district 8 mrs week: 05/18 mississippi river system · pdf file31 january 2018 lnm: 05/18...

38
31 January 2018 05/18 LNM: Coast Guard District 8-MRS Page 1 of 18 U.S. Department of Homeland Security United States Coast Guard LOCAL NOTICE TO MARINERS LIGHT LIST VOLUME V NOTICE NUMBER 05-18 January 31, 2018 LIGHT LIST REFERENCE: COMDTPUB P16502.5, Vol V, 2018 Edition. CONTENTS: Rivers are listed in alphabetical order and are included only when there is information to report. Broadcast Notice to Mariners Covered in this Edition Originating Unit Beginning BNM's Ending BNM's Sector Upper Mississippi River 0012 - 18 (UM) 0012 - 18 (UM) Sector Lower Mississippi River 0016 - 18 (LM) 0021 - 18 (LM) Sector Ohio Valley 0042 - 18 (OV) 0065 - 18 (OV) OB DWB 0005 - 18 (OB) 0009 - 18 (OB) COAST GUARD DISTRICT 8, WATERWAYS, (504) 671-2327, 7:00 a.m. until 3:30 p.m. (CST) COMMENTS REGARDING SECTION VI – PROPOSED CHANGES MAY ALSO BE EMAILED TO: [email protected] NIS WATCHSTANDER PHONE (703) 313-5900 24-HOURS A DAY INTERNET ADDRESS https://www.navcen.uscg.gov/ 2013 SPECIAL NOTICE TO MARINERS https://www.navcen.uscg.gov/ MISSISSIPPI RIVER SYSTEM LNM VIA INTERNET https://www.navcen.uscg.gov/?pageName=lnmDistrict&region=8&ext=r MISSISSIPPI RIVER SYSTEM LIGHT LIST VIA INTERNET https://www.navcen.uscg.gov/?pageName=lightLists ABBREVIATIONS District 8 MRS Week: 05/18 A through H ADRIFT - Buoy Adrift AICW - Atlantic Intracoastal Waterway Al - Alternating B - Buoy BKW - Breakwater bl - Blast BNM - Broadcast Notice to Mariner bu - Blue C - Canadian CHAN - Channel CGD - Coast Guard District C/O - Cut Off CONT - Contour CRK - Creek CONST - Construction DAYMK/Daymk - Daymark DBN/Dbn - Daybeacon DBD/DAYBD - Dayboard DEFAC - Defaced DEST - Destroyed DISCON - Discontinued DMGD/DAMGD - Damaged ec - eclipse EST - Established Aid ev - every EVAL - Evaluation EXT - Extinguished F - Fixed fl - flash Fl - Flashing I through O I - Interrupted ICW - Intracoastal Waterway IMCH - Improper Characteristic INL - Inlet INOP - Not Operating INT - Intensity ISL - Islet Iso - Isophase kHz - Kilohertz LAT - Latitude LB - Lighted Buoy LBB - Lighted Bell Buoy LHB - Lighted Horn Buoy LGB - Lighted Gong Buoy LONG - Longitude LNM - Local Notice to Mariners LT - Light LT CONT - Light Continuous LTR - Letter LWB - Lighted Whistle Buoy LWP - Left Watching Properly MHz - Megahertz MISS/MSNG - Missing Mo - Morse Code MRASS - Marine Radio Activated Sound Signal MSLD - Misleading N/C - Not Charted NGA - National Geospatial-Intelligence Agency NO/NUM - Number NOS - National Ocean Service P through Z PRIV - Private Aid Q - Quick R - Red RACON - Radar Transponder Beacon Ra ref - Radar reflector RBN - Radio Beacon REBUILT - Aid Rebuilt RECOVERED - Aid Recovered RED - Red Buoy REFL - Reflective RRL - Range Rear Light RELIGHTED - Aid Relit RELOC - Relocated RESET ON STATION - Aid Reset on Station RFL - Range Front Light RIV - River RRASS - Remote Radio Activated Sound Signal s - seconds SEC - Section SHL - Shoaling si - silent SIG - Signal SND - Sound SPM - Single Point Mooring Buoy SS - Sound Signal STA - Station STRUCT - Structure St M - Statute Mile TEMP - Temporary Aid Change TMK - Topmark Mississippi River System

Upload: nguyentruc

Post on 06-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 1 of 18

U.S. Departmentof Homeland Security

United StatesCoast Guard

LOCAL NOTICE TO MARINERS

LIGHT LIST VOLUME VNOTICE NUMBER 05-18

January 31, 2018

LIGHT LIST REFERENCE: COMDTPUB P16502.5, Vol V, 2018 Edition.CONTENTS: Rivers are listed in alphabetical order and are included only when there is information to report.

Broadcast Notice to Mariners Covered in this EditionOriginating Unit Beginning BNM's Ending BNM's

Sector Upper Mississippi River 0012 - 18 (UM) 0012 - 18 (UM) Sector Lower Mississippi River 0016 - 18 (LM) 0021 - 18 (LM) Sector Ohio Valley 0042 - 18 (OV) 0065 - 18 (OV) OB DWB 0005 - 18 (OB) 0009 - 18 (OB)

COAST GUARD DISTRICT 8, WATERWAYS, (504) 671-2327, 7:00 a.m. until 3:30 p.m. (CST)COMMENTS REGARDING SECTION VI – PROPOSED CHANGES MAY ALSO BE EMAILED TO: [email protected]

NIS WATCHSTANDER PHONE (703) 313-5900 24-HOURS A DAYINTERNET ADDRESS https://www.navcen.uscg.gov/

2013 SPECIAL NOTICE TO MARINERS https://www.navcen.uscg.gov/MISSISSIPPI RIVER SYSTEM LNM VIA INTERNET https://www.navcen.uscg.gov/?pageName=lnmDistrict&region=8&ext=r

MISSISSIPPI RIVER SYSTEM LIGHT LIST VIA INTERNET https://www.navcen.uscg.gov/?pageName=lightLists

ABBREVIATIONS

District 8 MRS Week: 05/18

A through H

ADRIFT - Buoy AdriftAICW - Atlantic Intracoastal WaterwayAl - AlternatingB - BuoyBKW - Breakwaterbl - BlastBNM - Broadcast Notice to Marinerbu - BlueC - CanadianCHAN - ChannelCGD - Coast Guard DistrictC/O - Cut OffCONT - ContourCRK - CreekCONST - ConstructionDAYMK/Daymk - DaymarkDBN/Dbn - DaybeaconDBD/DAYBD - DayboardDEFAC - DefacedDEST - DestroyedDISCON - DiscontinuedDMGD/DAMGD - Damagedec - eclipseEST - Established Aidev - everyEVAL - EvaluationEXT - ExtinguishedF - Fixedfl - flashFl - Flashing

I through O

I - InterruptedICW - Intracoastal WaterwayIMCH - Improper CharacteristicINL - InletINOP - Not OperatingINT - IntensityISL - IsletIso - IsophasekHz - KilohertzLAT - LatitudeLB - Lighted BuoyLBB - Lighted Bell BuoyLHB - Lighted Horn BuoyLGB - Lighted Gong BuoyLONG - LongitudeLNM - Local Notice to MarinersLT - LightLT CONT - Light ContinuousLTR - LetterLWB - Lighted Whistle BuoyLWP - Left Watching ProperlyMHz - Megahertz MISS/MSNG - MissingMo - Morse Code MRASS - Marine Radio Activated Sound SignalMSLD - MisleadingN/C - Not ChartedNGA - National Geospatial-Intelligence AgencyNO/NUM - NumberNOS - National Ocean Service

P through Z

PRIV - Private AidQ - QuickR - Red RACON - Radar Transponder BeaconRa ref - Radar reflectorRBN - Radio BeaconREBUILT - Aid RebuiltRECOVERED - Aid RecoveredRED - Red BuoyREFL - ReflectiveRRL - Range Rear LightRELIGHTED - Aid RelitRELOC - RelocatedRESET ON STATION - Aid Reset on StationRFL - Range Front LightRIV - RiverRRASS - Remote Radio Activated Sound Signals - secondsSEC - SectionSHL - Shoalingsi - silentSIG - SignalSND - SoundSPM - Single Point Mooring BuoySS - Sound SignalSTA - StationSTRUCT - StructureSt M - Statute MileTEMP - Temporary Aid ChangeTMK - Topmark

Mississippi River System

Page 2: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 2 of 18

RIAC - River Industry Action CommitteeMMSI - Mobile Maritime Service IdentityAIS - Automatic Identification SystemATON - Aids To NavigationCOTP - Captain of The PortTRDBN - Temporary Replaced by Daybeacon

SECTION I - SPECIAL NOTICESThis section contains information of special concern to the Mariner.

DEPARTMENT OF HOMELAND SECURITY SUSPICIOUS ACTIVITY

GPS TESTING - FORT POLK, LOUISIANA

UPPER MISSISSIPPI RIVER - CHANNEL CONDITION/SAFETY ADVISORY - UPDATE

OHIO RIVER AND TRIBUTARIES - WINTER NAVIGATION

USACE HUNTINGTON DISTRICT LOCKS - MAIL DELIVERY AND CREW CHANGE POLICIES

USACE HUNTINGTON DISTRICT - NOTIFICATION OF SINKING OR SUNKEN VESSELS, VESSEL GROUNDINGS AND BARGE BREAKAWAYS

USACE HUNTINGTON DISTRICT - REVIEW OF REGULATIONS AND GENERAL SAFETY PRACTICES

USACE HUNTINGTON DISTRICT - RESTRICTED AREAS AT NAVIGATION STRUCTURES

The Department of Homeland Security (DHS) encourages the maritime public to report information concerning suspicious activity to the local Federal Bureau of Investigation Joint Terrorism Task Force (JTTF) Office, http://www.fbi.gov/about-us/investigate/terrorism/terrorism_jttfs, or to other appropriate authorities. The U.S. Coast Guard reminds the maritime industry that they may also report information concerning suspicious activity to the www.AmericasWaterwayWatch.org, the National Response Center (NRC) 1-800-424-8802 or 1-877-24WATCH.

Continuing until February 4, 2018, GPS testing will be conducted in the vicinity of Fort Polk, Louisiana. Systems that rely on GPS, such as E-911,AIS and DSC, may be affected at an approximate test center of 31-05-35.01N 093-03-50.18W, with a possible impact radius of 45 nautical milesfrom the center point. More information is available at the U.S. Coast Guard Navigation Center Website, https://www.navcen.uscg.gov . During these periods, GPS users are encouraged to report any GPS outages that they may experience to the Navigation Information Service (NIS) by calling (703) 313-5900 or by using the NAVCEN Website to submit a GPS problem report.

Ice watch phase for all Zones has been cancelled.

Attached as an enclosure to this LNM is a USACE Huntington District Notice to Navigation Interests 18-02, regarding winter navigation on the Ohio River and tributaries.

Attached as an enclosure to this LNM is a USACE Huntington District Notice to Navigation Interests 18-05, regarding mail delivery and crew change policies at navigation locks, for towboats.

Attached as an enclosure to this LNM is a USACE Huntington District Notice to Navigation Interests 18-04, regarding notification of sinking or sunken vessels, vessel groundings and barge breakaways.

Attached as an enclosure to this LNM is a USACE Huntington District Notice to Navigation Interests 18-03, regarding the review of regulations and general safety practices.

Attached as an enclosure to this LNM is a USACE Huntington District Notice to Navigation Interests 18-06, regarding restricted areas at

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

DPW

02-18

05-18

03-18

03-18

03-18

03-18

Additional Abbreviations Specific to this LNM Edition:

G - Green GIWW - Gulf Intracoastal WaterwayHAZ - Hazard to NavigationHBR - HarborHOR - Horizontal ClearanceHT - Height

NW - Notice WriterOBSCU - ObscuredOBST - ObstructionOBSTR - ObstructionOc - OccultingODAS - Anchored Oceanographic Data Buoy

TRLB - Temporarily Replaced by Lighted BuoyTRLT - Temporarily Replaced by LightTRUB - Temporarily Replaced by Unlighted BuoyUSACE - Army Corps of EngineersW - WhiteY - Yellow

Page 3: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 3 of 18

ARKANSAS RIVER - USACE CHANNEL STATUS REPORT

UPPER MISSISSIPPI RIVER - ST. CROIX RIVER - MISSOURI RIVER - DRAWBRIDGE OPERATION

UPPER MISSISSIPPI RIVER - L/D RESTRICTIONS/WINTER CLOSURES

TENNESSEE RIVER - GPS TESTING

ALLEGHENY RIVER - CHANNEL CONDITION/SAFETY ADVISORY

navigation structures.

Attached as an enclosure to this LNM, is a USACE Tulsa District Arkansas River Channel Status Report 17-15.

Attached as an enclosure to this LNM, is Special Public Notice D8 DWB-879, regarding drawbridge operation on the Upper Mississippi River, St. Croix River and the Missouri River.

Attached as an enclosure to this LNM, is USACE Navigation Notice 17-8200-1, regarding L/D restrictions and L/D winter lock closures.

