dispatcher...•see kalmbach gmr to be published this year 1982 – 1988 3 ft x 6 ft n scale 2009...
TRANSCRIPT
![Page 1: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/1.jpg)
Burnt Hills and Big Flats Railroad Employee Training
DISPATCHER
Time Table and Train Order Dispatching Lessons
Steve Prevette
Burnt Hills & Big Flats RR
Photos by author
![Page 2: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/2.jpg)
Introduction
• This presentation is a set of lessons learned from implementing TT&TO over the past two years on my home layout
• I HAVE MADE COMPROMISES!
– You may or may not agree with them
• Oriented to Single Track TT&TO
• Example of TT&TO Dispatcher training
![Page 3: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/3.jpg)
Your Host Layout
• The Burnt Hills and Big Flats is a 20 x 30 ft N scale layout, 1970 NYO&W
• Have always “done operations”
• Dispatched with simplified track warrants – closer to “mother may I?”
– Fixed location radios
– 5 to 7 operators
• Moved from Washington state to South Carolina in 2009
• See Kalmbach GMR to be published this year
![Page 4: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/4.jpg)
1982 – 1988
3 ft x 6 ft N Scale
![Page 5: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/5.jpg)
2009 – Today
20 ft x 30 ft
![Page 6: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/6.jpg)
New Location, New Crew
![Page 7: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/7.jpg)
New Location, New Crew
• New crew size usually 8 to 12
– Larger crew size, need more jobs
• Oral orders were getting forgotten, unfamiliarity with layout
• Crew did not like using radios
• One layout in the existing group was planning on going TT&TO
![Page 8: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/8.jpg)
Initial Trial • Manual train order signals at 7
locations – Based upon David Barrow idea – Green/Green, Red/Green, Red/Red
signals – Manually placed in brass tube by
dispatcher
• All trains run as Extras
• Crews given Form 19’s and Clearance Forms by operators based upon orders given by Dispatcher
![Page 9: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/9.jpg)
Initial Lessons
• Manual signals worked
• Operating signals from Custom Signals installed
![Page 10: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/10.jpg)
Initial Lessons
• All trains as Extras created a LOT of Train Orders
– Created a Schedule with 12 Scheduled Trains
– Went to pre-printed Form G’s (run extra) to cover the remaining extra trains
– Added yard limits for two towns that had lots of interactions between local switching and through trains
![Page 11: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/11.jpg)
Compromises!
• All model railroading is a compromise
– We cut out boring, strenuous tasks
– We simplify procedures and paperwork
– You may or may not agree with my compromises, but here goes . . .
• THUMBTACK ON CAR
![Page 12: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/12.jpg)
Pre-Printed Orders
• The dispatcher starts with pre-printed Form G (Run Extra from A to B) Train Orders for all trains expected to be run
• Pre-printed Clearance Form A’s with some non-prototype info
– DCC two digit channel
– Point of Origination and Termination
– Call Time
![Page 13: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/13.jpg)
No Order Dictation
• My operators do not find repeating back orders and writing them to be “fun”
• Dispatcher hands written orders to the operators, who then post at train order signals
• Gives flexibility when there are not enough crew to man all operators
• Keeps communications lines open for OS reports (consider the compressed distances)
![Page 14: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/14.jpg)
No Register Books
• I should have at least three register stations
– Sidney (north end of division and adjacent to staging)
– Big Flats (adjacent to southern staging)
– Mayfield (division point)
• At the beginning of the session any pending trains are announced, and upon completion of any scheduled train
• This will probably be the next compromise to be “undone”
![Page 15: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/15.jpg)
What the Train Crews Get
• Small Clipboard
– Schematic on back, Schedule on Front
– Train Order(s)
– Clearance Form A
– Train Instructions
![Page 16: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/16.jpg)
Crew Clipboard
![Page 17: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/17.jpg)
What the Train Crews Get
![Page 18: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/18.jpg)
White Flag for Extras
Small square of white paper rubber cemented to engine
![Page 19: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/19.jpg)
“Employee Training”
• The following is the Dispatcher Training Power Point
• Also made Operator and Crew Training
• Want to avoid “Death By Power Point”
• You may find this example useful for your own purposes
• Intent is to quickly overview this part of the presentation
![Page 20: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/20.jpg)
Burnt Hills and Big Flats Railroad Employee Training
DISPATCHER
![Page 21: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/21.jpg)
Topics
• Scranton Division Overview
• Scheduled and Routine Extra Trains
• Limitations at Cadosia and Pleasant Mount
• Dispatcher Communications
• Standard Train Orders
• Yard Limits and Branches
• Trainsheet and Train Order Log
![Page 22: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/22.jpg)
Dispatcher Duties
1. Ensure safe movement of trains over the Main Track
2. Promote efficient flow of traffic to allow the railroad to make revenue
http://santaferailroad.blogspot.com/2010/11/archival-photos-dispatcher.html
![Page 23: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/23.jpg)
The Main Track • Northern Division
– Sidney to Norwich
• Scranton Division
– Mayfield to Sidney
– Big Flats to Scranton
– Capouse Jct to Big Flats
Burnt Hills and Big Flats R.R.
