district accountability committee 2018 capital …...2019 update program financial status • 2019 -...

60
DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital Improvement Program Calendar Year 2019 Update February 18, 2020

Upload: others

Post on 22-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

DISTRICT ACCOUNTABILITY COMMITTEE2018 Capital Improvement Program

Calendar Year 2019 UpdateFebruary 18 2020

2019 Update

Program Financial Status

bull 2019 - Spend - $81380375Includes Retention

bull District Projects $482Mbull Charter ProjectsDebt Payoff $235Mbull 6800 Joyce St Purchase (North

Transportation) $70Mbull Encumbered $338M

Activity by Articulation Area

Alameda - 9 Golden ndash 11Arvada - 15 Green Mountain - 11Arvada West - 13 Jefferson ndash 4Bear Creek - 8 Lakewood ndash 6Chatfield - 6 Pomona ndash 6Columbine - 8 Ralston Valley ndash 4Conifer - 6 Standley Lake ndash 18Dakota Ridge - 4 Wheat Ridge ndash 12Evergreen - 6 Options - 11

2019 Update

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Alameda Intl - AdditionRemodel radic radic radic radic radic Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25Columbine HS AdditionRemodel radic radic radic radic radic Green Mountain HS AdditionRemodel radic radic radic radic radic Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5Three Creeks K-8 Addition radic radic radic radic radic radic radic 50Wilmot ES Addition radic radic radic radic radic radic radic 20

Arvada HS radic radic radic radic radic radic radic radic 100Chatfield HS radic radic radic radic radic radic radic radic 100Conifer HS radic radic radic radic radic radic radic 98Dakota Ridge HS radic radic radic radic radic radic radic radic 100Evergreen HS radic radic radic radic radic radic radic radic 100Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Devinny ES radic radic radic radic radic radic radic radic 100Evergreen MS radic radic radic radic radic radic radic radic 100Hackberry Hill ES radic radic radic radic radic radic radic radic 100Maple Grove ES radic radic radic radic radic radic radic radic 100Parmalee ES radic radic radic radic radic radic radic radic 100Peck ES radic radic radic radic radic radic radic radic 100

Site

Status

Track amp Artificial Turf Fields

Started 1Q2019 PROJECTSAdditionRemodel Replacement

Paving Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Belmar ES radic radic radic radic radic radic radic radic 100Columbine Hills ES radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Free Horizon Montessori radic radic radic radic radic radic radic radic 100Patterson ES radic radic radic radic radic radic radic radic 100Ralston ES radic radic radic radic radic radic radic radic 100Welchester ES radic radic radic radic radic radic radic radic 100Wilmore-Davis ES radic radic radic radic radic radic radic radic 100

Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Green Gables ES radic radic radic radic radic radic radic radic 100Wilmot ES radic radic radic radic radic radic radic radic 100

IT Cameras - Districtwide radic radic radic radic radic 50Security Locks -Districtwide radic radic radic radic radic radic radic 95Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100Security Glazing Replacement radic radic radic radic radic 15

8 ES Sites radic radic radic radic radic radic radic radic 100

Arvada K8 radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Roofing

Security

Flooring Replacement

Fixtures Furnishings amp Equipment (FFampE)

Site

Status

Started 1Q2019 PROJECTSPlayground Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic De

sign

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Prici

ng

Cons

truc

tion

Perc

ent

Com

plet

e

Conifer HS AdditionRemodel radic radic radic radic Jefferson JrSr HS AdditionRemodel radic radic radic Bell MS Addition radic radic radic Lumberg ES AdditionRemodel radic radic radic Manning MS Addition radic radic radic South Warren Tech Facility radic radic radic Trailblazer Stadium radic radic radic radic Wayne Carle MS Addition radic radic radic

Arvada West HS Track radic radic radic radic radic Columbine HS radic radic radic radic radic Golden HS Track radic radic radic radic radic Green Mountain HS radic radic radic radic radic Pomona HS radic radic radic radic radic Standley Lake HS radic radic radic radic radic

Columbine Hills ES radic radic radic radic Everitt MS radic radic radic radic Lawrence ES radic radic radic radic Mitchell ES radic radic radic radic Ryan ES radic radic radic radic Shelton ES radic radic radic radic

Patterson ES radic radic radic radic Ryan ES radic radic radic radic Stott ES radic radic radic radic Westridge ES radic radic radic radic

Site

Status

3Q2019 PROJECTSAdditionRemodel Replacement or New

Track amp Artificial Turf Fields

Paving Projects

Mechanical Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Jefferson JrSr HS AdditionRemodel radic radic radic
Bell MS Addition radic radic radic
Lumberg ES AdditionRemodel radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 2: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Update

Program Financial Status

bull 2019 - Spend - $81380375Includes Retention

bull District Projects $482Mbull Charter ProjectsDebt Payoff $235Mbull 6800 Joyce St Purchase (North

Transportation) $70Mbull Encumbered $338M

Activity by Articulation Area

Alameda - 9 Golden ndash 11Arvada - 15 Green Mountain - 11Arvada West - 13 Jefferson ndash 4Bear Creek - 8 Lakewood ndash 6Chatfield - 6 Pomona ndash 6Columbine - 8 Ralston Valley ndash 4Conifer - 6 Standley Lake ndash 18Dakota Ridge - 4 Wheat Ridge ndash 12Evergreen - 6 Options - 11

2019 Update

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Alameda Intl - AdditionRemodel radic radic radic radic radic Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25Columbine HS AdditionRemodel radic radic radic radic radic Green Mountain HS AdditionRemodel radic radic radic radic radic Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5Three Creeks K-8 Addition radic radic radic radic radic radic radic 50Wilmot ES Addition radic radic radic radic radic radic radic 20

