The lot owner is currently applying lease modification for proposed covered footbridge link.
2. 41-43 Wong Chuk Hang Road
Planning permission valid until Nov 2019.
[The previous lease modification application for non-industrial use (including hotel) was
withdrawn by the applicant in 11/2012. The existing lease is for industrial use and hotel is
not permitted.]
9
Annex 3
District Development and Housing Committee, Southern District Council
Progress Report on Road Works in Southern District
(As at 31.12.2015)
I. Preliminary Project Plan of Construction Works
PWP No. / Cat. Type Project
Description Agency Progress / Remarks
Est. (Actual) Start
Date
Est. (Actual)
Completion Date
N.A. – Junction
Improvement at
Chung Hom Kok
Road / Stanley
Gap Road
Transport
Department
Chung Hom Kok Road and Stanley Gap
Road junction is confined by the adjacent
slopes, with limited road space. Junction
improvement works will require substantial
slope works, transplanting a large number of
trees, and temporary closure of traffic lanes.
Transport Department advised that they have
recently carried out traffic survey in the area
and the traffic condition is considered
acceptable. If other works are to be carried
out at the above area in future, such as slope
upgrading works, or new private
development, Transport Department will
request the project proponent to carry out
the junction improvement works.
Under review Under review
10
Annex 4
District Development and Housing Committee, Southern District Council
Progress Report on Other Works in Southern District
(As at 31.12.2015)
I. Works Commenced
PWP No. / Cat. Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual)
Start Date
Est. (Actual)
Completion Date
186WC/A Replacement and
Rehabilitation of Water
Mains Stage 3
WSD
Water mains replacement and rehabilitation works in
Southern District under Contract No. 18/WSD/08
commenced on 18 March 2009. Works currently being
carried out in Southern District include:
(a) Pok Fu Lam Road Footpath and Carriageway
(connection works in progress) [93%];
(b) Repulse Bay Road Footpath (Pending for XP issue for
remaining connection works) [99%];
(c) Red Hill Service Reservoir (connection works in
progress) [98%];
(3.2009)
(8.2010)
(7.2011)
(10.2010)
6.2016
6.2016
6.2016
3.2016
(d) Stanley Gap Road Carriageway (connection works in
progress) [95%];
(e) Stanley Village Road Footpath and Carriageway
(connection works in progress) [95%];
(f) Area in the vicinity of Pok Fu Lam Service Reservoir
(connection works in progress) [96%];
(g) Repulse Bay Road Carriageway (Pending for XP issue
for remaining connection works) [99%]; and
(h) Pok Fu Lam Village (connection works in progress)
[98%].
(3.2010)
(9.2010)
(11.2011)
(2.2012)
(11.2011)
6.2016
6.2016
3.2016
6.2016
3.2016
11
PWP No. / Cat. Project Description Agency Progress / Remarks [Completion rate (%)) Est. (Actual)
Start Date
Est. (Actual)
Completion Date
191WC/A Replacement and
Rehabilitation of Water
Mains Stage 4 Phase 1
WSD Contract No.12/WSD/10, which consists of construction
works in Southern District, commenced on 18 July 2011.
Works are being carried out. Works in Southern District
are as below:
(a) Consort Rise Footpath and Carriageway (in progress)
[92%]
[Reason: The alignment was required to be further
reviewed due to congested UU. TTA was required to be
revised.];
(b) Bisney Road Footpath and Carriageway (in progress)
[90%]
[Reason: The alignment was required to be further
reviewed due to congested UU. TTA was required to be
revised.];
(c) Area in the vicinity of Aberdeen Water Treatment
Works (in progress) [98%] [Reason: Water suspension
required for water connection works involved a large
affected area which included sensitive consumers (i.e.
