digital submission standard hagtag hamilton county local government gis technical advisory group...
TRANSCRIPT
Digital Submission Standard
HagTagHamilton County Local Government GIS Technical Advisory
GroupCarmel • Fishers • Noblesville • Westfield • Hamilton County
H T
Who are we?
Terry Krueskamp – Carmel Mike Cranfill – Fishers Mike Morris – Noblesville Eric Becker – Westfield Suzie Mills – Hamilton County
H T
What are we here to discuss?
A single technical standard for submitting digital data Secondary plats Water Storm sewer Sanitary sewer Easements Signs Sidewalks, multi-use paths
H T
Where are we?Boone County Hamilton County Hancock County Hendricks County Johnson County Marion County Shelby County
Total Total Total Total Total Total Total2005 2005 2005 2005 2005 2005 2005751 4,276 762 2,349 1,881 4,619 272
Indianapolis Metropolitan Planning Organization
H T
Where are we? We are the fastest
growing county in Indiana.
For several years, we have been adding about 4,000 new parcels each year.
We have over 5,000 new parcels for the year ending March 1, 2005.
March 1, 2006 – 6,383 We don’t expect the rate
of growth to slow down.
WASHINGTONWASHINGTONWASHINGTONWASHINGTONWASHINGTON
FALL CREEKFALL CREEKFALL CREEKFALL CREEKFALL CREEK
ADAMSADAMSADAMSADAMSADAMS WHITE RIVERWHITE RIVERWHITE RIVERWHITE RIVERWHITE RIVER
NOBLESVILLENOBLESVILLENOBLESVILLENOBLESVILLENOBLESVILLE WAYNEWAYNEWAYNEWAYNEWAYNE
CLAYCLAYCLAYCLAYCLAY
DELAWAREDELAWAREDELAWAREDELAWAREDELAWARE
JACKSONJACKSONJACKSONJACKSONJACKSON
Atlanta
Arcadia
Cicero
Sheridan
Westfield
Fishers
Carmel
Noblesvil le
H T
Why are we doing this? Why Digital Drawing File Submittal
Standards?
Why Collaborate with Others?
H T
Why are we doing this?
Official: Federal Mandates! Problems looking for Solutions
GIS: Solutions looking for Problems Infectious Enthusiasm
Developers/Engineers: Look to the source We need the data they already have
Public: Check cost of Government Save Money
H T
Why are we doing this? MS4 Program
AKA: Municipal Separate Storm Sewer System Program
A storm water management program federally mandated by the EPA to control polluted discharges into our nations’ waterways
Specifically for GIS is the need to develop storm sewer maps as well as locate and identify points of illicit discharge/illegal dumping.
Some of you may know it as Phase II that is for areas with a population of 100,000 or less.
H T
Why are we doing this? GASB 34
Another mandate from the Governmental Accounting Standards Board.
Imposed fundamental changes to the financial reports that local governments must produce.
Has to do with how things like roads and the cost to maintain verses an annual depreciated value, what ever…it’s Asset Inventory and its something that GIS can be an integral part of in the process.
H T
Why are we doing this?
GIS Family Crest
GIS is ...."An organized collection of computer hardware, software, geographic data, and personnel designed to effectively capture, store, update, manipulate, analyze, and display all forms of geographically referenced information.“--ESRI, 1995
H T
Why are we doing this? GIS !!! Limited funds at Local Level
Staff (Less staff…Less Taxes) Maintenance
Look to the Originators of Data Maximize Technology Improve data quality
Accurate Complete Current
Promote quality growth
H T
Why are we doing this? Why Collaborate?
Collaboration helps define collective priorities
Promotes consensus on decisions Promote understanding of whole process Define critical standards Meet future needs
H T
How did we do this?
Discussed Guidelines Met with Engineers Implemented Ordinances Implemented Standards
H T
How did we do this ? (page 2)
Benefits to us and others One Standard Less Paper Better Use of Data Data Availability:
Orthophotography,Parcels,Road centerlines Lakes, rivers, & streams, Regulated Drains Contours and spot elevations, corner records
H T
Digital Submittal Requirements
1.0 General Requirements
2.0 As-builts - Infrastructure
3.0 Secondary Plats
4.0 Record Drawings
H T
1.0 General Requirements
CD-ROM in a jewel case CD Label1.3 The CD label shall include the following:
1.3.1. Engineering Company Name with prepared by statement
1.3.2. Project Name 1.3.3. Date that data is burnt onto CD 1.3.4. Designate CD as As-built, Construction Plan or Other
H T
1.0 General Requirements
Files … 1.1. Files must be submitted in the native file format (DWG
or DGN) and DXF
1.4. File names should make sense to a viewer who may not be familiar with the consulting firms naming conventions and be indicative of the contents of the file.
