detailed second quarter 2017/18 progress...
TRANSCRIPT
Over achieved Achieved
Partially achieved Not achieved
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
PMU No milestone for the quarter n/a No milestone for the quarter No milestone for the quarter No milestone for the quarter
IT n/a n/a
Legal Services n/a n/a
HRM n/a n/a
Internal Audit n/a n/a
Risk Management n/a n/a
Financial Accounting n/a n/a
SCM n/a n/a
4.3.4 Percentage vacancy rate for engineers and
scientists
≤10% ≤10% n/a 114% filled over stablishment. (675 filled out of
592 posts).
Formula:
675/592*100=114%
114% filled over stablishment. (675 filled out of
592 posts).
Formula:
675/592*100=114%
Over by 24%
Formula:
114% - 90%=24%
114% filled over stablishment. (675 filled out of 592
posts).
Formula:
675/592*100=114%
The Department appoint candidate
engineers and scientists additional to
establishment as per OSD.
n/a Over achieved PoE accepted
4.3.5 Percentage of SMS employees attending
interventions identified through the DPSA
competency assessment
100% 30% n/a 108% ( 10 in Q1 +79 in Q2 = 89) attended training
interventions identified through DPSA
Competency assessment
Formula:
89/82*100= 108%
Note: The 82 is the annual target set in the APP.
This target is accumulative.
108% ( 10 in Q1 +79 in Q2 = 89) attended training
interventions identified through DPSA
Competency assessment
Formula:
89/82*100= 108%
Note: The 82 is the annual target set in the APP.
This target is accumulative.
Over by 8% (7) (please
provide the formula for the
calculation.)
Formula:
106% (89) – (82) 100%
108% ( 10 in Q1 +79 in Q2 = 89) attended training
interventions identified through DPSA
Competency assessment
Formula:
89/82*100= 108%
Note: The 82 is the annual target set in the APP.
This target is accumulative.
Instead of 2 groups spread in Q3 and Q4
attending Financial management, one
bigger group of 41 sms was conducted.
Other training took place as per
schedule.
n/a Over achieved PoE accepted for the Report of SMS
member who attended training
during Q2
4.4.1 Percentage of the Water and Sanitation
Sector Occupations (skills) registered with
OFO
100% of the Water and Sanitation Sector
Occupations (skills) registered with OFO
50% n/a 27% of occupations registered 27% of occupations registered 23% 23% 27% of occupations registered DHET OFO Task Team Qquarterly
meeting was moved to October
The remaining occupations submissions
for the financial year will be wholly
adjudicated in October 2017
Partially achieved Poe accepted
No milestone for the
quarter
August:
Johnson and Johnson Consultaion on the
Partnership TOR.
August:
Johnson and Johnson Consultaion on the
Partnership TOR.
August:
Johnson and Johnson Consultaion on the
Partnership TOR.
Poe accepted
September:
GIZ Consultation on Partnership Assesment
September 2017
September:
GIZ Consultation on Partnership Assesment
September 2017
September:
GIZ Consultation on Partnership Assesment
September 2017
Poe accepted
1
Partnership instruments finalised
1
Partnership instruments finalised
1
Partnership instruments finalised
Poe accepted
September:
MOU GIZ
September:
MOU GIZ
September:
MOU GIZ
Poe accepted
August:
GIZ MoU consultation
August:
GIZ MoU consultation
August:
GIZ MoU consultation
Poe accepted
July:
consultation of GIZ MoU
July:
consultation of GIZ MoU
July:
consultation of GIZ MoU
Poe accepted
5.2.1
Corporate Services
3 Stakeholder consultations:
July:
Life4U Consultation on Partnership TOR
Assesment.
3 Stakeholder consultations:
July:
Life4U Consultation on Partnership TOR
Assesment.
Annual assessment of benefits derived
from partnership agreement instruments
Annual assessment of the benefits derived
from partnership agreement instruments 3 Stakeholder consultations:
July:
Life4U Consultation on Partnership TOR
Assesment.
No milestone for the quarter
PMU
Communications
No milestone for the quarter
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
DETAILED SECOND QUARTER 2017/18 PROGRESS REPORT
Programe1: AdministrationDepartmental Management
4.3.1
n/a
Percentage compliance with MPAT standards
at the minimum targeted level 3
No milestone for the
quarter
Poe accepted n/a
1
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration6
Partnership meetings
6
Partnership meetings 6
Partnership meetings Poe accepted
September September September
Progress report against Water Sector Partnership
action plans
Progress report against Water Sector Partnership
action plans Progress report against Water Sector Partnership
action plans Poe accepted:
July (1) July (1) July (1) Poe accepted
Teleconference between WWF-SA & DWS Teleconference between WWF-SA & DWS Teleconference between WWF-SA & DWS Poe accepted
August (5) August (5) August (5) Poe accepted
Collaboration meeting between DTI & BBBEE Collaboration meeting between DTI & BBBEE Collaboration meeting between DTI & BBBEE Poe accepted
DWS & COBRA DWS & COBRA DWS & COBRA Poe accepted
Collaboration meeting betweenDWS&DTI Collaboration meeting betweenDWS&DTI Collaboration meeting betweenDWS&DTI Poe accepted
Collaboration meeting DWS women campaign Collaboration meeting DWS women campaign Collaboration meeting DWS women campaign Poe accepted
Collaboration meeting with sunlight Collaboration meeting with sunlight Collaboration meeting with sunlight Poe accepted
Quarterly report on the implementation
of the Annual Communications
programme
Quarterly report on the implementation
of the Annual Communications
programme
Quarterly report on the implementation
of the Annual Communications
programme
Poe accepted
1 Quarterly marketing and media report 1 Quarterly marketing and media report 1 Quarterly marketing and media report Poe accepted
12 media briefings 12 media briefings 12 media briefings More media briefings were done due to
issues in the environment Poe accepted for 12
378 media products 378 media products 378 media products More media products done due to issues
in the environment
PoE accepted
Opinion Pieces: 47
Sep:20
Aug: 14
July : 13
Opinion Pieces: 47
Sep:20
Aug: 14
July : 13
Opinion Pieces: 47
Sep:20
Aug: 14
July : 13
PoE accepted
Statements:125
September:52
August:33
July: 40
Statements:125
September:52
August:33
July: 40
Statements:125
September:52
August:33
July: 40
More statements done due to issues in
the environment
Poe accepted
Internet articles
September:24
August:17
July : 25
Internet articles
September:24
August:17
July : 25
Internet articles
September:24
August:17
July : 25
PoE accepted
Media interviews
September:21
August:32
July: 78
Media interviews
September: 21
August:32
July: 78
Media interviews
September: 21
August:32
July: 78
PoE accepted
2 Key messages 2 Key messages 2 Key messages Poe accepted
1 marketing and advertising campaign 1 marketing and advertising campaign 1 marketing and advertising campaign Poe accepted
8 cabinet announcements 8 cabinet announcements 8 cabinet announcements Poe accepted
5 member statement 5 member statement 5 member statement More member statements were done to
keep members of Parliament informed of
issues in the environment
Poe accepted
2 DWS Corporate Publications produced 2 DWS Corporate Publications produced 2 DWS Corporate Publications produced Poe accepted
Achieved
5.2.1
5.2.2 n/aQuarterly report on the implementation
of the Annual Communications
programme
Annual assessment on the implementation
of the Annual Communications Programme
Annual assessment on the implementation of
the Annual Communications Programme
Annual assessment of benefits derived
from partnership agreement instruments
Annual assessment of the benefits derived
from partnership agreement instruments
n/a
2
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNo milestone No milestone No milestone No milestone 1.1.8
n/a 8 community engagements / PPP
Sept: 3
August:2
July: 3
8 community engagements / PPP
Sept: 3
August:2
July: 3
8 community engagements / PPP
Sept: 3
August:2
July: 3
Poe accepted
n/a 20 targeted stakeholder engagements
Sept:8
August: 6
July: 6
20 targeted stakeholder engagements
Sept:8
August: 6
July: 6
20 targeted stakeholder engagements
Sept:8
August: 6
July: 6
more meetings took place due to issues
in the environment
Poe accepted
n/a 3 special events
Sept:1
August: 1
July: 1
3 special events
Sept:1
August: 1
July: 1
3 special events
Sept:1
August: 1
July: 1
Poe accepted
n/a 19 project stakeholder engagement session
Sept:9
August: 4
July: 6
19 project stakeholder engagement session
Sept:9
August: 4
July: 6
18 project stakeholder engagement session
Sept:8
August: 4
July: 6
Poe accepted
n/a 10 Capacity building of forums
Sept :5
August: 4
July: 1
10 Capacity building of forums
Sept :5
August: 4
July: 1
10 Capacity building of forums
Sept :5
August: 4
July: 1
Regions are reviewing and adding new
members which need to be capacitated
Poe accepted
n/a 40 issues management on water and
sanitation forums and hotspots
Sept: 16
Agust:12
July: 12
40 issues management on water and
sanitation forums and hotspots
Sept: 16
Agust:12
July: 12
15 issues management on water and sanitation
forums and hotspots
Sept: 6
Agust:5
July: 4
Meetings are convened as an when there
are issues to be addressed
Poe accepted
n/a 19 Forums involvement in DWS programmes
in all provinces
Sept:3
August: 6
July : 10
19 Forums involvement in DWS programmes
in all provinces
Sept:3
August: 6
July : 10
27 Forums involvement in DWS programmes in
all provinces
Sept:4
August: 13
July : 10
Forums have greater ability to participate
and organise activities after capacity
building programmes
Poe accepted
3.3.1.1 Percentage of targeted procurement budget
spent on qualifying small enterprises (QSE)
15% 15% n/a 24.60% 24.60% Over by 9.60% Over by 9.60% 24.60% There are more QSE participating in the
procurement of the department
n/a Over achieved PoE accepted
3.3.2.1 Percentage of targeted procurement budget
spent on exempted micro enterprises (EME)
15% 15% n/a 40.06% 40.06% Over by 25.06% Over by 25.06% 40.06% There are more EME participating in the
procurement of the department
n/a Over achieved PoE accepted
4.3.2 Percentage expenditure on annual budget 100% 40% n/a 46% 46% Over by 6% Over by 6% 46% Unfiled funded vacant position and
outstanding invoices across all
programmes.
