Page 1: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DIA Survey Requirements

Thomas Breitnauer, PLS

[email protected]

DIA Land Surveyor

December 10, 2014

Page 2: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Survey Requirements

- During Pre-Construction meeting

- Contractor should receive a survey packet with template for:

- Survey Statement of Work (SSOW)

- Survey and Quality Control Plan (SQCP)

- Weekly Project Status Report

- Final Project Report

- It would be fitting for the Contractor to submit the SSOW and

the SQCP for their project prior to the Pre-Survey meeting.

- The DIA Survey Section needs to review and approve.

- This process could take approximately a week or more.

Page 3: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Pre-Survey Meeting

– No survey work can commence until the SSOW and the

SQCP is approved.

– Best to be completed prior to the Pre-Survey Meeting.

– During this meeting, the DIA Survey Section will provide all

necessary data.

– NGS datasheets. (Do not retrieve them from NGS’ website)

– Current projection parameters.

– Coordinate list.

– Map of the points.

Page 4: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Control Network

– Contractor set their control network for their project

– Submit all field notes, raw files and reports to the DIA

Survey Section for review.

– Raw files must be read by Trimble Business Office (TBC).

– Reports must be in MS Word or MS Excel format

– Control Network must have DIA Survey Sections approval

before any survey work can begin.

Page 5: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Questions?

– Questions?

Page 6: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DIA Survey Requirements

Thomas Breitnauer, PLS

[email protected]

DIA Land Surveyor

December 10, 2014

Page 7: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

*

AIM Asset Management, BIM & Survey

Requirements

Brendan Dillon

[email protected]

BIM Manager

December 10th, 2014

Page 8: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

AIM Asset Management Group

*

AIM Asset Management

Research and Analytics

Maintenance Planning

Programs Building

Information Modeling

MAXIMO Administration

Page 9: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

What is BIM?

Building Information Modeling (BIM) is a digital

representation of physical and functional characteristics of a

facility. A BIM is a shared knowledge resource for

information about a facility forming a reliable basis for

decisions during its life-cycle; defined as existing from

earliest conception to demolition.

- USNBIMS

*

BIM is an approach to design, construction and facilities

management that makes the information generated at each

step more usable and accessible at every other step.

Page 10: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

What does BIM at DIA mean?

─ All design work is to be delivered to DIA in an .rvt format for work and

as Civil 3D generated .dwgs for horizontal/civil work.

─ Contractors follow a VDC (Virtual Design & Construction) process for

laying out and planning their construction path.

─ Commissioning of all DIA systems designated as Assets is required.

─ DIA uses the final Reconciled Model to feed into our BIM database.

─ BIM database connects to our GIS and Maximo Asset Management

systems.

─ BIM database is in a neutral SQL database, enabling it to connect to

a number of other systems for future uses such as our condition

assessment program, commercial tenant management, and other

programs

─ When a new project occurs in an area with existing BIM work, the

team will have better information on existing conditions than

previously available. *

Page 11: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Integration with Maximo

– Jet-Bridge Conditions Assessment

Page 12: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

BIM Software

─ 3 Software Platforms

─ Autodesk Revit – Buildings and building systems

─ Autodesk AutoCAD Civil 3D – Site and site utilities

─ Autodesk Navisworks – Used for Spatial Coordination & Clash Detection

Page 13: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Software - Revit - About

─ Modeling instead of drafting|

─ Live schedules reflect actual counts, lengths, areas and volumes of elements, rooms and spaces in the project

─ Change something in one view and it is automatically updated in others. i.e. change door number on plan and it is updated in schedule, move a door in plan, it is reflected in elevation and sections

Page 14: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Software - Revit - About

─ 4 Versions

– Architecture

– MEP

– Structure

– Revit - Three Previous in One

─ Not Backwards Compatible

─ Cannot open a Revit 2014 file in Revit 2013. Once you open a Revit 2013 file in 2014, it becomes a 2014 file permanently

─ DIA Upgrades versions first quarter each year

Page 15: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Software - Civil 3D - About

– Surface and Site Utility modeling

– Very similar to standard AutoCAD using Object Based

Data Tables

– Live schedules reflect actual counts, lengths, areas and

volumes of earth, pipe, equipment, etc.