NORTHERN DIVISION
Norwich
GX Tower
Sidney Yard Delaware
Sidney & Hudson
S Unadilla
Burnt Hills Delhi
Branch
Cadosia
Starlight
Pleasant Mount
Northwest Jct (NB)
Northwest Carbondale
Branch
Mayfield
Yards
E-L Crossing E-L Crossing
Mason
Capouse Jct (CP)
Capouse Branch
Cayuga Jct (CJ) Scranton
Big Flats (CNJ)
Hampden Yard
Sibley Jct
Coxton Taylor Yard (E-L)
Yard (LV)
SCRANTON DIVISION
S
S
S
Y
Y
S
S
S
S
S
Y
Y
N
O
R
T
H
Y
Y
Y
Y
Y
![Page 24: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/24.jpg)
NOT Main Track • Within Sidney Yard Limits
• Delhi Branch
• Northwest Branch
• Within Mayfield Yard Limits
• Within Hampden Yard Limits
• Any passing siding or secondary tracks
Burnt Hills and Big Flats R.R.
NORTHERN DIVISION
Norwich
GX Tower
Sidney Yard Delaware
Sidney & Hudson
S Unadilla
Burnt Hills Delhi
Branch
Cadosia
Starlight
Pleasant Mount
Northwest Jct (NB)
Northwest Carbondale
Branch
Mayfield
Yards
E-L Crossing E-L Crossing
Mason
Capouse Jct (CP)
Capouse Branch
Cayuga Jct (CJ) Scranton
Big Flats (CNJ)
Hampden Yard
Sibley Jct
Coxton Taylor Yard (E-L)
Yard (LV)
SCRANTON DIVISION
S
S
S
Y
Y
S
S
S
S
S
Y
Y
N
O
R
T
H
Y
Y
Y
Y
Y
![Page 25: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/25.jpg)
Northern Division
• On the prototype, Sidney NY was a division point, though the division’s primary yard was in Norwich, 25 miles to the north
• On the model, Sidney yard limits butt against Norwich Staging
• Scranton dispatcher (for model purposes) will authorize movements into and out of Norwich staging
![Page 26: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/26.jpg)
Train Schedule
• The schedule authorizes movement of trains
• No train orders are required to run schedule
• Safe movement is handled by the train crews
– Superiority is by Class and/or Direction
• The dispatcher may alter the schedule by issuing train orders if needed for efficiency
– Train has fallen behind schedule
– Lower class train has a priority movement
![Page 27: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/27.jpg)
BH&BF Passenger Trains
14, 15, 16, 17
• Passenger fan trips Taylor Yard (E-L) to Burnt Hills and return
• 15 minute station stops at Starlight and Pleasant Mount
• Note – there is no siding at Pleasant Mount, train will block main while stopped
![Page 28: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/28.jpg)
BH&BF First Class Freight Trains
• 84 & 87 (D&H/LV run through)
– Between Coxton Yard (LV) & Sidney (D&H)
– Reverse direction in Sidney
– Yard service in Mayfield
– Provides Washington DC to Portland ME service
• 81 & 88 (LV run through)
– Between Coxton Yard (LV) & Syracuse
– Yard service in Mayfield
