Developing a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort Jeff Davis (General Manager) and Norm Birdsey (WQ Manager/Operator) EPA/CA-SWAMP @ SCCWRP Workshop, April 25-27, 2017 Presented by Amy Little, CA SWRCB- Division of Drinking Water

Upload: lekiet

Post on 26-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Developing a Cyanotoxin Management Plan Case Study: Highlands MWC

USEPA supported effort

Jeff Davis (General Manager) and Norm Birdsey (WQ Manager/Operator)EPA/CA-SWAMP @ SCCWRP Workshop, April 25-27, 2017

Presented by Amy Little, CA SWRCB- Division of Drinking Water

Page 2: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Why develop a plan in Clear Lake? • 17watertreatmentplantsaroundClearLake,CA:developingonecouldserveasatemplateforothers

• UCDavisresearch(1969‐1991):IDcyanobacteriaand• cellconcentrationsexceedWHOrecreationvalues• Thickalgalmats,neurologicaldisordersreportedincatsfollowingabloomeventin1989

• Snapshot ofmicrocystin monitoringatdrinkingwaterintakesin2011(max8ug/L),2013(2.4ug/L)and2014(2.4ug/L)demonstratesEPAHealthAdvisoryof0.3ug/Lisexceededinrawwater(andWHODWlevel,1ug/L)

• Recreationalmonitoring:2010and2011County/SWAMPmonitoring,ongoing(BigValleyRancheriaBandofPomoIndiansandElemColony)– totalmicrocystins exceeding10,000ug/Lattheshoreline.

• Q:Ismywatersafetodrink?Customersareinquiring

Page 3: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Cyanotoxin Monitoring Plan Highlights• Step1.AssessSourceWater:EPADWMAPStool• Step2.Monitorforearlywarningsigns

• Sludgeturnsgreen,dielpHswings(7.7to9.7)• Step3.RawWaterMonitoringandTreatmentAdjustments

• Treatmentadjustment: seasonalPACoperations+• Step4.FinishWaterMonitoring/TreatmentAdjustments/PublicCommunication• Hemodialysiscenters&noticeinEnglish/Spanish• UsingMCADDA‐specificELISAfordecisionmaking• Focusedon0.3ug/LfortotalMCforPN

• Step5.ContinuedFinishedWaterCyanotoxinMonitoring/TreatmentAdjustments/PublicCommunication:Totalcoliformandtanksitesused

Page 4: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

HIGHLANDS MWC

44,000 people served via 17 water plantsSince 1969, doc cyanobacteria presence

Clear Lake

Clearlake

Page 5: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Cyanobacteria Water Treatment challenges• SourceWaterQuality

• Diel pHfluctuationscanbeextreme(acidadditionstocounter)

• Elevatedtotalorganiccarbon(attimes>10ug/L)• SuiteofTreatmentIssues:

• Shortfilterruns/Cloggedfilters• Increasedpre‐oxidationdemand• Increasedcoagulantdemands• Increasedfilterbackwashing/clarifiersludgeremoval• Increaseindisinfectionapplicationstomaintainrequiredresiduals

• Incr.disinfectionbyproductformation– installedaerationsys

• Taste&Odorcomplaints– largelyresolved• Unknownimpactsfromcyanotoxins

Page 6: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Clear Lake Treatment “50% Model”Treatment Strategies Evolve

O3

O3

O3

“TH

EN”

“NO

W”

DBPR

Page 7: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Highlands Treatment Plant and Intake

WTP

Page 8: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Highlands Mutual Water Company• ServingaportionofClearlake,CA,poorestcountyinthestate

• Connections:2,876 Populationserved:6,170• Supplyahemodialysiscenter– improvedcommunicationin2011

• Conventional coag +floc+sedimentation+filtration• Conventionaltreatmentplantwithadditionaltreatment

• In2015,operatingat1.4MGD(1,000gpm)• Pre‐treatment:pre‐oxidants(ozoneandsodiumhypochlorite),PAC• Processtreatment:filteraid,coagulantaid• Post‐treatment:twotypesofGAC

• Technicalexchangepartners

Page 9: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

OZONE-2

OZONE-1

150 HP GAC

GAC

PRESSURE FILTER -2

PRESSURE FILTER -1

CLARIFIER-1

CLEARWELL 397 K

150 HP

1.7 MGD max

720 GPM max

480 GPM max

CLARIFIER-2

KMNO4 NaOCl

PAC

ACH

NaOCl

Zn3(PO4)2

Screw press

Recycled Water to Headworks Sludge

Highlands MWC Treatment Plant

Filter aid

To customers

Microcystin monitoring point

Coag aid

Page 10: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Highlands MWC Treatment Plant cont…• FilterBackwashingofOneMulti‐mediaPressureFilter:

• Design:backwashafilterevery1to4days*• 80%ofthetime: 1filterbackwash/day• 10%ofthetime: 2filterbackwash/day• 10%ofthetime: 3+filterbackwash/day• Createsneedforbackwashdisposal

• EmptyBedContactTimeinCarbonFilter:• Design:cyanotoxinreferencesindicateminimumof10minutes• HighlandsMWC:30minutes• AnotherconventionalplantonClearLake:38minutes

*WaterTreatmentPrinciplesandDesign,2nd edition,MWH(2005)

Page 11: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Plan Development• Twodayson‐grounddedicatedtoeffort

• Documentedwatertreatment• Walkedthroughscenarios:triggers onwhentochangemonitoringandlocations/operations&investigations/whentonotify/whentoliftnotice,stakeholders,andpublicnotice.

