disciplined execution early ppt version

21
Boom Daniel 610.704.1232 [email protected] www.businessbattlefield.com

Upload: boomdaniel

Post on 23-Jun-2015

2.473 views

Category:

Business


0 download

DESCRIPTION

Training Session Opening presentation for Account Managers....Mission Commanders and the importance of their Leadership and Execution in their work.

TRANSCRIPT

Page 1: Disciplined Execution Early Ppt Version

Boom Daniel 610.704.1232boom@businessbattlefield.comwww.businessbattlefield.com

Page 2: Disciplined Execution Early Ppt Version

Organize

DISCIPLINEDEXECUTION

Pla

nDo

Deb

rief

Lear

n

Page 3: Disciplined Execution Early Ppt Version

Operation: STUMP REMOVAL

Page 4: Disciplined Execution Early Ppt Version

Situation In a continuation of domestic hostilities, the People’s Republic of North America

(PRONA) has taken control of 29 Palms, California near Palm Springs It is critical to our Homeland Defense effort to retake key geography lost to PRONA. This is a coordinated operation to retake the town Strategic center of gravity is Camp Wilson (29 Palms outskirts) Airfield for airdrops,

resupply, personnel Integrated air defense system negates use of airfield

Mission INTENT: deliver food, supplies, personnel and equipment to support the next phase of

this operation PHASE 1 AIR ELEMENT: Deny IADS for 2 day period 4 and 5 Jan 2009 to support

airfield operations Minimize collateral damage/injuries

Execution Coordinate with supporting agencies for planning and execution of mission as stated

Admin and Logistics 2d Marine Air Wing aircraft and UAV’s will be flying from MCAS Miramar, USAF

Tankers and AWACS will be flying from Tinker AFB Secure Skype available for mission conferencing Meeting space and planning resources available on request at MCAS Miramar

Command and Signal Operation Stump Removal is a joint operation being planned, HQ’d and directed

through the CG, 2d Marine Expeditionary Force forward (MCB Camp Pendleton CA)

Page 5: Disciplined Execution Early Ppt Version

Organize and Plan

Page 6: Disciplined Execution Early Ppt Version
Page 7: Disciplined Execution Early Ppt Version
Page 8: Disciplined Execution Early Ppt Version

UNMANNED RADAR SYSTEM GENERATORS

Page 9: Disciplined Execution Early Ppt Version
Page 10: Disciplined Execution Early Ppt Version

Target Study: What do I need to know?

From EAST looking WEST at 500’ AGL

From WEST looking EAST at 500’ AGL

From SOUTH looking NORTH at 500’ AGL

Page 11: Disciplined Execution Early Ppt Version

OPERATION: STUMP REMOVALDesired Effect to be madePhysical make-up of targetTarget area defensesFriendly assets availableEnvironmental considerationsCollateral damage considerations

Own-ship limitations/capabilitiesOwn-weapon limitations/”Own-sensor limitations/”Own-crew and team limitations/”

OPERATION: ROCHE BIZ•____________________

•____________________

•____________________

•____________________

•____________________

•____________________

Page 12: Disciplined Execution Early Ppt Version

STUMP:DeconflictionSafe Ingress/EgressCommunicationSafe/accurate deliveryTarget identificationBDAFuel/stores mgtSAM/SA ThreatsThreat reaction

ROCHE:_______

_______

_______

_______

Page 13: Disciplined Execution Early Ppt Version
Page 14: Disciplined Execution Early Ppt Version

sometimes obstacles are helpful

ROCHE accounts terrain study:

Page 15: Disciplined Execution Early Ppt Version

•Friendly Assets

•Personnel

•Stores load

•Aircraft systems/sensors

•Fuel matrix

•Admin (includes debrief time, participants and location) conduct

•Comm: ADMIN/TACTICAL

•Rendezvous planning

•Timing: Takeoff, Refuel, Jammer on, Push, IP, TOT, Refuel, UAV, RTB

•Ingress and egress tactics/rte

•Delivery details, Ps

•Battle Damage Assessment

•Threat reaction

•WHAT IF? •Down Aircraft, damaged, ejection, SAR, timeline slide, flight lead down

Page 16: Disciplined Execution Early Ppt Version

Operation: STUMP REMOVALExecution Challenges:•Timing•Communication•Equipment/systems•Performance•Threat performance•Other?

Assets:•Communication•Alignment•SOP•Training•Other?

ROCHE BIZ:Challenges:•___________•___________•___________•___________•___________

Assets:•___________•___________•___________•___________

Page 17: Disciplined Execution Early Ppt Version

Opportunity or Threat?

Page 18: Disciplined Execution Early Ppt Version
Page 19: Disciplined Execution Early Ppt Version

Implications?

STUMP REMOVAL?

ROCHE BIZ?

SITUATIONAL AWARENESS: ‘SA’

Page 20: Disciplined Execution Early Ppt Version

STUMP REMOVAL:

•Break down the mission•What went well and not:

•Stop Doing•Do More•Do Better•Start Doing

•Share and Train

ROCHE BIZ:

Application?

More

Better Stop

Start

Page 21: Disciplined Execution Early Ppt Version

MISSION of each workshop

DEBRIEF each workshop as it relates to key take-aways…how will you be better on Monday morning?

[email protected]