Arvada HS radic radic radic radic radic radic radic radic 100Chatfield HS radic radic radic radic radic radic radic radic 100Conifer HS radic radic radic radic radic radic radic 98Dakota Ridge HS radic radic radic radic radic radic radic radic 100Evergreen HS radic radic radic radic radic radic radic radic 100Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Devinny ES radic radic radic radic radic radic radic radic 100Evergreen MS radic radic radic radic radic radic radic radic 100Hackberry Hill ES radic radic radic radic radic radic radic radic 100Maple Grove ES radic radic radic radic radic radic radic radic 100Parmalee ES radic radic radic radic radic radic radic radic 100Peck ES radic radic radic radic radic radic radic radic 100

Site

Status

Track amp Artificial Turf Fields

Started 1Q2019 PROJECTSAdditionRemodel Replacement

Paving Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Belmar ES radic radic radic radic radic radic radic radic 100Columbine Hills ES radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Free Horizon Montessori radic radic radic radic radic radic radic radic 100Patterson ES radic radic radic radic radic radic radic radic 100Ralston ES radic radic radic radic radic radic radic radic 100Welchester ES radic radic radic radic radic radic radic radic 100Wilmore-Davis ES radic radic radic radic radic radic radic radic 100

Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Green Gables ES radic radic radic radic radic radic radic radic 100Wilmot ES radic radic radic radic radic radic radic radic 100

IT Cameras - Districtwide radic radic radic radic radic 50Security Locks -Districtwide radic radic radic radic radic radic radic 95Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100Security Glazing Replacement radic radic radic radic radic 15

8 ES Sites radic radic radic radic radic radic radic radic 100

Arvada K8 radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Roofing

Security

Flooring Replacement

Fixtures Furnishings amp Equipment (FFampE)

Site

Status

Started 1Q2019 PROJECTSPlayground Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic De

sign

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Prici

ng

Cons

truc

tion

Perc

ent

Com

plet

e

Conifer HS AdditionRemodel radic radic radic radic Jefferson JrSr HS AdditionRemodel radic radic radic Bell MS Addition radic radic radic Lumberg ES AdditionRemodel radic radic radic Manning MS Addition radic radic radic South Warren Tech Facility radic radic radic Trailblazer Stadium radic radic radic radic Wayne Carle MS Addition radic radic radic

Arvada West HS Track radic radic radic radic radic Columbine HS radic radic radic radic radic Golden HS Track radic radic radic radic radic Green Mountain HS radic radic radic radic radic Pomona HS radic radic radic radic radic Standley Lake HS radic radic radic radic radic

Columbine Hills ES radic radic radic radic Everitt MS radic radic radic radic Lawrence ES radic radic radic radic Mitchell ES radic radic radic radic Ryan ES radic radic radic radic Shelton ES radic radic radic radic

Patterson ES radic radic radic radic Ryan ES radic radic radic radic Stott ES radic radic radic radic Westridge ES radic radic radic radic

Site

Status

3Q2019 PROJECTSAdditionRemodel Replacement or New

Track amp Artificial Turf Fields

Paving Projects

Mechanical Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Jefferson JrSr HS AdditionRemodel radic radic radic
Bell MS Addition radic radic radic
Lumberg ES AdditionRemodel radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 3: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Activity by Articulation Area

Alameda - 9 Golden ndash 11Arvada - 15 Green Mountain - 11Arvada West - 13 Jefferson ndash 4Bear Creek - 8 Lakewood ndash 6Chatfield - 6 Pomona ndash 6Columbine - 8 Ralston Valley ndash 4Conifer - 6 Standley Lake ndash 18Dakota Ridge - 4 Wheat Ridge ndash 12Evergreen - 6 Options - 11

2019 Update

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Alameda Intl - AdditionRemodel radic radic radic radic radic Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25Columbine HS AdditionRemodel radic radic radic radic radic Green Mountain HS AdditionRemodel radic radic radic radic radic Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5Three Creeks K-8 Addition radic radic radic radic radic radic radic 50Wilmot ES Addition radic radic radic radic radic radic radic 20

Arvada HS radic radic radic radic radic radic radic radic 100Chatfield HS radic radic radic radic radic radic radic radic 100Conifer HS radic radic radic radic radic radic radic 98Dakota Ridge HS radic radic radic radic radic radic radic radic 100Evergreen HS radic radic radic radic radic radic radic radic 100Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Devinny ES radic radic radic radic radic radic radic radic 100Evergreen MS radic radic radic radic radic radic radic radic 100Hackberry Hill ES radic radic radic radic radic radic radic radic 100Maple Grove ES radic radic radic radic radic radic radic radic 100Parmalee ES radic radic radic radic radic radic radic radic 100Peck ES radic radic radic radic radic radic radic radic 100

Site

Status

Track amp Artificial Turf Fields

Started 1Q2019 PROJECTSAdditionRemodel Replacement

Paving Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Belmar ES radic radic radic radic radic radic radic radic 100Columbine Hills ES radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Free Horizon Montessori radic radic radic radic radic radic radic radic 100Patterson ES radic radic radic radic radic radic radic radic 100Ralston ES radic radic radic radic radic radic radic radic 100Welchester ES radic radic radic radic radic radic radic radic 100Wilmore-Davis ES radic radic radic radic radic radic radic radic 100

Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Green Gables ES radic radic radic radic radic radic radic radic 100Wilmot ES radic radic radic radic radic radic radic radic 100

IT Cameras - Districtwide radic radic radic radic radic 50Security Locks -Districtwide radic radic radic radic radic radic radic 95Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100Security Glazing Replacement radic radic radic radic radic 15

8 ES Sites radic radic radic radic radic radic radic radic 100

Arvada K8 radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Roofing

Security

Flooring Replacement

Fixtures Furnishings amp Equipment (FFampE)

Site

Status

Started 1Q2019 PROJECTSPlayground Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic De

sign

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Prici

ng

Cons

truc

tion

Perc

ent

Com

plet

e

Conifer HS AdditionRemodel radic radic radic radic Jefferson JrSr HS AdditionRemodel radic radic radic Bell MS Addition radic radic radic Lumberg ES AdditionRemodel radic radic radic Manning MS Addition radic radic radic South Warren Tech Facility radic radic radic Trailblazer Stadium radic radic radic radic Wayne Carle MS Addition radic radic radic

