DI&C Project & Lead-Plant Experiences
Gordon CleftonMarch 11, 2009
![Page 2: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/2.jpg)
Digital Experiences --- Agenda
–Why Digital Upgrades
– Digital Operating Experience at Oconee
– Lessons Learned with Oconee’s LAR
– Digital Project Path Forward
2
![Page 3: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/3.jpg)
Why Digital Upgrades (1 of 1)
Driving Forces for Digital Upgrades•Existing plant systems are obsolete
•Spare parts are limited
•Component repairs are addressing near-term equipment issues
•Elimination of single failure vulnerabilities through redundant equipment
•Enhancements to system design and functions
•Significantly improved on-line monitoring and channel check capability
3
![Page 4: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/4.jpg)
Digital Operating Experience at Oconee (1 of 2)
Digital Upgrades completed on Oconee Units:– Integrated Control System (1996-1998)
– Operator Aid Computer (1998-1999)
– Main Turbine Control System (2002-2004)
– Digital Control Rod Drive Control System
– Turbine Supervisory Instrumentation
– Foundation Fieldbus System for Instrument Loop Upgrades (Process Control System)
– Electrical Generator Automatic Voltage Regulator
4
![Page 5: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/5.jpg)
Digital Operating Experience at Oconee (2 of 2)
Positive OE from Digital Upgrades:• Replaced obsolete systems which had
performance problems• Improved system and plant reliability by
installing redundancy to eliminate single point vulnerabilities
• Improved reactivity management by increasing system stability and reducing operator burden during power maneuvers
• Significantly improved:– System monitoring – Online functional check capabilities– Improved diagnostic capabilities
5
![Page 6: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/6.jpg)
Lessons Learned with Oconee’s LAR (1 of 1)
For digital upgrades requiring NRC approval (RPS & ESPS), lessons learned by Oconee:
Regulatory findings Regulatory standards High quality, accurate, and timely documentsMilestone scheduleCommunicationsNRC/Vendor/Utility Engineering strength
6
![Page 7: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/7.jpg)
Digital Project Path Forward (1 of 1)
Interim Staff Guidance (ISG):– Revise DI&C-ISG-02, ISG-04, & ISG-05
– Create DI&C-ISG-06 & ISG-07
– Roll ISG content into permanent guidance
Digital Project Workshops– Lessons Learned (Oconee & Wolf Creek)
– LAR Preparation using ISGs
7
![Page 8: DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022072011/56649e2d5503460f94b1cbf9/html5/thumbnails/8.jpg)
DI&C Project & Lead-Plant Experiences
– Questions ?
– Items to carry to NEI ?
8