FRA Admin and Ops Review Pier Oddone, Fermilab August 3 rd , 2009

Upload: dewei

Post on 25-Feb-2016

31 views

Category:

Documents


1 download

DESCRIPTION

Pier Oddone, Fermilab August 3 rd , 2009. Director’s Report FRA Admin and Ops Review . Outline. Science program: progress since last year Strategy and briefings to new administration Operations: IT restructuring ES&H and Take Five Campaign Cyber-security audit and Tune It Up Campaign - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Director’s Report  FRA Admin and Ops Review

Director’s Report FRA Admin and Ops Review

Pier Oddone, FermilabAugust 3rd, 2009

Page 2: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20092

Outline

• Science program: progress since last year

• Strategy and briefings to new administration

• Operations:

IT restructuring ES&H and Take Five Campaign Cyber-security audit and Tune It Up Campaign Implementation of IQA Implementation of EVMS Engineering Manual Focus groups conclusions

• Budgets: FY09, FY10 and ARRA

Page 3: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20093

Progress: Tevatron

Page 4: Director’s Report  FRA Admin and Ops Review

Progress: Tevatron

• Continued vital collaborations with many results

• Achieved 1.8 fb-1, same as last year but in only 8.5 months

• Have made the case to run in FY11, provided additional funding of $27M compared to previous plan

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20094

Page 5: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20095 5

Progress: Higgs at the TevatronSensitivity Projection (Region favored by Mtop, MW, … meas.s)

Higgs Mass (GeV/C2)

Page 6: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20096 6

Progress: double Tevatron data

Luminosity Performance and Projection

We are here

Real data for FY02-FY08

9.3 fb-1

7.8 fb-1

Inte

grat

ed lu

min

osity

(fb-1

)

---------

FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11

~12 fb-1

Data Analysis (~3 fb-1)~100 Publications / Year

~60 Ph.D.s / Year

4-5 fb-1 Results

Summer Conferences

Page 7: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20097

Progress: LHC

Page 8: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20098

Progress: LHC

• All magnets in the damaged sector are back in the tunnel

• New circuits and wiring for the quench protection system: quenches will be detected much earlier

• Two review committees: analysis and recommendations Quench Protection System (half Fermilab members) Overall Risk

• Many more “bad splices”, especially in copper-to-copper splices in interconnecting busbars (suggested by QPS review committee)

Page 9: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 20099

Progress: LHC

• Additional sector (4-5) warming up: “to verify measurements at 80 K” – they check out

• Two more leaks in two cold sectors found and understood. Partial warming to fix them means ready for injection in mid- November at best

• Important for detectors to get some collision data at any energy

• Fermilab’s contributions recognized by Bertolucci at the Users Meeting, Rolf Heuer at the European Physical Society meeting

Page 10: Director’s Report  FRA Admin and Ops Review

10CMSPier Oddone, FRA Admin and Ops Review, August 3rd, 2009

Page 11: Director’s Report  FRA Admin and Ops Review

Progress: neutrinos

• Successful runs for both MINOS and MiniBooNE

• First results on electron appearance for MINOS

• No low energy excess in antineutrino running of MiniBooNE

• MINERVA first detectors taking data

• ArgoNeut first pictures

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200911

Page 12: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200912

Progress: neutrinos

Minos Far Detector

Page 13: Director’s Report  FRA Admin and Ops Review

Progress: MiniBooNE

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200913

Approaching 1021 POT

Page 14: Director’s Report  FRA Admin and Ops Review

Progress: MINOS

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200914

Page 15: Director’s Report  FRA Admin and Ops Review

Progress: MINOS e-appearance

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200915

With 3*1020 POT

Page 16: Director’s Report  FRA Admin and Ops Review

Progress: what is q13?

• Above: recent global fit to world data by Fogli et al. (arXiv:0905.3549)

• q13 = 0 disfavored by ~2 s• Central value sin2q13 = 0.02 or sin22q13=0.08

16 Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009

Page 17: Director’s Report  FRA Admin and Ops Review

Progress: NOvA groundbreaking

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200917

Page 18: Director’s Report  FRA Admin and Ops Review

Progress: NOvA groundbreaking

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200918

Page 19: Director’s Report  FRA Admin and Ops Review

Progress: NOvA groundbreaking

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200919

Page 20: Director’s Report  FRA Admin and Ops Review

The NOvA Collaborationat Argonne National Lab, 25 April 2009

180 Scientists and Engineers from 26 InstitutionsArgonne National Laboratory - University of Athens - California Institute of Technology - University of California, Los Angeles - Fermi National Accelerator

Laboratory - Harvard University - Indiana University - Lebedev Physical Institute - Michigan State University - University of Minnesota, Duluth - University of Minnesota, Minneapolis - The Institute for Nuclear Research, Moscow - Technische Universität München, Munich - State University of New York, Stony Brook - Northwestern University - University of South Carolina, Columbia - Southern Methodist University - Stanford University - University of Tennessee - Texas A&M University - University of Texas, Austin - University of Texas, Dallas - Tufts University - University of Virginia, Charlottesville - The College of William and Mary -

Wichita State University

20 Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009

Page 21: Director’s Report  FRA Admin and Ops Review

• NOvA is optimized for the detection of νμ→νe and νμ→νe

oscillations

• NOvA is: An upgrade of the NuMI beam

intensity from 400 kW to 700 kW

A 14 kt “totally active” tracking liquid scintillator calorimeter sited 14 mrad off the NuMI beam axis at a distance of 810 km

A 215 ton near detector identical to the far detector sited 14 mrad off the NuMI beam axis at a distance of 1 km

2.5 GeV νe + p →1.9 GeV e- + 1.1 GeV p + 0.2 GeV π+

20 cm

20 c

m

MIPs

MIPs

NOvA

21 Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009

Page 22: Director’s Report  FRA Admin and Ops Review

MINERvA prototype takes data

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200922

Page 23: Director’s Report  FRA Admin and Ops Review

First ArgoNeut LAr TPC events

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200923

Page 24: Director’s Report  FRA Admin and Ops Review

Progress: all other fronts

• Particle astrophysics going well, both projects and new ideas. DES is on track

• Key strategy to develop beamline to Homestake and high intensity source at Fermilab recognized in DOE

• Will the funding be available over the next decade?

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200924

Page 25: Director’s Report  FRA Admin and Ops Review

Briefings to the new administration

• Two hour briefing to Undersecretary Koonin and Office of Science Director Brinkman on general laboratory planning in April

• One and half hour briefing to Director Brinkman last week specifically on the development of the neutrino program globally and at Fermilab

• We have made needs clear: now administration has to decide what roadmap

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200925

Page 26: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200926

Ten-year plan at the three frontiersPrograms / Projects FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18

Energy FrontierTevatron CDF TBD

DZero TBDLHC CMS

ATLASLHC Upgrade Phase I R&D ConstructionLHC Upgrade Phase II R&D Construction

Lepton Collider R&D Construction ?

Intensity FrontierMiniBooNE TBD

MINOS TBDMINERvA CD-3b Shutdown for NOvA

MicroBooNE Conceptual Design Design/Construction Shutdown for NOvANOvA CD-2 CD-3a/bmu2e CD-0 CD-1 CD-2 CD-3a

Long-Basedline n CD-0 CD-1 CD-2 CD-3a CD-4Project X CD-0 CD-1 CD-2 CD-3a

Cosmic FrontierDark Matter CDMS (4 kg) CDMS (15 kg) CDMS (~1 ton) ?

COUPP (2 kg) COUPP (60 kg) COUPP (~500 kg) ? LAr (~1 ton)?Dark Energy SDSS

CD-3b DESJDEM Science Operation Center

UHE Cosmic Rays Pierre Auger (South) Pierre Auger (North) Engineering Design/Construction TBD

Science and Technology Development FacilitiesDetector Testbeam

Accelerator A0 Test FacilitySCRF Test Facility

Computation Lattice QCD

Page 27: Director’s Report  FRA Admin and Ops Review

Facilities and experiments

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200927

TevatronLHC

LHCLHC upgrades

MinosMiniBooNE

NOvAMicroBooNE

MINERvA

LHCILC or

Muon Collider

Now 2015

LHCILC??

LBNEMu2e

Project X+LBNEMu2e

n Factory

2012 2018

P AugerDM Searches

P AugerDM: scalable?

DESJDEM

DM searchesJDEM

Ene

rgy

Inte

nsity

Cos

mic

Page 28: Director’s Report  FRA Admin and Ops Review

Additional facilities and experiments

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200928

G-2Anti-hydrogenMiniBooNE II

Now 2015

NuSOnGP-pbarTev FT

2012 2018

Holog. Noise21 cm

Axions

P Auger North P Auger North

Ene

rgy

Inte

nsity

Cos

mic

Page 29: Director’s Report  FRA Admin and Ops Review

Budgetary needs over the decade

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200929

-

100

200

300

400

500

600

700

800

900

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19

Project X

LBNE

mu2e

Line Item Construction (SLI)

ILC, LHC, CMS, NOvA, etc.

New Initiatives

Core Technologies R&D

Core Research

Facility Operations

FY09 With Inflation

US costs will decrease with International Contributions.

