director power’s visit to nctps stage ii on 10/06/14

9
Director Power’s Visit To NCTPS STAGE II On 10/06/14

Upload: pink

Post on 24-Feb-2016

64 views

Category:

Documents


0 download

DESCRIPTION

Director Power’s Visit To NCTPS STAGE II On 10/06/14. Director Power Being Received By UCM Shri . Muthukumarasamy , AGM. Director Power Checking The Impeller Casing Of CW Pump. Discussing About The CW Pump Shaft. Director Power Viewing The Element 1 Along With GM I/C. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Director Power’s Visit To NCTPS STAGE II On 10/06/14

Page 2: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Director Power Being Received By UCM Shri. Muthukumarasamy, AGM

Page 3: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Director Power Checking The Impeller Casing Of CW Pump

Page 4: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Discussing About The CW Pump Shaft

Page 5: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Director Power Viewing The Element 1 Along With GM I/C

Page 6: Director Power’s Visit To NCTPS STAGE II On 10/06/14

UCM Explaining To Director Power about CW Pump Casing

Page 7: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Director Power Inside The Control Room

Page 8: Director Power’s Visit To NCTPS STAGE II On 10/06/14

Director Power Viewing The Thermal & Acoustic Enclosure Of TG 1

Page 9: Director Power’s Visit To NCTPS STAGE II On 10/06/14