Arvada West HS Track radic radic radic radic radic Columbine HS radic radic radic radic radic Golden HS Track radic radic radic radic radic Green Mountain HS radic radic radic radic radic Pomona HS radic radic radic radic radic Standley Lake HS radic radic radic radic radic

Columbine Hills ES radic radic radic radic Everitt MS radic radic radic radic Lawrence ES radic radic radic radic Mitchell ES radic radic radic radic Ryan ES radic radic radic radic Shelton ES radic radic radic radic

Patterson ES radic radic radic radic Ryan ES radic radic radic radic Stott ES radic radic radic radic Westridge ES radic radic radic radic

Site

Status

3Q2019 PROJECTSAdditionRemodel Replacement or New

Track amp Artificial Turf Fields

Paving Projects

Mechanical Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Jefferson JrSr HS AdditionRemodel radic radic radic
Bell MS Addition radic radic radic
Lumberg ES AdditionRemodel radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 4: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Alameda Intl - AdditionRemodel radic radic radic radic radic Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25Columbine HS AdditionRemodel radic radic radic radic radic Green Mountain HS AdditionRemodel radic radic radic radic radic Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5Three Creeks K-8 Addition radic radic radic radic radic radic radic 50Wilmot ES Addition radic radic radic radic radic radic radic 20

Arvada HS radic radic radic radic radic radic radic radic 100Chatfield HS radic radic radic radic radic radic radic radic 100Conifer HS radic radic radic radic radic radic radic 98Dakota Ridge HS radic radic radic radic radic radic radic radic 100Evergreen HS radic radic radic radic radic radic radic radic 100Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Devinny ES radic radic radic radic radic radic radic radic 100Evergreen MS radic radic radic radic radic radic radic radic 100Hackberry Hill ES radic radic radic radic radic radic radic radic 100Maple Grove ES radic radic radic radic radic radic radic radic 100Parmalee ES radic radic radic radic radic radic radic radic 100Peck ES radic radic radic radic radic radic radic radic 100

Site

Status

Track amp Artificial Turf Fields

Started 1Q2019 PROJECTSAdditionRemodel Replacement

Paving Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Belmar ES radic radic radic radic radic radic radic radic 100Columbine Hills ES radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Free Horizon Montessori radic radic radic radic radic radic radic radic 100Patterson ES radic radic radic radic radic radic radic radic 100Ralston ES radic radic radic radic radic radic radic radic 100Welchester ES radic radic radic radic radic radic radic radic 100Wilmore-Davis ES radic radic radic radic radic radic radic radic 100

Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Green Gables ES radic radic radic radic radic radic radic radic 100Wilmot ES radic radic radic radic radic radic radic radic 100

IT Cameras - Districtwide radic radic radic radic radic 50Security Locks -Districtwide radic radic radic radic radic radic radic 95Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100Security Glazing Replacement radic radic radic radic radic 15

8 ES Sites radic radic radic radic radic radic radic radic 100

Arvada K8 radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Roofing

Security

Flooring Replacement

Fixtures Furnishings amp Equipment (FFampE)

Site

Status

Started 1Q2019 PROJECTSPlayground Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic De

sign

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Prici

ng

Cons

truc

tion

Perc

ent

Com

plet

e

Conifer HS AdditionRemodel radic radic radic radic Jefferson JrSr HS AdditionRemodel radic radic radic Bell MS Addition radic radic radic Lumberg ES AdditionRemodel radic radic radic Manning MS Addition radic radic radic South Warren Tech Facility radic radic radic Trailblazer Stadium radic radic radic radic Wayne Carle MS Addition radic radic radic

Arvada West HS Track radic radic radic radic radic Columbine HS radic radic radic radic radic Golden HS Track radic radic radic radic radic Green Mountain HS radic radic radic radic radic Pomona HS radic radic radic radic radic Standley Lake HS radic radic radic radic radic

Columbine Hills ES radic radic radic radic Everitt MS radic radic radic radic Lawrence ES radic radic radic radic Mitchell ES radic radic radic radic Ryan ES radic radic radic radic Shelton ES radic radic radic radic

Patterson ES radic radic radic radic Ryan ES radic radic radic radic Stott ES radic radic radic radic Westridge ES radic radic radic radic

Site

Status

3Q2019 PROJECTSAdditionRemodel Replacement or New

Track amp Artificial Turf Fields

Paving Projects

Mechanical Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Jefferson JrSr HS AdditionRemodel radic radic radic
Bell MS Addition radic radic radic
Lumberg ES AdditionRemodel radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 5: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Belmar ES radic radic radic radic radic radic radic radic 100Columbine Hills ES radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Free Horizon Montessori radic radic radic radic radic radic radic radic 100Patterson ES radic radic radic radic radic radic radic radic 100Ralston ES radic radic radic radic radic radic radic radic 100Welchester ES radic radic radic radic radic radic radic radic 100Wilmore-Davis ES radic radic radic radic radic radic radic radic 100

Lakewood HS radic radic radic radic radic radic radic radic 100Ralston Valley HS radic radic radic radic radic radic radic radic 100Eiber ES radic radic radic radic radic radic radic radic 100Green Gables ES radic radic radic radic radic radic radic radic 100Wilmot ES radic radic radic radic radic radic radic radic 100

IT Cameras - Districtwide radic radic radic radic radic 50Security Locks -Districtwide radic radic radic radic radic radic radic 95Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100Security Glazing Replacement radic radic radic radic radic 15

8 ES Sites radic radic radic radic radic radic radic radic 100

Arvada K8 radic radic radic radic radic radic radic radic 100West Jefferson MS radic radic radic radic radic radic radic radic 100

Roofing

Security

Flooring Replacement

Fixtures Furnishings amp Equipment (FFampE)

Site

Status

Started 1Q2019 PROJECTSPlayground Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic De

sign

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Prici

ng

Cons

truc

tion

Perc

ent

Com

plet

e

Conifer HS AdditionRemodel radic radic radic radic Jefferson JrSr HS AdditionRemodel radic radic radic Bell MS Addition radic radic radic Lumberg ES AdditionRemodel radic radic radic Manning MS Addition radic radic radic South Warren Tech Facility radic radic radic Trailblazer Stadium radic radic radic radic Wayne Carle MS Addition radic radic radic