National Needs

National NeedsNational Needs

InflationThen

Yea

r $M

Page 30: Director’s Report  FRA Admin and Ops Review

Operational issues

Many issues are taking a lot of attention:

IT restructuring ES&H and Take Five Campaign Cyber-security audit and Tune It Up Campaign Implementation of IQA Implementation of EVMS Engineering Manual Focus groups conclusions

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200930

Page 31: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200931

Organization chart and changes

Computing S&T

Associate Director

MIS

Page 32: Director’s Report  FRA Admin and Ops Review

Operations: ES&H

• Concern over increase in injuries

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200932

00.0500000000000001

0.10.150.2

0.2500000000000010.3000000000000010.3500000000000010.4000000000000010.4500000000000010.5000000000000010.5500000000000010.6000000000000010.6500000000000020.700000000000002

Running 365-Day DART Rate (Goal = <0.25)

+1s+1s

Page 33: Director’s Report  FRA Admin and Ops Review

Operations: ES&H

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200933

6/18/0

7

7/16/0

7

8/13/0

7

9/10/0

7

10/8/

07

11/5/

07

12/3/

07

12/31

/07

1/28/0

8

2/25/0

8

3/24/0

8

4/21/0

8

5/19/0

8

6/16/0

8

7/14/0

8

8/11/0

89/8

/08

10/6/

08

11/3/

08

12/1/

08

12/29

/08

1/26/0

9

2/23/0

9

3/23/0

9

4/20/0

9

5/18/0

9

6/15/0

90

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

Running 365-Day TRC Rate (Goal = <0.65)

+1s

Page 34: Director’s Report  FRA Admin and Ops Review

ES&H: “Take Five – Goal Zero”

• Started new laboratory wide campaign modeled on other institutions

• Take five minutes to plan how to do the work - take five seconds to think of what you are going to do and take five things to reflect on when the job is done

• Web page and tools to help do jobs safely

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200934

Page 35: Director’s Report  FRA Admin and Ops Review

ES&H: “Take Five – Goal Zero”

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200935

Page 36: Director’s Report  FRA Admin and Ops Review

Operations: cyber-security

• DOE audit revealed several lapses:

Open offices with computers on System administrators ignoring system warnings Sloppy PII procedures in some practices

• Overall grade: marginal

• Response: major effort to get better

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200936

Page 37: Director’s Report  FRA Admin and Ops Review

Cyber-security

• Tune IT Up! Campaign

Limit number of system administrators

Train remaining administrators

Implement more software controls

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200937

Page 38: Director’s Report  FRA Admin and Ops Review

Operations: IQA

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200938

Page 39: Director’s Report  FRA Admin and Ops Review

Operations: IQA

• Accepted IQA plan

• “As is” assessment completed

• Corrective Action Plan submitted

• Trying to fix main problems prior to Fall audit

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200939

Page 40: Director’s Report  FRA Admin and Ops Review

EVMS certification

• Certification review led to three corrective actions:

Tracking “uncosted” scientific effort through hours

Procedure for “management reserve”

Charging direct cost of exempt personnel (instead of fraction of FTEs)

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200940

Page 41: Director’s Report  FRA Admin and Ops Review

Engineering manual

• Following triplet failure and “root cause analysis”, established committee to write an engineering process manual.

• Final draft is nearly complete. It has been a very useful exercise and we have a product that will set the process and standards across the lab

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200941

Page 42: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200942

Response to APS study

• Follow-up to findings of APS site visit in May 2008

• 23 focus groups, November through January

• 187 total participants

• Participants enthusiastic, open and constructive in their contributions

Page 43: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200943

Response to APS study

• Approach:

12 categories of employees and users

Random selection from whole population

Random selection from women and minorities

Neutral facilitator, all groups confidential

Detailed summaries of each group w/o attribution

All results posted on Web

• Important conclusions to improve various systems

Page 44: Director’s Report  FRA Admin and Ops Review

Focus groups

• No systemic diversity issues

• But lots of management issues No defined Fermilab culture Two tier system: physicist and non-physicists Unskilled managers Lack of employee support Lack of understanding of performance review and

salary management Policies and procedures not explained/understood Inconsistent application of family-friendly policies

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200944

Page 45: Director’s Report  FRA Admin and Ops Review

Focus groups

• Held an “all-hands” meeting in June to discuss the various issues raised by the report

• All the information posted on the web. Supervisors encouraged to discuss both findings and summaries with their groups

• We will discuss broadly ideas to improve on the various issues raised and implement changes over the next year

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200945

Page 46: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200946

FY09 budget

Page 47: Director’s Report  FRA Admin and Ops Review

FY09 budget

• We had to live through March with very restrictive budgets due to the continuing resolution: $60M difference between FY08 enacted budget and President’s budget

• Then huge ramp up in activity due to regular budget (only $10M below the President’s request) and ARRA funding.

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200947

Page 48: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200948

FY09 budget: ops & projects

FERMILAB OHEP FUNDING

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09

$ M

LHC Upgrade

DECam

MINERvA

NOvA

SRF Infrastructure

BTeV

CDF / D-Zero Run Ib Upgrades

CMS Construction

LHC Construction

CDF / D-Zero Run II Upgrades

NuMI / MINOS

WH Safety Improvements

Core Programs

Page 49: Director’s Report  FRA Admin and Ops Review

FY10 budget

• On the surface it appears like a good budget at $398 M, about $20M higher than FY09

• However, NOvA ramps up by about $30M and therefore the rest of the program is under stress

• The stress is ameliorated by managing carryover funds: $10M would be used in FY10 for a total budget of $408M

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200949

Page 50: Director’s Report  FRA Admin and Ops Review

FY11 budget

• We don’t know about the FY11 budget

• However, the distress exercises we do for OHEP indicates that budget guidance from OMB at this point is extremely tight – probably flat-flat for Office of Science

• Initial plans do not include running the Tevatron. OHEP is making the case for an additional $27M to run the Tevatron to Office of Science

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200950

Page 51: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200951

ARRA status

• President signed $787B Bill 2/17 DOE share is $38.71B SC share is $1.6B

• Secretary Chou announced $1.2B of SC projects 3/12

Page 52: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200952

ARRA status - FNAL

• Total Amount for Fermilab - $152.5M• Projects

NOvA - $55M At FNAL - $15M At UMinn - $40M

General Plant Projects - $25M SRF - $52.7M LBNE - $15M High Field Magnet- $4M SRF Materials R&D – $0.8M

Page 53: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200953

ARRA status - FNAL

• Total Public Announced Amount - $31.9M $31.9M – 3/23

• Received as of 6/11 NOvA - $49.5M

FNAL - $9.4M on 5/15 UMinn - $40.1M

General Plant Projects - $22.5M on 5/15

• Supposedly the rest of the funding has been released by the CFO and is working its way through the DOE system

Page 54: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200954

ARRA issues

• Hold Back 10-20% now supposedly solved• Reporting Requirements

Fund must not be co-mingled Little Guidance Beyond “Transparency” Jobs Created and Retained

• Contract Requirements New Access to Records requirements for subs

implemented through new Contract clauses• Job Creation and Retention

Very few if only prime contractor counted. Exact definition needed. DOE-SC weekly reports require subs data

Page 55: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200955

Fermilab ARRA implementation

• Formed ARRA task force 1/28• CFO formed reporting team• Legal Prepared Special Clauses• DOE modified contract with special ARRA

Clauses – multiple times• Legal briefed ARRA task force on Fraud,

Waste, & Abuse concerns and issues• Weekly DOE-SC, FSO and Lab telecon

briefing

Page 56: Director’s Report  FRA Admin and Ops Review

Further operational issues

• Restore NOvA project good to status by re-scheduling accelerator task. A severe optics problem, not a fundamental problem. Obtain EVMS certification

• Careful human resources planning: the system is too tight to get everything done that is on our plate

• IT overall architecture for the lab and many areas of improvement

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200956

Page 57: Director’s Report  FRA Admin and Ops Review

Further operational issues

• Restructuring below AD for Computing Science and Technology and AD for Research. Better alignment with strategic plan

• Improved financial planning and tracking. Held workshop with program managers to define structure. Should lead to better transparency and efficiency

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200957

Page 58: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200958

Page 59: Director’s Report  FRA Admin and Ops Review

FRA VISITING COMMITTEEADMIN AND OPS SUPPORT

3-5 AUGUST 2009

STATE OF LAB OPS/ADMIN SUPPORTBruce Chrisman

Page 60: Director’s Report  FRA Admin and Ops Review

60

Significant Lab Events

• ES&H Trend Reversal• Diversity Council Active• Diversity Focus Groups• New Associate Director Appointed

Split in two Greg Bock Vicky White

• Created CIO position• Moved MIS to CD• New ES&H Head Appointed

Chrisman

Page 61: Director’s Report  FRA Admin and Ops Review

Significant Lab Events – Cont.

• TeV running in FY10, maybe FY11• Mission Readiness• Draft “Admin” strategic plan• Mid-Year DOE-FSO PEMP review

Overall Doing well Noted the Safety Issues Minor procurement paperwork concern

• ARRA

Chrisman61

Page 62: Director’s Report  FRA Admin and Ops Review

Committee’s 08 Crosscutting Recommendations• Practice routine benchmarking to validate the

effectiveness of Fermilab systems• Little Progress

• Develop a formal space management program with well-defined roles and responsibilities to handle facilities in anticipation of mission readiness program• Little Progress

• Begin strategic planning using various scenarios for Tevatron shutdown & DUSEL/Project X/NOvA/new efforts• Fully Engaged with DOE-OHEP

Chrisman62

Page 63: Director’s Report  FRA Admin and Ops Review

Crosscutting Recommendations - Cont.• Negotiate phased CD0 delivery dates with DOE

• Complete• Develop formal succession planning program lab-wide

• Working with ANL on this – An FY10 PEMP item• Increase ANL collaboration and move to the next level

of cooperation and cost savings • See above• Joint Training – cost savings• Section Presentations on other actions

Chrisman63

Page 64: Director’s Report  FRA Admin and Ops Review

Crosscutting Recommendations - Cont.• Establish a Workforce Restoration Review Task Force

to restore positions needed lab-wide• Considered, but not implemented beyond OHAP.