On February 3, 2018, GPS testing will be conducted in the vicinity of Arnold Air Force Base, Tennessee. Systems that rely on GPS, such as E-911, AIS and DSC, may be affected at an approximate test center of 35-22-30.81N 086-04-36.31W, with a possible impact radius of 22 nauticalmiles from the center point. More information is available at the U.S. Coast Guard Navigation Center Website, https://www.navcen.uscg.gov . During these periods, GPS users are encouraged to report any GPS outages that they may experience to the Navigation Information Service (NIS) by calling (703) 313-5900 or by using the NAVCEN Website to submit a GPS problem report.

The U. S. Coast Guard COTP Pittsburgh, in conjunction with the Waterways Association of Pittsburgh, has issued this Safety Advisory due to iceflow on the Allegheny River. It is imperative that all necessary actions be taken to mitigate the risks posed by these conditions and that all mariners exercise extreme caution. Facility operators and fleeting area managers are reminded to review their fleeting procedures ensuring the continuous surveillance of fleeting areas, ensure fleets are secured with an adequate number of lines, that lines are doubled-up at the head of the fleet, and securing towboat assistance if necessary.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

03-18

51-17

48-17

47-17

05-18

05-18

DISCREPANCIES (FEDERAL AIDS)

SECTION II - DISCREPANCIESThis section lists all reported and corrected discrepancies related to Aids to Navigation in this edition. A discrepancy is a change in the status of

an aid to navigation that differs from what is published or charted.

LNM EndLLNR Aid Name Status Chart No. BNM Ref. LNM StBlue Mound Daybeacon

Brier Creek LightNon Lateral Mark 330.4

Non Lateral Mark 313.9

Arbuckle Island LightMulberry River Daybeacon

Moores Creek Light

O'Kane Island LightNon Lateral Mark 244.1

Cane Creek Light

Ragon Mountain LightDardanelle Reach Light

Non Lateral Mark 197.9

Galla Rock LightTri County Light

Crystal Hill Light

Estes Place Light

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST

LT IMCH/STRUCT DMGD

LT IMCH/STRUCT DMGDDAYMK MISSING

STRUCT DEST

STRUCT DESTDAYMK DMGD

STRUCT DEST

STRUCT DESTSTRUCT DEST

LT IMCH

DAYMK IMCH/STRUCT DMGD

13/16

31/1505/16

05/16

05/1611/17

44/16

44/1631/15

31/15

31/1531/15

13/17

44/1641/16

12/17

44/16

805

10701213

1267

14301455

1510

15201542

1585

15901695

1708

17301930

2005

2160

0162LM0205LM

0087LM

0089LM0091LM

0041UM

0394LM0393LM

0210LM

0210LM0209LM

0204LM

0052LM0395LM

0370LM

0047LM0396LM

Page 4: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 4 of 18

Non Lateral Mark 92.0

Ste. Marie Bend Lower DaybeaconRichland Bend Lower Daybeacon

Cooper Point Light

Kimbrough LightMud Lake Bend Light

Cummins Bend Daybeacon

Lake Bend LightSample Island Light

Sample Island Lower Light

South Bend Landing LightRoss Ferry Light

Cook Point Light

Mary Mcgraw LightParadise Bay Light

Owens Lake Daybeacon

Old Hickory LightWatkins Daybeacon

Harpeth Shoals Upper Light

Cumberland City Upper DaybeaconDover Island Daybeacon

Shammels Mound Landing Light

Saline Creek Light

Crooked Creek LightHurricane Isle Upper Daybeacon

Blooms Landing Light

Preston Peninsula LightQuaker Oats Light

Milton Bell Light

Stewart Bar LightMurphy Smith Upper Daybeacon

Murphy Smith Light

Bader LightNebraska Point Light

Josie Harry Bar Light

Harbert Point LightDelta Lower Light

Kangaroo Point Light

Miller Point LightOld Town Bend Foot Light

Robson Light

Sunflower Cut-Off Foot LightLudlow Bar Light

Wood Cottage Light

Knowlton LightMason Landing Daybeacon

Choctaw Bend Light

Anconia Point LightCorregidor Light

Opossum Point Lower Light

Skipwith Bar LightChinaman Light

Fitler Point Daybeacon

Belle Island Corner DaybeaconCabin Teele Light

Kings Point Light

STRUCT DEST

STRUCT DESTDAYMK DMGD

LT EXT

LT EXTLT EXT

STRUCT DEST

LT EXTSTRUCT DEST

STRUCT DEST

LT EXTSTRUCT DEST

LT EXT

LT EXTSTRUCT DEST

DAYMK DMGD

LT IMCHSTRUCT DEST

LT EXT

DAYMK IMCHDAYMK IMCH

STRUCT DEST

STRUCT DEST/TRUB

STRUCT DEST/TRUBSTRUCT DEST

STRUCT DEST

REDUCED INTSTRUCT DEST

LT EXT

DAYMK DMGDSTRUCT DEST

STRUCT DEST

STRUCT DESTLT EXT

STRUCT DEST

LT EXTSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

STRUCT DESTDAYMK DMGD

STRUCT DEST

STRUCT DESTSTRUCT DEST

LT EXT

STRUCT DESTSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

STRUCT DEST/TRDBNSTRUCT DMGD

LT EXT

44/16

45/1647/16

46/17

46/1746/17

06/16

46/1706/16

06/16

46/1739/15

46/17

14/1736/15

06/16

21/1719/17

19/17

33/1733/17

02/16

26/16

36/1630/17

12/14

46/1606/16

22/16

19/1614/17

40/15

14/1722/16

24/17

36/1506/16

06/16

14/1636/15

06/16

06/1604/18

06/16

06/1614/16

03/18

08/1605/16

06/16

05/1615/16

28/17

22/1512/14

35/16

2199

23702440

2465

24752490

2498

25202540

2550

25602570

2575

26402650

2665

37353965

4015

41654215

4250

4285

43907980

8085

91859535

9690

98209845

9850

993510000

10445

1054010625

10640

1065010660

10685

1070010710

10715

1072010730

10900

1107011125

11140

1114511195

11210

1125011270

11300

0398LM

0407LM0438LM

0335LM

0336LM0337LM

0103LM

0338LM0106LM

0107LM

0332LM0287LM

0334LM

0061LM0258LM

0110LM

0278OV0245OV

0244OV

0505LM0505LM

0010OV

0221OV0383OV

0301UM

0032UM0420LM

0043OV

0172OV0229LM

0065LM

0303LM0066LM

0254LM

0125LM0256LM

0118LM

0117LM0171LM

0253LM

0116LM0115LM

0018LM

0114LM0113LM

0172LM

0013LM0130LM

0080LM

0120LM

0079LM0182LM

0170LM

0134LM0079LM

0337LM

Page 5: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 5 of 18

Centennial Island Light

Coggins LightReid Bedford Point Light

Cannon Point Light

Giles Bend Cut-Off LightNatchez Beam Light

Warnicott Bar Light

Deadman Slough DaybeaconPerry Ruby Light

Nine-Mile Island Light

Capt Mike Ehrler LightCredit Island Towhead Light

Hershey Chute Upper Light

Port Louisa Lower LightEdwards Island Upper Light

Keithsburg Island Light

Burlington Island DaybeaconDes Moines River Lower Daybeacon

Bledsoe Light

Howard LightMudd Hurdle Light

Ste. Genevieve Island Light

Cholson Daybeacon

Mclain Ferry LightBlack Horse Light

Crown City Light

Rural Home LightBuena Vista Light

Scotts Landing Daybeacon

Patriot Bend LightMarkland Upper Light

Jobson Landing Light

Fulton LightMosquito Creek Light

Pates Hollow Light

Hancock Bend Lower LightMussel Shoal Light

Corn Island Light

Pup Creek LightBeeler Island Light

Bon Harbor Light

Robert Mann LightTobacco Patch Light

Deer Creek Light

Hamletsburg Towhead LightCotton Lower Daybeacon

Ben Routh Upper Daybeacon

Barbin DaybeaconHadden Fort Middle A Daybeacon

Hadden Fort Middle B Daybeacon

Larto Middle DaybeaconLarto Bayou Daybeacon

Catfish Bayou Daybeacon

Alligator Bayou DaybeaconThree Rivers Junction Light

Half Moon Foot Light

LT EXT

STRUCT DESTLT EXT

STRUCT DEST

STRUCT DESTLT EXT

STRUCT DEST

DAYMK DMGDSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST/TRUB

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

DAYMK IMCH/TRDBNLT EXT

LT IMCH

MISSING

LT EXTLT EXT

STRUCT DEST

STRUCT DESTSTRUCT DEST

DAYMK DMGD

LT EXTSTRUCT DEST

LT IMCH

LT EXTLT EXT

DAYMK DMGD

LT EXTDAYMK DMGD

STRUCT DEST

LT EXTLT EXT

LT EXT

LT IMCHSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

TRUB/STRUCT DESTMISSING

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST

STRUCT DESTSTRUCT DEST

STRUCT DEST/TRLB

35/16

29/1628/16

41/17

28/1725/16

27/17

04/1812/17

36/17

23/1717/17

23/17

16/1726/16

22/17

32/1725/17

14/17

10/1748/16

48/16

50/11

49/1647/17

42/15

42/1535/15

31/17

12/1705/17

45/16

45/1650/16

47/15

51/1614/17

28/15

14/1714/17

15/16

09/1704/18

29/13

12/1711/15

17/14

17/1441/11

17/14

12/1712/17

14/17

33/1733/17

01/18

11305

1140711415

11440

1154011550

11615

1350013510

14230

1432014830

14980

1512015170

15210

1534015535

15570

1564016895

16910

17930

2194523315

24850

2487525475

26065

2635526383

26585

2659026950

27150

2719027235

27275

2732727332

27440

2752027700

28035

2813529327

29518

2954229547

29549

2959729600

29655

2972529775

30600

0338LM

0296LM0292LM

0294LM

0171LM0269LM

0208LM

0012UM0061UM

0410LM

0217UM0136UM

0212UM

0128UM0403UM

0196UM

0334UM0249UM

0084UM

0040UM0592UM

0593UM

0623UM0529OV

0736OV

0558OV

0461OV

0441OV

0065OV

0502OV0500OV

0538OV

0599OV0542OV

0155OV

0355OV0156OV

0156OV

0101OV0109OV

0044OV

0142OV

0032LM

0113LM0115LM

0436LM

0114LM

0049LM0050LM

0055LM

0216LM0215LM

0824OV

Page 6: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 6 of 18

DISCREPANCIES (FEDERAL AIDS) CORRECTED

DISCREPANCIES (PRIVATE AIDS)

LNM End

LNM End

LLNR

LLNR

Aid Name

Aid Name

Status

Status

Chart No.

Chart No.

BNM Ref.

BNM Ref.

LNM St

LNM St

Fouchee Light

Yetters DaybeaconMelton Bluff Light

Chambers Daybeacon

Diamond Island Lower DaybeaconSales Light

Higgins Light

Standing Rock Upper LightClyde Light

Newburg Light

Cape Rock Daybeacon

Oakley Dock Light

Mobley Dock Light

Bunge Grain Elevator Lights (2)Island Harbor Marina Light

Century Tube Lights (2)

Pickett And Davison Lights (2)Bunge Grain Dock Light

Lakewood Marina Lights (4)

Old Hickory Intake LightDupont Dock Lights (2)

Nashville Water Intake Lights (2)

Holnam Dock Lights (2)Kerr-Mcgee Dock Lights (2)

Cohen Terminal Lights (2)

Alcoa Chemical Dock Lights (2)Hunter Marine Transport Dock Lights (2)

Riverview Marina Lights (2)

Clarksville Boat Club Dock Lights (2)Quantum Chemical Dock Lights (2)

Consolidated Grain & Barge Lights (2)

Flint Hills Dock Lights (2)S. T. Services Terminal Lights (2)

Continental Grain Company Light

Cargill Lights (3)Cargo Carriers Dock Lights (2)

Pekin Boat Club Breakwater Light

Shell Dock Lights (2)Adm Growmark Mooring Light

Sours Grain Tramway Light

Tomen Dock LightAdm Growmark Mooring Lights (3)

Cargill Mooring Lights (2)

Cargill Dock Lights (2)Pere Marquette Boat Harbor Light

Black Dog Lights (5)

Huffman Grain LightBunge Corporation Dock Lights (2)