The department is currently filling critical
vacant posts and the expenditure is
expected to improve in the third quarter.
All invoices related to goods and services
to be processed as soon as they are
received by the department.
Over achieved PoE accepted
3.3.1.2 Percentage of targeted
procurement budget
spent on qualifying small
enterprises (QSE)
15% 15% n/a 14% 14% Under by 1% Under by 1% 14% The implementation of the new PPR
2017 was still in progress during the
month of May 2017 and the budget was
resived which necessitate the review in
the DMP for 2017/2018.
Targetted procurement of goods and
services will be aligned with the new PPR
2017 which provides a platfom to target
the QSEs.
Partially achieved PoE accepted
3.3.2.2 Percentage of targeted procurement budget
spent on exempted micro enterprises (EME)
15% 15% n/a 48% 48% Over by 33% Over by 33% 48% The over achievement on EME target is
as a result of the implementation of the
Preferential Procurement Regulation
2017 where procurement of goods and
services is through the quotations.
Over achieved PoE accepted
4.3.3 Number of debtor days 100 days 100 days n/a 98 days 98 days exceeded by 2 day 98 days The reason for over achievement of
2days can be attributed to the increase in
revenue billed and amount impaired due
to municipalities and Water Boards not
servicing the accounts.
Over achieved PoE accepted
5.1.1 Number of analyses on progress against the
approved annual International Relations
Implementation Plan
4 1 n/a 1 1 n/a n/a 1 Achieved PoE accepted
Financial Management (Water Trading)
International Water Support
Financial Management (Main Account)
No milestone Assessment of impact of
mediated interactions that will
deliver meaningful engagements with
communities
Annual assessment of impact of mediated
interactions that will deliver meaningful
engagements with communities
5.2.3
3
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration
1.2.2 Integrated Water Quality Management
Strategy
Integrated Water
Quality Management
implementation plan
developed
Final Monitoring
and Evaluation
Framework
n/a Final Monitoring and Evaluation
Framework
Final Monitoring and Evaluation
Framework Final Monitoring and Evaluation
Framework
n/a Achieved Poe accepted for IWQM Strategy.
1.3.3 Number of hydroclimatic zones in
which assessments for climate change
vulnerability are completed
2
• Zone 4, the Orange WMA
• Zone 1 Northern Interior WMA
Concept notes and Vulnerability
Assessment methodology
developed for Zone 4 (Orange System) and
Zone 1 (Northern
Interior)
n/a Concept notes and Vulnerability
Assessment methodology
developed for Zone 4 (Orange System)
and Zone 1 (Northern Interior)
Concept notes and Vulnerability
Assessment methodology
developed for Zone 4 (Orange System)
and Zone 1 (Northern Interior)
Concept notes and Vulnerability
Assessment methodology
developed for Zone 4 (Orange System)
and Zone 1 (Northern Interior)
n/a Achieved Poe accepted
2.1.1 National Water and Sanitation master plan
(NWSMP) adopted (vi)
Draft National Water and Sanitation Master
Plan
Discussion document for consultation in 5
water management areas (i.e. Orange,
Breede-Gouritz, Berg-Olifants, Pongola-
n/a Discussion document for consultation in 9 water
management areas
Discussion document for consultation in 9 water
management areas
4 Consultatons Discussion document for consultation in 9 water
management areas
Project shedule was reviewed due to the
need to fast Achieved Poe accepted
3 No milestone No milestone No milestone Foxwood Dam Project No milestone No milestone No milestone No milestone Mokolo Crocodile (West)
Water Augmentation
Project Phase 2A
Comments and response report completed MOAs signed by DWS and negotiated with TCTA
for their agreement.
MOAs signed by DWS and negotiated with TCTA
for their agreement.
The report could not be finalised due to
delays in the signing of MoAs.
The MoAs have since been signed.
Meeting was held with technical team to
address technical issues of the projects
and looking at possibilities to fastrack the
project.
Not achieved Poe accepted
uMkhomazi Water Project
Phase 1
No milestone No milestone No milestone No milestone
4 Not achieved Not achieved Not achieved Not achieved Not achieved
• Mvoti,
• Mzimkulu,
Approval to gazette Water Resources
Classes and RQOs.
Draft legal notice gazetted for public
comments
Submission awaiting DG’s approval for the
gazetting of the Water Resources Classes and
RQOs.
Submission on route for DG’s approval for the
gazette final legal notice . Submission on route for DG’s approval for the
gazette final legal notice .
The knock-on effect of the delays on the
translation to the local language has
impacted on the planned gazetting
milestone
The submission to gazette has been
approved and the Water Resources
Classes and RQOs will be gazetted.
Not achieved Poe Accepted
• Crocodile (West)-Marico,
• Mokolo & Matlabas
Public comments addressed and
comments register compiled.
Submission awaiting DG’s approval for the
gazette final legal notice .
Submission on route for DG’s approval for the
gazette final legal notice . Submission on route for DG’s approval for the
gazette final legal notice .
The addressing of comments (reported in
Q1) on the draft RQOs took longer than
anticipated and this affected all planned
deliverables after that.