Chrisman64

Page 65: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200965

Page 66: Director’s Report  FRA Admin and Ops Review

FRA Visiting Committee for Administration and Operations

Martha MichelsFermilab ES&H Section August 3, 2009

FRA Visiting Committee for Administration and Operations

Martha MichelsFermilab ES&H Section August 3, 2009

Page 67: Director’s Report  FRA Admin and Ops Review

67

2008 Visiting Committee Findings

2009 FRA Visiting Committee - Finance

• Findings and Current Status

Fill the ES&H Section Head Position as soon as possible. It is important to find someone who is respected by Laboratory Management and the DOE Office of Science ES&H Community.Dr. Nancy Grossman was chosen to fill this position starting December 1, 2008. Her experience is:• ES&H Section Radiation Physicist and the Section QA

Coordinator.• Many years in project management (MINOS, MINERvA,

SNuMI, NOvA), focusing on ES&H, Document Control, QA, and Risk Management.

• Served on several Lehman Review Committees.• Well respected by Laboratory Management, DOE ES&H

Community and the Users at the Laboratory.

2009 FRA Visiting Committee - ESH

Page 68: Director’s Report  FRA Admin and Ops Review

100% of ES&H PM goals were met in 2008. This includes the TRC and DART rate goals which have always proven difficult to meet in the past.

It was predicted that sustaining this level of performance (for injury rates) would not be easy and this is certainly true at present.

On other PMs in environmental and radiation protection, we are doing well, but we will not meet the DART and TRC PM.

68

Charge Question #1 – Performance Measures

2009 FRA Visiting Committee - ESH

Page 69: Director’s Report  FRA Admin and Ops Review

2009 values are higher than we would like, but they are in line with 2006-2007.

We have tried to understand what caused 2008 to be such a “safe” year. A general thought is that fear of reprisal was a major reason.

We are working to improve our injury record by improving communication at all levels, making easier access to the correct tools for the job, providing clearer guidance on expectations – Take 5 web page and tools (http://www.fnal.gov/pub/takefive/)

It is important to note that we are doing at least as well in 2009 as we did in 2008 on all other PM’s.

69 2009 FRA Visiting Committee - ESH

Page 70: Director’s Report  FRA Admin and Ops Review

We have suffered from a lack of IT resources for some time within the ES&H Section.

We are hopeful that the reorganization and consolidation of IT support services will greatly benefit us as we have many tools that need to be used lab-wide and thus a lab-wide approach to IT can only make our job easier.

We are working closely with CD to increase our IT support (they are presently our only IT support) and to make sure we are heading in a direction consistent with CD’s vision.

70

Charge Question #2 – IT Consolidation

2009 FRA Visiting Committee - ESH

Page 71: Director’s Report  FRA Admin and Ops Review

ES&H needs to support the NEPA process for ARRA funds and we have done that successfully to date and feel we are equipped to continue to provide that support.

ES&H also needs to appropriately review ARRA projects and provide oversight. We have hired a new employee in order to allow us to have the resources to appropriately perform that task.

71 2009 FRA Visiting Committee - ESH

Charge Question #3 – ARRA Funds

Page 72: Director’s Report  FRA Admin and Ops Review

We have a QA Representative who interacts with OQBMP and keeps the Section Head informed

ES&H Section representation on Assurance Council

We were the main aspect of the DOE/FSO Contractor Assurance (Order 226) Review in 2009 (CAP finalized)

Nearly all of our QA “As-Is” issues are closed out. They were items that improved our overall program (most concerned document control)

72 2009 FRA Visiting Committee - ESH

Charge Question #4 – QA Implementation

Page 73: Director’s Report  FRA Admin and Ops Review

All items in the Issues Management System assigned to ES&H are closed out

We have continued to work with OQBMP on the Dashboard which we look forward to seeing as it will communicate ESH to the lab in a new manner

We have defined out major processes, are defining our 3 year review cycle of these processes and are looking to better document all of our processes – these efforts should improve the efficiency of our section.

73 2009 FRA Visiting Committee - ESH

Charge Question #4 – QA Implementation (continued)

Page 74: Director’s Report  FRA Admin and Ops Review

• We have a section member as part of the Strategic Laboratory Leadership Program (SLLP) working closely with ANL, who also has people in this program.

• Division Management The respective division managers interact primarily via

phone and email.

Nancy Grossman visited Argonne in March and shared lesson’s learned and approaches to various ES&H issues.

74 2009 FRA Visiting Committee - ESH

Charge Question #5 – Interaction with Argonne

Page 75: Director’s Report  FRA Admin and Ops Review

• Division Management (con’t) We have shared information/procedures relative to key current

events; a recent example is preparedness activities related to the potential H1N1 flu pandemic.

We also participate in monthly conference calls for all DOE-SC laboratory ESH Managers.

• Specific Department Interactions We collaborated repeatedly on the NOVA neutrino detector with

respect to chemical and fire issues; this is ongoing and is one of the key interactions that has had direct ties to programmatic work at both laboratories.

75 2009 FRA Visiting Committee - ESH

Charge Question #5 – Interaction with Argonne

(continued)

Page 76: Director’s Report  FRA Admin and Ops Review

• Specific Department Interactions (con’t) Environmental management activities to include assessments,

sampling protocols, and ISO 14001 certification

Radiation safety activities to include multiple assessments, site visits, accelerator safety, and instrument calibration.

Helped ANL achieve their DOELAP re-accreditation for the dosimetry program.

We participate in ANL’s Accelerator Safety Review Committee.

Fermilab will participate in the CARIBU (an upgrade to the Argonne Tandem Linear Accelerator System) readiness review at ANL in August.

Ongoing, frequent informal contacts 76 2009 FRA Visiting Committee - ESH

Charge Question #5 – Interaction with Argonne

(continued)

Page 77: Director’s Report  FRA Admin and Ops Review

• Future plans ANL ESQ to visit ANL – training/injury focus

Goal to meet face to face 3 times a year.

Looking to share injury information over the internet. Continue to work together on joint training classes – offer at

one or the other site and invite people from both sites (NEPA/EA, Dupont Training)

Emergency Response – MOU nearly complete – easy access to ANL site by FNAL personnel the remaining issue.

77 2009 FRA Visiting Committee - ESH

Charge Question #5 – Interaction with Argonne

(continued)

Page 78: Director’s Report  FRA Admin and Ops Review

Considering changing our worker’s compensation insurance to a local company (Better service? Cheaper?)

Can not cut personnel any more without cutting key services or missing some number of high level deadlines!

Main focus is on improving efficiency through our reorganization, cross training personnel, documenting processes clearly, providing easier access to tools/training to perform the work, and setting up the ESH-Docdb to facilitate this.

Many of our systems we are trying to make more user-friendly lab-wide and thus should improve overall lab efficiency and hopefully the safety record also.

ESHTRK, Lesson’s Learned, Training, ESH & Take 5 Web pages, etc.78 2009 FRA Visiting Committee - ESH

Charge Question #6 – Cost Reduction

Page 79: Director’s Report  FRA Admin and Ops Review

Worked with the D/S/C ESH organizations to: Set up the Take 5 Program and web pages Get feedback on how to improve our ESH Web page (in

progress)

Provide supplemental ES&H Material at Scheduling meetings to help inform/educate D/S/C heads about a variety of ES&H issues.

Regular meetings with SSO’s, EO’s, RSO’s, D/S Heads – encouraging team work, better communication, feedback in a “no-fault” manner – both ways.

Our discussions with people in general seem to say we (ESH Organization) are doing well in this effort.

79 2009 FRA Visiting Committee - ESH

Charge Question #7 – Service Culture

Page 80: Director’s Report  FRA Admin and Ops Review

Have been having on-going discussions with the ES&H Section management team concerning succession planning

Have a rough plan, but to do it efficiently it requires increased head count and money in order for people to overlap and be trained.

Annual performance reviews of all Section employees are held by management team and succession planning discussion is part of that process

Staff development issues are identified; opportunities for growth and leadership identified and included in individual performance evaluations/goals

80 2009 FRA Visiting Committee - ESH

Charge Question #8 – Succession Planning

Page 81: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200981

Page 82: Director’s Report  FRA Admin and Ops Review

FRA Visiting Committee for Administration and Operations

Randy OrtgiesenFacilities Engineering Services Section (FESS)

August 3, 2009

Page 83: Director’s Report  FRA Admin and Ops Review

83

2008 Visiting Committee Recommendations• Recommendations and Current Status• FESS participating in Tevatron decommissioning plans√• FESS involved in planning for new science √• Ongoing education of lab personnel on DP-18 √• Providing feedback on completed work orders √• Working with Divisions to budget equipment √• Evaluated funding mechanisms for infrastructure √• Continue matching staffing to current needs √• No findings

2009 FRA Visiting Committee - FESS

Page 84: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS84

Charge Question #1 – Performance Measures

FY08 Performance Results:• All 8 performance measures achieved

Scheduled maintenance √ Maintenance investment level √ Achieve GPP milestones √ TEAM executable plan developed √ GPP projects identified in Annual Lab Plan √ Electricity reliability √ Industrial Cooling Water (ICW) reliability √ Future funding for Infrastructure identified √

Page 85: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS85

Charge Question #1 – Performance Measures (cont.)

FY09 Performance Results to Date:• Expect to meet all seven performance

measures Scheduled maintenance Mission Readiness process Achieve GPP milestones Achieve TEAM executable plan actions GPP projects identified in Annual Lab Plan Electrical reliability Industrial Cooling Water reliability

Page 86: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS86

Charge Question #2 – IT Consolidation

• Transparent to most FESS employees so far• FESS Technical support has absorbed impact

Characterized as minimal effort to date• Work tracking through CD but performed by

FESS employees• Processes are becoming more streamlined;

FESS and CD are working closely to make this work

• FESS IT coordination with CD to understand work requirements for ISO 20000

Page 87: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS87

Charge Question #3 – ARRA Funds

• Engineering and Construction Management for General Plant Projects (GPP) MI-8 building addition New Muon Lab extension Feynman Computing Center Power upgrade Feynman Computing Center Cooling Upgrade Wilson Hall Emergency Generator Replacement IB-3 building addition (10% GPP hold back) Horizontal Test Stand and Cryogenic building (SRF

project GPP)

Page 88: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS88

Charge Question #3 – ARRA Funds (cont.)