Hospitals). Therefore, extra coordination work is
required with the affected premises. The pressure
logging for connection works is in progress.];
(7.2011)
(1.2012)
(1.2012)
(4.2012)
3.2017
6.2016
6.2016
4.2016
(d) Deep Water Bay Road Footpath and Carriageway (in
progress) [98%] [Reason: Water suspension required
for water connection works involved a large affected
area which included Shouson Hill Fresh Water Service
Reservoir. Therefore, extra coordination work is
required with the affected premises. ];
(e) Wah King Street Footpath and Carriageway (in
progress) [85%] [Reason: Additional mainlaing works
are required to facilitate the connection works as the
original connection point is covered by electric cables
excavation permits are granted.];
(11.2012)
(1.2014)
5.2016
9.2016
12
PWP No. / Cat. Project Description Agency Progress / Remarks [Completion rate (%)) Est. (Actual)
Start Date
Est. (Actual)
Completion Date
(f) Victoria Road Footpath and Carriageway (in progress)
[90%]
[Reason: There was interface with Towngas at Shek
Pai Wan Road and RMO did not allow concurrent TTA
to be implemented within 300m. The excavation permit
has been expired and the new excavation permit is
targeted to be granted in June 2016];
(g) Repulse Bay Road Carriageway near Belleview Drive
(in progress) [3%]
(h) Aberdeen Praya Road Carriageway (in progress) [40%]
(i) Wong Chuk Hang Road footpath (in progress) [50%]
(1.2014)
(1.2016)
(10.2015)
(10.2015)
3.2017
12.2016
3.2017
8.2016
13
Contract No.3/WSD/12, which consists of construction
works in Southern District, commenced on 15 March
2013. Works are being carried out. Works in Southern
District are as below:
(a) Pok Fu Lam Road near Pok Fu Lam Garden Footpath
and Carriageway (in progress) [70%] [Reason: We
experienced substantial amount of hard materials (e.g.
rocks and boulders) during excavation. Hence, the
progress of works was affected.]; and
(b) Shek O Village Road Footpath and Carriageway
(Completed) [100%].
(c) Aberdeen Praya Road near Fish Marketing
Organization at Footpath and Carriageway (in
progress) [80%].
(3.2013)
(8.2013)
(8.2013)
(11.2015)
4.2016
4.2016
(12.2015)
4.2016
341DS/A Harbour Area
Treatment Scheme,
stage 2A -
Upgrading of
Stonecutters Island
sewage treatment
works and
preliminary
treatment works
Drainage
Services
Department
The item comprises upgrading of the Stonecutters Island
Sewage Treatment Works and eight numbers of
preliminary treatment works at Hong Kong Island. The
project has been fully commissioned in November 2015.
Contract DC/2009/24 (Harbour Area Treatment Scheme
Stage 2A Upgrading of Preliminary Treatment Works
(PTWs) at Sandy Bay, Cyberport, Wah Fu, Aberdeen and
Ap Lei Chau), being part of the works of the above item,
has commenced on 31/8/2011. The works mainly include
the upgrading of the sewage treatment and
de-odourisation facilities in these PTWs. About 78%
of works under the contract has been completed.
(8.2011) 9.2016
14
Progress Report on Landslip Prevention and Mitigation Works
I. Works Commenced
PWP No.
/ Cat.
Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual)
Start Date
Est. (Actual)
Completion
Date
Head 705
Subhead
5001BX
Landslip Prevention
and Mitigation
Programme (LPMitP)
CEDD Landslip prevention and mitigation works for 102 man-made slopes and 3
natural hillside study areas 11SW-C/SA3, 15NW-B/SA1 and 11SW-C/SA4 are
completed. Landslip prevention and mitigation works for 12 man-made
slopes and 8 natural hillside study areas are currently in progress.