Submission to request approval to revise
the deliverables has been prepared for
Minister's approval
Not achieved Poe Accepted
1.2.1 Adopted Water Monitoring Network
Implementation plan implemented
Draft resourced Water Monitoring Network
Implementation Plan
Stakeholder consultation in 5
WMAs
Document on Stakeholder Consultations in 5
WMAs
Document on Stakeholder Consultations in 5
WMAs Document on Stakeholder Consultations in 5
WMAs Achieved Poe Accepted
Programme 2: Water Planning and Information Management
No milestone
Integrated Planning
1.3.1 Number of river systems with
water resources classes and
determined resource quality
objectives
Water Ecosystems
2.2.1 Number of completed Record
of Implementation Decisions (RID)
for bulk raw water planning projects
Water Information Management
4
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration1.3.2 71 63 Total =97
65 APP& 32 ADD
Total =97
65 APP& 32 ADD
Over by 34 Over by 53.96% Total =97
65 APP& 32 ADD Poe accepted for 97 River
Monitored
10 Total: 14
10 APP and 4 add
Total: 14
10 APP and 4 add
Total: 14
10 APP and 4 add
Lower Vaal Lower Vaal Lower Vaal Lower Vaal
Harts Harts Harts Harts
Blesbokspruit Blesbokspruit Blesbokspruit Blesbokspruit
Wilge Wilge Wilge Wilge
Natalspruit Natalspruit Natalspruit Natalspruit
Suikerbosrand Suikerbosrand Suikerbosrand Suikerbosrand
Renoster Renoster Renoster Renoster
Vals Vals Vals Vals
Vet Vet Vet Vet
Sand Sand Sand Sand
Klipriver Klipriver Klipriver Klipriver additional to the APP
Liebenbergvlei Liebenbergvlei Liebenbergvlei Liebenbergvlei additional to the
APP
Taaibos Taaibos Taaibos Taaibos additional to the APP
Leeuspruit Leeuspruit Leeuspruit Leeuspruit additional to the APP
7 Total: 9
7 APP and 2 add
Total: 9
7 APP and 2 add
Total: 9
7 APP and 2 add
Nwanedi Nwanedi Nwanedi Nwanedi
Nzhelele Nzhelele Nzhelele Nzhelele
Lephalale Lephalale Lephalale Lephalale
Crocodile Crocodile Crocodile Crocodile
Groot Marico Groot Marico Groot Marico Groot Marico
Molopo Molopo Molopo Molopo
Magalies Magalies Magalies Magalies
Ngothwane Ngothwane Ngothwane Ngothwane additional to the APP
Elands Elands Elands Elands additional to the APP
4 4 4 4 Caledon Caledon Caledon Caledon Modder Modder Modder Modder Riet Riet Riet Riet Orange Orange Orange Orange
25 25 25 25 Kowie Kowie Kowie Kowie Kromme Kromme Kromme Kromme Swartkops Swartkops Swartkops Swartkops Bloukrans Bloukrans Bloukrans Bloukrans Lottering Lottering Lottering Lottering Elands Elands Elands Elands Elandsbos Elandsbos Elandsbos Elandsbos Storms Storms Storms Storms Groot East Groot East Groot East Kouga/ Kouga/ Kouga/ Kouga/ Gamtoos Gamtoos Gamtoos Gamtoos Mthatha Mthatha Mthatha Mthatha Shixini Shixini Shixini Shixini Mngazi Mngazi Mngazi Mngazi Mngazana Mngazana Mngazana Mngazana Mnenu Mnenu Mnenu Mnenu Mzintlava Mzintlava Mzintlava Mzintlava Great kei Great kei Great kei Great kei Keiskamma Keiskamma Keiskamma Keiskamma Buffalo Buffalo Buffalo Buffalo Mbashe Mbashe Mbashe Mbashe Chalumna Chalumna Chalumna Chalumna Kwelera Kwelera Kwelera Kwelera Mzimvubu Mzimvubu Mzimvubu Mzimvubu Nahoon Nahoon Nahoon Nahoon Gonubie Gonubie Gonubie Gonubie
Water Information Management (WTE)
Number of rivers in which the River Eco-status
Monitoring Programme is implemented
Vaal (10)
Over achieved
Limpopo
North West (13)
Orange (4)
Mzimvubu-(25)
Tsitsikamma
5
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration2 Total: 12
APP 2 and 10 additional
Total: 12
APP 2 and 10 additional Total: 12
APP 2 and 10 additional
Olifants-Doring Olifants-Doring Olifants-Doring Olifants-Doring - Berg Berg Berg
Thabina Thabina Thabina Thabina additional to the APP
Letsitele Letsitele Letsitele Letsitele additional to the APP
Broederstroom Broederstroom Broederstroom Broederstroom additional to the APP
Debegeni Debegeni Debegeni Debegeni additional to the APP
Politsi Politsi Politsi Politsi additional to the APP
Ga-Selati Ga-Selati Ga-Selati Ga-Selati additional to the APP
Groot Letaba Groot Letaba Groot Letaba Groot Letaba additional to the APP
Klein Letaba Klein Letaba Klein Letaba Klein Letaba additional to the APP
Nsama Nsama Nsama Nsama additional to the APP
Shingwedzi Shingwedzi Shingwedzi Shingwedzi additional to the APP
Elands-Olifants Elands-Olifants Elands-Olifants Elands-Olifants additional to the
APP
Klein Olifants Klein Olifants Klein Olifants Klein Olifants additional to the APP
Bronkhorstpruit Bronkhorstpruit Bronkhorstpruit Bronkhorstpruit additional to the
APP
Wilge Wilge Wilge Wilge additional to the APP
Steelpoort Steelpoort Steelpoort Steelpoort additional to the APP
Kranspoort Kranspoort Kranspoort Kranspoort additional to the APP
Waterval Waterval Waterval Waterval additional to the APP
Olifants Olifants Olifants Olifants additional to the APP
Mohlapitse Mohlapitse Mohlapitse Mohlapitse additional to the APP
Blyde Blyde Blyde Blyde additional to the APP
Sterkspruit Sterkspruit Sterkspruit Sterkspruit additional to the APP
Spekboom Spekboom Spekboom Spekboom additional to the APP
Selons Selons Selons
16 Total: 30
16 (APP) & 14 ADD
Total: 30
16 (APP) & 14 ADD Total: 30
16 (APP) & 14 ADD
Mngeni Mngeni Mngeni Mngeni Mlazi Mlazi Mlazi Mlazi Matigulu Matigulu Matigulu Matigulu Mfolozi Mfolozi Mfolozi Mfolozi Mhlathuze Mhlathuze Mhlathuze Mhlathuze Thukela Thukela Thukela Thukela Mkhuze Mkhuze Mkhuze Mkhuze Mdloti Mdloti Mdloti Mdloti Mkhomazi Mkhomazi Mkhomazi Mkhomazi Mzimkhulu Mzimkhulu Mzimkhulu Mzimkhulu Phongola Phongola Phongola Phongola Hluhluwe Hluhluwe Hluhluwe Hluhluwe Mvoti Mvoti Mvoti Mvoti Thongathi Thongathi Thongathi Thongathi Lovu Lovu Lovu Lovu Mtamvuma Mtamvuma Mtamvuma Mtamvuma
- Bivane Bivane Bivane Bivane is the additional to the APP
- Black Mfolozi Black Mfolozi Black Mfolozi Black Mfolozi is the additional to the
APP
- White Mfolozi White Mfolozi White Mfolozi White Mfolozi is the additional to the
APP
- Slang Slang Slang Slang is the additional to the APP
- Ncandu Ncandu Ncandu Ncandu is the additional to the APP
- Sandspruit Sandspruit Sandspruit Sandspruit is the additional to the
APP
- Buffalo Buffalo Buffalo Buffalo is the additional to the APP
- Bushmans Bushmans Bushmans Bushmans is the additional to the
APP
- Unspecified Mooi Unspecified Mooi Unspecified Mooi Unspecified Mooi is the additional to
the APP
- Mooi Mooi Mooi Mooi is the additional to the APP
- Umsunduzi Umsunduzi Umsunduzi Umsunduzi is the additional to the
APP
- Nkhomazana Nkhomazana Nkhomazana Nkhomazana is the additional to the
APP
Olifants (13 add)
Number of rivers in which the River Eco-status
Monitoring Programme is implemented
Phongola-
Mzimkhulu (16)
Letaba(10)
Over achieved
Berg-
Olifants (2)
Berg
Olifants
6
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration- Mkomzi Mkomzi Mkomzi Mkomzi is the additional to the APP
- Mafadobo Mafadobo Mafadobo Mafadobo is the additional to the
APP1 Total: 3
1 APP & 2 ADD
Total: 3
1 APP & 2 ADD Total: 3
1 APP & 2 ADD
Olifants Olifants Olifants Olifants - Bronkhorstspruit Bronkhorstspruit Bronkhorstspruit Bronkhorstspruit is the additional to
the APP
- Elands Elands Elands Elands additional to the APP
1.4.1 Number of large water supply systems
assessed for water losses
8
• Vaal River,
• Umgeni River,
• Crocodile West River,
• Olifants River,
• Algoa,
• Amatole,
• Bloemfontein and
• Western Cape Supply Systems
Water Balance Data
and information
collection within the
8 large water supply
systems
n/a Water Balance Data
and information
collection within the
8 large water supply
systems
Water Balance Data
and information
collection within the
8 large water supply
systems
Water Balance Data
and information
collection within the
8 large water supply
systems
- Achieved Poe accepted
17 DMs Situational
assessments for 17
DMs developed
n/a Outstanding: Programme for the development of
17 Reliability Implementation Master Plans could
not start due to funding shorfall. The
establishment of five Working Stream Committees
in each DM could not start due to funding shortfall
Not achieved Situational
assessments for 17
DMs developed
Not achieved Outstanding: Programme for the
development of 17 Reliability
Implementation Master Plans could not
start due to funding shorfall. The
establishment of five Working Stream
Committees in each DM could not start
due to funding shortfall and National
Treasury was approached for additional
funding which was not approved.