![Page 29: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/29.jpg)
BH&BF First Class Trains
81, 88
84, 87
14, 15, 16, 17
![Page 30: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/30.jpg)
BH&BF Second Class Trains
• 92 & 95
– Between Mayfield and Syracuse
– Yard service at Norwich
• 93 & 94
– Between Mayfield and Utica
– Yard service at Norwich
92, 95
93, 94
![Page 31: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/31.jpg)
BH&BF Train Schedule Southern Division
Timetable No. 11 Milepost
SM-95 UM-93 SL-81 NE-87 15 17 14 16 NE-84 LS-88 MU-94 MS-92
Cars DAILY DAILY DAILY DAILY DAILY DAILY STATIONS DAILY DAILY DAILY DAILY DAILY DAILY
15 8:05 AM 8:10 PM 1:55 AM A 5:05 -- -- DN -R Sidney YL 94.7 -- -- A 5:20 5:20 8:25 9:35
AM PM AM AM PM PM South Unadilla 91.7 PM -- PM AM AM PM
16 8:10 8:15 2:00 5:15 D 1:00 D 4:30 DN Burnt Hills 73.5 A 12:15 A 3:50 5:15 5:15 8:20 9:33 P, Y
9 8:12 8:17 2:02 5:25 1:02 4:32 DN Cadosia 54.0 12:13PM 3:48 5:13 5:10 8:18 9:30
16 8:15 8:20 2:05 5:30 D 1:25 D 4:45 D Starlight 48.0 D 12:10 D 3:45 5:10 5:00 8:15 9:25 P
D 1:40 D 5:00 Pleasant Mount 33.7 D 11:55 D 3:30 P
AM PM AM AM PM PM DN Northwest Jct 20.3 AM PM PM AM AM PM
16 8:20 8:25 2:10 5:40 1:45 5:05 Carbondale 16.9 11:30 3:15 5:05 4:55 8:05 9:20
16 A 8:25 A 8:30 D 2:50 D 6:20 1:50 5:15 DN-R Mayfield YL 14.5 11:25 3:10 D 5:00 D 4:50 8:00 9:15 TF
AM PM AM AM PM PM Mason 5.7 AM PM PM AM AM PM
-- -- 2:55 6:25 1:55 5:20 DN Capouse Jct 5.3 11:20 3:05 4:20 4:10 -- --
12 -- -- -- -- -- -- Scranton 0.0 -- -- -- -- -- --
Capouse Branch
Timetable No. 11 Milepost
SL-81 NE-87 15 17 14 16 NE-84 LS-88
Cars DAILY DAILY DAILY DAILY STATIONS DAILY DAILY DAILY DAILY
3:05 6:25 2:05 5:20 DN Capouse Jct 19.6 11:20 3:05 4:20 4:10
AM AM PM PM DN-R Cayuga Jct 11.3 AM PM PM AM
12 -- -- 2:15 PM 5:25 PM Big Flats YL 11.2 11:15 AM 3:00 PM -- --
A 3:15 A 6:30 -- -- Sibley Jct 7.8 -- -- 4:15 PM 4:00 AM
FIRST CLASSFIRST CLASSSECOND CLASS
SECOND CLASS FIRST CLASSSiding
Length
Burnt Hills and Big Flats
NORTHWARD
SOUTHWARD NORTHWARD
Siding
Length
SOUTHWARD
SECOND CLASS
FIRST CLASS SECOND CLASS
![Page 32: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/32.jpg)
Schedule Notes • Covers Scranton to
Sidney, and the Capouse Branch
• Right (north) side read up from bottom
• “A” before time is arrival, “D” is departure
Southern Division
Timetable No. 11 Milepost
SM-95 UM-93 SL-81 NE-87 15 17 14 16 NE-84 LS-88 MU-94 MS-92
Cars DAILY DAILY DAILY DAILY DAILY DAILY STATIONS DAILY DAILY DAILY DAILY DAILY DAILY
15 8:05 AM 8:10 PM 1:55 AM A 5:05 -- -- DN -R Sidney YL 94.7 -- -- A 5:20 5:20 8:25 9:35
AM PM AM AM PM PM South Unadilla 91.7 PM -- PM AM AM PM
