• An Evaporator System was required to remove the organic solids from the waste stream generated by Porcine Heparin batch production process. The objective is to vaporize the water and separating from the concentrated solids (~ 45% solids) stream that will be sent for landfill. The evaporated water must be condensed and will be sent for further downstream on-site waste treatment prior to discharge to the Sabesb sewer.
• Each digestion sub batch consists of 36,000 kgs of Mucosa. The site currently produces six batches per week with batches completing digestion from Monday night through to Thursday. The maximum number of batches per week is currently six, but may be increased to 8 batches per week when about 20 % of ribbons are added to the mucosa. Processing of ribbons in Mucosa will increase the peptone volume by 25%.
• If required, then vendor to include a CIP skid with holding tank.• The Evaporator and associated equipment shall be in continuous operation 365 days
per year except when cleaning and maintenance is required.• The Supplier should therefore consider the following supply as a minimum:• Complete engineering design; lay out of the system, specifications and process
responsibility for the complete evaporator system package. Civil and structural design with will be done by a third part. Vendor should include design review man hours.
• Supply of the major equipment and critical items.• Control system and software.• Any proprietary or custom equipment as part of the evaporator package.
Project Scope
Project Functional Chart
GESManagercorporate
Procurement
SafetySupervisor
DocumentControl
MechanicalTechnician
Cost ControlCash Flow
PlanningEngineer
JJEngineeringConsulting
SHEDirectorcorporate
SHEManager
E&I Technician
SafetyTechnician
CivilEngineer
Construction-Assembly
Team
GES ProjectSupport
corporate
UtilitiesOperator
EvaporatorEvaporator
Conceptual Design, 1rst draft
EvaporatorEvaporator
Civil Works
EvaporatorEvaporator
Follow-Up at Supplier
EvaporatorEvaporator
Follow-Up at Supplier
EvaporatorEvaporator
Unloading and Positioning Equipment
EvaporatorEvaporator
Unloading and Positioning Equipment
EvaporatorEvaporator
Unloading and Positioning Equipment
EvaporatorEvaporator
Equipment Assembly
EvaporatorEvaporator
Equipment Assembly
EvaporatorEvaporator
Equipment Assembly
EvaporatorEvaporator
Equipment Assembly
EvaporatorEvaporator
Equipment Assembly
EvaporatorEvaporator
Control System
EvaporatorEvaporator
EvaporatorEvaporatorSite Master Plan
Initial LayoutInitial Layout
Final LayoutFinal Layout
LPG TanksLPG Tanks
Chemical Storage TanksChemical Storage Tanks
Contractor ShopContractor Shop
Covered ParkingCovered Parking
Control RoomControl Room
Production BuildingProduction Building
Temp Solvent TanksTemp Solvent Tanks
WarehouseWarehouse
New New SubstationSubstation
EvaporatorEvaporatorBiological Biological
UnitUnit
Covered ParkingCovered Parking
GuardhouseGuardhouse
Fire PumpFire Pump
Truck Truck ParkingParking
Boiler HouseBoiler House
Total Investment: US$ 1,5 Millions
Project Overall Schedule
Start up Quotation
Negotiation
Order
Kick-Off
Construction - Assembly
Commissioning
EvaporatorEvaporator