The Branch will re-allocate budget for this
activity during the budget adjusment
Poe accepted
Amajuba
uThungulu
uMgungundlovu
Joe Gqabi
Alfred Nzo
Ngaka Modiri Molema
Mopani
West Rand
iLembe
Ugu
uThukela
Zululand
Chris Hani
Capricorn
Waterberg
Dr Ruth Segomotsi Mompati
Sisonke
47 WSAs audited Situational
assessment of macro
delivery performance
confirmed
n/a Not achieved Achieved Achieved PoE accepted
Mier LM
!Kai! Garib LM
//Khara Hais LM
!Kheis LM
Tsantsabane LM
Kgatelopele LM
Sol Plaatjie LM
Dikgatlong LM
Magareng LM
Phokwane LM
Matzikama LM
Cederberg LM
Lephalale LM
Mogalakwena LM
Thabazimbi LM
Modimolle LM
Bela-Bela LM
Ventersdorp LM
Potchefstroom LM
Matlosana LM
Maquassi Hills LM
Maquassi Hills LM
Richtersveld LM
Bergrivier LM
Mogale City LM
Rand West City
Merafong City LM
Nokeng tsa Taemane LM
Kungwini LM
Emfuleni LM
Midvaal LM
Lesedi LM
The Msunduzi LM
Newcastle LM
uMhlathuze LM
Camdeboo LM
Blue Crane Route LM
Ikwezi LM
Makana LM
Ndlambe LM
Sunday’s River Valley LM
Baviaans LM
Achieved
Water Services and Local Water Management
2.1.2 Number of district municipalities (DMs) with
completed 5 year water and sanitation
services master plans
not achieved
Olifants (1)
(Gauteng-Mpumalanga)
Number of rivers in which the River Eco-status
Monitoring Programme is implemented
Phongola-
Mzimkhulu (16)
Over achieved
Number of Water
Services Authorities
(WSAs) audited on
Water and Sanitation
delivery performance
2.1.3
7
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationKouga LM
Kou-Kamma LM
Buffalo City LM
Mangaung LM
Mantsopa LM
22 Process to initiate feasibility studies
finalized (i.e. provincial interaction
sessions)
n/a Not achieved 3
Provincial interactions was achieved in Q1 and 1
carried over from previous FY and 2 planned
Implementation studies have been completed
3
Provincial interactions was achieved in Q1 and 1
carried over from previous FY and 2 planned
Implementation studies have been completed
Poe accepted
Mantsopa bulk sewer
(Ladybrand)
Spioenkop to Ladysmith BWS
Greater Bulwer Donnybrook
Water Scheme
Phase 2
Lephalale - Bulk Water
Augmentation
Northern Nsikazi Northern Nsikazi Northern Nsikazi
Kakamas Wastewater
treatment works
Coffee Bay Water Treatment
Works
Matjhabeng Bulk
sewer(Welkom)
Masilonyana Bulk sewer
(Brandfort and
Winburg)
Ngagane Bulk Water Supply
Provincial High Catalytic
Projects - Mutash
Hub
Msukaligwa regional water
supply scheme
(Phase 3)
Balfour WWTW
Kinira Regional BWSS
Belmont WWTW
Ntabankulu Bulk Water Supply
Mkemane Regional Bulk WSS
Reitz Upgrading WWTP
Mandlakazi BWS Phase 5
Cunningmore to Newington
BWS
Cunningmore to Newington
BWS
Cunningmore to Newington
BWS
Britstown Oxidation Ponds
Syferfontein
Driefontein BWS Phase
2 Carry over from
previous FY
Driefontein BWS Phase 2 Carry over
from previous FY
Driefontein BWS Phase 2 Carry over
from previous FY
25 Process to initiate implementation readiness
studies finalized (i.e. provincial interaction
sessions)
n/a Not achieved Achieved: Provincial interactions was achieved in
Q1 and 1 carried over and 5 planned
Implementation studies have been completed
Achieved: Provincial interactions was achieved in
Q1 and 1 carried over and 5 planned
Implementation studies have been completed
Poe accepted
Greater Mpofana Phase 1-3 Greater Mpofana Phase 1-3 Greater Mpofana Phase 1-3
Spioenkop to Ladysmith BWS Driefontein BWS Phase 2 Driefontein BWS Phase 2
Empuluzi and Methula Bulk
water scheme
Empuluzi and Methula Bulk
water scheme
Empuluzi and Methula Bulk
water scheme
Trompsburg bulk sewer
Mantsopa bulk sewer
(Ladybrand)
Sedibeng Bulk Regional
Sewerage Scheme
Nzhelele Valley Bulk Water
Supply
Matoks Regional Water
Scheme
Eerstehoek/Ekulindeni Bulk
Water Supply
Northern Nsikazi Northern Nsikazi Northern Nsikazi
Greater Bulwer Donnybrook
Water Scheme
Phase 2
Provincial High Catalytic
Projects - Mutash
Hub
Lephalale - Bulk Water
Augmentation
Balfour WWTW
Kathu Bulk Water Supply
Kakamas Wastewater
treatment works
2.2.2 Number of completed feasibility studies for
water and wastewater services projects
(RBIG)
Achieved
Achieved2.2.3 Number of completed
implementation
readiness studies for
water and wastewater
services projects
(RBIG)
Achieved Number of Water
Services Authorities
(WSAs) audited on
Water and Sanitation
delivery performance
2.1.3
8
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationKagisano Molopo Bulk Water
Supply
Kagisano Molopo Bulk Water
Supply
Kagisano Molopo Bulk Water
Supply
Chris Hani DM Cluster 7
Cookhouse WWTW
Ngqamakhwe Bulk Water
Supply
Syferfontein
Mandlakazi BWS Phase 5 Mandlakazi BWS Phase 5 Mandlakazi BWS Phase 5
Ngagane Bulk Water Supply
Britstown Oxidation Ponds
Calitzdorp Waste Water
Treatment Works
127 WSAs 39 WSAs assessed not achieved 32 under by 7 Under by 17.94% 32 Municipalities (i.e. City of Johannesburg
Metropolitan, City of Tshwane
Metropolitan, Ekurhuleni Metropolitan,
Emfuleni, Lesedi, Midvaal) delayed to
confirm inception meetings
uThukela: The WSA cancelled the
training
To be fastracked Poe submitted
July (13 WSAs) July (13 WSAs)
Mopani • Mopani • Mopani
Polokwane • Polokwane • Polokwane • Polokwane
Sekhukhune • Sekhukhune
Thabazimbi • Thabazimbi • Thabazimbi • Thabazimbi
Vhembe • Vhembe • Vhembe • Vhembe
City of Johannesburg
Metropolitan
• City of Johannesburg
Metropolitan
• City of
Johannesburg
Metropolitan
City of Tshwane Metropolitan • City of Tshwane Metropolitan • City of Tshwane
Metropolitan
Ekurhuleni Metropolitan • Ekurhuleni Metropolitan • Ekurhuleni
Metropolitan
Emfuleni • Emfuleni • Emfuleni
• Lesedi • Lesedi • Lesedi
• Midvaal • Midvaal • Midvaal
• Alfred Nzo • Alfred Nzo • Alfred Nzo • Alfred Nzo
• Amathole • Amathole • Amathole • Amathole
August (13 WSAs) August (13 WSAs)
• Blue Crane Route • Blue Crane Route • Blue Crane Route • Blue Crane Route
• Buffalo City • Buffalo City • Buffalo City • Buffalo City
Metropolitan Metropolitan Metropolitan Metropolitan
• Camdeboo • Camdeboo • Camdeboo
• Chris Hani • Chris Hani • Chris Hani • Chris Hani
• Joe Gqabi • Joe Gqabi • Joe Gqabi • Joe Gqabi
• Kouga • Kouga • Kouga • Kouga
• Kou-Kamma • Kou-Kamma • Kou-Kamma • Kou-Kamma
• Makana • Makana • Makana • Makana
• Ndlambe • Ndlambe • Ndlambe • Ndlambe
• Nelson Mandela Bay • Nelson Mandela Bay • Nelson Mandela Bay • Nelson Mandela Bay
Metropolitan Metropolitan Metropolitan Metropolitan
• O.R. Tambo • O.R. Tambo • O.R. Tambo • O.R. Tambo
• Sundays River Valley • Sundays River Valley • Sundays River Valley • Sundays River Valley
• Amajuba • Amajuba • Amajuba • Amajuba
September 13 WSAs September 13 WSAs
• eThekwini Metropolitan • eThekwini Metropolitan • eThekwini Metropolitan • eThekwini Metropolitan
• iLembe • iLembe • iLembe • iLembe
• Newcastle • Newcastle • Newcastle • Newcastle
• Harry Gwala (Sisonke) • Harry Gwala (Sisonke) • Harry Gwala (Sisonke) • Harry Gwala (Sisonke)
• The Msunduzi • The Msunduzi • The Msunduzi • The Msunduzi