Arvada West HS Track radic radic radic radic radic Columbine HS radic radic radic radic radic Golden HS Track radic radic radic radic radic Green Mountain HS radic radic radic radic radic Pomona HS radic radic radic radic radic Standley Lake HS radic radic radic radic radic

Columbine Hills ES radic radic radic radic Everitt MS radic radic radic radic Lawrence ES radic radic radic radic Mitchell ES radic radic radic radic Ryan ES radic radic radic radic Shelton ES radic radic radic radic

Patterson ES radic radic radic radic Ryan ES radic radic radic radic Stott ES radic radic radic radic Westridge ES radic radic radic radic

Site

Status

3Q2019 PROJECTSAdditionRemodel Replacement or New

Track amp Artificial Turf Fields

Paving Projects

Mechanical Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Jefferson JrSr HS AdditionRemodel radic radic radic
Bell MS Addition radic radic radic
Lumberg ES AdditionRemodel radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 6: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic De

sign

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Prici

ng

Cons

truc

tion

Perc

ent

Com

plet

e

Conifer HS AdditionRemodel radic radic radic radic Jefferson JrSr HS AdditionRemodel radic radic radic Bell MS Addition radic radic radic Lumberg ES AdditionRemodel radic radic radic Manning MS Addition radic radic radic South Warren Tech Facility radic radic radic Trailblazer Stadium radic radic radic radic Wayne Carle MS Addition radic radic radic

Arvada West HS Track radic radic radic radic radic Columbine HS radic radic radic radic radic Golden HS Track radic radic radic radic radic Green Mountain HS radic radic radic radic radic Pomona HS radic radic radic radic radic Standley Lake HS radic radic radic radic radic

Columbine Hills ES radic radic radic radic Everitt MS radic radic radic radic Lawrence ES radic radic radic radic Mitchell ES radic radic radic radic Ryan ES radic radic radic radic Shelton ES radic radic radic radic

Patterson ES radic radic radic radic Ryan ES radic radic radic radic Stott ES radic radic radic radic Westridge ES radic radic radic radic

Site

Status

3Q2019 PROJECTSAdditionRemodel Replacement or New

Track amp Artificial Turf Fields

Paving Projects

Mechanical Projects

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Jefferson JrSr HS AdditionRemodel radic radic radic
Bell MS Addition radic radic radic
Lumberg ES AdditionRemodel radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 7: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radic Arvada K-8 radic radic radic radic Belmar ES radic radic radic radic Brady Option radic radic radic radic Columbine Hills ES radic radic radic radic Coronado ES radic radic radic radic Dutch Creek ES radic radic radic radic Eiber ES radic radic radic radic Foothills ES radic radic radic radic Fremont ES radic radic radic radic Green Gables ES radic radic radic radic Hackberry Hill ES radic radic radic radic Hutchinson ES radic radic radic radic Kullerstrand ES radic radic radic radic Lukas ES radic radic radic radic Ralston ES radic radic radic radic Semper ES radic radic radic radic Stober ES radic radic radic radic Vivian ES radic radic radic radic Welchester ES radic radic radic radic Witt ES radic radic radic radic

Efficiency amp Future Ready3Q2019 PROJECTS

Site

Status

2019 Update

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 8: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Update

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Desig

n Ad

viso

ry

Grou

p

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Adams ES radic radic radic radicBelmar ES radic radic radic radicEiber ES radic radic radic radicFoothills ES radic radic radic radicFremont ES radic radic radic radicGreen Gables ES radic radic radic radicHutchinson ES radic radic radic radicLukas ES radic radic radic radicStober ES radic radic radic radicWelchester ES radic radic radic radicWitt ES radic radic radic radicKendrick Lakes ES radic radic radic radicThree Creeks K-8 radic radic radic radicWilmot ES radic radic radic radic

3Q 2019 Fixtures Furnishings amp Equipment (FFampE)

Site

Status

3Q2019 PROJECTS

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 9: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Update

Debt

Red

uctio

n

Cons

ulta

nt

Sele

ctio

n

Cont

ract

or

Sele

ctio

n

Sche

mat

ic

Desig

n

Desig

n De

velo

pmen

t

Cons

truc

tion

Docu

men

ts

Pric

ing

Cons

truc

tion

Perc

ent

Com

plet

e

Jefferson Academy HS radic 100Jefferson Academy ESMSLincoln Academy radic radic radic Excel Academy radic radic radic radicAddenbrooke radic radic radicCollegiate Academy radicDoralGreat Work MontessoriCompass Montessori Golden radic 60Compass Montessori Wheat Ridge radic 60Montessori Peaks radic Rocky Mountain Academy of Evergreen radic 100Rocky Mountain Deaf School radic radic Woodrow Wilson Academy radic 100Mountain Phoenix radic radic radic radic radic radic Two Roads radic 100New America radic 100