– Change something in one view and it is automatically

updated in others. i.e. change grading on plan and it is

updated in schedule

Page 16: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Software – Spatial Coordination/Clash Detection

─ Navisworks - 3 Versions

– Freedom - Free viewer. Good for most consultants

– Simulate - Premium Design Suites. Create/Track Clash Views

– Manage - Ultimate Design Suites. Automated Clash Detection

tools

– BIM 360 Glue – Cloud hosted option for Spatial

Coordination/Clash Detection with more advanced tracking

features

– Revit - Spatial Coordination can be done within Revit during

Design, though it is not recommended

Page 17: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Software – Other Recommended Tools

─ SysQue

─ Model Review Add-In

─ BIM 360 Field

─ Bluebeam

Page 19: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Wetware / Users

No hardware or software can compensate for a user knowledge base shortfall, while a knowledgeable user can get around many hardware and software limitations ─ Train existing staff

─ Hire new staff

─ Subconsultant

– In-House

– Out-of-House

─ Which approach? ALL!

Page 20: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DEMO HTC – Model integration

Page 21: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Who is Implementing BIM?

Denver International Airport USACE / GSA Other Airports

– Tampa International Airport

– Cleveland Airport

– Honolulu

– LaGuardia

University of Colorado Children's Hospital City of Denver BIM adoption will be ubiquitous within 5-10 years for all longterm facility owners

*

Page 22: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Analytics & BIM Deliverables Tracking

─ Every proposal is reviewed for conformance to DIA standards

─ BIM model is evaluated at each deliverable

─ RFI's, Change Orders, Bulletins, etc. tracked

─ All reviews are documented and recorded in our cross referenced database for project and full project team evaluation, including internal DIA performance

*

Page 23: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Questions so far?

*

Page 24: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DSM 12

─ 7 Chapters plus Appendix & Attachments

─ White Papers Coming Soon!

─ Conformance to DSM standards is a requirement for all projects. No exceptions!

*

Page 25: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DSM 12 - Chapter 1 & 2

─ Chapter 1- Electronic Data Collection and Interchange (EDCI) Compliance Policy

– References and summary of FAA NextGen and A-GIS requirements

– 5 pages

─ Chapter 2 - BIM Introduction Overview

– Organization strategy

– Implementation

– PXP Introduction

– Objectives & Application

– BIM Process Summary

– 16 Pages

*

Page 26: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DSM 12 - Chapter 3 & 4

─ Chapter 3 - Subsurface Utilities Data Standard

– Requirements for surveying and documenting

underground utilities

– 4 Pages

─ Chapter 4 – BPXP Instructions

– Guidelines for working with the DIA BIM Project

Execution Plan

– 7 Pages

*

Page 27: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DSM 12 - Chapter 5

─ CADD Procedures Manual

– Includes Requirements and Procedures

– Applicable to Civil work only (>5’ from building footprint)

– File management and naming

– File configuration

– Layer standards

– Best practices

– GIS Data requirements

– File delivery

– 88 Pages

*

Page 28: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DSM 12 - Chapter 6

─ BIM Standards

– Introduction

– Project Setup

– Project File Standards

– Content Modeling Standards

– Modeling Requirements – Design

– Modeling Requirements – Construction

– Spatial Coordination

– R300

– Data Commissioning

─ 44 Pages *

Page 29: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DSM 12 - Chapter 7

*

Tenant BIM Standards Restaurants, Shops, etc. Design team not typically contracted by

DIA, but still required to meet DIA standards.