• Management of funds: Uses well established existing lab GPP procedures Bi-weekly management status meetings Weekly project update meetings Weekly ARRA budget reporting Quarterly GPP reports

• All projects have separate accounting tasks• All projects captured in lab accounting system

Page 89: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS89

Charge Question #4 – QA Implementation

• Section Head member of lab Assurance Council• FESS participant in lab IQA plan development• Assigned half time FESS QAR• Examined FESS major processes• Completed As-Is analysis of 5 major processes

and 8 cross-cutting processes• Developed 6 corrective action plans• Developed FESS policies and procedures

manual• It is an integration effort that will take time

Page 90: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS90

Charge Question #5 – Interaction with Argonne

Existing: Shared resources for project reviews National Environmental Research Park (NERP)

collaboration Land Management collaboration/best practices Janitorial contract process review Mission Readiness peer review participation

Planned: Continuation of existing Utility management information sharing Energy Savings Performance Contract direction

Page 91: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS91

Charge Question #6 – Cost Reduction

• Energy Savings Performance Contract (ESPC)• Energy purchase strategies • Public utility easement management• Building automation and monitoring• Reliability Centered Maintenance (RCM)• Outsourcing HVAC services • Cost Reduction is not a net cost savings

Redirected to unfunded or unplanned requirements

Page 92: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS92

Charge Question #6 – Cost Reduction (cont.)

• Future plans Building consolidation and elimination strategies Continue existing initiatives

• Lessons Learned from workforce reduction Communication improvements to limit anxiety and

loss of good employees Need for education on value of FESS engineering Single shift craft work can be successfully

accomplished

Page 93: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS93

Charge Question #7 – Service Culture

• Communicate Listen Feedback Customer and Topic Specific Meetings

Division and Section Meetings • Coordinate

Critical Activity Planning and Scheduling Meetings• Educate

Face to Face meetings FESS website

• P/S Group Daily Schedules and e-forms

Page 94: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS94

Charge Question #7 – Service Culture (cont.)

• Future plans Continue existing activities GIS expansion and offering Metasys expansion and offering

Page 95: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - FESS95

Charge Question #8 – Succession Planning

• Ensured “Continuity of Operations”• Created and filled Deputy Section Head position• Identified vulnerable positions• Anticipate attrition and outcomes• Recruited and hired senior engineers to meet

current workload and backfill anticipated positions as needed

• Retention of current critical workforce Workload balancing through hires and contracts

Page 96: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 200996

Page 97: Director’s Report  FRA Admin and Ops Review

FRA Administrative Visiting CommitteeOQBP ActivitiesAugust 3, 2009

Bob GrantOQBP

Page 98: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Office of Quality and Best PracticesEG&G Personnel

98

Page 99: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

99

FRA Administrative and Support Review

Jed HeyesQA Mgr

Kurt MohrQAE

Tom KingQAE

Tom GehrkeQAE

Ed VokounLogistics MgrFacilitator

Gary BentleyQAE

Gary LammQAE

Jim McDonaldQAE

Robert WilsonQAE

Page 100: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Office of Quality and Best PracticesLaboratory Personnel

100

Page 101: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

101

FRA Administrative and Support Review

Bakul BanerjeeCD

Frank CesaranoBSS

Nicole GeeWDRS Tim Miller

ES&HJim RifeTD

Don RhodeAD

Kieth SchuhPPD

Rod WaltonFESS

Jim WollwertFI

Page 102: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

102

QARs Regularly Scheduled Meetings Defining Fermilab Processes

• High Level Complete• Next Level Under Development• Finished Product = Hierarchal View of Fermilab

Processes 2006 DOE QA Audit Review

• Review Findings and D/S/C response• V & V• POA for Each D/S/C

September 2009 DOE QA Audit

FRA Administrative and Support Review

Page 103: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

FY2008 Accomplishments Staffed QA Engineers to support QA implementation Revise SBIR/WFO/CRADA Process Pressure Vessel Coding and Design Review (i.e., assist

with a design review for a device being provided to a laboratory outside of Fermi)

Draft Engineering Manual development Wrote IQA implementation plan and schedule

• Revised IQA and modified implementation plans and schedules (several iterations) to meet financial, time, and scoping constraints identified by the Fermilab Director and DOE Site Office

103

Page 104: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

FY2008 Accomplishments (cont.) Completed NOvA Environmental Assessment with a

“Finding of no significant impact” (FONSI) Assisted Fermilab MIS with development of the

prototype Dashboard Developed the Fermilab Integrated Contractor

Assessment Plan (FICAP) Wrote FICAP implementation plan and schedule Provided an expert to review final EVMS documents to

be used in the Fermilab EVMS certification effort and to advise on how to proceed

104

Page 105: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

FY2008 Accomplishments (cont.) Developed QA Baseline As-Is tool to record and

archive process information, link to implementing documentation, and establish whether the associated process controls meet current requirements

Developed Suspect/Counterfeit Item system Developed Graded Approach process

105

Page 106: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

106

FRA Administrative and Support Review

FY2008 Administrative Peer Review Recommendations

Develop a QA plan that meets threshold compliance requirements for DOE O 414.1C NOW

Plan should build on and not replace the 90% effort being performed correctly currently

Find a common terminology and develop a collaborative culture between Quality professionals and laboratory staff

Phase in comprehensive plan once threshold compliance has been achieved

Do not field a QA program that relies primarily on assessments and negative input

Expand OQBP services to include process improvements

Page 107: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

107

FRA Administrative and Support Review

FY2008 Administrative Peer Review Findings

FRA is not compliant with the terms of the M&O contract and DOE orders 414.1C and 226.1A. This must be remedied as soon as possible or run the risk of forfeiting fee or contract extension

Page 108: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

108

FRA Administrative and Support Review

Page 109: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

FY2009 Accomplishments to Date Identified and trained D/S/Cs QA Representatives in

QA processes and audits• Augmented QA staff to perform assessments• Arranged for an expert from the American Society

for Quality (ASQ) to provide audit training• Arranged for an expert to provide conflict

management training Planned, executed, and reported on the QA baseline

activity to develop a snapshot of the level of QA compliance

109

Page 110: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

FY2009 Accomplishments to date (cont.) Developed the Consolidated Assessment Plan and

procedures integrating Fermilab assessments Developed Corrective Action/Preventive Action

program Staffed project controls and engineering personnel to

assist Fermilab with new project implementation Developed Graded Approach system tool to record

and archive application of quality controls to process risk

110

Page 111: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

All OQBP metrics are on schedule for the FY09 PEMP (Q1) Measure 6.5.3

• By the end of this performance period, demonstrate implementation of an approved Fermilab Integrated Quality Assurance Program (IQAP) and effective compliance with DOE Order 414.1C, Quality Assurance.

Target 6.5.3.1• Complete the lab-wide “As-Is” quality assurance baseline

activity (gap analysis) and the resultant Corrective Action Plan on an approved schedule.

Target 6.5.3.2• Appoint, train, and activate Quality Assurance Representatives

to support the implementation of the Quality Assurance Program and work toward full compliance with DOE Order 414.1C under the approved IQAP and graded approach.

111

Page 112: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Effects of IT Re-organization (Q2) Management Dashboard project no longer associated

with OQBP All work on the project terminated February 2009 EG&G resource supporting project re-assigned

112

Page 113: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

ARRA Funding (Q3) OQBP has no involvement in this activity

113

Page 114: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

IQA Plan Implementation (Q4) Implementation Plan (Pier Letter to DOE) Project Schedule

• Significant Milestones Staffing Plan

• Current Activities Document Development Automated Tool Development AS-Is Assessment DOE Relationship DOE QA Audit (Sept. 14, 2009)

114

Page 115: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Letter to DOEAugust 15, 2008

115

Page 116: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

116

FRA Administrative and Support ReviewResource commitment from the Laboratory Director to DOE

Page 117: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

117

Director’s letter to Dr. Joanna Livengood, DOE Site Mgr, dated 8/15/08 – Application of IQA Programmatic, site-wide processes (procurement,

engineering etc) TD & PPD first in-depth application New Science projects and their support processes Remaining D/S/C two at a time after TD & PPD

implemented• In the meantime participate in site-wide

implementation plans/procedures, process improvements, and address outstanding issues from the CAP

Process changes to be reflected in updates to the CAP

FRA Administrative and Support ReviewResource commitment from the Laboratory Director to DOE

Page 118: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

IQA Project Schedule

118

Page 119: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

119

Page 120: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Staffing Plan

120

Page 121: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

Staffing

Increasing QOBP Staff Two additional QAEs

• Based on Director’s Implementation Approach– QAE Support for TD & PPD (staffed)– QAE Support – Scientific Projects (staffed)– QAE Support CD & Operations (hiring)– QAE Support AD & ES&H (planned)

FRA Administrative and Support Review

121

Page 122: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

OQBP Support Staff Eight on site and two openings

Staff Augmentation (other areas) Ten on site and three openings

122

Page 123: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Document Development

123

Page 124: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Line Document Status Responsible Party1 Fermilab Assessments Manual Draft Under Review OQBP

2 Fermilab Corrective & Preventive Action Procedure Published OQBP

3 Fermilab Design and Engineering Processes Manual In Process Pier Oddone

4 Graded Approach Procedure Published OQBP

5 Issues Management System Procedure In Process – CA Project OQBP

6 Lessons Learned Program In Process – CA Project OQBP7 Management Review Procedure First Draft – CA Project OQBP

8 Records Management Policies and Procedures In Process – COO Project COO

9 Root Cause Analysis Procedure Planned – QA Project OQBP/SME

10 Strategic Planning Open Directorate11 Suspect/Counterfeit Items Program In Use – Procedures ready for final

review OQBP/SITE12 Worker Feedback Implemented WDRS

13 Quality Guidelines for Scientific Research at Fermilab In Final Review Research Program Manager

14 Director’s Policy on Scientific Research In Final Review OQBP

15 Fermilab Integrated Contractor Assurance Program Approved OQBP

124

Page 125: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

125

Mandated by DOE O 414.1C in prime contract ANSI/ASQ Z1.13

DOE requires a consensus standard 3 Choices –

• NQA-1• ISO-9000• ANSI/ASQ Z1.13

2 not appropriate to Fermilab Fermilab selected ANSI/ASQ Z1.13

FRA Administrative and Support ReviewWhy Did We Select a Consensus Standard

Page 126: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

126

ANSI/ASQ Z1.13 allows a graded approach to various levels of research conducted at Fermilab: Experiments of varying size and complexity Theoretical Explorations in Physics Development of Other Supporting Technologies (e.g.

accelerator elements and systems, cryogenics, material science, detector development, computing, etc.)