16 8:10 8:15 2:00 5:15 D 1:00 D 4:30 DN Burnt Hills 73.5 A 12:15 A 3:50 5:15 5:15 8:20 9:33 P, Y
9 8:12 8:17 2:02 5:25 1:02 4:32 DN Cadosia 54.0 12:13PM 3:48 5:13 5:10 8:18 9:30
16 8:15 8:20 2:05 5:30 D 1:25 D 4:45 D Starlight 48.0 D 12:10 D 3:45 5:10 5:00 8:15 9:25 P
D 1:40 D 5:00 Pleasant Mount 33.7 D 11:55 D 3:30 P
AM PM AM AM PM PM DN Northwest Jct 20.3 AM PM PM AM AM PM
16 8:20 8:25 2:10 5:40 1:45 5:05 Carbondale 16.9 11:30 3:15 5:05 4:55 8:05 9:20
16 A 8:25 A 8:30 D 2:50 D 6:20 1:50 5:15 DN-R Mayfield YL 14.5 11:25 3:10 D 5:00 D 4:50 8:00 9:15 TF
AM PM AM AM PM PM Mason 5.7 AM PM PM AM AM PM
-- -- 2:55 6:25 1:55 5:20 DN Capouse Jct 5.3 11:20 3:05 4:20 4:10 -- --
12 -- -- -- -- -- -- Scranton 0.0 -- -- -- -- -- --
Capouse Branch
Timetable No. 11 Milepost
SL-81 NE-87 15 17 14 16 NE-84 LS-88
Cars DAILY DAILY DAILY DAILY STATIONS DAILY DAILY DAILY DAILY
3:05 6:25 2:05 5:20 DN Capouse Jct 19.6 11:20 3:05 4:20 4:10
AM AM PM PM DN-R Cayuga Jct 11.3 AM PM PM AM
12 -- -- 2:15 PM 5:25 PM Big Flats YL 11.2 11:15 AM 3:00 PM -- --
A 3:15 A 6:30 -- -- Sibley Jct 7.8 -- -- 4:15 PM 4:00 AM
FIRST CLASSFIRST CLASSSECOND CLASS
SECOND CLASS FIRST CLASSSiding
Length
Burnt Hills and Big Flats
NORTHWARD
SOUTHWARD NORTHWARD
Siding
Length
SOUTHWARD
SECOND CLASS
FIRST CLASS SECOND CLASS
• Left column shows car length of sidings • Middle column left: Operator (D = day, N = night);
R = Register station • Middle column right: YL = Yard Limit • Right column: P = Passenger Station, Y = wye, TF =
Turning Facility
![Page 33: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/33.jpg)
Extra Trains – Coal and Transfers • Coal Trains – two each direction
• Norwich/Mayfield Transfers – two each direction with block setout and pickup at Sidney
• D&H/Mayfield Transfers – three each direction
• LV/Mayfield Transfers – four each direction
• E-L/Mayfield Transfers – four each direction
![Page 34: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/34.jpg)
BH&BF Coal Trains
c
Oswego Coal
Utica Coal
c
Both Coal Trains have yard service in Norwich
![Page 35: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/35.jpg)
BH&BF Transfers (Extra Trains)
Norwich Transfer
D&H Transfer
E-L Transfer
LV Transfer
![Page 36: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/36.jpg)
Extra Trains - Locals • Big Flats Mine Run – shuttles between
Mayfield, Scranton, and Big Flats as needed
• Northwest Mine Run – two round trips Mayfield to Northwest Branch and return
• Burnt Hills Local – two round trips Mayfield to Sidney and return, service to Starlight, Cadosia, Burnt Hills and S. Unadilla
• Sidney Local – Norwich to Mayfield and return. Switches Sidney industries.