Site

Status

Charter School Projects

Funds to Jefferson Academy HS Project

Sheet1

amp-Boldamp14 2019-25 Captital Improvement Plan

Sheet2

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Phase Project Budget CostEstimate variance
Started 1Q2019 PROJECTS
AdditionRemodel Replacement
Alameda Intl - AdditionRemodel radic radic radic radic radic SD $ 19500000 $ 24000000 23
Arvada HS - AdditionRemodel radic radic radic radic radic radic radic 25 CDCN $ 13435000 $ 12650000 -6
Columbine HS AdditionRemodel radic radic radic radic radic DD $ 14800000 $ 12037000 -19
Green Mountain HS AdditionRemodel radic radic radic radic radic DD $ 12500000 $ 12828000 3
Kendrick Lakes ES Replacement radic radic radic radic radic radic radic 5 CD $ 23400000 $ 23402000 0
Three Creeks K-8 Addition radic radic radic radic radic radic radic 50 CN $ 4930000 $ 4590000 -7
Wilmot ES Addition radic radic radic radic radic radic radic 20 CN $ 4100000 $ 6694000 63
Track amp Artificial Turf Fields
Arvada HS radic radic radic radic radic radic radic radic 100 CN
Chatfield HS radic radic radic radic radic radic radic radic 100 CP
Conifer HS radic radic radic radic radic radic radic 98 CN
Dakota Ridge HS radic radic radic radic radic radic radic radic 100 CN
Evergreen HS radic radic radic radic radic radic radic radic 100 CP
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Paving Projects
Devinny ES radic radic radic radic radic radic radic radic 100 CP $ 236000
Evergreen MS radic radic radic radic radic radic radic radic 100 CP
Hackberry Hill ES radic radic radic radic radic radic radic radic 100 CP $ 288750
Maple Grove ES radic radic radic radic radic radic radic radic 100 CP $ 111300
Parmalee ES radic radic radic radic radic radic radic radic 100 CP
Peck ES radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
1Q2019 PROJECTS
Playground Projects
Belmar ES radic radic radic radic radic radic radic radic 100 CP
Columbine Hills ES radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Free Horizon Montessori radic radic radic radic radic radic radic radic 100 CP
Patterson ES radic radic radic radic radic radic radic radic 100 CP
Ralston ES radic radic radic radic radic radic radic radic 100 CP
Welchester ES radic radic radic radic radic radic radic radic 100 CP
Wilmore-Davis ES radic radic radic radic radic radic radic radic 100 CP
Roofing
Lakewood HS radic radic radic radic radic radic radic radic 100 CP
Ralston Valley HS radic radic radic radic radic radic radic radic 100 CP
Eiber ES radic radic radic radic radic radic radic radic 100 CP
Green Gables ES radic radic radic radic radic radic radic radic 100 CP
Wilmot ES radic radic radic radic radic radic radic radic 100 CP
Security
IT Cameras - Districtwide radic radic radic radic radic 50
Security Locks -Districtwide radic radic radic radic radic radic radic 95
Site Lighting - 6 sites radic radic radic radic radic radic radic radic 100
Fire Alarm Upgrades radic radic radic radic radic radic radic radic 100
Security Glazing Replacement radic radic radic radic radic 15
Flooring Replacement
8 ES Sites radic radic radic radic radic radic radic radic 100 CP
Fixtures Furnishings amp Equipment (FFampE)
Arvada K8 radic radic radic radic radic radic radic radic 100 CP
West Jefferson MS radic radic radic radic radic radic radic radic 100 CP
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Started 3Q2019 PROJECTS
Playground Projects
Allendale ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Fletcher Miller Special radic radic radic radic
Kendallvue ES radic radic radic radic
Sheridan Green ES radic radic radic radic
Stony Creek ES radic radic radic radic
Stott ES radic radic radic radic
Vanderhoof ES radic radic radic radic
Westridge ES radic radic radic radic
Roofing
Carmody MS radic radic radic radic
Evergreen HS radic radic radic radic
Kullerstrand ES radic radic radic radic
Little ES radic radic radic radic
Swanson ES radic radic radic radic
Thompson ES radic radic radic radic
Security
IT Cameras - Districtwide radic radic radic radic radic radic
Security Locks -Districtwide radic radic radic radic radic
Security Glazing Replacement radic radic radic radic radic radic
Flooring Replacement
Flooring Replacement - 8 Sites radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
AdditionRemodel Replacement or New
Conifer HS AdditionRemodel radic radic radic radic
Bell MS Addition radic radic radic
Manning MS Addition radic radic radic
South Warren Tech Facility radic radic radic
Trailblazer Stadium radic radic radic radic
Wayne Carle MS Addition radic radic radic
Track amp Artificial Turf Fields
Arvada West HS Track radic radic radic radic radic
Columbine HS radic radic radic radic radic
Golden HS Track radic radic radic radic radic
Green Mountain HS radic radic radic radic radic
Pomona HS radic radic radic radic radic
Standley Lake HS radic radic radic radic radic
Paving Projects
Columbine Hills ES radic radic radic radic
Everitt MS radic radic radic radic
Lawrence ES radic radic radic radic
Mitchell ES radic radic radic radic
Ryan ES radic radic radic radic
Shelton ES radic radic radic radic
Mechanical Projects
Patterson ES radic radic radic radic
Ryan ES radic radic radic radic
Stott ES radic radic radic radic
Westridge ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
Efficiency amp Future Ready
Adams ES radic radic radic radic
Arvada K-8 radic radic radic radic
Belmar ES radic radic radic radic
Brady Option radic radic radic radic
Columbine Hills ES radic radic radic radic
Coronado ES radic radic radic radic
Dutch Creek ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hackberry Hill ES radic radic radic radic
Hutchinson ES radic radic radic radic
Kullerstrand ES radic radic radic radic
Lukas ES radic radic radic radic
Ralston ES radic radic radic radic
Semper ES radic radic radic radic
Stober ES radic radic radic radic
Vivian ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Site Status
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
3Q2019 PROJECTS
3Q 2019 Fixtures Furnishings amp Equipment (FFampE)
Adams ES radic radic radic radic
Belmar ES radic radic radic radic
Eiber ES radic radic radic radic
Foothills ES radic radic radic radic
Fremont ES radic radic radic radic
Green Gables ES radic radic radic radic
Hutchinson ES radic radic radic radic
Lukas ES radic radic radic radic
Stober ES radic radic radic radic
Welchester ES radic radic radic radic
Witt ES radic radic radic radic
Kendrick Lakes ES radic radic radic radic
Three Creeks K-8 radic radic radic radic
Wilmot ES radic radic radic radic
Site Status
Debt Reduction Consultant Selection Contractor Selection Schematic Design Design Development Construction Documents Pricing Construction Percent Complete
Charter School Projects
Jefferson Academy HS radic 100
Jefferson Academy ESMS Funds to Jefferson Academy HS Project
Lincoln Academy radic radic radic
Excel Academy radic radic radic radic
Addenbrooke radic radic radic
Collegiate Academy radic
Doral
Great Work Montessori
Compass Montessori Golden radic 60
Compass Montessori Wheat Ridge radic 60
Montessori Peaks radic
Rocky Mountain Academy of Evergreen radic 100
Rocky Mountain Deaf School radic radic
Woodrow Wilson Academy radic 100
Mountain Phoenix radic radic radic radic radic radic
Two Roads radic 100
New America radic 100
2019 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Adams ES bull bull bull bull bull bull bull
Alameda International
Arvada HS
Arvada K8 bull bull bull bull bull bull bull bull bull
Bell MS bull bull bull bull bull bull bull bull bull bull bull
Belmar ES bull bull bull bull bull bull bull bull bull bull bull bull
Columbine HS
Conifer HS bull bull bull bull bull bull bull bull bull bull bull bull
Coronado ES bull bull bull bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dutch Creek ES bull bull bull bull bull bull bull bull bull
Eiber ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull
Foothills ES bull bull bull bull bull bull bull bull bull bull
Free Horizon bull bull bull bull bull bull bull bull
Fremont ES bull bull bull bull bull bull bull bull bull bull
Green Gables ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Green Mountain HS
Hackberry Hill ES bull bull bull bull bull bull bull
Hutchinson ES bull bull bull bull bull bull bull bull bull bull bull bull
Jefferson JHS bull bull bull bull bull bull bull bull bull bull bull