1. Slope No. 15NE-A/C96 at South Bay Road [50%]
2. Slope No. 15NE-A/C115 at Repulse Bay Road [50%]
3. Slope No. 15NE-A/F68 at Repulse Bay Road [40%]
4. Slope No. 11SW-C/F210 at East of Electric Sub-station, along Victoria
Road [100%] (Works Completed)
5. Slope No. 11SW-C/F222 at Victoria Road [100%] (Works Completed)
6. Slope No. 11SW-C/FR350 at Waterfall Bay Park, Pok Fu Lam
[100%] (Works Completed)
7. Slope No. 15NE-B/C26 at Shek O Road [100%] (Works Completed)
8. Slope No. 15NW-B/C117 at Island Road [100%] (Works Completed)
9. Slope No. 11SW-A/C477 at Pok Fu Lam Road
[100%] (Works Completed)
10. Slope No. 15NE-A/CR40 at Repulse Bay Road [60%]
11. Slope No. 11SW-C/F443 at Pok Fu Lam Road [60%]
12. Slope No. 11SW-C/F444 at Pok Fu Lam Road [60%]
13. Slope No. 15NE-A/CR603 at Tai Tam Reservoir Road
[100%] (Works Completed)
(3.2014)
(3.2014)
(3.2014)
(6.2014)
(8.2014)
(8.2014)
(12.2014)
(11.2014)
(1.2015)
(2.2015)
(3.2015)
(3.2015)
(3.2015)
4.2016
4.2016
7.2016
(10.2015)
(11.2015)
(11.2015)
(10.2015)
(9.2015)
(9.2015)
2.2016*
2.2016*
2.2016*
(9.2015)
15
PWP No.
/ Cat.
Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual)
Start Date
Est. (Actual)
Completion
Date
14. Slope No. 15NE-B/C27 at Shek O Road [60%]
15. Slope No. 15NE-B/C72 at Big Wave Bay Road
[100%] (Works Completed)
16. Slope No. 15NW-B/FR42 at Lee Chi Road, Ap Lei Chau
[100%] (Works Completed)
17. Slope No. 11SE-D/C406 near the junction between Shek O Road & Cape
Collinson Road [100%] (Works Completed)
18. Slope No. 15NE-C/C309 at Tung Tau Wan Road [60%]
19. Slope No. 15NE-B/C28 at Shek O Road [10%]
20. Slope No. 15NE-B/C145 at Big Wave Bay Picnic Area [10%]
21. Slope No. 11SW-D/CR141 at Shouson Hill Road [5%]
22. Slope No. 15NW-B/C136 at Main Street, Ap Lei Chau [5%]
23. 2 Natural hillside study areas behind Queen Mary Hospital
(Study Area Numbers 11SW-C/SA1 and 11SW-C/SA2) [90%]
24. 1 Natural hillside study area above Ap Lei Chau Bridge Road
(Study Area Number 15NW-B/SA5) [95%]
25. 1 Natural hillside study area above Ruby Court at South Bay Road
(Study Area Number 15NE-A/SA3) [40%]
26. 1 Natural hillside study area at Shouson Hill
(Study Area Number 11SW-D/SA12) [70%]
27. 1 Natural hillside study area above Pok Fu Lam Road
(Study Area Number 11SW-C/SA5) [20%]
28. 1 Natural hillside study area at Shek Pai Wan Road, Aberdeen
(Study Area Number 11SW-C/SA5) [5%]
(3.2015)
(3.2015)
(3.2015)
(4.2015)
(6.2015)
(9.2015)
(10.2015)
(11.2015)
(11.2015)
(1.2012)
(1.2014)
(3.2014)
(4.2014)
(11.2014)
(9.2015)
2.2016*
(11.2015)
(12.2015)
(12.2015)
2.2016*
3.2016
3.2016
2.2016
7.2016
3.2016
3.2016*
9.2016
3.2016*
3.2017*
3.2017
16
PWP No.
/ Cat.
Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual)
Start Date
Est. (Actual)
Completion
Date
29. 1 Natural hillside study area above Ap Lei Chau fronting the Aberdeen
Channel (Study Area Number 15NW-B/SA2) [5%]
(12.2015) 1.2017
* Anticipated completion date is revised as the works have been affected by inclement weather
Head 705
Subhead
5001BX
Landslip Prevention
and Mitigation
Programme (LPMitP)
CEDD In the coming year, CEDD is planning to progressively commence the landslip
prevention and mitigation works for other 14 man-made slopes and 1 natural
hillside study area.