– Introduction

– Project Setup

– Project File Standards

– Content Modeling Standards

– Modeling Requirements – Design

– Modeling Requirements – Construction

– Spatial Coordination

─ 44 Pages

Page 30: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

BIM Project Execution Plan

─ Project Information

─ Project Processes

─ Data Requirements

─ Collaboration Procedures

─ Model Structure

─ Deliverables

*

Page 31: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Level of Development Matrix

─ Organized by UNIFORMAT II

– Additional Level 1 Major Group Elements “L – Airport

Equipment”

– Level of Development definitions as defined by BIMForum 2013

LoD Specification

– Indicates whether a sub-element category is:

– considered an Asset by DIA

– Requires Commissioning

– Requires training for DIA staff

– Toggle for indicating which sub-element categories are in the

scope of that project

*

Page 32: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Level of Development Matrix

~Chapter Summary~

*

Page 33: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

DIA Templates & Kit of Parts

─ Updated Annually

─ Always growing

─ Available to everyone, for any

project, at DIA or not.

─ 4,000+ Families, not counting

system families in Container files

*

Page 34: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Project Process & Deliverables

─ Proposal

─ Award

─ Pre-Design

─ Schematic Design

─ Design Development

─ Construction Documents

─ Bid Phase

─ Construction Phase

─ Commissioning

─ Project Closeout

*

Page 35: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Project Process & Deliverables

─ Proposal

– Review current DSM

– Review provided BIM backgrounds, scan and survey

information for proposal

─ Award

– Submit BPXP within 30 days of NTP.

– DIA will return with comments within 14 days.

– Submit base model for each discipline to insure each consultant

is using correct template and Shared Coordinates

─ Pre-Design

– Preliminary programmatic spaces modeled *

Page 36: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Project Process & Deliverables

─ Schematic Design

– All rooms and spaces placed

– Model submitted at end of phase for high level review

─ Design Development

– Needed equipment families should be developed

– Model submitted at end of phase for high level review

*

Page 37: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Project Process & Deliverables

─ Construction Documents

– Model submissions at 30, 60, 90 & 100%

– Modeled elements conform to LoD Matrix

– New families submitted for review as created

Family and model reviews returned within 14 days

– All rooms/spaces named and placed

– All equipment modeled

– Systems (duct, pipe, conduit, etc) modeled to tolerances in DSM

*

Page 38: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Project Process & Deliverables

─ Bid Phase

– Update BIM Model with Addenda as appropriate

– Contractors review DSM, BPXP

─ Construction Phase

– Contractor model created and coordinated

– Design model updated with RFI’s, Change Orders, etc.

– R300 Model

─ Commissioning

– Commissioning data integrated into models

─ Project Closeout

– Construction, Design & Facilities models delivered to DIA

*

Page 39: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Model Review Process & Document

─ Breakdown of

requirements

─ Numerical Grading

─ Reference to DSM

location

─ Framework to

discuss next steps

*

Page 40: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

What if...

...you don't know

Revit or Civil 3D

well enough to

meet DIA's

standards?

*

Let’s discuss it.

Page 41: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

Resources

DIA – Free resource for clarification and guidance, NOT training.

Youtube - Free

AUGI.com - Autodesk User’s Group International - Free

Autodesk University - videos available free to Autodesk Subscription holders

RoMBIS - Rocky Mountain Building Information Society

BoB Tech – Boulder Building Technology Group

Publications

Mastering Autodesk Revit Architecture 2015

Mastering Autodesk Revit MEP 2015

Autodesk Revit Architecture Essentials 2015

Autodesk Revit MEP Essentials 2015

Autodesk Revit Architecture 2015: No Experience Required

The Aubin Academy: Revit MEP 2015

Exploring Autodesk Revit Structure 2015

*

Page 42: DIA Survey Requirements - Denver International Airportbusiness.flydenver.com/bizops//documents/BIM_Survey_Requirements.pdfLevel of Development Matrix ─Organized by UNIFORMAT II –

*

AIM Asset Management, BIM & Survey

Requirements

Brendan Dillon

[email protected]

BIM Manager

December 10th, 2014