• Delhi Branch – Norwich to Delhi and return
![Page 37: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/37.jpg)
Locals Delhi Branch
Burnt Hills Local
Big Flats / Scranton Local
Sidney Local
NW Branch
![Page 38: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/38.jpg)
Dispatcher Information
Call Time Train Name Engine North
Engine South
Origination Destination NOTES
3:00 PM
16/17 DH 16 DH 16 EL Taylor 3 EL Taylor 3 EL to Burnt Hills and return. Station stops at Pleasant Mount & Starlight.
Passenger.
3:00 D&H South
DH 2310
D&H 3 Mayfield Changes direction in Sidney.
3:30 BF Mine Run
14 19 Mayfield Mayfield Works Mason / Big Flats and Scranton as needed
3:45 Sidney South
35 Norwich 4 Mayfield Works Sidney Industries & Yard
• Dispatcher receives a table with notes on the expected sequence of trains to be run
![Page 39: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/39.jpg)
Station Notes
• Cadosia – siding only holds 9 cars. Generally not a good option for meets
• Pleasant Mount has no siding, but trains 14, 15, 16, 17 do stop there, blocking the main
![Page 40: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/40.jpg)
Cadosia
• The Cadosia siding is only 9 cars long
• The Burnt Hills Local can have as many as 12 cars, clearing for a meet or pass while switching in Cadosia may pose difficulties
![Page 41: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/41.jpg)
Dispatcher Communications
• FORMAL – Train orders to the train crews via operators, authorizing movement of trains
• INFORMAL:
– Clearance Form A’s
– O.S. reports from operators
– Information to and from operators
– Information to and from yardmasters
![Page 42: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/42.jpg)
Form G Train Order
• This train order authorizes Extra trains
• Example for northward coal train follows:
• Order addressed to the conductor and engineer (C&E) of the engine at Mayfield since the extra does not yet exist
• The expected Form G’s have been pre-printed
Engine 27 Run Extra Mayfield to Norwich
![Page 43: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/43.jpg)
Trains in Opposing Directions
• The Dispatcher does not need to provide protection for scheduled trains against extras
• The Dispatcher MUST provide protection for opposing extras:
– Hold the Form G until opposing train terminates
– A “Meet Order”
– A “Right Over Order”
![Page 44: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/44.jpg)
Extra 27 North Scenario 1
• The dispatcher is ready to give the Form G to the engine 27, but notes that No. 17 is running southward from Burnt Hills. Are any additional orders needed?
No!
• Extra 27 North must study the schedule and determine their meeting location with No. 17
![Page 45: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/45.jpg)
Extra 27 North Scenario 2
• The dispatcher is ready to give the Form G to the engine 27, but notes that Extra 20 South is authorized to run southward from Sidney. Are any additional orders needed?
Yes!
• Form S-A example (addressed to both trains):
Extra 20 South take siding and meet
Extra 27 North at Starlight
![Page 46: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/46.jpg)
Extra 27 North Scenario 2
• Modified Form G example:
After Extra 20 South has arrived at Mayfield, Eng 27 run extra Mayfield to
Norwich
• Form S-C example to do same thing:
Extra 20 South has right over
Extra 27 North Sidney to Mayfield
![Page 47: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/47.jpg)
Meet Orders
• To date, no more than two meet or right over orders have been needed per session
• The locals are sequenced to stay out of each other’s way
• The scheduled trains don’t need meet orders
• Yard Limits at Sidney and Big Flats also reduce need for orders
• Must plan ahead and provide orders at least one station prior to meeting location
![Page 48: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/48.jpg)
Extras in the Same Direction
• The Dispatcher has NO safety responsibilities for trains going the same direction
• If a train is stopped, it sends out a flagman to protect the rear of the train
• The stopped train does not have to allow a following extra train to pass it
• The Dispatcher MAY order a train to allow another to pass it for efficiency purposes using a Form B
![Page 49: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/49.jpg)
Extra 27 North Scenario 3
• The dispatcher is ready to give the Form G to the engine 27, but notes that Extra 32 North is switching in Burnt Hills. Are any additional orders needed?