H T
1.0 General Requirements
Bloopers … Volume in drive E is Carmel
Volume Serial Number is 8947-D91D
Directory of E:\
08/24/2005 09:33a 2,957,296 C501-AS-BUILT-07-21-05.dwg
1 File(s) 2,957,296 bytes
0 Dir(s) 0 bytes free
H T
1.0 General Requirements
Bloopers … Volume in drive E is New_Compilation
Volume Serial Number is D4E9-8339
Directory of E:\
10/13/2005 01:08p 6,623,964 41760S1.dwg
10/13/2005 01:10p 2,270,909 41760S2.dwg
2 File(s) 8,894,873 bytes
0 Dir(s) 0 bytes free
H T
1.0 General Requirements
And More Bloopers … Volume in drive E is Wexley Chase
Volume Serial Number is 901A-CEDD
Directory of E:\Record Drawings
10/06/2005 10:08a <DIR> .
10/06/2005 10:08a <DIR> ..
10/06/2005 10:07a 1,007,392DEST2636.tif
10/06/2005 10:07a 2,774,675DEST2637.tif
10/06/2005 10:07a 2,454,285DEST2638.tif
10/06/2005 10:07a 1,493,244 DEST2639.tif
10/06/2005 10:07a 1,207,592DEST2640.tif
H T
1.0 General Requirements
1.10. Projection shall be referenced to NAD83, Indiana State Plane Coordinate System, East Zone, using U.S. Survey Feet and per the Hamilton County datum…
H T
2.0 Infrastructure Excel Spreadsheet (use template) Object Data Table (use template) Storm Water BMPs included As-Built information
Input procedures I.E - Structure ID’s, Lines snapped to
insertion point and drawn in direction of flow
PDF of signed As-Built documents
H T
2.0 Infrastructure
Excel Spreadsheet (use template) Hamilton County Digital As Built Submittal Spreadsheets (Ver.
1.2).xls Tabs
Directions San Structure San Pipe Storm Structure Storm Pipe BMP Non Structure BMP Types Water Node Water Line Signs
H T
2.0 Infrastructure Object Data Table (use template)
Use in place of Excel Autodesk Map Object Data Tutorial
This document describes the workflow and detailed procedures to populate the Object Data Table with As-Built data required by the digital information submittal format. All Instructions and Illustrations contained in this document were derived from Autodesk Map 2004. For use with Autodesk Map products 2004 and current.
H T
2.0 Infrastructure
As-Built information Input procedures
I.E - Structure ID’s populating Block ID
H T
2.0 Infrastructure
As-Built information Input procedures
Lines snapped to insertion point of block
H T
2.0 Infrastructure
PDF of signed As-Built documents Digital reduces paper Allows for quicker access Allows for hyperlinks in a GIS
H T
Submittal Matrix List each item in the specs
I.E. 1.9 - Separate layers for structures, pipes, annotation etc. with a logical description for each layer
List each participant and what items they require
H T
Submittal MatrixSection Carmel Fishers Noblesville Westfield CTRWD Hamilton County Surveyor Hamilton County Auditor
1.1 ● ● ● ● ● ● ●1.2 ● ● ● ● ● ● ●1.3 ● ● ● ● ● ● ●1.4 ● ● ● ● ● ● ●1.5 ● ● ● ● ● ● ●1.6 ● ● ● ● ● ● ●1.7 ● ● ● ● ● ● ●1.8 ● ● ● ● ● ● ●1.9 ● ● ● ● ● ● ●
1.10 ● ● ● ● ● ● ●1.11 ● ● ● ● ● ● ●1.12 ● ● ● ● ● ●1.13 ● ● ● ● ● ● ●2.1 ● ● ● ● ● ●2.2 ● ● ● ● ●2.3 ● Prefered ●2.4 ● Prefered ●
2.5.1 ● ● ● ● ● ●2.5.2 ● ● ● ● ●2.5.3 ● ● ● ● ● ●2.5.4 ● ● ● ● ● ●2.5.5 ● ● ● ● ● ●2.5.6 ● ● ● ● ● ●2.5.7 ● ● ● ● ● ●2.5.8 ● ● ● ● ● ●2.5.9 ● ● ● ● ●
2.5.10 ● ● ● ● ● ●2.5.11 ● ● ● ●
2.6 ● ● ● ● ● ●2.7 ● ● ● ● ●2.8 ● ● ● ● ● ●2.9 ● ● ● ● ● ●
2.10 ● ● ● ● ● ●2.11 ● ● ● ● ● ●2.12 ● ● ● Optional ● ●3.1 ● ● ● ● ● ● ●3.2 ● ● ● ● ● ●3.3 ● ● ● ● ● ●
H T
3.0 Secondary Plats
Included layers Must match recorded plat exactly PDF of the recorded plat with the
recording stamp
H T
What’s Not Specified DWG, DGN or DXF
Version Layer Names* Text Size Colors Line styles & Weights File Names Software you don’t have
H T
What’s Not Specified Layer Names
purge (pûrj) v. purged, purg·ing, purg·es v.tr.1. To free from impurities; purify.2. To remove (impurities and other elements) by or as if by cleansing.3. To rid of sin, guilt, or defilement.