ANSI/ASQ Z1.13 viewable at http://tdserver1.fnal.gov/project/standards/ANSI-ASQ-Z1-13.pdf

FRA Administrative and Support ReviewWhy choose ANSI/ASQ Z1.13?

Page 127: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Automated Tool Development

127

Page 128: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support ReviewAs-Is Data Collection Tool Screen Shot

128

Page 129: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support ReviewAs-Is Data Collection Tool Screen Shot

129

Page 130: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support ReviewAs-Is Data Collection Tool Screen Shot

130

Page 131: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support ReviewAs-Is Data Collection Tool Screen Shot

131

Page 132: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

“As-Is” Assessment

132

Page 133: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

133

Page 134: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

134

FRA Administrative and Support Review

Page 135: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

135

Page 136: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

As-Is Status – Where Are We?

As-Is implementation field work 100% complete 4/30/09

Cleanup mode Corrective Actions reviewed, approved, OQBP

concurrence CAP implementation in progress

136

Page 137: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

137

Page 138: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

As-Is Baseline Reports Completed CAP Report Approved by Director, Delivered to FSO

6/15/09 D/S/C Reports To Be Routed to Heads Final Report Review Complete, To Be Delivered to Director

• Executive Summary & Conclusions• Detailed Summary & Conclusions with % Yes, No, N/A on

Controls• Detailed Analysis of 2006 QA Review Status• Detailed Analysis for Four Risk Areas (Documents/Records, M&TE,

Qualification & Training, Item Control)• Detailed D/S/C Reports

138

Page 139: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Results & Conclusions (81 pages, w Tables, Charts, Appendices) Overall Many Requirements of IQA & FICAP Are Met (70%+)

(formally or informally – effectiveness not judged)

CAPs Initiated for GAPs Between As-Is and Expected Controls (includes “To Be” see earlier As-Is Baseline Corrective Action Report)

Four Risk Areas Reviewed:• Documents & Records• Item Control• M&TE• Qualification & Training

2006 DOE QA Program Assessment• Less Than Adequate Total 26, Closed 21, In Process 5

139

Page 140: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

140

Yes = Applicable & Implemented No = Applicable Not Fully Implemented

Page 141: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

141

Page 142: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Results & Conclusions Four Risk Areas:

• Documents & Records – (DP# 1 & 13) Inconsistent, ~ 50% of CAPs (includes elevated CAPs on Policies), different kinds & levels of controls, requirements awareness, & flowdown issues

• Item Control – (Work Processes, Inspection/Test, S/CI) Properly applied most processes, ProCard for shackles allowed? ~1% of CAPs

• M&TE – (Work Processes, Inspection/Test) No single division or group has a comprehensive program, inconsistent awareness ~ 9% of CAPs (includes elevated CAP)

• Qualification & Training – Open 2006 findings; current worker’s retirements, & subsequent knowledge loss are concerns ~ 14% of CAPs (includes elevated CAPs)

142

Page 143: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Corrective Action Plan Report to DOE 6/15/09 “As-Is” Full Final Report Complete

D/S/C individual reports Site-wide roll-up Review and reconciliation of DOE 2006 QA Audit Report on four risk areas

• Document Control• Training• Item Control• M&TE

143

Page 144: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

AC attention required to abate systemic risk posed by site-wide issues

Elevated CAP process QARs/QAEs reviewed all CAPs; propose elevation CAP temporarily assigned to OQBP as AC Secretary CAP brought to AC through the Chair

• Chair decides whether they warrant AC attention• Chair assigns responsible organization and person

Chair brings CAPs to AC for concurrence with assigned actions• OQBP places in IMS for tracking

144

Page 145: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

DOE RelationshipTypical Briefing

145

Page 146: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Briefing Content Review of previous brief Status of current milestones Discussion of any issues Consensus for resolution Scheduled activities

Schedule for briefing Every 60 – 90 days

146

Typica

l Slid

e

Page 147: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

147

QA implementation is on-schedule Staffing

OQBP QA Engineers (QAEs) Hired Mid-Sept D/S/C QA Representatives (QARs) Selected Mid-Oct Ad Hoc QAEs on-board Dec-Jan

FRA Administrative and Support Review

Typica

l Sli

de

Page 148: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

Training QAEs oriented Sept – Oct QARs oriented Oct – Nov

• DOE Orders• DOE Implementation Guides• Integrated Quality Assurance Plan• Contractor Assurance Plan• Graded Approach• ASQ-Provided Assessment Training

FRA Administrative and Support Review

148

Typica

l Sli

de

Page 149: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

QARs Regularly Scheduled Meetings Detailed Planning for Next Major Event – As-Is Baseline Defining Fermilab Processes

• High Level Complete• Next Level Under Development• Finished Product = Hierarchal View of Fermilab

Processes 2006 DOE QA Audit Review

• Review Findings and D/S/C response• V & V• POA for Each D/S/C

FRA Administrative and Support Review

149

Typical SlideTyp

ical S

lide

Page 150: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

150

Key Dates: Nov 17-19 – Quality Audits for Improved Performance Course Jan 09 – As-Is Preparation Feb – Apr 09 – As-Is Baseline Activity May 09 – Corrective Action Plan to Close Gaps Sept 09 – DOE QA Program Review Oct 09 – Internal Assessments

FRA Administrative and Support ReviewSchedule

QAR Orientation

Plan for “As Is”

Perform Gap Analysis – Current to Planned Practices

Baseline Implementation Plan to Close Gaps

Application of Graded Approach

Implement Training, Assessments, and QA Program

Oct08 Dec08 Feb09 Apr09 Jun09 Aug09 Oct09 Dec09 Feb10

QAR Orientation

Plan for “As Is”

Perform Gap Analysis – Current to Planned Practices

Baseline Implementation Plan to Close Gaps

Application of Graded Approach

Implement Training, Assessments, and QA Program

Oct08 Dec08 Feb09 Apr09 Jun09 Aug09 Oct09 Dec09 Feb10

QAR Orientation

Plan for “As Is”

Perform Gap Analysis – Current to Planned Practices

Baseline Implementation Plan to Close Gaps

Application of Graded Approach

Implement Training, Assessments, and QA Program

Oct08 Dec08 Feb09 Apr09 Jun09 Aug09 Oct09 Dec09 Feb10

Typica

l Slid

e

Page 151: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support ReviewQA Schedule

CAP ReportApr09 Jul09 Oct09 Jan10 Apr10 Jul10 Oct10 Jan11 Apr11 Jul11

Oct11 Jan11

CAP ClosureBuild DOE O 414.1c Self-Assessment ProgramBuild Consolidated Assessment & CAPA Program

QAR/QAE OrientationAssessment Program (1st Assessment 8/09)

Begin Continuous Improvement ProcessAutomate Graded Approach from As-Is System

Prototype Automated Graded Approach Tool and TestStartup Graded Approach Process

Root Cause Analysis TrainingS/CI Program

Establish Lessons Learned ProgramImplement Lessons Learned Program

151

Typica

l Slid

e

Page 152: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

Key Dates: 6/15/09 - CAP Report On-Going - CAP Closure 6/09 – 8/09 - Build DOE O 414.1c Self-Assessment Program 6/09 – 8/09 - Build Consolidated Assessment and CAPA Program

6/30 - QAR/QAE Orientation 8/09 - Assessment Program (1st assessment – 8/09; ongoing thereafter) 8/09 - Begin Continuous Improvement Process 6/09 – 8/09 - Automate Graded Approach from As-Is System

9/09 – 10/09 - Prototype Automated Graded Approach Tool and Test 11/09 - Startup Graded Approach Process

2/10 - Root Cause Analysis Training On-Going - S/CI Program 6/09 – 9/09 - Establish Lessons Learned Program

9/09 - Implement Lessons Learned Program

FRA Administrative and Support ReviewQA Schedule

152

Typica

l Slid

e

Page 153: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

DOE QA Audit 2009

153

Page 154: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Schedule

Document Call• August 17, 2009

Preliminary Planning Meeting• August 18, 2009

On-Site Audit Activities• September 14 – 17, 2009

154

Page 155: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Response to 2006 QA Audit

155

Page 156: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

2006 DOE QA Program Assessment – *Status By Criteria

156

* Open Items in process, some may be completed

Page 157: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Argonne Interactions

157

Page 158: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Interactions with Argonne National Laboratory (Q5)

Few occurrences• Several attempts – mostly unsuccessful• Limited to Dashboard Project in past• No current activities underway

158

Page 159: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Cost Reduction

159

Page 160: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Actions to Reduce Cost (Q6)

All OQBP QA work is done by a subcontractor Use of ad-hoc committees for special projects

160

Page 161: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Service Culture

161

Page 162: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Establishment of a Service Culture (Q7)

Communication Continual offers of help

• Internal consulting services Posters Management Presentations

162

Page 163: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Succession Planning

163

Page 164: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

How is succession planning addressed? (Q8)

Not addressed in the plan at this time

164

Page 165: Director’s Report  FRA Admin and Ops Review

OQBP Briefing – August 3, 2009Fermilab

FRA Administrative and Support Review

Questions?