No, these two extras are running in the same direction. Extra 32 North should
have a flagman at the south end of Burnt Hills
![Page 50: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/50.jpg)
Extra 27 North Scenario 3
• If the dispatcher wants to ensure the coal extra is not delayed by the local switching in Burnt Hills, the Dispatcher may either:
Unofficially advise the Burnt Hills operator to tell the local to clear up
• Or issue a Form B order:
Extra 27 North pass Extra 32 North at Burnt Hills
![Page 51: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/51.jpg)
Yard Limits – Big Flats
• There are Yard Limits at Big Flats
• When the Big Flats Mine Run is switching in Big Flats, then Extras and Scheduled Trains meet or pass the local under Rule 93, no train orders needed.
• Trains run at Restricted Speed within yard
• See http://www.pcrnmra.org/conv2012/handouts/allAboutYardLimits.pdf
![Page 52: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/52.jpg)
Yard Limits – Mayfield
• The Mayfield Yards are controlled by the Yardmaster
• There are call-on signals operated by the Yardmaster at yard entrances
• Dispatcher does not control movements within the yards
• All extra trains (northward and southward) terminate at Mayfield, there are no run through extras
![Page 53: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/53.jpg)
Yard Limits – Sidney
• Yard Limits at Sidney allow multiple trains to operate within the area without dispatcher attention
• The Burnt Hills Local ends its run switching in Sidney. Once it arrives at Sidney, and prior to receiving the run extra order for Sidney to Mayfield, their switching does not have to be protected by the dispatcher
![Page 54: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/54.jpg)
Branches
• There are no train order stations at Scranton, Delhi, or on the Northwest Branch
• Form G orders to Scranton must include “and return to Capouse Junction”
• Form G orders to Northwest Branch must include “and return to Northwest Junction”
• From G orders to Delhi should include “and return to Burnt Hills”
• The pre-printed Form G’s cover these requirements
![Page 55: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/55.jpg)
Branches
• Often the Northwest Mine Run will be ready to depart Mayfield, and there is a southward extra on the main north of Carbondale
• If the dispatcher wants the NW Mine Run to run Mayfield to Carbondale prior to arrival of the southward extra in Mayfield, send a “right over” Form S-C order:
Extra 34 North has right over Extra 27 South Mayfield to Carbondale
![Page 56: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/56.jpg)
Branches
• If extra 34 North enters the Northwest Branch prior to arrival of the southward extra (the dispatcher will know this from the OS report), the southward extra should be notified using a Form V:
Extra 34 North has passed Carbondale
• The same situation could arise with Scranton and Delhi, but has not happened yet
![Page 57: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/57.jpg)
Changing Orders
• An order may be modified ONCE using a Form P order:
Extra 27 North take siding and meet Extra 7 South at Starlight instead of Burnt Hills
• An order may be cancelled (annulled) using a Form L order:
Order No 2 is annulled
![Page 58: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/58.jpg)
Basic Order Overview
A BH&BF operating session may be successfully completed with just these types of orders:
• Eng 27 Run Extra Mayfield to Norwich
• Extra 32 North take siding and meet Extra 35 South at Burnt Hills
• Extra 32 North has right over Extra 35 South Mayfield to Burnt Hills
• Order No 11 is Annulled
![Page 59: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/59.jpg)
Basic Order Forms
A. Meet: No. _____ take siding and meet No. _____ at ___________
B. Pass: No. _____ pass No. ______ at ________
C. Right Over No. ___ has right over No. ___ _____ to _____ (locations) E. Time: No. _____ run ____ mins late _____ to _____ (locations)
No. _____ wait at _______ until ________ (time)
No. _____ wait at _______ for No. _______
G. Extra: Eng. _____ run extra ____________ to ___________
L. Annul Order No. _____ is annulled P. Supersede ________________ instead of ______________
(A train order should only be superseded once. After that, annul it)
V. Register No. _____ has passed _______ (location)
![Page 60: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/60.jpg)
What if a Scheduled Train is Delayed?