Cargill Dock Light

LT EXT

STRUCT DESTSTRUCT DEST/TRUB

STRUCT DEST

STRUCT DESTTRUB/STRUCT DEST

STRUCT DEST

STRUCT DESTLT EXT

STRUCT DEST

REBUILT/REMAINS

LT EXT

LT EXT

LT IMCHLT EXT

LT EXT

LT EXTLT IMCH

LT IMCH

LT EXTOFF STA/LT EXT

LT EXT

LT EXTLT EXT

LT EXT

MSLD SIG/LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

STRUCT DESTLT EXT

LT EXT

45/17

21/1716/17

11/13

11/1319/14

27/15

41/1344/15

29/15

24/17

44/14

48/13

26/1745/16

45/16

50/1341/11

34/15

34/1526/15

44/11

44/1144/11

44/11

14/1047/08

47/08

34/1231/01

41/14

41/1441/14

41/14

41/1425/08

05/16

16/0216/02

21/03

25/0821/03

21/03

35/0804/15

43/16

08/1608/03

34/01

05/18

30635

3065531805

32140

3217032445

32480

3253032600

32605

17315

1685

1690

23002337

2340

24002450

3725

37403750

3795

38053815

3820

39303960

3995

40556170

6580

66356650

6695

67007225

7235

72507255

7260

72657295

7460

76208095

9440

996510110

10300

0715OV

0267OV0179OV

0178OV

0177OV0269OV

0342OV

0658OV0581OV

0362OV

0307-14 LM

0454-13 LM

0481-13 LM

0438-11 LM

0439-15 OV0438-15 OV

0305-15 OV

0216-10 OV

0533-12 OV

0436-01 UM

0429-14 UM

0123-02 UM0122-02 UM

0279-03 UM

0281-03 UM

0284-03 UM

0013-15 UM

0131-16 LM0090-03 LM

0361-01 LM

Page 7: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 7 of 18

Peavey Lights (2)

Suburban Propane Dock LightWestern Tar Products Dock Light

Bunge Corporation Desoto Terminal Lights (2)Bear Industries Barge Dock Lights (4)

Riverside Dock Lights (2)University Dock Lights (3)

Koch Fuel Dock Lights (2)

Newport Terminal Lights (2)Shiely Dock Lights (2)

City of Red Wing Metering Station Special LightConsolidated Grain and Barge Loading Dock Piling Lights (2)Alma City Dock Light/Daymarks (3)

G. Heileman Brewery Dock LightCounty Of Lacrosse Cell Light

Isle Of Capri Casino Marina Daybeacon

Koch Nitrogen Dock LightRiverview Park Dock Light

Jersey County Grain Dock Lights (2)

Piasa Harbor LightCommodore Meyer Light

Con-Agra Mooring Lights (2)

Alton Marina Breakwater Lights (3)Amoco Dock Light

Amoco Dock Lights (4)

Redco Dock Lights (2)Sioux City/New Orleans Terminal Light

Western Dock Lights (9)

Adm-Growmark Dock Lights (4)Union Electric Coal Dock Lights (2)

St. Louis Terminal Light

Continental Cement Lights (2)Cargill Lights (3)

Peavey Company Dock Lights (3)

Cahokia Marine Terminal Lights (2)Slay Bulk Terminal Lights (2)

Peavey Lights (3)

Eagle Marine Industries LightPhillips Pipeline Lights (2)

Growmark Dock Lights (2)

Eagle Marine Dock Lights (2)Savannah Foods Dock Lights (2)

J.H. Collier Barge Mooring Lights (2)

Clark Oil Refining Dock Lights (4)Alcoa Foil Lights (2)

Hci Chemtech Dock Lights (2)

Semmaterials Terminal Lights (2)American Commercial Dock Lights (2)

Bussen Terminal Light

Bunge Dock Lights (3)Bartlett Dock Light

St. Joseph L & P Dock Light

Bartlett Grain Dock Light

Leavenworth Water Intake Lights (2)

LT EXT

LT EXTLT EXT

LT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT IMCH

MISSING

MISSING

MISSING

MISSINGMISSING

MISSING

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTSTRUCT DEST

LT EXT

LT EXTSTRUCT DEST

LT IMCH

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT IMCHLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

MISSING/LT EXTMISSING

LT IMCH

LT EXT

LT EXT

36/02

36/0236/02

14/12

30/17

40/0140/01

35/16

35/1635/16

42/16

42/16

42/16

42/1642/16

03/16

41/1449/15

19/16

22/1521/16

21/16

22/1535/09

35/09

35/0935/09

34/08

44/0134/08

32/08

34/0834/08

34/08

34/0834/08

34/08

34/0834/08

34/08

34/0834/08

34/08

34/0834/08

34/08

34/0834/08

34/08

18/0840/07

17/08

44/14

39/07

10390

1039510415

10875

11943

1199012080

12215

1232012385

12712

12768

12930

1340513423

14756

1534515415

16100

1620516215

16220

1623016265

16280

1629516310

16380

1639016430

16440

1644516490

16505

1653016540

16545

1655016560

16565

1657516585

16600

1660516609

16615

1661716630

16655

1870019175

19185

19300

19415

0398-02 LM

0396-02 LM0394-02 LM

0091-12 LM

0600-17 NO

0695-01 UM0696-01 UM

0531-15 UM

0131-15 UM

0131-15 UM

0776-01 UM0305-08 UM

0305-08 UM3305-08 UM

0305-08 UM

0305-08 UM0305-08 UM

3305-08 UM

0305-08 UM0305-08 UM

0305-08 UM

0305-08 UM0305-08 UM

0305-08 UM

0305-08 UM0305-08 UM

0305-08 UM

0305-08 UM0305-08 UM

0305-08 UM

0539-07 UM

0104-07 UM

Page 8: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 8 of 18

DISCREPANCIES (PRIVATE AIDS) CORRECTED

SECTION III - TEMPORARY CHANGES and TEMPORARY CHANGES CORRECTEDThis section contains temporary changes and corrections to Aids to Navigation for this edition. When charted aids are temporarily relocated for dredging, testing, evaluation, or marking an obstruction, a temporary correction shall be listed in Section IV giving the

new position.

TEMPORARY CHANGES

TEMPORARY CHANGES CORRECTED

LNM End

LNM End

LLNR

LLNR

Aid Name

Aid Name

Status

Status

Chart No.

Chart No.

BNM Ref.

BNM Ref.

LNM St

LNM St

LNM EndLLNR Aid Name Status Chart No. BNM Ref. LNM St

Smoot Grain Dock Lights (2)

Board Of Public Utilities LightPublic Utilities Intake Lights (3)

Midwest Terminal Lights (3)

Continental Grain Dock Lights (4)Kansas City Power And Light Company Lights (2)Judd Light

Cargill Barge Loading Facility Light

Orsanco LightBoone County Sand And Gravel Lights (2)Nsp Dock Lights (2)

Ergon Dock Lights (2)

Gavilon Barge Dock Light

LT EXT

LT EXTLT EXT

LT EXT

LT EXTLT EXT

LT EXT

LT EXT

MISSINGLT EXT

LT EXT

LT IMCH

WATCHING PROPERLY

39/07

39/0738/08

34/16

24/0824/08

40/09

40/09

40/0940/00

26/16

17/13

45/16 05/18

19460

1950519535

19595

1966019695

25750

25820

2584726290

29840

32900

2313

Blue Creek Point Lower Lighted Buoy

Drolls Point Upper Lighted Buoy

Peoria Heights Lighted Buoy

Belle Island Corner Daybeacon

Marshall Point Cut-Off Daybeacon

Joseph Henry Daybeacon

Dutchman Island Lighted Buoy

Sunken M/V John Paul Lighted Buoy

Waggoner PT Lighted Buoy

George Zerr Daybeacon

Craig Bar Lower Light

TRUB

TRUB

TRUB

TRDBN

TRDBN

TRDBN

TRUB

TRUB

TRUB

DISCONTINUED

DISCONTINUED

51/17

51/17

51/17

49/16

49/16

49/16

47/17

47/17

47/17

49/17

11/17

7015

7030

7040

11250

11275

11280

15395

15435

15475

22910

26445

None

0385-07 UM

0386-07 UM

0181-08 UM0181-08 UM

0549-09 OV

0552-09 OV

0553-09 OV0769-00 OV

0766OV

0137OV

PLATFORM DISCREPANCIES

PLATFORM DISCREPANCIES CORRECTED

Name

Name

Status

Status

Position

Position

BNM Ref.

BNM Ref.

LNM St

LNM St

LNM End

LNM End

None

None

PLATFORM TEMPORARY CHANGES

Page 9: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 9 of 18

SECTION V - ADVANCE NOTICESThis section contains advance notice of approved projects, changes to aids to navigation, or upcoming temporary changes such as dredging, etc.

Mariners are advised to use caution while transiting these areas.

SUMMARY OF ADVANCED APPROVED PROJECTS

Approved Project(s) Project Date Ref. LNM

UPPER MISSISSIPPI RIVER

UPPER MISSISSIPPI RIVER

ARKANSAS RIVER

VERDIGRIS RIVER

TENNESSEE RIVER

OHIO RIVER

ILLINOIS RIVER

The following changes will be made after February 6, 2018.Discontinue Meeker Island Daybeacon (LLNR-12125) at mile 851.1, Right Descending Bank in approximate position 44-57-33.980N/093-13-09.944W.Discontinue Groveland Park Daybeacon (LLNR-12145) at mile 849.9, Left Descending Bank in approximate position 44-56-50.683N/093-12-00.324W.Discontinue Pike Island Daybeacon (LLNR-12165) at mile 844.6, Right Descending Bank at position in approximate position 44-53-37.313N/093-09-54.353W.Discontinue Shelton Daybeacon (LLNR-12170) at mile 844.4, Left Descending Bank in approximate position 44-53-50.960N/093-09-30.618W.Change Minnesota River Mouth Daybeacon (LLNR-12175) at mile 844.0, Right Descending Bank in approximate position 44-53-48.631N/093-09-03.427W, downstream dayboard from 4SG to 4TR.

The following changes will be made after February 6, 2018.Due to shoaling and the project depth not being maintained above lock and dam 1 at mile 847.6, the U.S. Coast Guard is unable to maintain the channels aids to navigation. The U. S. Coast Guard intends to remove all federal maintained aids to navigation previously used to mark the channel.

The following changes will be made after February 13, 2018.Discontinue Gala Rock Light (LLNR-1730) at mile 190.5, Left Descending Bank in approximate position 35-10-22.069N/092-58-37.999W.Discontinue Ragon Mountain Light (LLNR-1590) at mile 230.6, Right Descending Bank in position 35-24-31.950N/093-28-21.200W.Discontinue Cane Creek Light (LLNR-1585) at mile 232.5, Right Descending Bank in approximate position 35-23-32.878N/093-30-03.632W.Discontinue Non Lateral Mark 244.1 (LLNR-1542) at mile 244.1, Right Descending Bank in approximate position 35-23-00.520N/093-40-45.360W.

The following changes will be made after February 13, 2018.Discontinue Blue Mound Daybeacon (LLNR-805) at mile 413, Left Descending Bank in approximate position 35-57-56.210N/095-30-06.520W.

The following changes will be made after February 13, 2018.Discontinue Melton Bluff Light (LLNR-31805) at mile 287.4, Left Descending Bank in approximate position 34-45-17.784N/087-12-58.641W.

The following changes will be made after February 13, 2018.Discontinue Hamletsburg Towhead Light (LLNR-28135) at mile 921.3, Left Descending Bank in approximate position 37-07-57.022N/088-25-36.433W.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

42/17

42/17

51/17

51/17

51/17

51/17

PLATFORM TEMPORARY CHANGES CORRECTED

Name

Name

Status

Status

Position

Position

BNM Ref.

BNM Ref.

LNM St

LNM St

LNM End

LNM End

None

None

None

Advance Notice(s)

Page 10: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 10 of 18

MISSOURI RIVER

Due to bank erosion caused by river scouring in the vicinity of mile 9.3 Right Descending Bank, the Coast Guard is unable to rebuild Blooms Landing Light (LLNR-8085).The following change will be made after March 6, 2018.Discontinue Blooms Landing Light (LLNR-8085) at mile 9.3 Right Descending Bankin approximate position 38-59-39.466N/090-34-22.098W.

The following changes will be made after March 27, 2018.Discontinue Cholson Daybeacon (LLNR-17930) at mile 686.1 Right Descending Bank in approximate position 41-58-41.759N/096-10-01.793W.

LNM:

LNM:

02/18

05/18

SECTION VI - PROPOSED CHANGESPeriodically, the Coast Guard evaluates its system of aids to navigation to determine whether the conditions for which the aids to navigation were

established have changed. When changes occur, the feasibility of improving, relocating, replacing, or discontinuing aids are considered. This section contains notice(s) of non-approved, proposed projects open for comment. SPECIAL NOTE: Mariners are requested to respond in writing to the District

office unless otherwise noted (see banner page for address).

PROPOSED WATERWAY PROJECTS OPEN FOR PUBLIC COMMENT

Proposed Project(s) Closing Docket No. Ref. LNM

ILLINOIS RIVER

ARKANSAS RIVER

OHIO RIVER

Comments to be received by March 6, 2018. This aid to navigation is destroyed and the Coast Guard is unable to rebuild.Discontinue Pilot Peak Bend Daybeacon (LLNR-7875) at mile 47.8 Left Descending Bank in approximate position 39-31-10.067N/090-34-44.353W.