1. Slope No. 15NE-A/C13 at Repulse Bay Road
2. Slope No. 15NE-A/C70 at Repulse Bay Road
3. Slope No. 15NW-B/C54 at Island Road
4. Slope No. 15NE-A/CR45 at Repulse Bay Road
5. Slope No. 15NE-B/C235 at Shek O Road
6. Slope No. 11SW-D/C2259 at Deep Water Bay Drive
7. Slope No. 11SW-C/CR874 at Victoria Road
8. Slope No. 11SW-C/R407 at Aberdeen Praya Road
9. Slope No. 11SW-D/C1058 at Hong Kong Police College Lower Range,
Police School Road, Aberdeen
10. Slope No. 11SW-D/R1222 at Near Lamppost No. 35053, Aberdeen
Reservoir Road
11. Slope No. 11SW-D/R1223 at Near Lamppost No. 35053, Aberdeen
Reservoir Road
12. Slope No. 15NE-C/FR154 at Behind Correctional Services Department
Staff Quarters (Front Block), Stanley
@
@
@
@
@
4.2016
5.2016#
4.2016#
1.2016
8.2016
8.2016
8.2016
@
@
@
@
@
9.2016
9.2016#
12.2016
12.2016
1.2017
1.2017
4.2017
17
PWP No.
/ Cat.
Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual)
Start Date
Est. (Actual)
Completion
Date
13. Slope No. 11SW-D/C1440 at Yue Kwong Road
14. Slope No. 15NE-A/R244 at Repulse Bay Main Sewage Pumping Station
15. 1 Natural hillside study area at Ap Lei Chau
(Study Area Number 15NW-B/SA6)
4.2016
4.2016
2.2016#
9.2016
9.2016
8.2017#
# #
# Anticipated start date and completion date are revised due to reschedule of works programme
@ Anticipated start date and completion date will be re-scheduled due to re-programming of works
18
Annex 5
District Development and Housing Committee, Southern District Council
Progress Report on Public Housing Works in Southern District
(As at 31.12.2015)
I. Works Commenced (up to the end of two financial years later)
Project Description
PWP / Estate Responsible Team Est. (Actual) Start Date Est. (Actual)
Completion Date Remarks
Lift Modernisation
for Ap Lei Chau
Estate
BSE/CM2 May 2014 (May 2014) June 2017 The lift modernisation project for Ap Lei
Chau Estate involves four sections of works.
The works for the five lifts in Section I (Lei
Yee House L2; Lei Ning House L4; and Lei
Chak House L8, L11 and L14) were
completed. The works for the ten lifts in
Section II (Lei Yee House L3; Lei Ning
House L5; Lei Chak House L7, L10 and
L15; Lei Tim House L16; Lei Fook House
L20 and L24; and Lei Moon House L26 and
L30), commencing in mid-April 2015 in
phases, will be completed in the first quarter
of 2016.
19
II. Works with Tender Value above $1Million in 2009-2010
Project Description
PWP / Estate Responsible Team Est. (Actual) Start Date
Est. (Actual)
Completion Date
Remarks
Lift Modernisation
for Wah Fu (I) &
(II) Estates
BSE/HW (June 2011) February 2016 The lift modernisation work for Wah Fu (I) and
(II) Estates involves five sections of works.
Five lifts involved in Section I had been
completed in 2012. Another five lifts involved
in Section II were completed and put into
operation in October 2013.
The works for four lifts in Section III and IV
(Wah Chui House L2, Wah King House L6,
Wah Cheong House L12 and Wah Chun House
L8) were completed. Wah Chun House L8
was put into operation in October 2014 while
the other lifts were also completed in advance
and put into operation in late December 2014.