• Ugu • Ugu • Ugu • Ugu
• UMgungundlovu • UMgungundlovu • UMgungundlovu
• uMhlathuze • uMhlathuze • uMhlathuze • uMhlathuze
• Umkhanyakude • Umkhanyakude • Umkhanyakude • Umkhanyakude
• Umzinyathi • Umzinyathi • Umzinyathi • Umzinyathi
• Uthukela • Uthukela • Uthukela
• King Cetshwayo • King Cetshwayo • King Cetshwayo • King Cetshwayo
(Uthungulu) (Uthungulu) (Uthungulu) (Uthungulu)
• Zululand • Zululand • Zululand • Zululand
Bela Bela Bela Bela Bela Bela Bela Bela carried over from QR1
Capricon Capricon Capricon Capricon Carried over from QR1
Dr Beyers Naude Dr Beyers Naude Dr Beyers Naude Dr Beyers Naude carried over from
QR1
Lephalale Lephalale Lephalale Lephalale carried over from QR1
4.1.1 Approved National Water and Sanitation
Resources and Services Strategy (NWSRSS)
and implementation plan
Draft National Water Resources and
Services Strategy Framework completed
Draft 1 NWSRSS-1 framework stakeholder
consultation Draft Document produced; stakeholder
consultation done
Draft Document produced; stakeholder
consultation done Draft Document produced; stakeholder
consultation done Achieved PoE accepted
4.1.2 Revised water and sanitation norms and
standards for all water and sanitation supply
and services
Approved norms and standards Public consultation finalised and comments
consolidated Consultations still continuing, comments still to be
consolidated since extension has been requested
Consultations still continuing, comments still to be
consolidated since extension has been requested Consultations still continuing, comments still to be
consolidated since extension has been requested Achieved PoE accepted
Achieved2.2.3 Number of completed
implementation
readiness studies for
water and wastewater
services projects
(RBIG)
Policy and Strategy
Pattially achieved
Sanitation Planning and Management
Number of WSAs
assessed for socioeconomic
impact
2.1.4
9
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration
5
Tzaneen Tender for spillway raising advertised Tender documents for spillway raising have been
finalised
Tender documents for spillway raising have been
finalised
Tender documents for spillway raising have been
finalised
Tender cannot be advertised due to
budget constraints. The approved 3 year
MTEF budget issued for the project in
2017/18 was insufficient to go into
construction. The budget approved was
R40million and the project construction
cost is estimated at R322million over a
period of 18 months. National Treasury
Regulations now stipulates that no
tenders can be advertised without
confirmation of budget for the entire
project.
Fast track the submission requesting
approval to advertise all tenders and the
award be subject to availability funds.
Submission requesting the advertisement
of the tender was signed on 28
September 2017.
A further submission requesting the
advertisement of all tenders and
subsequent award being subject to
availability of funds was done and
awaiting approval in order to expedite the
situation. Budget bid submitted to
National Treasury for funding in 2018/19
MTEF.
Not achieved PoE accepted
Clanwilliam Tender awarded Not achieved Not achieved Not achieved The approved 3 year MTEF budget
issued for the project in 2017/18 was
insufficient to go into construction. The
budget approved was R13million and the
project construction cost is estimated at
R2.2billion over a period of 5 years.
National Treasury Regulations now
stipulates that no tenders can be
advertised /awarded without confirmation
of budget for the entire project.
Bid Evaluation Committee to convene in
the third week of October 2017. Tender
validity extended to 31 December 2017.
The tender validity was extended to 31
December 2017. It is anticipated that the
evaluation will commence and be finalised
before this period. Appointment to be
made subject to the availability of funding
on the project. Budget bid submitted to
National Treasury for funding in 2018/19
MTEF.
Not achieved PoE accepted
Nwamitwa Detailed dam engineering design
completed
Detailed dam engineering design completed Detailed dam engineering design completed Detailed dam engineering design completed Achieved PoE accepted for Nwamitwa
Progress Report and Nwamitwa
Tender Design Report (Combined)
No milestone No milestone No milestone No milestone No milestone
Detail design for Ntabelanga WTW
completed
Detail design for Ntabelanga WTW is 90%
complete
Detail design for Ntabelanga WTW is 90%
complete
Detail design for Ntabelanga WTW is 90%
complete
The completion of the detailed design is
pending the results of additional
geotechnical investigations
Fast track the completion of the
geotechnical investigations so that the
completion of the designs is achieved. A
Variation Order has been approved via
the existing Professional Service provider
contract to facilitate the additional
geotechnical investigations.
Not achieved PoE accepted for Mzimvubu
Progress Report
ORWRDP 2E, 2F Tender design continues Review of designs by DWS: Engineering Services
continues
Review of designs by DWS: Engineering Services
continues
Review of designs by DWS: Engineering Services
continues
Achieved PoE accepted for ORWRDP 2DEF
Monthly Progress Report
4
Tzaneen Demolishing works on spill way
completed
Demolition work on spillway is 50% complete Demolition work on spillway is 50% complete Demolition work on spillway is 50% complete Slow breakage rate due existing spillway
concrete strength being higher than
expected
Explosives demolition methods (blasting)
are being used to speed up the demolition
work. The revised approved project
completion date is 30 November 2017.
Not achieved PoE accepted for Demolition
Contract Progress Report
Clanwilliam No milestone No milestone No milestone No milestone No milestone
PKW keys
completed
The PKW outlet slabs and upstream walls are
complete.
The PKW outlet slabs and upstream walls are
complete.
The PKW outlet slabs and upstream walls are
complete.
PoE accepted forHazelmere
Contractor Progress Report and
Hazelmere PSP Progress Report
Operational anchors completed Operational anchors
completed
Operational anchors
completed
Operational anchors completed PoE accepted forHazelmere
Contractor Progress Report and
Hazelmere PSP Progress Report
Grout curtain installation
completed
Grout curtain installation completed Grout curtain installation completed Grout curtain installation completed PoE accepted forHazelmere
Contractor Progress Report and
Hazelmere PSP Progress Report
ORWRDP 2D Site establishment completed Not achieved Not achieved Not achieved Site Establishment cannot commence
due to budget cuts.
Budget bid submitted to National Treasury
for funding in 2018/19 MTEF. Evaluation
is done and the tender was awarded
subject to funds on the project being
made available. Once funding is available
on the project, construction will
commence in line with the conditions of
the appointment of contractor.