Comments to be received by March 6, 2018. These aids to navigation are destroyed and the Coast Guard is unable to rebuild them.Discontinue Non Lateral Mark 313.9 (LLNR-1267) at mile 313.9 Right Descending Bank in approximate position 35-20-42.590N/094-29-42.710W.Discontinue Non Lateral Mark 330.4 (LLNR-1213) at mile 330.4 Right Descending Bank at approximate position 35-19-45.790N/094-41-39.660W.

Comments to be received by March 27, 2018. This aid to navigation is destroyed and the Coast Guard is unable to rebuild.Discontinue Crown City Light (LLNR-24850) at mile 290.0 Right Descending Bankin position 38-35-53.325N/082-15-54.383W.

LNM:

LNM:

LNM:

02/18

02/18

05/18

SECTION VII - GENERALThis section contains information of general concern to the Mariners. Mariners are advised to use caution while transiting these areas.

Continuing until approximately March 1, 2018, repairs will be conducted to the RS Kerr L/D 15 in the vicinity of Mile 336.2. Delays will primarily be weekdays from 7:00 a.m. until 9:00 a.m. and 2:30 p.m. until 3:30 p.m. Mariners are asked to check with L/D 15, for the latest information. Mariners may contact Mr. Robert Steiner, Navigation Operation Manager at (918) 775-4474, ext. 5833 or Mr. Vic Heister, Navigation Field Engineer at (918) 669-7244, for additional information.

Continuing until March 24, 2018, the Dardanelle L/D (No. 10) in the vicinity of Mile 205.5, will have intermittent closures, lasting up to 8-hours. Subsequent delays are anticipated to be four hours or less in duration. During this timeframe, the tow haulage system's availability will be Intermittent and double cut tows may have to be locked the conventional way, without the use of tow haulage. Lock operators may be contacted via VHF-FM Channel 16 or by phone at (479) 890-4987 in advance of arrival to be advised of current conditions. Questions or requests for additional information should be directed to USACE Little Rock, at (501) 324-5739 or via e-mail at [email protected] .

Shoaling has been reported in the vicinity of Mile 7.3. Mariners are urged to exercise caution in the area.

LNM:

LNM:

02-18

02-18

ARKANSAS RIVERMILE 336.2 - L/D DELAYS

MILE 205.5 - L/D TEMPORARY CLOSURES

None

Proposed Change Notice(s)

Page 11: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 11 of 18

A M/V reportedly sank at the dock in the vicinity of Mile 7.8. Pollution recovery operations are ongoing. Mariners are urged to exercise caution between approximate Miles 8.0 and 4.0. Recovery boom is in place between approximate Miles 8.0 and 6.0.

Attached as an enclosure to this LNM is USACE Nashville District Notice to Navigation Interests LRN 18-01, regarding the Oak Ridge Rowing Association 2018 schedule for rowing events between approximate Miles 52.0 and 49.0.

Multiple buoys have been reported not properly marking the channel between approximate Miles 147.2 and 68.0. Mariners are urged to exercise caution in the area.

Multiple buoys have been reported off station between approximate Miles 66.1 and 64.0. Mariners are urged to exercise caution in the area.

Houbolt Road Extension Bridge; A public notice has been issued for the construction of the Houbolt Road Extension Bridge across the Illinois Waterway, Mile 282.5, at Joliet, Illinois. The public notice can be viewed at the following website: https://www.navcen.uscg.gov/pdf/bridges/publicNotices//D08rD8DWB-876_Houbolt%20Road_Illinois%20Waterway.pdf . Comment period ends February 23, 2018.

Utica Highway Bridge; Horizontal clearance may be reduced to 325 feet, due to cofferdam construction on the right descending bank. Work barges may be in the river, during daylight hours, Monday through Saturday. For additional information mariners may contact the M/V TAYLOR LYNN via VHF-FM Channels 13 or 16, or the site supervisor at (779) 205-8080.

In accordance with the Illinois Waterway Action Plan Annex, navigation has been restricted to one way traffic between Mile 181.0 and 167.0. Tows should be grouped together when transiting this area, when possible. This will help maintain the current ice trail and prevent sheet ice from breaking off the bank. Mariners should use ice couplings when required by the USACE prior to lockage and are reminded to exercise extreme care when entering or departing lock chambers, to avoid damage to lock gates. Mariners should be aware that buoys may be unreliable due to icing conditions. Ice flows render reflective material ineffective and may drag buoys off station and sever their moorings. Mariners are urged to exercise caution in the area and report areas of shoaling, hazardous conditions or missing aids to navigation to U.S. Coast Guard Sector Upper Mississippi River via VHF-FM Channel 16 or at (314) 269-2332.

A camouflaged and ice bound duck blind has been reported adrift in the vicinity of Mile 167.1, RDB. Mariners are urged to exercise caution in the area.

Shoaling has been reported between approximate Miles 113.7 and 113.0, Grand Island, along the can buoy line. The navigation channel width in the area is limited to approximately 200 feet. Mariners are urged transit the area with caution.

Shoaling has been reported between approximate Miles 87.6 and 87.1, extending approximately 75 feet into the channel from the LDB. Mariners are urged to exercise caution in the area.

Meredosia Bridge Replacement; Due to a suspended platform below low steel, vertical clearance in the navigation span is reduced 6.5 feet. The

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

03-18

03-18

02-18

05-18

05-18

05-18

02-18

03-18

05-18

03-18

05-18

MILE 7.3 - CHANNEL CONDITION

BIG SANDY RIVERMILE 8.0 - MILE 4.0 - SUNK VESSEL/POLLUTION RECOVERY OPERATION

CLINCH RIVERMILE 52.0 - MILE 49.0 - MARINE EVENT

CUMBERLAND RIVERMILE 147.2 - MILE 68.0 - AIDS TO NAVIGATION

MILE 66.1 - MILE 64.0 - AIDS TO NAVIGATION

ILLINOIS WATERWAYMILE 282.5 - PUBLIC NOTICE

MILE 229.6 - BRIDGE CONSTRUCTION

MILE 181.0 - MILE 167.0 - ONE-WAY TRAFFIC

MILE 167.1 - ADRIFT DUCK BLIND

MILE 113.7 - MILE 113.0 - CHANNEL CONDITION

MILE 87.6 - MILE 87.1 - CHANNEL CONDITION

MILE 71.3 - BRIDGE REPLACEMENT

Page 12: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 12 of 18

platform measures 16 feet across and will be at various locations in the navigation span, until further notice. Mariners are urged to transit the bridge with caution.

Continuing until approximately March 30, 2018, Amherst Madison Incorporated will install an outfall diffuser for Black Hawk Mining L.L.C., in the vicinity of Mile 73.4, LDB. The contractors floating plant will consist of the M/V EARL FRANKLIN, a barge mounted crane and a material barge. TheM/V EARL FRANKLIN will monitor VHF-FM Channel 13 or 16. Work will be conducted from 7:00 a.m. until 5:00 p.m., Monday through Friday. During non-working hours, the contractors floating plant will be moored at the work site and lighted accordingly. Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution.

Continuing until February 3, 2018, from 7:00 a.m. until 3:00 p.m., ABC Corp., is constructing a recreational boat dock in the vicinity of Mile 62.5, LDB. The contractors floating plant will consist of the M/V SAM S., a crane barge and a equipment flat. During non-working hours, the contractorsfloating plant will be moored at the work-site and lighted accordingly. The M/V SAM S., will monitor VHF-FM Channel 13 or 16. Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution.

Continuing until approximately February 14, 2018, the M/V HELEN TULLY will conduct work on an existing dike along the RDB between approximateMiles 891.0 and 889.0. Work will be conducted from 7:00 a.m. until 5:00 p.m. The M/V HELEN TULLY will monitor VHF-FM Channel 13, 16 or 68 or at (901) 262-9286. Mariners are urged to transit the area at their slowest safe speed to minimize their wake.

Two can buoys have been reported missing in the vicinity of Mile 858.0. Mariners are urged to exercise caution in the area.

Continuing until approximately April 6, 2018, bendway weir construction operations will be conducted the vicinity of Mile 811.0, Barfield, Arkansas. The work will require daylight channel closures for construction operations from 6:30 a.m. until 6:00 p.m. Mariners are requested to contact the M/V SHERYL at (573) 803-7166. The contact pilots will monitor VHF-FM Channel 13, 16 or 72, and will manage the vessel queue daily. The contactpilot will broadcast conditions and procedures for navigating the reach every hour at the top of the hour and every attempt will be made to pass tows as possible during work day hours. Any queued traffic will be cleared daily.

Aids to navigation in the vicinity of Mile 677.5, have been reported missing. Mariners are urged to exercise caution in the area.

The U.S. Coast Guard has placed 2 can buoys, mid-channel, in the vicinity of Mile 593.0, to mark shoaling. Mariners are urged to exercise caution in the area.

Shoaling has been reported mid-channel between approximate Miles 486.0 and 485.0. The shoaling has been marked with 6 buoys. Mariners are urged to exercise caution in the area.

Shoaling has been reported in the vicinity of Mile 476.9, mid-channel, approximately 108 feet inside the can buoy line. Mariners are advised to remain 150 feet off the can buoy line and transit the area with caution.

Natchez-Vidalia Dual Bridge; A containment system may reduce vertical clearance by up to 2 feet 4 inches and will remain in place until April 2019. For additional information, mariners may contact the site supervisor at (727) 744-8866.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

05-18

02-18

04-18

01-18

03-18

04-18

03-18

05-18

05-18

52-17

25-17

MILE 71.3 - BRIDGE REPLACEMENT

KANAWHA RIVERMILE 73.4 - DIFFUSER INSTALLATION

MILE 62.5 - DOCK CONSTRUCTION

LOWER MISSISSIPPI RIVERMILE 891.0 - MILE 889.0 - DIKE WORK

MILE 858.0 - AIDS TO NAVIGATION

MILE 814.0 - MILE 808.0 - WEIR CONSTRUCTION/TEMPORARY RIVER CLOSURES

MILE 677.5 - AIDS TO NAVIGATION

MILE 593.0 - CHANNEL CONDITION/AIDS TO NAVIGATION - UPDATE

MILE 486.0 - CHANNEL CONDITION - UPDATE

MILE 476.9 - CHANNEL CONDITION

MILE 363.3 - BRIDGE MAINTENANCE

UPPER MISSISSIPPI RIVERMILE 853.4 - MILE 847.6 - CHANNEL CONDITION/AIDS TO NAVIGATION

Page 13: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 13 of 18

Shoaling has been reported between approximate Miles 853.4 and 847.6, pool one. Aids to navigation in the area may not be marking a 9-foot channel. Mariners are urged to exercise caution in the area.

Belt Line (Pigs Eye) Railroad Bridge; Mariners shall only use the right descending navigation span at slowest safe speed, as the left descending navigation span is closed to vessel traffic, due to lack of fendering. Mariners should contact the onsite work boats M/V JAMES BRENNAN or the M/V BARBARA B via VHF-FM Channel 13 or 16, prior to transiting the bridge. All southbound tows are recommended to use an assist vessel, but southbound tows with more than 9 loads are required to use an assist vessel. For further information, mariners may contact the bridge tender.

Continuing until further notice, the M/V BRAND MARIE is conducting dredging operations in the vicinity of Mile 802.0. Work will be conducted from 7:00 a.m. until 7:00 p.m., Monday through Friday. The M/V BRAND MARIE will monitor VHF-FM Channel 12 or 13 and requests 30-minutes advance notice of passage, prior to transiting the area. Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution.

Red Wing Highway Bridge; Horizontal clearance may be reduced to 368 feet due to cofferdam construction until February 2018. For additional information mariners may contact the site supervisor at (715) 610-4019 or (262) 366-9558.

Shoaling has been reported in the vicinity of Mile 788.9, approximately 75 feet off the nun buoy line. Mariners are urged to exercise caution in thearea.

Shoaling has been reported between approximate Miles 785.4 and 782.5. The channel width has been reduced and at its narrowest is 270 feet, inthe vicinity of Mile 784.7. The area has been marked with buoys. Mariners are urged to exercise caution in the area.

A subsiding sheet-pile cell, hollowing out of former Minneiska DBN has been reported as a partially submerged obstruction in the vicinity of Mile 742.7, RDB, in approximate position 44-12-09.335N 091-52-41.959W. Mariners are urged to exercise caution in the area.

A concrete pier of former Island Light 49 has been reported as a partially submerged obstruction in the vicinity of Mile 742.0, RDB, in approximate position 44-11-40.679N 091-51-57.884W. The obstruction is marked with a green buoy, set approximately 100 feet channel-ward of the obstruction. Mariners are urged to exercise caution in the area.

Winona Highway Bridge; Repairs are ongoing, a work platform is suspended up to 4 feet below low steel in the navigation span following the contour of the bridge. For additional information, mariners may contact the M/V ANDREA M., via VHF-FM Channels 13 or 16 or by phone at (651) 328-4994.

A 6-foot by 6-foot concrete pier has been reported in the vicinity of Mile 720.4, LDB, approximately 130 feet outside of the navigation channel in approximate position 44-01-25.964N 091-33-01.987W. The concrete pier has been marked with a red buoy, set approximate 130 feet channel-ward of the obstruction. Mariners are urged to exercise caution in the area.