165

Page 166: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009166

Page 167: Director’s Report  FRA Admin and Ops Review

FRA Visiting Committee for Administration and Operations

Cindy Conger, CFOFermilab Finance Section

August 3, 2009

Page 168: Director’s Report  FRA Admin and Ops Review

168

2008 Visiting Committee Recommendations

• Recommendations and Current Status

Restore positions to enable FI section to meet charge as well as complete planned and endorsed initiatives - one of two Accounting positions restored; one MIS position restored before consolidation with CD.

Establish a Workforce Restoration Review Task Force to restore positions needed lab-wide – BLC addressed

Investigate more serious collaboration with ANL to consolidate activities that could bring cost savings and increased efficiency for both labs – still looking

2009 FRA Visiting Committee - Finance

Page 169: Director’s Report  FRA Admin and Ops Review

169

2008 Visiting Committee Findings

• Findings and Current Status

FI section/personnel operating at minimum sustainable level, and this section needs attention for progress on important initiatives. Any additional assignment to the section brings the risk of failure to carry out core activities. - as discussed under Recommendations

There is considerable redundancy and duplication of effort in the computing and IT systems lab-wide. Enlist external evaluator to make plan for consolidation of these systems to eliminate redundancy, which will result in savings in the cost of operation. – consolidation of MIS into CD, no external evaluator

2009 FRA Visiting Committee - Finance

Page 170: Director’s Report  FRA Admin and Ops Review

Charge Question #1 – Performance Measures

• FY08 Performance Results: Finance received a B+ on Objective 6.1 – “Provide an Efficient,

Effective, and Responsive Financial Management System.” All 4 measures were met and no deficiencies were cited in the DOE narrative.

Objective 6.4 – “Provide Efficient, Effective, and Responsive Management Systems for Internal Audit and Oversight; Quality; Information Management; and Other Administrative Support Services as Appropriate” received a grade of B. Contributing to this low grade was the delay in completing the FTL project according to schedule due to furloughs and staff reduction.

Consolidation of MIS into Computing Division transferred responsibility for the project to the CIO in 2QFY09. The project has been reviewed and a new plan for completing the implementation has been prepared.

2009 FRA Visiting Committee - Finance170

Page 171: Director’s Report  FRA Admin and Ops Review

Charge Question #1 – Performance Measures (cont.)

• FY09 Performance Results to Date: Finance met all performance measures under

Objective 6.1 – “Provide an Efficient, Effective, and Responsive Financial Management System.” at the DOE Mid-Year Evaluation.

On-time vendor payment exceeded the target goal, and DOE cited it as a “Notable Observation/Positive Outcome” for Goal 6.0 in the report.

No Finance issues were cited in the “Concerns/Watch List Items” for Goal 6.0 in the report.

Finance expects to meet all performance measures and to exceed the on-time vendor payment target in FY09.2009 FRA Visiting Committee - Finance171

Page 172: Director’s Report  FRA Admin and Ops Review

Charge Question #2 – IT Consolidation

• Impacts to Finance of move of MIS to CD: Internal control concerns: Major change to a group

integral to the Laboratory’s internal controls over financial information requires increased scrutiny to assure that controls remain well-designed and effective.

CFO meets at least biweekly with CIO to discuss the effects of organizational, process, and system changes on the control environment.

Four-month delay in go-live date for PPD CD-MIS resource constraints has slowed some

response times for service but mostly fully supported Transfer of 26 employees and $5.6M budget

2009 FRA Visiting Committee - Finance172

Page 173: Director’s Report  FRA Admin and Ops Review

Charge Question #2 – IT Consolidation (cont.)

• Benefits anticipated from move of MIS to CD: Additional resources available to move forward

many priorities for improved effectiveness and efficiency of financial operations:

Completion of FTL implementation Labwide budgeting tool Labor planning tool (may be part of

budgeting tool) Travel reservation and settlement

system(s) Electronic invoice approval system Conversion to SGL-based chart of

accounts2009 FRA Visiting Committee - Finance173

Page 174: Director’s Report  FRA Admin and Ops Review

Charge Question #3 – ARRA Funds

• Issues for Finance related to ARRA funds Segregation of funds

Budget Office controls set-up of separate projects and tasks for RA funds – easy to do in our system

Required some system changes for STARS feed

Reporting requirements Weekly to DOE – began in May

Many questions at startup but smooth now Concerns: Reporting jobs created and

retained at subcontractor level; future increase in # of projects

Quarterly to OMB – to begin QE September 30th, due October 10th. Jobs only at prime level – will be small #.

Will handle with no additional staff; not expected to significantly affect delivery on Finance mission work

2009 FRA Visiting Committee - Finance174

Page 175: Director’s Report  FRA Admin and Ops Review

Charge Question #4 – QA Implementation

• Finance has participated fully in the implementation of the QA program.

• Three processes were selected for testing in the as-is review.

• Selected processes were tested on time and Corrective Action Plans have been developed.

• Most of Finance’s significant processes are documented and routinely tested as part of the A-123 assessment process.

2009 FRA Visiting Committee - Finance175

Page 176: Director’s Report  FRA Admin and Ops Review

Charge Question #5 – Interaction with Argonne

• Respective COOs and CFOs meet together every 6 weeks or so to discuss problems and identify ways we can help each other.

• CFOs serve together on FMSIC Council and are members of SC CFO group as well as the DOE CFO’s newly-formed Lab CFO group.

• Second Finance staff person is participating in SLLP program

• As noted earlier in discussing last year’s recommendations, we are still looking for ways the labs can collaborate in the Finance arena.

2009 FRA Visiting Committee - Finance176

Page 177: Director’s Report  FRA Admin and Ops Review

Charge Question #6 – Cost Reduction

• Key right now is cost avoidance – trying to accomplish additional work with current staff. ARRA funds management and reporting Increasing level of non-DOE sources of funding Increased OHEP reviews and data calls Quarterly budgeting and stepped-up monitoring

processes• IT consolidation should help eventually

Significant savings/cost reductions in Finance have generally come from IT investments

2009 FRA Visiting Committee - Finance177

Page 178: Director’s Report  FRA Admin and Ops Review

Charge Question #6 – Cost Reduction (cont.)

• Looking at employee suggestions that could yield some savings: Reduce paper (e.g. stop distributing pay stubs)

Some progress in this area in Accounting Pay non-exempt employees bi-weekly rather than

weekly• Workforce reduction lessons learned

Customer service in Travel suffers considerably with one less clerk in Accounting

Administering a furlough program consumes significant resources

Cannot reduce workforce any further without core mission work at risk

2009 FRA Visiting Committee - Finance178

Page 179: Director’s Report  FRA Admin and Ops Review

Charge Question #7 – Service Culture

• Accounting Department has recently added Customer Service as agenda item to all department staff meetings

• Long-standing goal in Payroll to answer all questions within 24 hours

• Long-standing goal in Travel to keep voucher backlog to 2 weeks or less

• Grants & Contracts manager holds PIs’ hands through grant process

• Open-door policy across Section for “customer” visits

2009 FRA Visiting Committee - Finance179

Page 180: Director’s Report  FRA Admin and Ops Review

Charge Question #8 – Succession Planning

• CFO formed “Executive Financial Manager” group of senior financial managers across lab Major driver for forming group is to look at the financial

community as a whole to identify top performers and provide appropriate promotion and development opportunities

Subgroup currently working on review/rework of Budget job family

• Deputy Lab Financial Planning Manager (Budget Officer) position created in 2007; long-standing deputy position in Accounting

• Seven CPAs in Finance; several others at lab.• Succession planning more challenging in leanly-staffed

organizations

2009 FRA Visiting Committee - Finance180

Page 181: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009181

Page 182: Director’s Report  FRA Admin and Ops Review

FRA Visiting Committee for Administration and Operations

David CarlsonHead, Business Services Section

August 3, 2009

Page 183: Director’s Report  FRA Admin and Ops Review

183

2008 Visiting Committee Recommendations

1) Aggressively pursue advance acquisition planning for new projects – Doing this. Procurement is welcomed by project managers. Procurement 101. Cycle time presentation. Attending PMG’s. Specific staff assigned to all projects in FY10, some already.

2) Proactively address succession planning See Charge Question #8.

2009 FRA Visiting Committee – Business Services

Page 184: Director’s Report  FRA Admin and Ops Review

184

2008 Visiting Committee Recommendations

3) Continue to explore cost reduction opportunities See Charge Question #6

4) Continue to implement travel management improvement initiatives Great progress – new Travel website up and running Online Travel Authorization/Voucher implemented (ref: last

year’s report)

2009 FRA Visiting Committee – Business Services

Page 185: Director’s Report  FRA Admin and Ops Review

#1 – Performance Measures – FY08 Results

• Objective 6.1 – Provide an Efficient, Effective and Responsive Acquisition and Property Management System(s) Grade A-

Property: “The Property function at the Laboratory is conducted in an effective and efficient manner … DOE performance expectations for FY2008 were exceeded.”

Procurement: “DOE performance expectations for FY2008 were exceeded.” DOE re-approved the Procurement System for 3 years

• Objectives 8.3 & 8.4 (BSS partially responsible) – Sensitive Property (B+) & Information (B)

Security: Property Protection Areas access and wearing of badges. “Compliance in FY2008 was 98.8%, exceeding expectations.”