Not achieved PoE accepted for ORWRDP 2DEF
Monthly Progress Report and a
submission
2.3.3 Number of bulk raw water projects completed 1
(Hazelmere)
No milestone No Milestone No Milestone No Milestone No milestone
2.3.1
Hazelmere
Number of bulk raw water projects under
construction
2.3.2
Number of bulk raw water projects ready for
implementation
Mzimvubu
Achieved
Programme 3: Water Infrastructure DevevelopmentStrategic Infrastructure Development and Management
10
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration3.4.1 Number of job opportunities created through
implementing augmentation infrastructure
projects
2800 600 157 157 Under by 73.83% 157 Construction on ORWRDP 2D not
commenced therefore there was no job
creation occurring on the project.
However, 137 jobs created on Hazelmere
Dam and 20 job created on Tzaneen
Dam demolishing contract.
None
(Target will not be met due to budgetary
constraints)
Once funding is available on the
ORWRDP 2D project, construction will
commence which will result in an increase
in job creation. However, it should be
noted that the overall target will not be
achieved as a result of the non-
commencement and unavailability of
funds to date on ORWRDP 2D.
Not achieved PoE accepted for 137 jobs for
Hazelmere PoE accepted
for 20 jobs for Tzaneen
2.4.1 Number of dam safety rehabilitation projects
completed
Roodekoppies
Dam
60% completion 89% completion 89% completion Over by 29% Over by 29% 89% completion Insufficient budget delayed the
procurement of crasher material
Budget has been confirmed and the
Contractor will fast track the finalisation
for the procurement of material.
Over achieved PoE accepted for Roodekoppies for
July 2017, August 2017 and
September 2017 progress reports
2.4.2 Percentage of projects completed as per AMP
aligned maintenance Plan (Planned
Maintenance)
Operations of Water Resources
90% The budget was approved end of June
2017 due to negotiations with the
National Treasury as a result of the
overdraft. Late allocation of budget,
meant that maintenance plan
implementation was delayed by 3
months.
Fast track Maintenance plan
implementation following late budget
allocation to cover for lost time.
Increase resources through the extension
of the term contract in Central Operations.
Partially achieved PoE accepted for AMP
Maintainance Plans.
18% (72/390)(inclusive of 45 for Q2) projects
completed thus far: 1. Goudrtrouw
Dam: Service Lift Monthly
2. Pongola River(Lavumisa Pump Station):
Transformer Oil Samplings 3.
Hluhluwe Dam: Transformer Oil Samplings
4. Klipfontein Dam: Transformer Oil Samplings
5. Mhlathuze River GWS (Goedertrouw Dam):
Transformer Oil Samplings
6. Midmar Dam: Water Supply to the newly
constructed guard house/hut on the left bank
7. Bushmans GWS(Wagendrift Dam): Roof
stripped and assesed, 8.
agendrift Dam: House needed to be tiled with
ceramic tiles in the kitchen, passage, bathroom
and lounge and the bedroom needed carpet tiles
to be installed 9.
Wagendrift Dam: Houses 6, 7 &8 shower door
and toilet seats to be replaced, broken windows to
be replaced, damaged floor tiles need to be
replaced. Two damaged garage doors to be
replaced 10.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 11.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 12. Midmar
Dam: Supply and delivery of water
storage/conservancy tanks, tam to assist with
excavation and location ot tank
13. ,Craigieburn Dam: Replace water pipe system
Area A and Area B 14.
Midmar Dam: Midmar Office - TSS building:
Ceiling and other leaks. Install shelves and
cupboards. Geyser to be installed. Toilet
accessories to be installed. Carpots and access
15. Pongolapoort Dam: Additional Cost
16. ,Qamata/Lanti: Clearing of unwanted
vegetation at Lay Dam B1 and C2 clearing of
blocked mainholes at Lanti Weir
17. Glebrock Dam: Clearing of drainage system.
Clearing of unwanted vegetation along th dam wall
18. Corona Dam: Clearing of furrow drains at
dam wall. Killing of ants and termites activities
along the dam wall area 19.
Gcuwa Dam: herbicide spraying of unwanted
vegetation along the dam wall 20. Fish
Sundays( Teebus0: Grading of roads 2.4KM
21.Beervlei Dam: Clearing of vegetation at
Beervlei Dam
22. Darlington Dam: Clearing of vegetation
downstream toe area
23. Elandsdrift Dam: Clearing of vegetation on
canal from Elandsdrift Dam to Tunnel
24. Uitkeer Sludge Ponds and WTW: Clearing of
vegetation at Uitkeer sludge ponds and WTW 25.
Brandvlei Main dam wall: Rebuil toe-drain
measuring structure with outlet pipe
26.Miertjieskraal: Replace broken pipe section on
right bank outlet 27.
Albasini Dam: Replacement of Generator
28.Boschkop – Upgrading of the server at
VRESAP
29. Boschkop - Replace gate motors at Boschkop
pumpstation 30
Rietfontein - Replace gate motors at Rietfontein
pumpstation 31.
Grootdraai - Replace gate motors at Grootdraai
pumpstation 32.
Boschkop - Replace gate motors at Boschkop
pumpstation 33.
Zaaihoek - Replace gate motors at Zaaihoek
pumpstation 34.
Rietfontein / KWSAP - Repairs, replacement and
supply of manhole de-watering pump
35.Grootdraai - Repairs, replacement and supply
of manhole de-watering pump 36.
Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 37.
Rietfontein - Refurbishment of Motor No 1 at RFT
Pump Station 38.
Geelhoutboom – Syphon project
39. Onverwacht pipe set (Usutu River)
40. Westoe – upgrading access road (Usutu River)
41. Boschkop – Upgrading of the server at
VRESAP
42. Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 43.
Rietfontein – Supply, installation and
commissioning VSD at KWSAP
44. Rietfontein – Refurbishment of 1x DN600
Control Valve 45.
Grootdraai Pump Station-Commissioning of
powerpack & setting of upper limits radial gate
25% 18% (72/390)(inclusive of 45 for Q2) projects
completed thus far: 1. Goudrtrouw
Dam: Service Lift Monthly 2. Pongola
River(Lavumisa Pump Station): Transformer Oil
Samplings 3. Hluhluwe Dam:
Transformer Oil Samplings 4. Klipfontein Dam:
Transformer Oil Samplings
5. Mhlathuze River GWS (Goedertrouw Dam):
Transformer Oil Samplings
6. Midmar Dam: Water Supply to the newly
constructed guard house/hut on the left bank 7.
Bushmans GWS(Wagendrift Dam): Roof stripped
and assesed, 8.
agendrift Dam: House needed to be tiled with
ceramic tiles in the kitchen, passage, bathroom
and lounge and the bedroom needed carpet tiles
to be installed 9.
Wagendrift Dam: Houses 6, 7 &8 shower door
and toilet seats to be replaced, broken windows to
be replaced, damaged floor tiles need to be
replaced. Two damaged garage doors to be
replaced 10.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 11.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 12. Midmar
Dam: Supply and delivery of water
storage/conservancy tanks, tam to assist with
excavation and location ot tank
13. ,Craigieburn Dam: Replace water pipe system
Area A and Area B 14.
Midmar Dam: Midmar Office - TSS building:
Ceiling and other leaks. Install shelves and
cupboards. Geyser to be installed. Toilet
accessories to be installed. Carpots and access
15. Pongolapoort Dam: Additional Cost
16. ,Qamata/Lanti: Clearing of unwanted
vegetation at Lay Dam B1 and C2 clearing of
blocked mainholes at Lanti Weir
17. Glebrock Dam: Clearing of drainage system.
Clearing of unwanted vegetation along th dam wall
18. Corona Dam: Clearing of furrow drains at
dam wall. Killing of ants and termites activities
along the dam wall area 19.
Gcuwa Dam: herbicide spraying of unwanted
vegetation along the dam wall 20. Fish
Sundays( Teebus0: Grading of roads 2.4KM
21.Beervlei Dam: Clearing of vegetation at
Beervlei Dam
22. Darlington Dam: Clearing of vegetation
downstream toe area
23. Elandsdrift Dam: Clearing of vegetation on
canal from Elandsdrift Dam to Tunnel
24. Uitkeer Sludge Ponds and WTW: Clearing of
vegetation at Uitkeer sludge ponds and WTW 25.