Shoaling has been reported mid-channel in the vicinity of Mile 615.2, north of L/D 10. Mariners are urged to exercise caution in the area.

Shoaling has been reported between approximate Miles 594.7 and 592.2. Mariners are urged to exercise caution in the area.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

32-17

52-17

48-17

39-17

32-17

52-17

51-17

52-17

37-17

52-17

46-17

47-17

UPPER MISSISSIPPI RIVERMILE 853.4 - MILE 847.6 - CHANNEL CONDITION/AIDS TO NAVIGATION

MILE 835.7 - BRIDGE REPAIR

MILE 802.0 - DREDGE OPERATION

MILE 790.6 - BRIDGE MAINTENANCE

MILE 788.9 - CHANNEL CONDITION

MILE 785.4 - MILE 782.5 - CHANNEL CONDITION

MILE 742.7 - PARTIALLY SUBMERGED OBSTRUCTION

MILE 742.0 - PARTIALLY SUBMERGED OBSTRUCTION

MILE 725.9 - BRIDGE MAINTENANCE

MILE 720.4 - VISIBLE OBSTRUCTION

MILE 615.2 - CHANNEL CONDITION

MILE 594.7 - MILE 592.2 - CHANNEL CONDITION

Page 14: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 14 of 18

Railroad Bridge #39.2; A small wooden trestle railroad bridge is being replaced over an unnamed creek in the vicinity of Mile 575.5. A work barge is protruding 150 feet out into the river from the RDB. For additional information mariners may contact the work barge via VHF-FM Channels 13 or 16, or by phone at (608) 770-3206.

Savanna (US 52) Highway Replacement Bridge; New bridge construction complete, old bridge demolition preparatory work ongoing with no impact to navigation. Navigation channel remains reduced to 350 feet, due to new bridge’s channel pier. A helper boat will be available upon request to assist vessels transiting the site by contacting M/V WILLIAM E. LAWSON via VHF-FM Channel 11 or 16, or by telephone at (563) 249-9282.

Continuing until 7:00 p.m., March 6, 2018, L/D 14 in the vicinity of Mile 493.3, will be closed for maintenance. During this closure, mariners are requested NOT to tie up on the guidewalls. Mariners may contact the lock via VHF-FM Channel 14 or at (309) 794-4357, for additional information.

I-74 Replacement Bridge; The main navigation span may at times be reduced to 500 feet, due to pier construction. All access in and around Sylvan Slough remains open but mariners are requested to transit the construction site with caution. Mariners may contact the M/V CLEVA LEE via VHF-FM Channel 16 or at (920) 450-1357, for more information.

Rock Island Railroad & Highway Bridge; Due to emergency repairs, drawbridge will be unable to open for navigation from 7:00 a.m., January 29, 2018 until 5:00 p.m., February 14, 2018.

Continuing until noon, March 6, 2018, the L/D 16, in the vicinity of Mile 457.2, will be closed for construction. During this closure, tow boat operators are requested NOT to tie up on the guidewalls. Mariners may contact L/D 16 at (309) 537-3191 or via VHF-FM Channel 14, for assistance.

Continuing until noon, March 6, 2018, L/D 18 in the vicinity of Mile 410.5, will be closed for maintenance. During this closure, mariners are requested NOT to tie up on the guidewalls. Mariners may contact L/D 10 via VHF-FM Channel 14 or at (309) 873-2246, for assistance.

The following aids to navigation have been removed and replaced with an unlighted buoy, for the season:Dutchman Island Lighted Buoy (LLNR 15395), vicinity of Mile 384.8, Sunken M/V John Paul Lighted Buoy (LLNR 15435) andWaggoner PT Lighted Buoy (LLNR 15475).

Fort Madison Drawbridge; Due to scheduled maintenance the drawbridge will be unable to open for navigation.

Due to ice conditions at L/D 21 in the vicinity of Mile 324.9, double tripping or the use of an industry helper boat will be required for doubles, as both locks are unable to use tow haulage units to pull cuts. The width restriction has been lifted, as ice and weather conditions continue to change. Mariners may contact L/D 21 at (217) 222-0918, for the latest information.

Due to ice conditions at L/D 21 in the vicinity of Mile 324.9, double tripping or the use of an industry helper boat will be required for doubles, as both locks are unable to use tow haulage units to pull cuts. The width restriction has been lifted, as ice and weather conditions continue to change. Mariners may contact L/D 21 at (217) 222-0918, for the latest information.

Shoaling has been reported between approximate Miles 324.1 and 323.6, extending from the LDB approximately 200 yards. Mariners are urged toexercise caution in the area.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

28-17

46-17

47-17

33-17

04-18

47-17

47-17

47-17

02-18

03-18

03-18

36-17

MILE 575.5 - BRIDGE REPLACEMENT

MILE 537.81 - BRIDGE CONSTRUCTION

MILE 493.3 - L/D CLOSURE

MILE 485.81 - BRIDGE REPLACEMENT

MILE 482.9 - BRIDGE CLOSURE

MILE 457.2 - L/D CLOSURE

MILE 410.5 - L/D CLOSURE

MILE 384.8 - MILE 367.2 - AIDS TO NAVIGATION

MILE 383.9 - BRIDGE MAINTENANCE/CLOSURE

MILE 324.9 - L/D RESTRICTION

MILE 324.9 - L/D RESTRICTIONS

MILE 324.1 - MILE 323.6 - CHANNEL CONDITION

Page 15: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 15 of 18

Due to ice conditions at L/D 22 in the vicinity of Mile 301.2, double tripping or the use of an industry helper boat will be required for doubles, as both locks are unable to use tow haulage units to pull cuts. The width restriction has been lifted, as ice and weather conditions continue to change. Mariners may contact L/D 22 at (573) 221-0294, for the latest information.

Louisiana Highway Bridge; Horizontal clearance in the navigation channel may be reduced to 325 feet, until March 31, 2018, due to ongoing construction. Work boats may be traversing the navigation channel at various times while work is being conducted. For additional information, mariners may contact the M/V BILL STAHL or M/V BILOXI II via VHF-FM Channel 13 or 16, or call (573) 238-5724.

Shoaling has been reported in the vicinity of Mile 274.4, along the RDB, north of L/D 24. Mariners are urged to exercise caution in the area.

Shoaling has been reported in the vicinity of Mile 254.4, LDB. Mariners are urged to exercise caution in the area.

Shoaling has been reported in the vicinity of Mile 220.5, LDB. Mariners are urged to exercise caution in the area.

Continuing until 6:00 p.m., March 8, 2018, Mel Price L/D 26 (main chamber), in the vicinity of Mile 200.8, is closed to navigation. The 600-foot auxiliary chamber is available to pass traffic. The auxiliary L/D does not have tow haulage equipment. Tows requiring double lockage must providetheir own helper boat, NO government assist vessel will be provided to pull cuts. Mariners should be alert for and abide by any special instructions from the lockmaster.

Poplar Street Bridge; A Safespan Platform system is being installed following the contours of the bridge in the main navigation span. The platform will extend approximately 3 feet below low steel of the bridge. Work barges will be spudded down on the backsides of both left and right descending main navigation piers. Barges will remain in place overnight and properly lit.

A partially submerged barge has been reported in the vicinity of Mile 158.5, RDB. Salvage operations are ongoing. Mariners are requested to transit at slowest safe speed to minimize wake and transit the area with caution.

The COTP Ohio Valley has established a Safety Zone from Mile 46.0 to Mile 38.0, to facilitate subsurface rock removal operations. Vessels are NOTpermitted to transit this area from 8:00 a.m. until 7:00 p.m., unless permission has been granted by the U.S. Coast Guard. When stopping to await passage through the Thebes area, mariners are to contact U.S. Coast Guard MSU Paducah at (270) 557-6882 or via e-mail at [email protected] , to be placed in vessel queue. The River Industry Action Committee will contact vessels in the queue to facilitate passage throughthe Thebes Area when the river opens to traffic. Mariners are urged to transit the area with caution.

Washington Bridge Replacement; Horizontal clearance in the navigation span is reduced to 350 feet due to ongoing construction work. Mariners may contact M/V PIASA via VHF-FM Channel 13 or 16, for more information.

South 10th Street Bridge; Vertical clearance in the navigation channel may be reduced by 3 feet, until February 28, 2018, due to ongoing construction. During this time a small safety boat may be in the water and will monitor VHF-FM Channel 13, daily.

Liberty Bridge; Vertical clearance in the navigation span is reduced by 4 feet due to installed containment system. The system follows the contourof the bridge providing 70 feet of vertical clearance above normal pool at the center and 40 of vertical clearance above normal pool at the pier faces. At various times and locations the channel’s horizontal clearance may be temporarily reduced by up to 100 feet due to the presence of a

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

03-18

05-18

28-17

46-17

36-17

02-18

03-18

03-18

04-18

20-17

05-18

MILE 301.2 - L/D RESTRICTION

MILE 283.2 - BRIDGE CONSTRUCTION - UPDATE

MILE 274.4 - CHANNEL CONDITION

MILE 254.4 - CHANNEL CONDITION

MILE 220.5 - CHANNEL CONDITION

MILE 200.8 - L/D CLOSURE

MILE 179.2 - BRIDGE CONSTRUCTION

MILE 158.5 - SUNK BARGE/SALVAGE OPERATION

MILE 46.0 – MILE 38.0 - ROCK REMOVAL/SAFETY ZONE

MISSOURI RIVERMILE 67.61 - BRIDGE REPLACEMENT

MONONGAHELA RIVERMILE 1.5 - BRIDGE MAINTENANCE

MILE 1.1 - BRIDGE MAINTENANCE

Page 16: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 16 of 18

floating workplant. Mariners may contact M/V DONNA LEE via VHF-FM Channel 13 or 16, or the site supervisor at (412) 400-3679, for more information.

A partially sunken barge has been reported in the vicinity of Mile 2.3, laid up against the right descending channel pier, Brunot Island Railroad Bridge (LLNR 22794). Mariners are urged to exercise caution in the area.

A submerged obstruction was identified by sonar in the vicinity of Mile 3.8. The assumed depth of the obstruction is 28 feet at normal pool at Emsworth L/D 16.0 feet. Mariners are urged to exercise caution in the area.

A submerged obstruction was identified by sonar in the vicinity of Mile 12.5. The assumed depth of the obstruction is 30 feet at normal pool at Dashields L/D 12.0 feet. Mariners are urged to exercise caution in the area.

Continuing until further notice, salvage operations are being conducted between approximate Miles 95.0 and 110.0. The M/V STALLION will monitor VHF-FM Channel 13, for passing arrangements. Mariners are urged to exercise caution in the area.

A can entrance buoy in the vicinity of Mile 129.0, Hannibal L/D, has been reported off station. Mariners are urged to exercise caution in the area.

Ironton-Russell Bridge; The old navigation piers have been partially removed and are below the waterline. Lighted buoys are marking the position of the piers.

Matthew E. Walsh Bridge; Vertical clearance will be reduced 5 feet below low steel due to a containment system, following the contour of the bridge, until October 2018. Vertical clearance in the main navigation span will be reduced to 86 feet; the alternate navigation span will be reduced to 83.3 feet. For additional information mariners may contact the site supervisor by phone at (330) 503-1615 or (330) 503-6482.

The L/D 52 navigation pass in the vicinity of Mile 938.9, is restricted to 750 feet from the lock chamber. The M/V CHRISTINE ELAINE is on-scene and can be contacted via VHF-FM Channel 13.

Continuing until further notice, the Columbia L/D in the vicinity of Mile 117.0, the L/D will only be locking through commercial vessels, due to unscheduled maintenance. Mariners may contact the L/D via VHF-FM Channel 12 or 16, or by calling (318) 649-2049, for additional information and any updates.

A barge grounded on a submerged obstruction in the vicinity of Mile 57.5, inside the navigation channel. Salvage operations for the aground barge are pending. Mariners are urged to exercise caution in the area.

Continuing until further notice, the Dredge T-MUSKRAT is conducting dredging operations in the vicinity of Mile 155.5. Mariners are urged to exercise caution in the area.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

39-17

04-18

05-18

05-18

04-18

05-18

42-17

28-17

02-18

05-18

04-18

02-18

MILE 1.1 - BRIDGE MAINTENANCE

OHIO RIVERMILE 2.3 - AWASH BARGE

MILE 3.8 - SUBMERGED OBSTRUCTION

MILE 12.5 - SUBMERGED OBSTRUCTION

MILE 104.0 - SALVAGE OPERATION

MILE 129.0 - AID TO NAVIGATION

MILE 326.6 - BRIDGE REMOVAL

MILE 647.8 - BRIDGE MAINTENANCE

MILE 938.9 - L/D RESTRICTION

OUACHITA-BLACK WATERWAYMILE 117.0 - L/D RESTRICTION

MILE 57.5 - AGROUND BARGE/SUBMERGED OBSTRUCTION

RED RIVERMILE 155.5 - DREDGE OPERATION

MILE 1.0 - TEMPORARY L/D CLOSURES

Page 17: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 17 of 18

Continuing until further notice, the Old River L/D in the vicinity of Mile 1.0 will have temporary closures during daylight hours, of up to 12-hours, for repairs. Mariners are urged to exercise caution in the area.