• All scheduled trains have run on schedule to date
• If the dispatcher does want to advance an opposing train over the scheduled train, the dispatcher may use a Meet or Right Over order
• Also, the dispatcher may use a form S-E:
No 87 run 45 minutes late Sidney to Mayfield
![Page 61: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/61.jpg)
Keeping Track of Trains and Orders
• Currently, we use a spreadsheet to track train orders, versus a hard bound book
• A spreadsheet map is used to track the clearances and progress of trains, based upon OS reports
• Prototypical paper forms are available for those who prefer the paper forms
• Purpose is to keep track of train locations, meet points, and potential conflicts
![Page 62: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/62.jpg)
Train Order Log Copy of log from six fast hours (two sessions):
“Completed” is time order issued to Operator
Number C&E At Directions Completed No longer active
27 Eng 34 Mayfield
Run Extra Mayfield to Northwest Branch
and return to Northwest Jct 12:17 PM X
28 Eng DH4023 NW Jct Run Extra Carbondale to Mayfield 2:45PM X
29 Eng DH2310 Sidney Run Extra Sidney to Mayfield 2:55 PM X
30 Eng 19 Mayfield Run Extra Mayfield to Big Flats 3:00 PM X
31 Eng 35 Norwich Run Extra Norwich to Mayfield 3:50 PM X
32 Eng 14 Big Flats Run Extra Big Flats to Mayfield 4:25 PM X
33
X35South /
X34North
Burnt Hills /
Mayfield
Extra 34 North has right over Extra 35
South Mayfield to Carbondale 4:40PM X
34 Eng 34 Mayfield
Run Extra Mayfield to Northwest Branch
and return to Northwest Jct 4:50 PM X
35 Eng 19 Mayfield
Run Extra Mayfield to Scranton and return
to Capouse Jct 4:55 PM X
36 Eng 14 Capouse Jct Run Extra Capouse Jct to Mayfield 6:00 PM X
![Page 63: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/63.jpg)
Spreadsheet Map
• Extra 32 North is in Burnt Hills, with authorization to run to Sidney
![Page 64: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/64.jpg)
Spreadsheet Map
• Green arrows advance a train along the map
• Red X clears the train from the track section
• Advance each train from origination to the limit of its movement authorization
• Clear the track sections behind the train as OS reports are received
• Track sections within Yard Limits are pink
![Page 65: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/65.jpg)
Train Sheet Burnt Hills and Big Flats Railroad
DISPATCHER'S RECORD OF MOVEMENT OF TRAINS
SOUTHWARD Scranton Division
TRAINENGINE
ENGINE
ENGINEER
CONDUCTOR
Arr. Lv. Arr. Lv. Arr. Lv. Mile Post Station Office Designation Arr. Lv. Arr. Lv.
94.7 SIDNEY (D&H Crossing) SI
3.0 MILES
91.7 SOUTH UNADILLA18.2 MILES
73.5 BURNT HILLS WN
19.5 MILES
54.0 CADOSIA HD
6.0 MILES
48.0 STARLIGHT SR
14.3 MILES
• Above is a section of the trainsheet used to record progress of trains at stations.
![Page 66: DISPATCHER...•See Kalmbach GMR to be published this year 1982 – 1988 3 ft x 6 ft N Scale 2009 – Today 20 ft x 30 ft New Location, New Crew New Location, New Crew •New crew](https://reader033.vdocuments.mx/reader033/viewer/2022041707/5e45e65c08b5db39bf74d02b/html5/thumbnails/66.jpg)
Goal
• BH&BF Management hopes some employees will be interested in the Dispatcher job
• This will increase flexibility and give some job rotation
• Dispatching can be the most prototypically correct jobs available