• Seasonalreadyunderway• Interimplandevelopedwithbackboneofdiscussionsabove;focusedonthoseinbold

• Fine‐tuneplan:backandforthdiscussions• Bonus:Sourcewaterprotectioncomponent

Page 12: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Challenges, Part 1• MonitoringFrequency/SamplingSchedule

• Questionswrestledwith:(1)howbesttocapturepeakinrawmonitoring,(2)partnershiprestrictedscheduletobi‐weekly,(3)ifraw>0.3ug/LMC,howdowecollectfinishsample?

• Overcome:collectedfinishwatersamplesatsametimeasraw• Publicwatersystemshavemanycompetingprioritiesandwearmultiplehats:managersandoperators• Attimeofdevelopment,

• Backwashprojectindevelopment• Granularactivatedcarbonmediafilterchange• Day‐to‐dayoperations:5operatorsonstaff,turnovercanbeaproblem

• Overcome:scheduletime/meetingstoaccomplishtasks

Page 13: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Challenges, Part 2• LaboratoryMethod:whichtouse?

• Interferences,turn‐aroundtime,partialMCvs.ADDAspecific

• Overcome:Introducedflexibility tousetheADDAspecificELISAwithanoptiontouseEPAMethod544forconfirmation

• Nowthere’sEPAMethod546,anotherconsideration• Knowingwhentoliftthenotice

• Doweflushthesystem/tanks?Whatamountofsamplingensuresitissafetodrink?

• Overcome: usedroutinebacteriologicalmonitoringsitesandstoragetanksites.• 1st :striptest 2nd :confirmwithlaboratoryorADDA‐specificELISA

Page 14: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Challenges, Part 3• WaterSystemisISOLATED fromwatershedactivities

• Overtheyears,moreDWtreatmentandtoolsrequired(latestwavesincludePAC,coagulantaids,filteraids,benchtopchargeanalyzers;manyalreadyhavegranularactivatedcarbon)

• Overcome:shiftfocustopartnershipstoimprovesourceWQ

Page 15: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Source water protection = education• HABsriskfactorscanberanked:vulnerableApril‐ Nov• Readthewatershedreports

• Impairedwaterbodyfornutrients(andmercury)• TMDLdevelopedinresponse– target:phosphorus,derivedfromsedimenterosion

• UseTools:USEPADWMAPS – identifypotentialsourcesofcontaminationinwatershed(tier1‐watershedboundaryzoneandtier2– 10mi.upstreamzone)• PointsourcesofP(andN)canbeidentified(2%)• Non‐pointsourcesofPcarrytheload(98%)

• ActivitiesID’d mostlikelytobesourceofexcessP

Page 16: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Building Bridges in Source Water Protection• 17PublicwatersystemspooltogetherresourcestocompleterequiredCAWatershedSanitarySurvey(every5years)• Description/sourceWQmonitoring/activities/sourcesofcontaminants/changes/managementpractices/abilitytomeetSWTR/recommendationsforcorrectiveactions.

• PilotinganewWatershedSanitarySurvey!• convertingsurveyintoameanstoobtainfundingforsourcewaterprotection.Survey=fundingapplication

• Partnership:Entities/Agencies&WaterSystems

Page 17: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Successful Cyanotoxin Management Plan• Bepreparedtonotifycustomers

• Comfortablewiththelanguageandtriggers:arethereanylaboratory confirmationsamplesfollowingscreen?

• Carvededicatedtimeouttocompleteplan• Stepthroughthetoughscenariosandliftingthenotice• Includeareferencesamplingtableorguidefortheoperatortofollow

• Arethereanysamplingrestrictions?• Evaluatescreeningkits,includingthresholds• Planforlaboratoryturn‐aroundtime

• Getinvolvedwithsourcewaterprotection

Page 18: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

2016 Update and Next Steps• Eightadditionalwatersystemsadoptedtheabbreviatedplanin2016andparticipatedinthesomeformofmonitoring

• 2016rangeofconcentrationsattheintake:ND– 0.73ug/L• infinishwater:ND– 0.18ug/L• NextSteps:

• Continuequarterlywatersystemmeetings;startedin2016• Hosttwo‐dayjartestworkshopwithbenchtopchargeanalyzertooltooptimizecoagulantdosages(lastweek)

• Participatein2017WatershedSanitarySurvey• Use0.45umfiltersonrawwatertopotentiallydriveozoneoperations(toexamine[intra‐,extra‐cellular]distributionofMC),+sludge

Page 19: Developing a Cyanotoxin Management Plan Case … a Cyanotoxin Management Plan Case Study: Highlands MWC USEPA supported effort ... Screw press Recycled Water to

Development Team• AppreciatethesupportandassistanceprovidedbytheEPA,includingHannahHolisinger

• KarenSklenarofCadmus:implementer/headofdevelopment;tirelesseffortsandabilitytoeducate,capturescenariosandabsorbinformation

• Professional,accommodating,andinformative:JeffDavis andNormBirdsey,HighlandsMWC

• AmyLittleandSheriMiller ofCASWRCBDiv.ofDrinkingWater

[email protected]