Commencing approximately February 19, 2018 and continuing until approximately March 21, 2018, a Neon Aquatic Observatory will be constructedbetween approximate Miles 125.8 and 125.7, Lenoir Landing. The construction will involve drilling of observation wells and the establishment of shore based land equipment. The activity will involve the placement of 2 buoys in the area. Mariners may contact Mr. Lance Robinson at (702) 921-2697 or Mr. David Mitchell at (865) 272-0058, for additional information. Mariners are urged to exercise caution in the area.

Attached as an enclosure to this LNM is USACE Nashville District Notice to Navigation Interest LRN 17-65, concerning intermittent closures at the Chickamauga L/D, in the vicinity of Mile 471.0.

Continuing until approximately February 2, 2018, dive operations will be conducted at the Chickamauga L/D in the vicinity of Mile 471.0. Mariners can expect temporary delays in lockage. Crews will monitor VHF-FM Channel 13, for additional information.

Continuing until approximately February 2018, overhead cable work will be conducted in the vicinity of Mile 298.0, Browns Ferry-Trinity. Work will be conducted Monday through Friday, during daylight hours. Safety patrol boats will be on-site and will monitor VHF-FM Channel 13, 16 or 18, to assist passing traffic through the area. Mariners are urged to exercise caution in the area.

Continuing until May 19, 2018, mooring cell construction operations will be conducted at the up-stream mooring cell in the vicinity of Mile 209.0, above Pickwick L/D. Work will be conducted Monday through Friday, during daylight hours. The contractors floating plane will consist of the M/V LOW BID TOO, a crane barge, a deck barge and a hopper barge. The M/V LOW BID TOO will monitor VHF-FM Channel 13. During non-working hours, the contractors floating plant will be moored at the worksite. The down-stream mooring cell is not available for moorage during this construction.

Attached as an enclosure to this LNM is a USACE Nashville District Notice to Navigation Interest 17-66, regarding coffer dam construction at the Kentucky Lock in the vicinity of Mile 18.8. RDB.

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

05-18

05-18

50-17

05-18

49-17

02-18

51-17

SECTION VIII - LIGHT LIST CORRECTIONSAn Asterisk *, indicates the column in which a correction has been made to new information

ENCLOSURESUSACE Nashville District Notice to Navigation Interests LRN 18-01

USACE Huntington District Notice to Navigation Interests 18-02

Oak Ridge Rowing Association 2018 schedule.

Winter navigation on the Ohio River and tributaries.

02-18

03-18

LNM:

LNM:

(7)Remarks

(1)No.

(2)Name and Location

(3)Mile

(5)Characteristic

(4)Bank

(6)Structure / Dayboard Up Down

MILE 1.0 - TEMPORARY L/D CLOSURES

TENNESSEE-TOMBIGBEE WATERWAYMILE 125.8 - MILE 125.7 - CONSTRUCTION ACTIVITY

TENNESSEE RIVERMILE 471.0 - L/D INTERMITTENT CLOSURES

MILE 471.0 - L/D TEMPORARY DELAYS/DIVE OPERATIONS

MILE 298.0 - OVERHEAD CABLE OPERATION

MILE 209.0 - MOORING CELL CONSTRUCTION

MILE 18.8 - COFFERDAM CONSTRUCTION

12655 Priarie Island Channel Buoys (31)

Remove from list.

*

05/18

Page 18: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

31 January 201805/18LNM:

Coast Guard District 8-MRSPage 18 of 18

USACE Huntington District Notice to Navigation Interests 18-05

USACE Huntington District Notice to Navigation Interests 18-14

USACE Huntington District Notice to Navigation Interests 18-03

USACE Huntington District Notice to Navigation Interests 18-06

USACE Tulsa District Channel Status Report 17-15

Special Public Notice D8 DWB-879

USACE Navigation Notice 17-8200-1

Nashville District Notice to Navigation Interest LRN 17-65

Nashville District Notice to Navigation Interest 17-66

Mail delivery and crew change policies at navigation locks, for towboats.

Notification of sinking or sunken vessels, vessel groundings and barge breakaways.

Review of regulations and general safety practices.

Restricted areas at navigation structures.

Arkansas River Channel Status Report.

Winter drawbridge operation.

L/D restrictions and L/D winter lock closures.

Intermittent lock closures.

Coffer dam construction at the Kentucky Lock.

03-18

03-18

03-18

03-18

51-17

48-17

47-17

50-17

51-17

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

LNM:

Commander, Eighth Coast Guard DistrictHale Boggs Federal Building, Room 1230

500 Poydras Street, New Orleans, LA 70130-3310Telephone (504) 671-2327

(Business Hours 7:00 a.m. - 3:30 p.m. Monday - Friday)(Nights, Weekends, Holidays) (504) 589-6225

RADM Thomas

Page 19: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NOTICE TO NAVIGATION INTERESTS

HUNTINGTON DISTRICT DATE: 01/10/2018 NOTICE NUMBER: 8339

ATTN: CELRH-DE502 8TH STREETHUNTINGTON WV 25701-2070HTTP://WWW.LRH.USACE.ARMY.MIL/

POC: Kent C. BrowningChief, Waterways(304)399-5239

LOCAL NUMBER: 18-02WATERWAY: BIG SANDY RIVER

KANAWHA RIVERMUSKINGUM RIVER

OHIO RIVER

EFFECTIVE: 12/21/2017 11:28 thru 03/20/2018 23:59 EDT________________________________________________________________________________________________________________________

WINTER NAVIGATION ON THE OHIO RIVER AND TRIBUTARIES

In the interest of navigation safety on the waterways, users are reminded that navigation during winter months is a hazardous undertaking. Operators are requested to exercise extreme caution during this season and carefully evaluate the makeup and motive power for each tow.

ICE CONDITIONS

It is common for ice to build up beneath barges navigating the river, causing subsequent grounding in shoal areas. Should this occur, notify the nearest navigation structure as to your location and exercise caution when trying to remove barges so as not to disturb the navigation channel. When locking down bound there is the potential that build-up of ice under a barge could come in contact with the bottom of the lock chamber and puncture the bottom of the barge causing it to sink. Additionally, any build-up of ice between barges in a tow or on the sides of the barges will increase the overall width and possibly hamper the entrance or the exit of the locks. Any noticeable build-up, either in or under the tow, should be checked to assure that the lockage can be accomplished without incident. Whenever conditions warrant, vessel owners should consider adjusting their tow size to compensate for ice formation.

When ice builds up on the lock walls to the extent that full usage of the lock chamber is prohibited, width restrictions will be imposed on lockages. In addition, ice at times will prevent the full opening of the lock miter gates. Should this occur, locking will cease until the ice can be removed or the width of the tow is reduced. Navigators should contact the Lockmaster at each facility to verify locking conditions. This practice will continue as long as ice conditions warrant. Each company should access the Ohio River Region’s computerized navigation daily reports to keep abreast of the latest conditions. This information can be obtained via the internet from the Great Lakes and Ohio River Division’s Water Management website at: http://www.lrd-wc.usace.army.mil/OhioRiver/text/lourpti.rpt

Another occurrence during heavy icing conditions is the freezing of the floating mooring bitts in the recesses in the lock walls. In the event the floating bitts become inoperable, it will be necessary for the vessel to utilize the fixed line hook and manually move the mooring lines as the water in the chamber is raised or lowered. Additional lines should be readily available for the deck crew.

Page 20: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

In an effort to assist navigators and help alleviate the ice problems at navigation structures, the auxiliary lock chamber may be used for the passage of ice and may not be available for use by traffic at the following locks:

Location River Mile

Meldahl Locks 436.2 R

Greenup Locks 341.0 L

Robert C. Byrd Locks 279.2 L

Racine Locks 237.5 L

Belleville Locks 203.9 R

Willow Island Locks 161.7 R

All three locks on the Kanawha River - Winfield (mile 31.1R), Marmet (mile 67.7R) and London (mile 82.8R) have the capability for passage of ice. This is accomplished by using the Roller Flap Dam Gate, unlike the Ohio River where the emergency gates or bulkheads are used in the auxiliary chamber.

During heavy ice conditions, historic information in the Huntington District indicates that ice jams can most frequently be expected to form on the Ohio River at the following locations:

- Meldahl Dam to Augusta, Kentucky (mile 436.2 to approximate mile 429.0)

- Manchester Islands Area (mile 395.2 to mile 393.5)

- Brush Creek Island Area (mile 388.0 to mile 387.0)

- Scioto River to New Boston, Ohio Area (mile 356.6 to mile 352.0)

- Racine Dam to Head of Letart Island (mile 237.5 to mile 235.0)

- Ravenswood, West Virginia, Area (mile 223.0 to mile 220.0)

- Long Bottom, Ohio, and Area (mile 210.0 to mile 208.0)

Navigators are advised that ice conditions may become severe enough to warrant the closure of navigation on certain reaches of the river. Should conditions so develop, it is imperative that navigators take refuge in safe harbors. Safe refuge from ice may be found for vessels operating on the Ohio and Kanawha Rivers at the Government owned ice piers at the following locations in the Huntington District:

Page 21: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

Ohio River Mile City Piers Bank

251.7 Middleport, Ohio 3 Right

269.5 Gallipolis, Ohio 3 Right

408.5 Maysville, Kentucky 3 Left

Kanawha River Mile

1.3 Henderson, West Virginia 1* Left

*Two additional piers at this location are owned by Amherst Industries, Incorporated.

The locations of the ice piers are shown on the Huntington District Ohio and Kanawha River Navigation Charts. Several privately-owned piers are also located along the Ohio and Kanawha Rivers. In addition to the ice piers, safe harborage is afforded in the mouth of the Muskingum, Little Kanawha, Guyandotte, and Big Sandy Rivers. Some of these areas are designated as congested areas on the Navigation Charts and can only be used for harborage during icing conditions. Navigators using these streams for safe harborage are cautioned about low clearances of the bridges near the mouth of these streams. Tows using the ice piers and the mouths of the tributary streams should be moored in such a manner as to not obstruct the passage of other vessels.

HIGH FLOW CONDITIONS

Seasonal high water, normally encountered during the late winter and early spring months, increases the problem of maintaining a safe course. Vessel operators are reminded that specific regulations govern the operation of vessels on navigable waters at flood stage. When passing habitations or other structures partially or wholly submerged that are subject to damage from wave actions, vessels shall proceed slowly and keep as far away from such structures as circumstances allow. The Navigation Charts have the elevation of ordinary high water indicated on each sheet, except for the R. C. Byrd Pool. When water levels in the river is equal to or is greater than that elevation, navigators should operate near the published sailing line to prevent damage attributable to waves created by the vessel.

In the immediate vicinity of navigation structures, the potential exists for adverse out draft currents to develop across the upper lock approaches whenever there are high flows in the river. These currents, coupled with high winds, exert tremendous forces upon large flotillas, especially when empty barges are in the tow. All operators should carefully evaluate the makeup of each tow and its motive power. Power should be sufficient to counter the adverse conditions that can be expected during a voyage.

The Ohio River current, coupled with excessive headway when exiting a slack water area of any lock, especially R. C. Byrd upper approach, may be a contributing factor for the head barge of tows to “dive” as they exit the canal and enter the main channel. Navigators should carefully evaluate their tow configuration and give special attention to the draft and freeboard of their head barges. Extreme caution

Page 22: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

and good navigational judgment should be used at all times, particularly when there is more than forty feet of gate openings on the dam.

MOORING TOWS

Another facet of this season that is of major concern is the problem of breakaways. Barges left unattended, whether simply tied to natural objects or moored at terminals and fleeting areas, are subject to being dislodged by strong currents aided by wind, wave-wash from passing tows, ice flows and/or drift. Operators are urged to use extreme care in tying off tows or individual barges, to prevent such occurrences. Three or more lines are recommended, with both the upstream and downstream ends of the tow being made fast.

As required by the Department of the Army Permits for all permitted fleeting areas, barges must be securely attached such that rotation or a breakaway does not occur. All headline attachments to the bank shall be to permanent, authorized mooring devices. At least one safety line, equal or greater in strength than the headline shall be used in addition to all headlines. Breasting lines shall be used to prevent rotation of the barges. Stern lines shall be used at all unwatched facilities. Breakaways resulting from noncompliance will result in a suspension or termination of the facility’s permit.

If, under emergency conditions, it becomes necessary to tie off tows along the banks, extreme care should be exercised in selecting trees or other natural objects for mooring. Banks are usually softened by saturation during high water and during spring thaws and rains, and using trees near the water for tie off could be risky under such conditions. Should the emergency necessitate temporary mooring within ten miles of any navigation dam, especially upstream of one, the Lockmaster will be promptly advised.