Brandvlei Main dam wall: Rebuil toe-drain
measuring structure with outlet pipe
26.Miertjieskraal: Replace broken pipe section on
right bank outlet 27.
Albasini Dam: Replacement of Generator
28.Boschkop – Upgrading of the server at
VRESAP
29. Boschkop - Replace gate motors at Boschkop
pumpstation 30
Rietfontein - Replace gate motors at Rietfontein
pumpstation 31.
Grootdraai - Replace gate motors at Grootdraai
pumpstation 32.
Boschkop - Replace gate motors at Boschkop
pumpstation 33.
Zaaihoek - Replace gate motors at Zaaihoek
pumpstation 34.
Rietfontein / KWSAP - Repairs, replacement and
supply of manhole de-watering pump
35.Grootdraai - Repairs, replacement and supply
of manhole de-watering pump 36.
Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 37.
Rietfontein - Refurbishment of Motor No 1 at RFT
Pump Station 38.
Geelhoutboom – Syphon project
39. Onverwacht pipe set (Usutu River)
40. Westoe – upgrading access road (Usutu River)
41. Boschkop – Upgrading of the server at
VRESAP
42. Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 43.
Rietfontein – Supply, installation and
commissioning VSD at KWSAP
44. Rietfontein – Refurbishment of 1x DN600
Control Valve 45.
Grootdraai Pump Station-Commissioning of
powerpack & setting of upper limits radial gate
18% (72/390)(inclusive of 45 for Q2) projects
completed thus far: 1. Goudrtrouw
Dam: Service Lift Monthly 2. Pongola
River(Lavumisa Pump Station): Transformer Oil
Samplings 3. Hluhluwe Dam:
Transformer Oil Samplings 4. Klipfontein Dam:
Transformer Oil Samplings
5. Mhlathuze River GWS (Goedertrouw Dam):
Transformer Oil Samplings
6. Midmar Dam: Water Supply to the newly
constructed guard house/hut on the left bank 7.
Bushmans GWS(Wagendrift Dam): Roof stripped
and assesed, 8.
agendrift Dam: House needed to be tiled with
ceramic tiles in the kitchen, passage, bathroom
and lounge and the bedroom needed carpet tiles
to be installed 9.
Wagendrift Dam: Houses 6, 7 &8 shower door and
toilet seats to be replaced, broken windows to be
replaced, damaged floor tiles need to be replaced.
Two damaged garage doors to be replaced
10. Craigieburn Dam: Fencing of wo water
reservoirs at Craigieburn Dam 11.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 12. Midmar
Dam: Supply and delivery of water
storage/conservancy tanks, tam to assist with
excavation and location ot tank
13. ,Craigieburn Dam: Replace water pipe system
Area A and Area B 14.
Midmar Dam: Midmar Office - TSS building:
Ceiling and other leaks. Install shelves and
cupboards. Geyser to be installed. Toilet
accessories to be installed. Carpots and access
15. Pongolapoort Dam: Additional Cost
16. ,Qamata/Lanti: Clearing of unwanted
vegetation at Lay Dam B1 and C2 clearing of
blocked mainholes at Lanti Weir
17. Glebrock Dam: Clearing of drainage system.
Clearing of unwanted vegetation along th dam wall
18. Corona Dam: Clearing of furrow drains at
dam wall. Killing of ants and termites activities
along the dam wall area 19.
Gcuwa Dam: herbicide spraying of unwanted
vegetation along the dam wall 20. Fish
Sundays( Teebus0: Grading of roads 2.4KM
21.Beervlei Dam: Clearing of vegetation at
Beervlei Dam
22. Darlington Dam: Clearing of vegetation
downstream toe area
23. Elandsdrift Dam: Clearing of vegetation on
canal from Elandsdrift Dam to Tunnel
24. Uitkeer Sludge Ponds and WTW: Clearing of
vegetation at Uitkeer sludge ponds and WTW 25.
Brandvlei Main dam wall: Rebuil toe-drain
measuring structure with outlet pipe
26.Miertjieskraal: Replace broken pipe section on
right bank outlet 27.
Albasini Dam: Replacement of Generator
28.Boschkop – Upgrading of the server at
VRESAP
29. Boschkop - Replace gate motors at Boschkop
pumpstation 30
Rietfontein - Replace gate motors at Rietfontein
pumpstation 31.
Grootdraai - Replace gate motors at Grootdraai
pumpstation 32.
Boschkop - Replace gate motors at Boschkop
pumpstation 33.
Zaaihoek - Replace gate motors at Zaaihoek
pumpstation 34.
Rietfontein / KWSAP - Repairs, replacement and
supply of manhole de-watering pump
35.Grootdraai - Repairs, replacement and supply
of manhole de-watering pump 36.
Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 37.
Rietfontein - Refurbishment of Motor No 1 at RFT
Pump Station 38.
Geelhoutboom – Syphon project
39. Onverwacht pipe set (Usutu River)
40. Westoe – upgrading access road (Usutu River)
41. Boschkop – Upgrading of the server at
VRESAP
42. Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 43.
Rietfontein – Supply, installation and
commissioning VSD at KWSAP
44. Rietfontein – Refurbishment of 1x DN600
Control Valve 45.
Grootdraai Pump Station-Commissioning of
powerpack & setting of upper limits radial gate
11
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration
90% The budget was approved end of June
2017 due to negotiations with the
National Treasury as a result of the
overdraft. Late allocation of budget,
meant that maintenance plan
implementation was delayed by 3
months.
Fast track Maintenance plan
implementation following late budget
allocation to cover for lost time.
Increase resources through the extension
of the term contract in Central Operations.
Partially achieved PoE accepted for AMP
Maintainance Plans.
18% (72/390)(inclusive of 45 for Q2) projects
completed thus far: 1. Goudrtrouw
Dam: Service Lift Monthly
2. Pongola River(Lavumisa Pump Station):
Transformer Oil Samplings 3.
Hluhluwe Dam: Transformer Oil Samplings
4. Klipfontein Dam: Transformer Oil Samplings
5. Mhlathuze River GWS (Goedertrouw Dam):
Transformer Oil Samplings
6. Midmar Dam: Water Supply to the newly
constructed guard house/hut on the left bank
7. Bushmans GWS(Wagendrift Dam): Roof
stripped and assesed, 8.
agendrift Dam: House needed to be tiled with
ceramic tiles in the kitchen, passage, bathroom
and lounge and the bedroom needed carpet tiles
to be installed 9.
Wagendrift Dam: Houses 6, 7 &8 shower door
and toilet seats to be replaced, broken windows to
be replaced, damaged floor tiles need to be
replaced. Two damaged garage doors to be
replaced 10.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 11.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 12. Midmar
Dam: Supply and delivery of water
storage/conservancy tanks, tam to assist with
excavation and location ot tank
13. ,Craigieburn Dam: Replace water pipe system
Area A and Area B 14.
Midmar Dam: Midmar Office - TSS building:
Ceiling and other leaks. Install shelves and
cupboards. Geyser to be installed. Toilet
accessories to be installed. Carpots and access
15. Pongolapoort Dam: Additional Cost
16. ,Qamata/Lanti: Clearing of unwanted
vegetation at Lay Dam B1 and C2 clearing of
blocked mainholes at Lanti Weir
17. Glebrock Dam: Clearing of drainage system.
Clearing of unwanted vegetation along th dam wall
18. Corona Dam: Clearing of furrow drains at
dam wall. Killing of ants and termites activities
along the dam wall area 19.
Gcuwa Dam: herbicide spraying of unwanted
vegetation along the dam wall 20. Fish
Sundays( Teebus0: Grading of roads 2.4KM
21.Beervlei Dam: Clearing of vegetation at
Beervlei Dam
22. Darlington Dam: Clearing of vegetation
downstream toe area
23. Elandsdrift Dam: Clearing of vegetation on
canal from Elandsdrift Dam to Tunnel
24. Uitkeer Sludge Ponds and WTW: Clearing of
vegetation at Uitkeer sludge ponds and WTW 25.
Brandvlei Main dam wall: Rebuil toe-drain
measuring structure with outlet pipe
26.Miertjieskraal: Replace broken pipe section on
right bank outlet 27.