Kendrick Lakes ES bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull bull
Lumberg ES bull bull bull bull bull bull bull bull bull bull bull bull
Lukas ES bull bull bull bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Manning 6-8 bull bull bull bull bull bull bull bull bull bull bull bull
Ralston ES
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull
Semper ES bull bull bull bull bull bull
Stober ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Three Creeks K-8
Vivian ES bull bull bull bull bull bull bull
WTC South bull
Wayne Carle MS bull bull bull bull bull bull
Welchester ES bull bull bull bull bull bull bull bull bull
Wilmot ES
Witt ES bull bull bull bull bull bull bull bull bull bull bull bull
2020 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Brady Exploration School bull bull bull bull bull bull bull bull bull bull bull bull
Carmody MS bull bull bull bull bull bull bull bull bull bull
Chatfield HS bull bull bull bull bull bull bull bull
Columbine Hills ES bull bull bull bull bull bull bull bull bull bull
Dakota Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Deane ES bull bull bull bull bull bull bull bull bull bull
Dennison ES bull bull bull bull bull bull bull bull bull
DEvelyn 7-12 bull bull bull bull bull bull bull bull
Devinny ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen HS bull bull bull bull bull bull bull bull bull bull bull bull bull
Evergreen MS bull bull bull bull bull bull bull bull bull bull bull bull
Everitt MS bull bull bull bull bull bull bull bull bull
Fitzmorris ES bull bull bull bull bull bull bull bull bull
Foster ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Kullerstrand ES bull bull bull bull bull bull bull bull bull bull bull
Lasely ES bull bull bull bull bull bull bull bull bull bull
Lawrence ES bull bull bull bull bull bull bull bull bull bull
Maple Grove ES bull bull bull bull bull bull bull bull bull bull
Miller Special School bull bull bull bull bull bull bull bull bull bull bull bull
Parmalee ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Patterson ES bull bull bull bull bull bull bull bull
Pomona HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Powderhorn ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Ralston Valley HS bull bull bull bull bull bull
Ryan ES bull bull bull bull bull bull bull bull bull bull
Sheridan Green ES bull bull bull bull bull bull bull
Standley Lake HS bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Stott ES bull bull bull bull bull bull bull bull bull bull
Trailblazer Stadium bull bull bull bull bull
Vanderhoof ES bull bull bull bull bull bull bull bull bull bull bull bull
West Jefferson MS bull bull bull bull bull bull bull bull bull
Westridge ES bull bull bull bull bull bull bull bull bull bull bull bull bull
2021 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull bull bull bull bull bull
Bergen Valley ES bull bull bull bull bull
Blue Heron ES bull bull bull bull bull bull bull bull bull
Colorow ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Edgewater ES bull bull bull bull bull bull bull bull bull bull
Elk Creek ES bull bull bull bull bull bull bull bull bull bull
Emory ES bull bull bull bull bull bull bull bull bull
Green Mountain ES bull bull bull bull bull bull bull bull bull bull bull bull
Jeffco Open School bull bull bull bull bull bull bull bull
Kyffin ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Long View bull bull bull bull
Mandalay MS bull bull bull bull bull bull bull bull bull
Mitchell ES bull bull bull bull bull bull bull bull bull bull bull bull
Molholm ES bull bull bull bull bull bull bull bull bull bull bull
Mortensen ES bull bull bull bull bull bull
North Arvada MS bull bull bull bull bull bull bull bull bull bull bull
North TransMaint Shops
Oberon MS bull bull bull bull bull bull bull bull bull
Peck ES bull bull bull bull bull bull bull bull bull bull bull
Prospect Valley ES bull
Red Rocks ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Secrest ES bull bull bull bull bull bull bull bull bull bull
Shaffer ES bull bull bull bull bull bull bull bull bull bull
Shelton ES bull bull bull bull bull bull bull bull bull
Slater ES bull bull bull bull bull bull bull bull bull bull
Stevens ES bull bull bull bull bull bull
Stony Creek ES bull bull bull bull bull bull bull bull bull bull
Thomson ES bull bull bull bull bull bull bull bull bull bull bull bull
Warder ES bull bull bull bull bull bull bull
WTOC North bull bull bull bull bull bull bull
West Jefferson ES bull bull bull bull bull bull
Westgate ES bull bull bull bull bull bull bull bull bull bull bull bull bull
Wheat Ridge HS bull bull bull bull bull bull bull bull bull bull bull bull
Wilmore Davis ES bull bull bull bull bull bull bull bull bull bull
2022 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
bull bull bull bull bull bull bull bull
Bear Creek K-8 bull bull bull bull bull bull bull bull
Campbell ES bull bull bull bull bull bull
Coal Creek K-8 bull bull bull bull bull bull bull bull
Connections bull
Deer Creek MS bull bull bull bull bull bull bull bull bull bull
Drake MS bull bull bull bull bull bull bull
Dunstan MS bull bull bull bull bull
Fairmount ES bull bull bull bull bull bull bull bull bull bull bull bull
Falcon Bluffs MS bull bull bull bull bull bull bull bull
Free Horizon Montessori bull bull bull bull bull bull bull bull bull
Glennon Heights ES bull bull bull bull bull bull bull bull
Governors Ranch ES bull bull bull bull bull bull bull bull bull bull
Irwin PreK
Ken Caryl MS bull bull bull bull bull bull bull bull bull bull bull bull
Kendallvue ES bull bull bull bull bull bull bull bull bull bull bull
Leyden Rock bull
Little ES bull bull bull bull bull bull bull bull bull bull bull
Litz PreK
Marshdale ES bull
Mount Carbon ES bull bull bull bull bull bull bull bull bull bull
Mt Evans OELS
Norma Anderson PreK
Parr ES bull bull bull bull bull bull bull bull bull
Peiffer ES bull bull bull bull bull bull bull bull
Pennington ES
South Lakewood ES bull bull bull bull bull bull bull
Summit Ridge MS bull bull bull bull bull bull bull bull bull bull bull
Swanson ES bull bull bull bull bull bull bull bull bull
Van Arsdale ES bull bull bull bull bull bull bull bull bull
WTOC Central bull bull bull bull bull bull bull bull bull bull bull
Windy Peak OELS
2023 Projects
Site PHASE PROGRESS SCOPE OF WORK
Consultant Selection Contractor Selection Design Advisory Group Schematic Design Design Development Construction Documents Pricing Construction Percent Complete Addition Renovation Replacement School at Same Site New Facility Remove Modular Buildings Security Cameras Lock Upgrades Secure Entries amp Office Locations Exterior Doors Windows Finishes Technology Upgrades Landscaping amp Field Improvements Interior Paint Doors Partitions LED amp Electrical improvements Updated HVAC Plumbing Update amp Repair Exterior Finishes Food Service Improvements Parking amp Sidewalk Improvements Playgrounds amp Equipment Furniture Replacement Carpet Floor amp Tile Replacement Replace Cabinet Shelving amp Sink Replace Movable Partitions Ceiling Replacement Roofing Debt Reduction
Bear Creek HS bull bull bull bull bull bull
Bradford K8 North bull bull bull bull bull bull
Bradford K8 South bull bull bull bull bull bull
Ute Meadows ES bull bull bull bull bull bull bull bull bull bull bull
Leawood ES bull bull bull bull bull bull bull bull bull
Normandy ES bull bull bull bull bull bull bull bull bull bull bull bull bull bull
Rose Stein ES bull bull
Rooney Valley School bull
Rooney Ranch ES bull bull bull bull bull bull bull
Golden HS bull bull bull bull bull
Creighton MS bull bull bull bull bull bull bull bull
Lakewood HS bull bull bull bull bull bull bull
McLain Community bull bull bull bull bull bull
Sobesky Program bull bull bull bull bull bull
Moore MS bull bull bull bull bull bull bull bull
Weber ES bull bull bull bull bull bull bull
Meiklejohn ES bull bull bull bull
West Woods ES bull bull bull bull bull bull bull bull bull bull
2024 Projects
Sierra ES
Charters
Jefferson Academy HS
Jefferson Academy ESMS
Lincoln Academy
Excel Academy
Addenbrooke
Collegiate Academy
Doral
Great Work Montessori
Comp Montessori Golden
Comp Montessori Wht Ridge
Montessori Peaks
Rocky Mtn Acad Evergreen
Rocky Mountain Deaf School
Woodrow Wilson Academy
Mountain Phoenix
Two Roads
New America
Page 10: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2019 Construction Projects