Security: Support smooth transition of the current security contract to the new DOE-managed small business contractor. “The Laboratory had some success in facilitating the transition…”

Property: Protection of sensitive and technology transfer information and export control items. “Effective, slightly exceeds expectations.”

185 2009 FRA Visiting Committee – Business Services

Page 186: Director’s Report  FRA Admin and Ops Review

#1 – Performance Measures – FY09 Status

• 6.2.1.1 – Procurement BSC score 90 out of 100. OK. 92, (94-96?)• 6.2.2.1 – Documents for Site Office review and/or approval are complete,

of a high quality and contain no critical issues. OK.• 6.2.3.1 – Process improvements in two procurement areas. OK.• 6.3.1.1 – Property BSC score 90 out of 100. OK. (99?).• 6.3.2.1 – Resolve concerns/issues identified as a result of DOE’s

oversight and/or internal self-assessment of Fleet Management. OK.• 6.3.2.3 – Vehicle Management reporting procedures are effectively

implemented and data submitted to DOE is accurate, complete and timely. OK.

• 8.3.2.1 – Property Protection Areas access and wearing of badges. OK.• 8.3.3.1 –Effective support toward the management of DOE’s prime

security contract. OK. Met w/ DOE & TPS; Meeting w/ DOE re: FY10.• 8.4.1.1 – Protection of sensitive and technology transfer information or

export control items. OK.• DOE S&S Survey (3/09) gave highest rating category, no Findings.

186 2009 FRA Visiting Committee – Business Services

Page 187: Director’s Report  FRA Admin and Ops Review

#2 – IT Consolidation

• BSS continues to receive an adequate level of support for its core business systems (Oracle eBS, ProCard, Sunflower) and desktops. Prior to, and since the reorganization until the last few weeks,

support generally came from two familiar sources:

1) BSSHELPDESK and contacts from the transferred FI/MIS department (Procurement, TeleCom, Property, Transportation, Vehicle Maintenance, Receiving, Travel, Section Office)

2) CD core support groups (Fire Department, Security, Information Resources, Accommodations.)

• Now, the mix of support response contacts is broadening somewhat as the reorganization takes deeper hold in CD.

187 2009 FRA Visiting Committee – Business Services

Page 188: Director’s Report  FRA Admin and Ops Review

#2 – IT Consolidation (cont’d)

• BSS has some concerns about advancing its previous plans within new Laboratory IT priorities: Vehicle Fleet Management system replacement – “must do” …

October 2009 still looks good ProCard Front End replacement project – “must do” …

schedule deferred/unknown but CIO aware of importance Online catalog ordering system – “cost savings opportunity” …

priority and schedule unknown

188 2009 FRA Visiting Committee – Business Services

Page 189: Director’s Report  FRA Admin and Ops Review

#3 – ARRA Funds

• BSS involvement is concentrated in Procurement. Section Office and Procurement sit on the COO’s ARRA

Planning Committee; early involvement Excellent support was received from Legal Office on new

contract requirements, flow-down requirements, new terms & conditions

Procurement is well engaged with project managers and FESS engineering

A stretch for Procurement but executing work with existing staff, systems and procedures

189 2009 FRA Visiting Committee – Business Services

Page 190: Director’s Report  FRA Admin and Ops Review

#4 – Q and BP Plan Implementation

• Integrated Quality Assurance program implementation: QAR appointed from Section Office, shared to Finance Processes identified Baseline sample of processes assessed, CAP’s identified &

accepted CAP development in process Preparing to respond to DOE data call for September audit BSS actions from 2006 QA audit on track

190 2009 FRA Visiting Committee – Business Services

Page 191: Director’s Report  FRA Admin and Ops Review

#4 – Q and BP Plan Implementation (cont’d.)

• Contributions to Other Initiatives and Commitments Director’s Council on Integrated Assurance Records Management Program Implementation Committee OHAP Strategic Planning – Administration and Operations OQBP EG&G Contract Support Using Issues Management System – all BSS issues closed

191 2009 FRA Visiting Committee – Business Services

Page 192: Director’s Report  FRA Admin and Ops Review

#5 – Interaction with Argonne• Information Resources

Ongoing lunch meetings with Records Management staff (>) Contacted ANL (4/16) to offer Archive and History collaboration (>) Visited U of C with ANL to discuss library collaboration (>) Invited ANL librarian to Fermilab for SCOAP3 meeting (>) Assisted ANL scientist gather SPIRES-based citation statistics (<) Added >60 ANL job postings to the HEPjobs database, 23 of these

submitted by people at ANL (>, <)• Transportation

Assisted ANL traffic/shipping to identify freight forwarders & movers (<) Provided advice and procedures to ANL for fleet management

reporting & utilization (<) Provided inspection staff to ANL for CNG vehicle cylinders (<)

Key: (>) FNAL initiated (<) ANL initiated

192 2009 FRA Visiting Committee – Business Services

Page 193: Director’s Report  FRA Admin and Ops Review

#5 – Interaction with Argonne (cont’d.)

• Procurement Studied ANL use of industrial partners – prime contract provisions,

internal procedures. Obtained ANL Reachback Procedure and adapted to FNAL for use of designated subcontractor, EG&G. (>)

Received Procurement and Shipping assistance from ANL regarding U.S. Department of Commerce duty-free entry application procedures for WLS fiber for NOvA; potential cost savings of $760K) (>)

• Property Electronics recycling (continuation)

Won FY2008 award Federal Electronics Challenge, Midwest medium civilian facility category. FNAL recycles ANL electronics.

• Accommodations Cafeteria – contracts not synchronized, but obtained information from

ANL’s service provider.

Key: (>) FNAL initiated (<) ANL initiated

193 2009 FRA Visiting Committee – Business Services

Page 194: Director’s Report  FRA Admin and Ops Review

#6 – Cost Reduction

• Accomplished: Great progress on e-commerce for procurements (RFQ’s,

Fermilab bid posting website, electronic drawings) New Electronic Travel Authorization/Voucher implemented FY2008 award, Federal Electronics Challenge, Midwest medium

civilian facility category. Working with CD on EPEAT compliance Increased the use of electronic methods for surplus disposition Exceeded annual petroleum consumption reduction & alternative

fuel usage targets

194 2009 FRA Visiting Committee – Business Services

Page 195: Director’s Report  FRA Admin and Ops Review

#6 – Cost Reduction (cont’d.)

• Future: Online catalog for common use stockroom and other

commodity items … stalled (IT support)

• Lesson Learned from WF Reduction: Caused a good, hard look at “required” vs. “nice to have”

functions Services that were not contractually required were valued Further sharpened awareness of performance management

195 2009 FRA Visiting Committee – Business Services

Page 196: Director’s Report  FRA Admin and Ops Review

#7 – Service Culture• “A strong service culture has been established. This service

culture was confirmed during the Committee’s interviews with BSS customers.” (FRA Visiting Committee, August 2008)

• However, risks exist: Complacency – Lead the resistance to this every day; praise

contributions and teamwork; share successes Succession Planning – Section level plan created, serves as

input to WPAS and OHAP, possible reformulation and integration with Lab-wide plan

Additional Staff Needs Procurement – mentioned in last year’s

report, progress Property – mentioned earlier

• Deeper integration of support staff into projects and new initiatives promotes service culture.

196 2009 FRA Visiting Committee – Business Services

Page 197: Director’s Report  FRA Admin and Ops Review

#8 – Succession Planning

• Bruce Chrisman addressed the crosscutting issue• BSS Staffing Plan submitted to COO 8/29/08

+1 Procurement Administrator, June 2009; +1 in WPAS for FY2010 Assistant Property Manager – new position description in process Procurement and Property Education in government practices Cross-Training

197 2009 FRA Visiting Committee – Business Services

Page 198: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009198

Page 199: Director’s Report  FRA Admin and Ops Review

FRA Visiting Committee for Administration and Operations

Kay Van VreedeFermilab

Workforce Development and Resources SectionAugust 3, 2009

Page 200: Director’s Report  FRA Admin and Ops Review

200

2008 Visiting Committee Recommendations

• Recommendations and Current Status

Ongoing performance management of all employees is essential especially with those previously identified as marginal performers to ensure that managers don’t mistake an employee who is not performing as being better than none at all - Performance improvement plans are implemented for poor performers.

Explain why merit increases were discontinued and assist managers with other strategies for rewarding their high performers – This was communicated when merits were discontinued and it is also communicated in our management training. The system allows us to reward performance through annual increases and special award programs.

2009 FRA Visiting Committee - WDRS

Page 201: Director’s Report  FRA Admin and Ops Review

201

2008 Visiting Committee Findings

• Findings and Current Status

Conduct a post-mortem regarding the communications timeline from when the initial message was conveyed to employees about the need for a layoff, whether it was voluntary or not, to point of actual implementation – The Lab determined that transparency from the beginning was the desired way to proceed.

Consider offering a voluntary short term disability program to all employees - This is currently in the procurement process.

2009 FRA Visiting Committee - WDRS

Page 202: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS202

2008 Visiting Committee Findings• Recommendations and Current Status• Consider offering long term disability to part

timers – We have researched this and decided not to offer this benefit.

• Dedicate contiguous space for education programs – Space was made available for summer programs.

Page 203: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS203

Charge Question #1 – Performance Measures• FY08 Performance Results:

WDRS received a B+ on Objective 6.3 – “Provide an Efficient, Effective, and Responsive Human Resources Management System.” Both measures were met. Positives cited: the Lab was granted Compensation certification. 93% of Balanced Scorecard goals were achieved. The Lab implemented a timely voluntary separation program, a corrective action plan for the benefits value study and successfully conducted three collective bargaining negotiations. Negatives cited: a pay equity study was not completed in FY 2008. DOE did not approve the involuntary layoff plan.

