ARA Heavy Haul Conference
Proactive maintenance without
affecting train movements
Dirk van Doesburg
Perth 23 June 2015
Step 1: Define & Select
KPIs on strategy and process:
• TCO of asset
• $ maintenance / Mtpa
• Safety objectives
Input: fault register
KPIs on track availability / reliability:
• Reduce disturbances by at least 50%
• Eliminate 80% of the speed restrictions
Input: company strategy
Step 2: Measure & Monitor
Specific actions and intervals
• Track geometry recording
• Switch & plain line inspection
• Condition monitoring
Turnout condition
monitoring
Switch Inspection
Measurement
vehicle
Step 3: Manage data & Interface
Irissys application for track geometry
Issues at civil structures
Track geometry
information
Step 4: Analyse & Interpret
Converting data into information • Root cause analysis
• Trend analysis
• Data output interpretation
“Heavy moving turnout”
Trend dashboard
Application of nut locking devices on bolts
to prevent nut loosening
Step 6: Maintain & Feedback
Step 6: Maintain & Feedback
Input for the “AM cycle”
Maintain • High level and accurate maintenance
• Use of innovative products & services
SMART feedback
on action and quality
Feedback
Step 6: Maintain & Feedback
Application of remotely controlled track
circuit short device
Safety and efficiency