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 11: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Creighton MS ndash 8 Classroom Addition

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 12: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Creighton MS ndash Furniture

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 13: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Ken Caryl MS ndash 8 Classroom AdditionIssue ndash Locker delivery delay

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 14: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Summit Ridge MS ndash 8 Classroom Addition

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 15: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Playgrounds ndash 4 Schools

Free Horizon Montessori

Wilmore Davis ESPatterson International

Columbine Hills ES

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 16: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Bradford K-8 ndash Gym Flooring

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 17: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Wilmore Davis ES ndash Gym Flooring

Before

Complete

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 18: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Arvada K8 ndash Furniture

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 19: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Evergreen HS ndash Site Improvements (Turf Field amp Track)

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 20: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Chatfield HS ndash Site Improvements (Turf Field amp Track)

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 21: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

West Jefferson MS ndash Site Improvements (Turf Field)

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 22: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Kendrick Lakes ES ndash Replacement

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 23: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Kendrick Lakes ES ndash Replacement

Construction

Dec 2020Completion

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 24: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Wilmot ES ndash Addition

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 25: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Wilmot ES ndash Addition

Construction

August 2020Completion

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 26: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Three Creeks K8 ndash Addition

Construction

May 2020 Completion

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 27: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Arvada HS ndash Addition ndash (Phase II)

ConstructionComplete

August 2020

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 28: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2020 Construction Starts

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 29: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Green Mountain HS ndash AdditionMOA ndash CMGC GE Johnson

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 30: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Columbine HS ndash Addition amp Renovation

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 31: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Alameda HS ndash Addition amp Renovation

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 32: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Conifer HS ndash Addition amp Renovation

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 33: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2020 Field ImprovementsAwest HS Columbine HS Golden HS

Green Mountain HS Pomona HS Standley Lake HS

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 34: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

New Building Additions amp RenovationsStart Summer Fall 2020

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 35: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Bell MS ndash 1 Story - 4 Classroom Addition

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 36: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

CTE South ndash New Building

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 37: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Jefferson HS ndashAddition amp Renovation