If conditions warrant, the Huntington District Emergency Operations Center will be opened and maintained on a round-the-clock basis serving as an information/control center. Daily or as-required aerial flights over the river, supplemented by on-ground patrols, will be utilized to supplement the data obtained from our established field offices, to maintain current river condition data base for operational uses. Navigators wishing to make reports to the Huntington District should call (304) 399-5239 or relay the information through one of the Huntington District navigation projects.

//signed//

Dale A. SmithActing Chief, Technical Support Branch

Page 23: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NAVIGATION POLICY NOTICE

HUNTINGTON DISTRICT DATE: 01/10/2018 NOTICE NUMBER: 8342

ATTN: CELRH-DE502 8TH STREETHUNTINGTON WV 25701-2070HTTP://WWW.LRH.USACE.ARMY.MIL/

POC: Kent BrowningChief, Waterways(304)399-5239

LOCAL NUMBER: 18-05WATERWAY: KANAWHA RIVER

OHIO RIVER

EFFECTIVE: Until Superseded________________________________________________________________________________________________________________________

CREW CHANGE AND MAIL DELIVERY POLICIES AT NAVIGATION LOCKS

HUNTINGTON DISTRICT

The following policies are in effect for all navigation locks within the Huntington District. Crew changes will be allowed only when security levels warrant. The following procedures will be used for crew changes:

The towing companies must request permission from the Lockmaster or designee for crew changes at least two (2) hours prior to requested change. If given permission, the shift change will take place at high pool (when lock chamber is full). The crew change vehicle will remain outside the government facility gate until the motor vessel has arrived at the lock. All crew members must be in possession of a Transportation Worker Identification Credential (TWIC) card, with all other passengers having valid photo ID. A valid photo ID would be either a state-issued driver’s license or a state- or federally-issued identification card. Crew change vehicle will not be left on the government facility or unattended. Once the crew change vehicle leaves, all personnel will leave with the vehicle and not stay on the government facility.

No mail and/or packages will be accepted for any non-government personnel at any navigation lock. Also, stamped mail from boat crews will not be accepted by lock personnel for postal pickup. Personally delivered mail and/or packages will not be accepted by the lock personnel, nor shall items be stored at the locks for later pickup by towboat personnel. The only mail that will be accepted by the project will be stamped mail addressed to the towing company.

If a motor vessel needs parts or service for breakdown maintenance, they must request permission to deliver them to the project two (2) hours in advance. If the Regional Repair Fleet is working at a project, there will be no crew changes.

//signed//

Dale SmithActing Chief, Technical Support Branch

Page 24: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NAVIGATION POLICY NOTICE

HUNTINGTON DISTRICT DATE: 01/10/2018 NOTICE NUMBER: 8341

ATTN: CELRH-DE502 8TH STREETHUNTINGTON WV 25701-2070HTTP://WWW.LRH.USACE.ARMY.MIL/

POC: Kent BrowningChief, Waterways(304)399-5239

LOCAL NUMBER: 18-04WATERWAY: KANAWHA RIVER

OHIO RIVER

EFFECTIVE: Until Superseded________________________________________________________________________________________________________________________

NOTIFICATION OF SINKING OR SUNKEN VESSELS,

VESSEL GROUNDINGS, AND BARGE BREAKAWAYS

Timely notification of sinking or sunken vessels, groundings, and barges breakaway is a matter of great concern to the United States Army Corps of Engineers because of the potential danger that could result from unreported cases.

Pursuant to Section 7 of the River and Harbor Act of August 8, 1917, regulations have been prescribed to govern the use, administration, and navigation of the Ohio River, the Mississippi River above Cairo, Illinois, and their tributaries. Excerpts from these regulations (33 CFR 207.300) are as follows:

“Any accident resulting in uncontrolled barges shall immediately be reported

to the nearest lock. The report shall include information as to the number

of loose barges, their cargo, and the time and location where they broke loose.

The lockmaster or locks shall be kept informed of the progress being made in

bringing the barges under control so that they can initiate whatever actions may

be warranted.”

“Sunken or sinking barges shall be reported to the nearest lock both downstream

and upstream of the location in order that other traffic passing those points may

be advised of the hazards.”

“Any other activity on the waterways that could conceivably endanger

navigation or a navigation structure shall be reported to the nearest lock.”

The following is a listing of pertinent information for all Huntington District Lock and Dam Projects.

Page 25: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

Location River River Mile Telephone Number

Willow Island Ohio 161.7 R 740-374-8710

Belleville Ohio 203.9 R 740-378-6110

Racine Ohio 237.5 L 740-247-3130

Robert C. Byrd Ohio 279.2 L 304-576-2272

Greenup Ohio 341.0 L 606-473-7441

Meldahal Ohio 436.2 R 513-876-2921

Winfield Kanawha 31.1 R 304-586-2501

Marmet Kanawha 67.7 R 304-949-1175

London Kanawha 82.8 R 304-442-8422

Reporting incidents such as these to other Federal Agencies other than the U. S. Army Corps of Engineers does not fulfill your reporting obligation.

If you have any questions, please contact this office at (304) 399-5239.//signed//

Dale SmithActing Chief Technical Support Branch

Page 26: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NAVIGATION POLICY NOTICE

HUNTINGTON DISTRICT DATE: 01/10/2018 NOTICE NUMBER: 8340

ATTN: CELRH-DE502 8TH STREETHUNTINGTON WV 25701-2070HTTP://WWW.LRH.USACE.ARMY.MIL/

POC: Kent BrowningChief, Waterways(304)399-5239

LOCAL NUMBER: 18-03WATERWAY: KANAWHA RIVER

OHIO RIVER

EFFECTIVE: Until Superseded________________________________________________________________________________________________________________________

REVIEW OF REGULATIONS AND

GENERAL SAFETY PRACTICES

Notice is given that the Huntington District Corps of Engineers is requesting that all towing companies and other waterway users review their operating procedures to insure that their personnel are complying with all regulations and general safety practices.

Regulations prescribed by the Secretary of the Army to govern the use, administration, and navigation for the Ohio River, Mississippi River above Cairo, Illinois, and their tributaries are contained in the “Blue Book” (33 CFR 207.300). It is required that a copy of these regulations be kept at all times on board each vessel regularly engaged in navigating the rivers to which these regulations apply.

In the interest of safety to personnel and property, it is essential that the following procedures be reviewed by your operating vessel personnel in order that they may have a comprehensive understanding of the rules for vessels in the locking process, including the act of approaching or departing a lock:

a. All deck hands working outside areas not having bulwarks or handrails shall wear a USCG approved work vest which shall be fastened.

b. Smoking, open flames, chipping or other spark-producing activities are not permitted during the locking cycle on or inside barges, on outside areas of the towboat, or on the lock walls, except in designated areas.

c. Vessels with flammable or hazardous cargo barges, loaded or empty, are required to use spark-proof protective rubbing fenders (“possums”). All vessels shall utilize “possums” to help alleviate damages that are occurring to lock structures. Repairs necessitated by these damages require closure of the lock chambers and are expensive.

d. Vessels shall be moored with bow and stern lines leading in opposite directions to prevent the vessel from “running” the lock whenever possible. Floating mooring bitts cannot be used for “checking”, nor shall the pilot engage movement of propellers once the tow is secured to the floating mooring bitts, except for an

Page 27: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

emergency or when directed by the lockmaster.

e. Tow boat operators shall not use the walls of the lock to push off to gain thrust. This technique is also known as “heeling” and is not permitted.

The observance of safe locking procedures leads to a safer and more efficient locking process both for the navigation industry and for the U.S. Army Corps of Engineers.

Thank you for your help and participation.//signed//

Dale A. SmithActing Chief, Technical Support Branch

Page 28: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NAVIGATION POLICY NOTICE

HUNTINGTON DISTRICT DATE: 01/10/2018 NOTICE NUMBER: 8343

ATTN: CELRH-DE502 8TH STREETHUNTINGTON WV 25701-2070HTTP://WWW.LRH.USACE.ARMY.MIL/

POC: Kent BrowningChief, Waterways(304)399-5239

LOCAL NUMBER: 18-06WATERWAY: KANAWHA RIVER

OHIO RIVER

EFFECTIVE: Until Superseded________________________________________________________________________________________________________________________

RESTRICTED AREAS AT NAVIGATION STRUCTURES

IN THE HUNTINGTON DISTRICT

This Notice is applicable to the following Huntington District Corps of Engineers’ Ohio River Locks and Dams: Captain Anthony Meldahl, Greenup, R.C. Byrd, Racine, Belleville, and Willow Island, and the following Kanawha River Locks and Dams: Winfield, Marmet, and London.

A number of accidents have occurred in the past when vessels, particularly small recreation/fishing craft, violated existing regulations and entered the “Restricted Areas” either above or below the navigation dams. These “Restricted Areas” are exceedingly dangerous and have been permanently declared restricted to all vessels excepting those on official business. Vessel operators who enter these “Restricted Areas” risk their lives and property and may interfere with required operation of the locks and dam.

The Huntington District has adopted a practice whereby as soon as river flow conditions permit each spring, “special purpose” buoys are placed in the river to physically mark the boundaries of the “Restricted Areas.”These “special purpose” buoys have a white background with two reflective orange horizontal bands and a reflective orange cross enclosed within a diamond. The words “KEEP OUT” are lettered on each buoy. The buoys are placed above and below the dam to delineate the “Restricted Area” at each project. Signs are also in place adjacent to the buoy lines on the river wall of the lock and on / or near the opposite riverbank.

These signs and buoys are positioned to delineate areas where unpredictable currents flow upstream toward the dam on the surface. These currents create dangerously turbulent water and nearly always contain hidden undertows. Additional signs (Day Markers) are installed on the downstream side of the dam “DANGER, STAY OUT”. An additional hazard exists in the culvert valve discharge areas where water from the locks empties into the river. These areas are in the “Restricted Areas” and are marked by signs mounted on the riverside of the lock wall over the discharge areas reading “DANGER, TURBULENT WATER.” The force of water issuing from these underwater discharges is extremely violent and can capsize vessels, especially small recreation/fishing craft. The releases are intermittent and can cause sudden changes in the character of the water surface. A long warning siren is sounded prior to each such discharge to alert all persons of the release of water. This is a total different sound than the whistle to enter and leave the lock chamber.

Navigators must educate themselves to the boundaries of the “Restricted Areas” and stay clear at all times, even when buoys are off station. “Restricted Areas” are delineated on the current issue of the Navigation Charts.

Page 29: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

The Federal regulations which control restricted areas are contained in the current issue of the “Blue Book” and are repeated in part:

33 CFR 207.300 “ (s) Restricted Areas at Lock and Dam. All waters immediately

above and below each dam, as posted by the respective District Engineers, are hereby

designated as restricted areas. No vessel or other floating craft shall enter any such

restricted areas at any time. The limits of the restricted areas at each dam will be

determined by the responsible District Engineer and marked by signs and/or flashing

red lights in conspicuous and appropriate places.”

Lockmasters, their staff, and Corps Park Ranger(s) will enforce these Federal regulations. The U. S. Coast Guard, state agencies and local law enforcement officers may render assistance as appropriate. Violators may be subject to a citation requiring appearance in Federal and / or State Court and upon conviction are subject to fine and / or imprisonment – (or both).

//signed//

Dale SmithActing Chief, Technical Support Branch

Page 30: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

Lock & Dam - Flows Nav Mile

Notices to Navigational Interests (NTNI): https://ntninotices.usace.army.mil/

USCG Local Notice to Mariners: https://www.navcen.uscg.gov/?pageName=lnmDistrict&region=8&ext=g

Navigation Conditions: http://www.swt-wc.usace.army.mil/

Location Normal El. Deviation

Lock 14 W.D. Mayo 411 - 413 None

Lock 15 Robert S. Kerr 458 - 460

Lock 16 Webbers Falls 487 - 490

Groundings

Dredge

MKARNS - OK Channel Status Report No. 18-01 January 10, 2018

Lock 15 Robert S. Kerr

Lock 16 Webbers Falls

Lock 17 Chouteau

Lock 18 Newt-Graham

401.5

421.6

366.6

336.2

319.6

Lock 14 W.D. Mayo

Ark

ansa

s R

iver

Tulsa District

Lock 17 Chouteau

Lock 18 Newt-Graham

511 - 511.5

532 - 532.5

None

None

None

None

Updates

Port of Catoosa

Oakley's Port 33

Mid America Port

Port of Dunkin

Port of Muskogee

Port of Keota

Port of Fort Smith

Ports

7,900 cfs

7,700 cfs

8950 cfs

200 cfs

200 cfs

Navigation Notice TD 2017-4(Reference Navigation Notice TD 2016-15 Date 6 Oct 2016) The rebuilding of the Hwy 412 Bridge over the McClellan-Kerr Arkansas River Navigation System NM431.6 by the Oklahoma Department of Transportation is in progress. Barges and cranes will periodically be positioned along the banks and in or near the navigation channel. Mariners are advised to use caution when transiting this area during these activities. Waterway users are asked to check with Newt-Graham Lock and Dam 18 for the latest information concerning these events at 543-2216 ext 1. Questions or requests for additional information concerning this notice should be directed to Mr. Kenneth Todd; Navigation Operations Manager: 918-687-4501 ext 2 or Mr. Vic Heister; Navigation Field Engineer: 918-669-7244.

