Javier Arrisueo R.

Mine Planning 2009

Specialist Mining Engineer MODULAR, Mine Services

19 y 20 Noviembre 2009

NOTICE: LEGAL NOTICE: The contents of these materials are protected by federal and international intellectual property laws. No portion of these materials may be reprinted, republished, modified, reproduced, sold or distributed in any form without the express written consent of Modular Mining Systems, Inc. These materials may contain third party copyright and/or trademark materials, the use of which may not always have been specifically authorized by the intellectual property owner. All copyrights and/or trademarks contained in these materials are the sole and exclusive property of their respective owners. These materials, including third party information, are provided for information purposes only. Actual specifications may vary from those documented in these materials. Consult your local Modular Mining office for further details.

Copyright 2007 Modular Mining Systems, Inc. All rights reserved.

NOTICIA LEGAL :Los contenidos de estos materiales estn protegidos por las leyes de derecho intelectual internacionales y federales. Ninguna parte de estos materiales puede ser reimpresa, re-publicada, modificada, reproducida, vendida o distribuida de ninguna forma sin el consentimiento expreso por escrito de Modular Mining Systems, Inc. Estos materiales pueden contener derechos reservados y marcas registradas de terceras partes, cuyo uso tal vez no haya sido especficamente autorizado por el propietario de la propiedad intelectual. Todos los derechos reservados y/o marcas registradas contenidas en estos materiales son propiedad nica y exclusiva de sus respectivos dueos. Estos materiales, incluyendo la informacin de terceras partes, se proveen para propsitos de informacin solamente. Las especificaciones reales pueden variar de aquellas documentadas en estos materiales. Consulte a su oficina Modular Mining local para mayores detalles.Derechos reservados 2007 Modular Mining Systems, Inc. Todos los derechos reservados.

Qu es el Simulador de DISPATCH?El Simulador de DISPATCH es una aplicacin/mdulo que emula una operacin minera en tiempo real

t1MINA1

t2MINA2

Tiempo

Simula la operacin de carguo y transporte (Pala - Camin) por un periodo de tiempo determinado usando el turno como unidad bsica Utiliza la misma filosofa de DISPATCH Bases de datos (Mina, Turno, Sumaria, GPS, Minecare) Algoritmos de optimizacin (MR, PL, PD) Utilidades de reportabilidad Interactividad con el usuario Etc

Beneficios de la SimulacinAdelantarse a los acontecimientos antes de que stos sucedan Cunto incremento en la produccin se puede generar al agregar una nueva pala a la operacin de la mina?, Es este incremento de produccin suficiente para justificar el costo de adquisicin de la nueva pala? Podrn los actuales camiones dar abasto al nuevo nmero de palas?

Bases de Datos del SimuladorDISPATCH almacena toda la informacin (Data) recopilada en tres bases de datos.

Algoritmos que utiliza el SimuladorLa Base de Datos de Mina es un sistema dinmico que se va actualizando de manera continua, DISPATCH para hacer asignaciones ptimas, trabaja como una herramienta que resuelve problemas en tiempo real utilizando tres modelos computacionales (algoritmos matemticos)

Mejor Ruta (MR) Programacin Lineal (PL) Programacin Dinmica (PD)

Fase 1 Fase 2

MetodologaConstruccin del Modelo Virtual

Calibracin del Modelo Base

Modelo Optimizado

Anlisis de Resultados

Mdulo de Simulacin de DISPATCHTeclado Maestro de DISPATCH

Mdulo de Simulacin de DISPATCHMen del Mdulo de Simulacin

AplicacionesAplicable a la planificacin de corto, mediano y largo plazo. Verificar estrategias de explotacin Adelantarse a los hechos antes de que ocurran Tomar decisiones a tiempo Evaluacin de escenarios potenciales (what-if)

Clculo de flota optima de equipos Validacin de capacidades y rendimientos Mejor combinacin Match Factor Estimacin de productividades y rendimientos esperados Estimacin de ndices operacionales Anlisis de adquisicin de equipos

Scenario / Capability PlanningProduo (Mt/ano) Minrio Estril Total Turnos Nmero Durao (h) Intervalo por Turno (h) Dias por Semana Horas Programadas por Ano Caminhes Carga Nominal (tons) Disponibilidade (%) Utilizao (%) Eficincia Operacional (%) Tempo de Ciclo Total (min) Produo Horria (t/h) Produo Anual por Caminho (Mt/ano) Nmero de Unidades Minrio Estril Total Capacidade do Tanque de Combustvel (l) Consumo de Combustvel (l/h) Escavadeiras Volume da Caamba(m3) Disponibilidade (%) Utilizao (%) Eficincia Operacional (%) Produo Horria (t/h) Produo Anual por Escavadeira (Mt/ano) Nmero de Unidades Minrio Estril Total Capacidade do Tanque de Combustvel (l) Consumo de Combustvel (l/h) Locais de Descarga Pilha de Estril Materiais Permitidos Meta de Alimentao (t/h) Capacidade (t/h) Britador Materiais Permitidos Meta de Alimentao (t/h) Capacidade (t/h) 12.0 15.0 27.0 3 8 1 7 8760 40 90 90 90 15 160 1.14

Modelo 8_3rb_tk22 Destinao Dinmica com 2 Caminhes a Menos Usando Otimizao IntelliMine

Modelo 8_1 Destinao Fixa por Escavadeira

24 600 22 3.6 90 85 90 1066 7.1

INDICADOR DE DESEMPENHO

Producao Media (Tons) Produtividade Media Caminhoes (TPH) TKPH

19027

19093 150.5 376760

% Diferena 0% 10% 11%

dos137.2 338474

4 720 60

Estril 1800 Sem Limite Minrio Ver obs. 1 Ver obs. 2

Obs. 1 - Estabelecida pela capacidade produtiva das escavadeiras 2 - A capacidade do britador primrio foi assumida como compatvel com a expanso da capacidade produtiva da mina

Nuevo Modelo

Simulacin

Resultados

Modelamiento por simulacin IntelliMine de los futuros escenarios de

capacidad utilizando la simulacin de IntelliMine Flota, diseo minero, asignaciones de transporte, escenarios de produccin, etc

Modelamiento de Plan Minero Modelar futuros escenarios y casos de explotacin Escenarios "Qu pasa si?" para tomar mejores decisiones Modelamiento por Simulacin IntelliMine

Modelar futuros planes para maximizar la productividad Niveles ptimos de utilizacin para los sistemas, flota, y trabajadores Minimizar el sub y sobre dimensionamiento de los requerimientos de flota Decisiones de Inversin de Capital Decisiones de movimiento de materiales y desarrollo operacional

Modelamiento de Capacidad Entender produccin en tiempo real y parmetros de negocio Disponibilidad, Utilizacin, y Rendimiento Dependencias y restricciones

Definicin de la capacidad y modelo de capacidad Potencial propio local Real nivel alcanzable

Desarrollo de un marco de funcionamiento de diseo Proceso de mejora continua impulsado por las mejores prcticas locales Optimizacin en todas las reas de negocio

Mdulo de Simulacin de DISPATCH

Mdulo de Simulacin de DISPATCH

Mdulo de Simulacin de DISPATCH

Mdulo de Simulacin de DISPATCH

Mdulo de Simulacin de DISPATCHSpot time Dig Rates

Dumping time

Mdulo de Simulacin de DISPATCH