The works for three lifts in Section V (Wah
Chui House L1, Wah King House L5 and Wah
Cheong House L11) were completed and had
been put into operation in mid -January 2016.
20
Annex 6
District Development and Housing Committee, Southern District Council
Progress Report on FEHD District Minor Works in Southern District
(As at 31.12.2015)
Item
No.
Proposed
Minor Works Location
Estimated
Start Date
[Actual
Start Date]
Estimated
Completion
Date
[Actual
Completion
Date]
Remarks FEHD Contact
Person
ASD Contact
Person
--- --- --- --- --- --- --- ---
21
Annex 7
District Development and Housing Committee, Southern District Council
Progress Report on Lands Department Temporary Government Lands Allocation in Southern District
(As at 31.12.2015)
Item
No.
TGLA No./
File Ref.
Type of
TGLA
(New/
Renewal)
Location
Proposed
Area (m2)
Proposed
User
Proposed
Term
User Dept.
(Allocatee)
Date of
Allocation
Date of
Withdrawn
Remarks
(Current
Situation)
1. GLA-THK 1981
612/SHGS/82
New Government land
opposite to 18-21
Bisney Road
52 RCP From the
date of
approval for
5 years
FEHD - - Departmental
circulation
completed.
Being
considered.
2. GLA-THK 1753
504/SHGS/82
Renewal Government land
between No.24 and
25 Shum Wan
Road, Wong Chuk
Hang
126 Car parking
spaces
Extend up to
11.2.2018
C of P Departmental
circulation
completed.
Pending
approval.
3. GLA-THK1853
546/SHGS/82
Renewal Northern Coastline
of Ap Lei Chau
next to Ap Lei
Chau Park
1,550 Works Area Extend up to
16.5.2016
DSD - - DSD submitted
this proposal
for DDEC’s
(i.e. the present
DDHC)
consideration
22
Item
No.
TGLA No./
File Ref.
Type of
TGLA
(New/
Renewal)
Location
Proposed
Area (m2)
Proposed
User
Proposed
Term
User Dept.
(Allocatee)
Date of
Allocation
Date of
Withdrawn
Remarks
(Current
Situation)
during meeting
on 20.7.2015
who supported
the proposal.
Under
departmental
circulation.
4. GLA-THK1892
L/M
988/SHMS/82 A
Renewal Tin Wan Praya
Road, Aberdeen
820 Works Area Extend up to
30.6.2016
DSD - - Departmental
circulation
completed.
Pending
approval.
5.
GLA-THK1550
413/SHGS/82
Renewal Hok Tsui Village 667 Sitting out area
and meeting
venue
Extend up to
30.6.2017
HAD,
DO(S)
- - Departmental
circulation
completed.
Pending
approval.
23
Item
No.
TGLA No./
File Ref.
Type of
TGLA
(New/
Renewal)
Location
Proposed
Area (m2)
Proposed
User
Proposed
Term
User Dept.
(Allocatee)
Date of
Allocation
Date of
Withdrawn
Remarks
(Current
Situation)
6. GLA-THK950
177/HGS/82
Renewal At Stanley Gap
Road
127 Manoeuvring
and/or Parking of
Waterworks
Vehicles to/from
Stanley Mound
Fresh Water
Pumping Station
& Extension
Extend up to
31.5.2020
WSD - - Departmental
circulation
completed.
Pending
approval.
7. GLA-THK 2003
3/SHGS/2015
New Sandy Bay,
Pok Fu Lam
3,590 Works Area From the
date of
possession
for 4 years
CEDD - - Departmental
circulation
completed.
Objections
being handled
by CEDD.
8. GLA-THK 1785
394/SHGS/82
Renewal Cyberport Road,
Pok Fu Lam
7,010 Sewage
Treatment Plant
Extended up
to
31.12.2017
DSD - - Departmental
circulation
completed.
Being
considered.
24
Item
No.
TGLA No./
File Ref.