Hwy 412 Bridge Construction NM 431.6

Deviations:

None

Tainter Gate Maintenance through 28 Feb 2018

Navigation Notice TD 2018-2 Dated 8 January 2018 Mariners can expect delays at RS Kerr L&D No. 15 through 28 February 2018 as the Corps of Engineers Major Maintenance Unit (MMU) makes repairs to the Tainter Gates. Delays will primarily be weekdays from 0700-0900 and 1430-1530 as the MMU transits in/out of the spillway. Waterway users are asked to check with Lock No. 15 for the latest information. Questions or request for additional information concerning this notice should be directed to Mr. Robert Steiner; Navigation Operation Manager: 918-775-4475 ext 5833 or Mr. Vic Heister; Navigation Field Engineer: 918-669-7244.

Page 31: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

!P

!P

!P

!P

!P

!P

!P

!P

[ Webbers Falls L&D 16]Current Flows

Nav Chart

[ Newt Graham L&D 18 ]Current Flows

Nav Chart

[ Robers S. Kerr L&D 15 ]Current Flows

Nav Chart

[ W.D. Mayo L&D 14 ]Current Flows

Nav Chart

[ Chouteau L&D 17 ]Current Flows

Nav Chart

Port of Dunkin

Port of CatoosaMid America Port

Oakley's Port 33

Port of Keota

Port of Muskogee

Port of Van Buren

Port of Fort Smith

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, © OpenStreetMap contributors, and the GISUser Community

MAP CREATED BY: CESWT-ODT-N JOE SCHMALZ, C.E.TechUPDATED BY: CESWT-ODT-N DAWN BIRTH, C.E. Tech

Legend_̂ Groundings !P Ports ! USACE Site

Marine Fleet

XY Locks ! River Miles

MKARNS Navigation µ

0 10 20 30 40Miles

MKARNS - Tulsa District River Status Report

U.S. Army Corps of Engineers Southwestern Division

Deviations: None

All Locks are open

[Navigation Notice] Highway 412 Bridge NM431.6

[Navigation Notice]Lock 15 Delays for Tainter Gate

Maintenance through 28 February 2018

Page 32: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

28 November 2017

SPECIAL PUBLIC NOTICE NUMBER D8 DWB-879

UPPER MISSISSIPPI, ST. CROIX AND MISSOURI RIVERS

In accordance with 33 Code of Federal Regulations 117.671, from on or about December 15 through the last day of February at least 24 hours advance notice is required for opening all drawbridges between Lock and Dam No. 14, Mile 493.3 and Lock and Dam No. 2, Mile 815.2 UMR. The Stillwater Highway Drawbridge over the St. Croix River during the winter months from October 16 to May 14 require at least 24 hours advance notice for openings and all other bridges on the St. Croix River during winter months from November 1 to March 31 require at least 24 hours advance notice for openings, (33 CFR 117.667). In accordance with 33 CFR 117.687, drawbridges on the Missouri River require at least 24 hours advance notice during the winter operating season (December 01, 2017 to April 1, 2018) as published by the Army Corps of Engineers. A list of these bridges and the name and telephone number of the person to contact for opening each bridge is as follows: UPPER MISSISSIPPI RIVER: (12 hr Advance Notice) MILE BRIDGE NAME AND TELEPHONE NUMBER 841.4 Omaha Railroad Drawbridge Mark Watlington: 402-570-6947 839.2 Chicago & Northwestern See Omaha RR Drawbridge Railroad Drawbridge 835.7 Beltline Railroad Drawbridge See Omaha RR Drawbridge UPPER MISSISSIPPI RIVER: (24 hr Advance Notice) MILE BRIDGE NAME AND TELEPHONE NUMBER 813.7 Hastings Railroad Drawbridge Nate Lund: 651-238-8033 699.8 LaCrosse Railroad Drawbridge Pat Flannery: 612-799-2181 579.9 Illinois Central Railroad Drawbridge Chad Earle: 319-404-3417 535.0 Sabula Railroad Drawbridge Bob Hansel: 563-929-0178

518.0 Clinton Railroad Drawbridge Yardmaster (24 hrs): 563-244-3204 Brandon Sherman: 515-212-0294

CommanderEighth Coast Guard District

1222 Spruce Street St. Louis, MO 63103-2832 Staff Symbol: dwb Phone: (314) 269-2434 Fax: (314) 269-2737

Page 33: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

2

ST. CROIX RIVER: (24 hr Advance Notice) MILE BRIDGE NAME AND TELEPHONE NUMBER 23.4 Stillwater Highway Drawbridge MNDOT Dispatchers: 651-234-7110 17.3 Hudson Railroad Drawbridge Mark Watlington: 402-570-6947 0.3 Prescott Highway Drawbridge Mike Stevens: 563-580-6801 0.2 Burlington Northern Santa Fe Matt Holland: 319-371-1628 Drawbridge Yardmaster (24 hrs): 319-758-5603 MISSOURI RIVER: (24 hr Advance Notice) MILE BRIDGE NAME AND TELEPHONE NUMBER 448.2 Union Pacific Railroad Drawbridge Colin Fitzgerald: 402-616-4723 913-360-0109 422.5 Atchison Railroad Drawbridge See Union Pacific Railroad Drawbridge 366.1 Hannibal Railroad Drawbridge Destrey Gibson: 701-509-4005 365.6 A.S.B. Highway and Railroad Drawbridge See Hannibal Railroad Drawbridge 359.4 Harry S. Truman Railroad Drawbridge Primary: 816-459-9714 //s// ERIC A. WASHBURN Bridge Administrator, Western Rivers By direction of the District Commander

Page 34: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NAVIGATION NOTICE

ROCK ISLAND DISTRICT DATE: 11/21/2017 NOTICE NUMBER: 8200-1ATTN: CEMVR-DECLOCK TOWER BLDG. - RODMAN AVEROCK ISLAND IL 61299HTTP://WWW.MVR.USACE.ARMY.MIL/

POC: Robert V. Castro, P.E.Chief, Lock and Dam Section(309) 794-4580

LOCAL NUMBER: MR 17-8200-1WATERWAY: UPPER MISSISSIPPI

EFFECTIVE: 12/12/2017 00:00 thru 03/06/2018 00:00 CDT

________________________________________________________________________________________________________________________

WINTER LOCKAGE HOURSLock & Dam No. 11 UMR 583.0 THROUGH Lock & Dam No. 22 UMR 301.2

Locks 11, 12, 13, 15, and 17 will be staffed to lock traffic between 0800 and 1600, Monday through Friday during the period from 12 December 2017 through 6 March 2018.

Locks 14 and 16 will be closed to navigation from 12 Dec 2017 thru 6 March 2018. Refer to separate Navigation Notices for each site.

Lock 18 will be closed to navigation from 16 Dec 2017 thru 6 March 2018. Refer to separate Navigation Notice.

Locks 19, and 20 will be staffed to lock traffic between 0800 and 1600, Monday through Friday during the period from 17 December 2017 through 6 March 2018.

Locks and Dam 21 and 22 will be staffed to lock traffic 24/7 throughout the winter.

Tows requiring a lockage outside of these hours must contact the Lockmaster in advance so that lock operators can be called in to operate the lock. Winter conditions will dictate whether or not a lockage can be accomplished.

Operational Aspects

Rake to box ice couplings the entire width of the tow, at break points of the tow, will be required at all locks when ice is present at the lock.

Double tripping and use of industry helper boats during ice conditions will be required if proper couplings are not accomplished prior to arrival at the locks.

Failure to have the tow configured properly may result in loss of lock turn.

Tow configuration to ice couplings shall not be accomplished at the lock or lock approach.

//signed//

Robert V. Castro, P.E.Chief, Lock and Dam SectionMississippi River Project

b5odptjb
Highlight
Page 35: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

POC: NAVIGATION NOTICE NO.: 8328 Regatta Director Oak Ridge Rowing Association (508) 488-0868

LOCAL NOTICE NO.: LRN 18-01

DATE: 3 JAN 2018

ATTN: CELRN-DE 110 9TH AVENUE SOUTH NASHVILLE TN 37203-3863

OAK RIDGE ROWING ASSOCIATION 2018 SCHEDULE Clinch River Mile 49-52 (Tennessee River Basin)

The Oak Ridge Rowing Association anticipates the following schedule of events for the 2018 season. This is to notify interested parties of the safety concerns with operations of power water craft in the proximity of the low profile, slow moving craft used in preparation for and during rowing events. All operators of water borne vessels are asked to exercise extreme caution when transiting this area during these events. Dates subject to change. Date Event

February 3rd Set up course

February 19th – April 30th Spring Training

March 16th -18th Cardinal Invitational

March 23rd-24th Atomic City Turn & Burn

April 13th-15th SIRA Regatta

April 27th – 29th Dogwood Junior Regatta

May 11th - 13th Big 12 Championships

May 18th – 19th Dogwood Masters

October (TBD) Secret City Head Race FOR THE DISTRICT ENGINEER:

/////original signed/////

JOHN D. TRIBBLE, JR Chief, Navigation Section JKS Technical Support Branch

NOTICE TO NAVIGATION INTERESTS EFFECTIVE: 1 February – 31 October 2018

Page 36: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

POC: NAVIGATION NOTICE NO.: 8279 Lockmasters Office Chickamauga Lock and Dam (423) 875-6230

LOCAL NOTICE NO.: LRN 17-65

DATE: 12 Dec 2017

ATTN: CELRN-DE 110 9TH AVENUE SOUTH NASHVILLE TN 37203-3863

INTERMITTENT CLOSURES CHICKAMAUGA LOCK TENNESSEE RIVER MILE 471.0

The Nashville District U.S. Army Corps of Engineers and the Tennessee Valley Authority have schedule a series of intermittent closures at Chickamauga Lock, Tennessee River Mile 471.0, in order to replace the upstream miter gate anchorages. The majority of this work will be accomplished utilizing intermittent, daytime closures with crews working 10 ½ hour shifts, however there are two instances where a complete closure is necessary. The work is scheduled as follows: (All times are Eastern Time Zone) 6 February – 5 March 2018: Daytime intermittent closures daily 7:00 am to 5:30 pm (lockage will occur starting at 6:00 pm and continue through 6:30 am the following morning) 6 – 11 March 2018: Complete closure (no traffic 7:00 am on the 6th to 5:30 pm on the 11th.) 12 – 18 March 2018: Fully operational with no restrictions 19 – 25 March 2018: Complete closure (no traffic 7:00 am on the 19th to 5:30 on the 25th.) 26 March – 19 April, 2018: Daytime intermittent closures daily 7:00 am to 5:30 pm (lockage will occur starting at 6:00 pm and continue through 6:30 am the following morning) This work will be actively tracked and updates to this schedule will be distributed as needed. FOR THE DISTRICT ENGINEER: ////original signed//// John D Tribble, Jr. Chief, Navigation Section Technical Support Branch JKS

NOTICE TO NAVIGATION INTERESTS EFFECTIVE: 6 February – 19 April, 2018

Page 37: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

NAVIGATION NOTICE NO.: 8281 POC: LOCAL NOTICE NO.: LRN 17-66 Clay Burns (701) 609-0513

DATE: 12 December 2017

ATTN: CELRN-DE 110 9TH AVENUE SOUTH NASHVILLE TN 37203-3863

Kentucky Lock Addition Project Downstream Cofferdam Contract No. W912P5-16-C-0006

Casting Dock at TRM 18.8

Kentucky Lock Addition project’s Downstream Cofferdam construction contractor, Johnson Bros, is establishing a concrete casting operation at the existing Vulcan Materials dock on the right descending bank at Tennessee River Mile 18.8. A sketch of the maximum extent of anticipated floating plant away from the bank is enclosed. All concrete casting will occur on two casting barges and will be supported by two barge mounted cranes. The concrete and most materials will be supplied by truck. A barge mounted crane and the casting barges used to cast the monolith shells will likely arrive at this location the week of December 11, 2017. Johnson Bros use of this site is expected to last up to nine months. All barges fleeted at this location will have white steady burn lights. Should evening or night operations take place throughout this operation the use of light plants will be required. If light plants are utilized they shall be oriented in a fashion that will not obstruct the vision from crews on bypassing river traffic. For any questions in regards to this activity, please contact Clay Burns (General Superintendent) at (701) 609-0513. A secondary poc is Tommy Bowles (Assistant Superintendent) at (985) 788-9068. Facility can also be reached on marine radio channels 16 & 13. FOR THE DISTRICT ENGINEER: “Original Signed” JOHN D. TRIBBLE, JR. Chief, Navigation Section Technical Services Branch

NOTICE TO NAVIGATION INTERESTS EFFECTIVE: 12 December 2017

Page 38: District 8 MRS Week: 05/18 Mississippi River System · PDF file31 January 2018 LNM: 05/18 Coast Guard District 8-MRS Page 3 of 18 ARKANSAS RIVER - USACE CHANNEL STATUS REPORT UPPER

O.T.