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 38: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Lumberg ES ndash 4 CR Addition

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 39: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Manning Option ndash Addition amp Renovation

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 40: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Wayne Carle ndash Classroom Addition

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 41: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Parmalee ES ndash Classroom Addition

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 42: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

2020-21 DAC School Budget Survey Results

SummaryJanuary 2020

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 43: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Survey Background

bull Available to all School Accountability Committees

bull Administered online

bull Open from November 1 through December 20 2019

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 44: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Responses by Level

137 Schools

Elementary 63Middle 14High

14Multi-level 9

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 45: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Responses by Articulation Area

All neighborhood amp option schools responded

One charter school responded

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 46: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Respondent Role

Nearly 90 of responses submitted with the principal

About two-thirds submitted with a SAC chairmember

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 47: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

SAC Membership

Respondents were directed to ldquocheck all that applyrdquo so responses exceed 100

The schools current SAC includes

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 48: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

SAC Meeting FrequencySAC meets (check the most accurate answer)

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 49: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

SAC Meeting Attendance

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 50: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

The agendas for SAC meetings are typically

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 51: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Minutes and agendas for SAC meetings are typically

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 52: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

As part of the Budget Prioritization Process our SAC

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 53: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 2019

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 54: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

UIP amp Budget Priorities

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 55: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

Spending Priorities by Level

The next 3 slides summarize SAC spending priorities by level for

bull 1 spending priority (slide 15)

bull 2 spending priority (slide 16)

bull 3 spending priority (slide 17)

Each slide shows descending order of priority by total counts

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 56: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

SCHOOL LEVEL 1 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

Additional classroom teachers 39 3 5 7 54

MentalBehavioral Health supports 11 2 4 2 19

Additional elective programming (world languages technology additional Art Music PE)

6 3 2 11

Instructional coach 8 8

Instructional resources 2 3 1 6

Literacy interventions 5 1 6

Professional development 2 1 3 6

Math interventions 2 2 1 5

Additional administrators (assistant principal(s) and deans) 3 1 4

Additional paraaide timesupport 2 1 1 4

Teacher release time for professional developmentPLC 1 2 3

Technology (student devices computer labs classroom tools softwareapps etc)

2 2

Grand Total (items with total count of 1 not shown on slide see full report)

84 18 19 12 133

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 57: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

SCHOOL LEVEL 2 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 12 2 1 4 19

Additional paraaide timesupport 12 1 1 14

Additional elective programming (world languages technology additional Art Music PE) 6 1 5 1 13

Additional administrators (assistant principal(s) and deans) 10 1 11

Additional classroom teachers 4 2 2 1 9

Additional Digital Teacher Librarian (DTL) 9 9

Literacy interventions 5 4 9

Instructional coach 4 2 1 7

Teacher release time for professional developmentPLC 6 1 7

Instructional resources 3 1 2 6

Math interventions 4 1 1 6

Professional development 2 2 1 5

Adding STEMSTEAM programming 1 1 2 4

Technology (student devices computer labs classroom tools softwareapps 3 1 4

Grand Total (items with 3 or less total count not shown on slide see full report) 84 18 19 12 133

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 58: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

SCHOOL LEVEL 3 SPENDING PRIORITY BY LEVEL Elementary Middle High Multi-Level Total Count

MentalBehavioral Health supports 10 2 3 1 16

Additional paraaide timesupport 12 1 1 14

Literacy interventions 8 2 1 1 12

Additional classroom teachers 5 2 3 1 11

Professional development 7 1 2 1 11

Additional elective programming (world languages technology additional Art Music PE)

5 1 1 1 8

Instructional coach 6 1 1 8

Additional Digital Teacher Librarian (DTL) 6 1 7

Instructional resources 6 1 7

Math interventions 4 2 1 7

Supplemental resources for at-risk student populations 3 3 6

Technology (student devices computer labs classroom tools softwareapps etc)

3 1 2 6

Grand Total (items with 4 or less total count not shown on slide see full report)

83 18 18 12 131

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 59: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

DAC RECOMMENDATIONS

bull DAC RECOMMENDS SBB FUNDING

bull Specifically to meet school staffing needs for additional educators

bull DAC RECOMMENDS CONTINUED FOCUS ON MENTALBEHAVIORAL HEALTH SUPPORT

bull DAC RECOMMENDS MAINTAINING CURRENT FUNDING FOR DUIP INITIATIVES

bull DAC SUPPORTS FAMILY ENGAGEMENT THROUGH FSCP PROGRAMMING

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion
Page 60: DISTRICT ACCOUNTABILITY COMMITTEE 2018 Capital …...2019 Update Program Financial Status • 2019 - Spend - $81,380,375* *Includes Retention • District Projects: $48.2M • Charter

QuestionsDiscussion

  • Presentation DAC 2019 BondUpdate 20200218
    • Presentation DAC 2019 BondUpdate 20200218
      • Slide Number 1
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
      • 2019 Update
        • 20200218 DAC ConstSlides
          • 2019-20 DUIP 2520 draft
            • 2019 DUIP Targets
            • 2019-20 DUIP 12120
            • 2019-20 DUIP 121619 draft
              • Presentation DAC SchoolBudgetSurveyResultsSummary 021820
                • 2020-21 DAC School Budget Survey Results Summary
                • Survey Background
                • Responses by Level
                • Responses by Articulation Area
                • Respondent Role
                • SAC Membership
                • SAC Meeting Frequency
                • SAC Meeting Attendance
                • The agendas for SAC meetings are typically 13
                • Minutes and agendas for SAC meetings are typically
                • As part of the Budget Prioritization Process our SAC 13
                • Please rate the degree to which the SAC provided input into the development ofrevisions to the schoolrsquos Unified Improvement Plan (UIP) during fall 201913
                • UIP amp Budget Priorities
                • Spending Priorities by Level
                • Slide Number 15
                • Slide Number 16
                • Slide Number 17
                • DAC RECOMMENDATIONS
                • QuestionsDiscussion