Type of
TGLA
(New/
Renewal)
Location
Proposed
Area (m2)
Proposed
User
Proposed
Term
User Dept.
(Allocatee)
Date of
Allocation
Date of
Withdrawn
Remarks
(Current
Situation)
9. GLA-THK 1875
988/SHMS/82B
Renewal Sandy Bay,
Pok Fu Lam
1,480 Works Area Extended up
to 30.6.2016
DSD - - Under
departmental
circulation.
10. GLA-THK 1538
L/M 7/SHGS/82
(68)
Renewal Pak Sha Wan, Ap
Lei Chau
799 Works Area for
installation and
maintenance of
Shark Prevention
Nets
Extended up
to 30.6.2018
LCSD - - Under
departmental
circulation.
11. GLA-THK 1922
574/SHGS/82
Renewal Ap Lei Chau Praya
Road, Ap Lei Chau
666 Works Area for
management and
maintenance of
Roads
Extended up
to 30.6.2021
HyD - - Departmental
circulation for
renewal is
under
processing
12. GLA-THK 2007
6/SHGS/2015
New Chung Hom Kok 4,580
Works Areas and
Storage
Compounds
From the
date of
approval to
31.12.2017
WSD Under
departmental
circulation.
25
Annex 8
District Development and Housing Committee, Southern District Council
Follow-up on the Land Use upon MTRC Handing Back the Lands Currently Used as Work Sites
(As at 31.12.2015)
Location Anticipated
Handover
Date
Approximate
Area Size
(m2)
Managing
Agent
Planned Use/Follow-up Actions
(Provided by Managing Department/Agent) Date of First Discussion
(Date of updates)
Site next to
Ocean Park
2Q-3Q 2016
(Proposed
Extension)
5,800
(Subject to
MTRCL’s
confirmation
of the
boundary of
the subject
site)
LandsD
Long-term planned use of the land is to be advised by
PlanD. LandsD would facilitate any application for
use of the land in accordance with applicable
procedures.
(PlanD’s comments: The subject site falls within an
area zoned “Government, Institution or Community”
(“G/IC”) on the approved Aberdeen & Ap Lei Chau
Outline Zoning Plan No. S/H15/29 and is reserved for
provision of GIC facilities.)
26.1.2015
(19.1.2016)
26
Location Anticipated
Handover
Date
Approxim
ate Area
Size
(m2)
Managing
Agent
Planned Use/Follow-up Actions
(Provided by Managing Department/Agent) Date of First Discussion
(Date of updates)
Chung Hom
Shan Magazine
Site
Handed over 2,500 LandsD Long-term planned use of the land is to be advised by
PlanD. LandsD would facilitate any application for
use of the land in accordance with applicable
procedures.
(PlanD’s comments: The subject site falls within an
area zoned “Other Specified Uses” annotated
“Composite Signals Organization Station Complex”
on the approved Stanley Outline Zoning Plan No.
S/H19/10 intended primarily to provide land for
composite signals organization station complex and
its ancillary facilities.)
26.1.2015
(26.1.2015)
Chung Hom
Shan Nursery
Site next to
Magazine Site
2nd Half 2017
(To tie in with the
latest progress of
the reprovisioning
works at Harcourt
Garden, some of
the trees
temporarily
transplanted from
Harcourt Garden
at the Chung Hom
6,400 LandsD Long-term planned use of the land is to be advised by
PlanD. LandsD would facilitate any application for
use of the land in accordance with applicable
procedures.
(PlanD’s comments: The subject site falls within an
area zoned “Other Specified Uses” annotated
“Composite Signals Organization Station Complex”
on the approved Stanley Outline Zoning Plan No.
S/H19/10 intended primarily to provide land for
composite signals organization station complex and
26.1.2015
(10.9.2015)
27
Shan Nursery Site
need to be
maintained for a
longer period. The
reprovisioning is
expected to be
substantially
completed by the
end of 2017.)
its ancillary facilities.)