WDRS did complete and implement the pay equity plan in FY09.

Page 204: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS204

Charge Question #1 – Performance Measures (cont.)

FY09 Performance Results to Date: WDRS expects to meet/exceed all performance measures at fiscal year end. Draft a succession plan. Will be completed. Devise an R2A2 (roles, responsibilities, accountabilities,

authorities) model and write 15% of them. Will be completed. Develop procedures to incorporate HR practices and policies

into the scientific hiring process. Completed. Staff seven Diversity Council committees. Completed. Implement two initiatives recommended by the Diversity

Council. Will be completed.

Page 205: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS205

Charge Question #2 – IT Consolidation• Support for PeopleSoft now resides with the

Computing Division.• There are more resources available for

service.• They have taken time to understand our needs

and priorities. • So far we see no real differences in service.

Page 206: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS206

Charge Question #3 – ARRA Funds

• We do not have a role in ARRA funding.

Page 207: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS207

Charge Question #4 – QA Implementation

• Major processes were identified.• We have completed the “as is” study.• We have developed our corrective action plans

and should meet all deadlines.• We will work on developing our three-year

assessment plan.

Page 208: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS208

Charge Question #5 – Interaction with Argonne

• Collaborated on development of a succession planning proposal.

• Ongoing administration and monitoring of University of Chicago Strategic Laboratory Leadership Program (SLLP).

• Argonne audited "Behavioral Interviewing" course to consider offering it at Argonne.

• Argonne employees attended one of our advanced computing courses and will attend future courses.

• Shared information on development of R2A2 ( roles, responsibilities, authorities, accountabilities) plan.

• Jointly developed strategy on presenting information to DOE on benefits value study.

Page 209: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS209

Charge Question #5 – Interaction with Argonne (cont)

• Collaborated with Argonne and other Labs to develop a white paper on the benefits value and cost study DOE requirements.

• Shared our programs with ANL in order to assist them in their development of: applicant tracking system, vacation donation, day care.

• Shared information on compensation, benefits, and labor relations.

Future• We will continue to collaborate and share information. The goal is

to save time and labor when one Lab already has a program that works, share ideas that enhance our programs, work together to present consistent information to DOE, and look for opportunities to share costs particularly in the training area.

Page 210: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS210

Charge Question #6 – Cost Reduction• Insurance plan design changes, cost share

shifting and aggressive negotiation resulted in an annual savings of 1.5 million.

• Change in retiree medical cost share resulted in an annual savings of 600K.

Smaller savings included:• Green initiatives • Cost sharing with Argonne on training classes• Virtual job fair• Computer generated payroll authorizations.

Page 211: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS211

Charge Question #6 – Cost Reduction

Future• Negotiate insurance renewals below 7%.• Increase participation in disease management

programs and wellness initiatives.

Workforce Reduction Lessons Learned• It will be difficult to reduce or eliminate

services (e.g., the swimming pool) at the Lab as many of these non-essential services are highly valued by the Lab population.

Page 212: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS212

Charge Question #7 – Service Culture• Section employees have attended customer

service training.• Customer service surveys for training and

education classes and programs for employment have yielded very positive feedback.

• Rollout of new programs has included a change management model which incorporates input from clients.

Page 213: Director’s Report  FRA Admin and Ops Review

2009 FRA Visiting Committee - WDRS213

Charge Question #7 – Service Culture

We recently received some negative feedback as a result of lab wide diversity focus groups. As a result, we are in the process of developing a plan for improvement. To develop the plan we are gathering suggestions from the Lab population.

Page 214: Director’s Report  FRA Admin and Ops Review

214

Charge Question #8 – Succession Planning

• Possible successors have been identified for some department manager positions.

• We implemented “stretch and grow” opportunities to further develop skills.

• We have done cross-training between departments to enhance overall cross- functional knowledge.

2009 FRA Visiting Committee - WDRS

Page 215: Director’s Report  FRA Admin and Ops Review

Pier Oddone, FRA Admin and Ops Review, August 3rd, 2009215

Page 216: Director’s Report  FRA Admin and Ops Review

Information TechnologyVicky WhiteActing CIO

August 4, 2008

Page 217: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White217

1) Performance Measures

• FY08 Core Business Systems performance measure 6.4 rating of B was addressed in CFO’s presentation – largely FTL delays.

• FY08 Cyber Security performance measure 8.2 (Provide an Efficient and Effective System for Cyber-Security) earned an A-

• Network bandwidth goals were exceeded and contributed to the A- rating in 7.0 (Sustain Excellence in Operating,Maintaining, and Renewing the Facility and Infrastructure Portfolio to Meet Laboratory Needs)

Page 218: Director’s Report  FRA Admin and Ops Review

218

1) FY09 Performance Measures Progress

• Business systems will not meet all of the goals unless a re-baselined schedule for the FTL project is used for the assessment But FTL will be successfully completed, taking into

account information from two internal reviews (Operational Readiness and FTL Code review), with central authentication implemented.

Also all exempt employees will be using the system by Sept. (as required for EVMS certification)

• Goals for strategic planning and customer satisfaction are expected to be met.

Information Technology - Vicky White

Page 219: Director’s Report  FRA Admin and Ops Review

219

1) FY09 Performance Measures Progress

• Cyber security audit (6 findings and overall grade of marginal on a scale of Satisfactory – Marginal – Unsatisfactory) highlighted the need for tighter IT systems management and greater care in the handling of PII.

• Aggressive response in Tune IT up campaign and accelerated consolidation of IT across the lab may help grade. Certainly will make us stronger and safer

Information Technology - Vicky White

Page 220: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White220

2) Reorganization and consolidation of IT

Particle Physics Division desktop support and help desk are now fully integrated (10 people)

Management Information Systems department (formerly under CFO) joined with Computing Division in February 2009

Longer transition than planned (June 1) due to significant cultural adjustments, vacations, Tune IT up, desire to make a successful organization that most people are happy with.

Fully integrated organization chart just finalized and sets the stage for

elimination of duplicate services (will take up to 1 year) bringing more resources to bear on some of the long list

Information Systems projects that are sorely needed. Technical Division (5 people) to be consolidated in

Sept/October Remaining consolidation of lab IT - TBD

Page 221: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White221

2) Consolidation of IT and Information Systems• High (and somewhat unrealistic) expectations

to rapidly transform many inefficient and historical business processes, and to enable planning and management, by the use of modern information systems Several basic “plumbing” projects simply have to be

done before most of the projects that provide visible value to the lab can be executed

Peoplesoft upgrade, people and account management systems rationalized, finish FTL, chart of accounts changes, obsolete systems replacement (e.g. ProCard front-end), purchase of an EDMS for engineering docs, data warehouse of operational data and performance data.

Page 222: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White222

Consolidation of IT and Information Systems• Important to continue to pursue the ISO20000 certification

project for IT service management and implement lab-wide (formal service management, change control, incident management, problem management, and all ITIL processes)

We have set a very aggressive goal for certification by the end of 2010 We set this prior to IT consolidation getting going and prior to Tune IT up

and it might slip by a few months – but I hope not• CIO will set up IT councils and IT governance, including

policies and objectives in order to Effectively manage IT lab-wide Prioritize the large number of urgent Information Systems projects that the

lab needs • Will engage outside consultants (probably Gartner) to help us

with IT governance and Enterprise Architecture

Page 223: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White223

3) ARRA funds

• High Availability Computing room (in Feynman Computing Center (FCC)) is an ARRA project. Managed by FESS, with CD Slight delay while FCC underwent a structural

evaluation Milestones should be met

Page 224: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White224

4) Quality and Best practices plan

• Computing Division fully participated in QA assessment and selected a number of processes to assess this year, based primarily on the division’s Activity work breakdown structure

• Four Corrective Action Plans were developed and will be completed on schedule

• Two best practices were identified Work planning and financial management Implementation of Information Technology Service

Management (ITSM) framework (IS20000 certification project)

Page 225: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White225

5) ANL interactions

• Meet regularly with the CIO at NLCIO events• Frequent contacts between cyber security

experts • Discussed initiatives in cloud computing as a

potential direction White paper of NLCIO and ANL CIO visited Fermilab

and gave a presentation • Scientific computing contacts w.r.t. leadership

computing – at ANL/UC/Fermilab collab. meetings Also use of leadership computing by Accel modeling

and Lattice QCD

Page 226: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White226

6) Cost-reduction opportunities

• Oracle licenses – cost containment strategy of buying additional licenses, rather than leasing

• Longer term effects of IT service management should result in cost reductions and better services

• Longer term effects of IT consolidation should result in elimination of duplicate services and cost reduction in basic IT (to apply greater resources to business process improvements and information management)

Page 227: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White227

6) Cost reduction opportunities

• Using contractors more than in the past and outsourcing management of some services (e.g. Exchange mail server, Sharepoint service (soon))

• Lessons from workforce reduction preparations We would benefit from outsourcing additional core

IT services We need to work out a way to do it

Page 228: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White228

7) Service culture

• We are working hard to implement industry standard IT service management processes for all IT services (including the scientific ones) This is a big change in culture We are still in the middle of this

The new service desk implementation is not yet fully functioning as a service desk – but expect it to be working well within the next 3 months

Some very sad personnel losses have not helped We design and document each standard ITIL

process and then “implement” it using an industry standard software product that supports IT service management (BMC – Remedy)

We are implementing Stage 2 of a 5 stage roadmap

Page 229: Director’s Report  FRA Admin and Ops Review

Information Technology - Vicky White229

8) Succession planning

• We have identified (openly) successors for four key positions Field Financial Manager Computer Facility Manager Associate Head for Facilities planning Network manager

• I have identified and offered opportunities for greater management responsibility to Individuals with potential to be CIO (2) Individuals with potential to be CD Head or AD (3) Individuals with potential in the future to lead large

organizations – now running departments