Albasini Dam: Replacement of Generator
28.Boschkop – Upgrading of the server at
VRESAP
29. Boschkop - Replace gate motors at Boschkop
pumpstation 30
Rietfontein - Replace gate motors at Rietfontein
pumpstation 31.
Grootdraai - Replace gate motors at Grootdraai
pumpstation 32.
Boschkop - Replace gate motors at Boschkop
pumpstation 33.
Zaaihoek - Replace gate motors at Zaaihoek
pumpstation 34.
Rietfontein / KWSAP - Repairs, replacement and
supply of manhole de-watering pump
35.Grootdraai - Repairs, replacement and supply
of manhole de-watering pump 36.
Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 37.
Rietfontein - Refurbishment of Motor No 1 at RFT
Pump Station 38.
Geelhoutboom – Syphon project
39. Onverwacht pipe set (Usutu River)
40. Westoe – upgrading access road (Usutu River)
41. Boschkop – Upgrading of the server at
VRESAP
42. Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 43.
Rietfontein – Supply, installation and
commissioning VSD at KWSAP
44. Rietfontein – Refurbishment of 1x DN600
Control Valve 45.
Grootdraai Pump Station-Commissioning of
powerpack & setting of upper limits radial gate
25% 18% (72/390)(inclusive of 45 for Q2) projects
completed thus far: 1. Goudrtrouw
Dam: Service Lift Monthly 2. Pongola
River(Lavumisa Pump Station): Transformer Oil
Samplings 3. Hluhluwe Dam:
Transformer Oil Samplings 4. Klipfontein Dam:
Transformer Oil Samplings
5. Mhlathuze River GWS (Goedertrouw Dam):
Transformer Oil Samplings
6. Midmar Dam: Water Supply to the newly
constructed guard house/hut on the left bank 7.
Bushmans GWS(Wagendrift Dam): Roof stripped
and assesed, 8.
agendrift Dam: House needed to be tiled with
ceramic tiles in the kitchen, passage, bathroom
and lounge and the bedroom needed carpet tiles
to be installed 9.
Wagendrift Dam: Houses 6, 7 &8 shower door
and toilet seats to be replaced, broken windows to
be replaced, damaged floor tiles need to be
replaced. Two damaged garage doors to be
replaced 10.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 11.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 12. Midmar
Dam: Supply and delivery of water
storage/conservancy tanks, tam to assist with
excavation and location ot tank
13. ,Craigieburn Dam: Replace water pipe system
Area A and Area B 14.
Midmar Dam: Midmar Office - TSS building:
Ceiling and other leaks. Install shelves and
cupboards. Geyser to be installed. Toilet
accessories to be installed. Carpots and access
15. Pongolapoort Dam: Additional Cost
16. ,Qamata/Lanti: Clearing of unwanted
vegetation at Lay Dam B1 and C2 clearing of
blocked mainholes at Lanti Weir
17. Glebrock Dam: Clearing of drainage system.
Clearing of unwanted vegetation along th dam wall
18. Corona Dam: Clearing of furrow drains at
dam wall. Killing of ants and termites activities
along the dam wall area 19.
Gcuwa Dam: herbicide spraying of unwanted
vegetation along the dam wall 20. Fish
Sundays( Teebus0: Grading of roads 2.4KM
21.Beervlei Dam: Clearing of vegetation at
Beervlei Dam
22. Darlington Dam: Clearing of vegetation
downstream toe area
23. Elandsdrift Dam: Clearing of vegetation on
canal from Elandsdrift Dam to Tunnel
24. Uitkeer Sludge Ponds and WTW: Clearing of
vegetation at Uitkeer sludge ponds and WTW 25.
Brandvlei Main dam wall: Rebuil toe-drain
measuring structure with outlet pipe
26.Miertjieskraal: Replace broken pipe section on
right bank outlet 27.
Albasini Dam: Replacement of Generator
28.Boschkop – Upgrading of the server at
VRESAP
29. Boschkop - Replace gate motors at Boschkop
pumpstation 30
Rietfontein - Replace gate motors at Rietfontein
pumpstation 31.
Grootdraai - Replace gate motors at Grootdraai
pumpstation 32.
Boschkop - Replace gate motors at Boschkop
pumpstation 33.
Zaaihoek - Replace gate motors at Zaaihoek
pumpstation 34.
Rietfontein / KWSAP - Repairs, replacement and
supply of manhole de-watering pump
35.Grootdraai - Repairs, replacement and supply
of manhole de-watering pump 36.
Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 37.
Rietfontein - Refurbishment of Motor No 1 at RFT
Pump Station 38.
Geelhoutboom – Syphon project
39. Onverwacht pipe set (Usutu River)
40. Westoe – upgrading access road (Usutu River)
41. Boschkop – Upgrading of the server at
VRESAP
42. Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 43.
Rietfontein – Supply, installation and
commissioning VSD at KWSAP
44. Rietfontein – Refurbishment of 1x DN600
Control Valve 45.
Grootdraai Pump Station-Commissioning of
powerpack & setting of upper limits radial gate
18% (72/390)(inclusive of 45 for Q2) projects
completed thus far: 1. Goudrtrouw
Dam: Service Lift Monthly 2. Pongola
River(Lavumisa Pump Station): Transformer Oil
Samplings 3. Hluhluwe Dam:
Transformer Oil Samplings 4. Klipfontein Dam:
Transformer Oil Samplings
5. Mhlathuze River GWS (Goedertrouw Dam):
Transformer Oil Samplings
6. Midmar Dam: Water Supply to the newly
constructed guard house/hut on the left bank 7.
Bushmans GWS(Wagendrift Dam): Roof stripped
and assesed, 8.
agendrift Dam: House needed to be tiled with
ceramic tiles in the kitchen, passage, bathroom
and lounge and the bedroom needed carpet tiles
to be installed 9.
Wagendrift Dam: Houses 6, 7 &8 shower door and
toilet seats to be replaced, broken windows to be
replaced, damaged floor tiles need to be replaced.
Two damaged garage doors to be replaced
10. Craigieburn Dam: Fencing of wo water
reservoirs at Craigieburn Dam 11.
Craigieburn Dam: Fencing of wo water reservoirs
at Craigieburn Dam 12. Midmar
Dam: Supply and delivery of water
storage/conservancy tanks, tam to assist with
excavation and location ot tank
13. ,Craigieburn Dam: Replace water pipe system
Area A and Area B 14.
Midmar Dam: Midmar Office - TSS building:
Ceiling and other leaks. Install shelves and
cupboards. Geyser to be installed. Toilet
accessories to be installed. Carpots and access
15. Pongolapoort Dam: Additional Cost
16. ,Qamata/Lanti: Clearing of unwanted
vegetation at Lay Dam B1 and C2 clearing of
blocked mainholes at Lanti Weir
17. Glebrock Dam: Clearing of drainage system.
Clearing of unwanted vegetation along th dam wall
18. Corona Dam: Clearing of furrow drains at
dam wall. Killing of ants and termites activities
along the dam wall area 19.
Gcuwa Dam: herbicide spraying of unwanted
vegetation along the dam wall 20. Fish
Sundays( Teebus0: Grading of roads 2.4KM
21.Beervlei Dam: Clearing of vegetation at
Beervlei Dam
22. Darlington Dam: Clearing of vegetation
downstream toe area
23. Elandsdrift Dam: Clearing of vegetation on
canal from Elandsdrift Dam to Tunnel
24. Uitkeer Sludge Ponds and WTW: Clearing of
vegetation at Uitkeer sludge ponds and WTW 25.
Brandvlei Main dam wall: Rebuil toe-drain
measuring structure with outlet pipe
26.Miertjieskraal: Replace broken pipe section on
right bank outlet 27.
Albasini Dam: Replacement of Generator
28.Boschkop – Upgrading of the server at
VRESAP
29. Boschkop - Replace gate motors at Boschkop
pumpstation 30
Rietfontein - Replace gate motors at Rietfontein
pumpstation 31.
Grootdraai - Replace gate motors at Grootdraai
pumpstation 32.
Boschkop - Replace gate motors at Boschkop
pumpstation 33.
Zaaihoek - Replace gate motors at Zaaihoek
pumpstation 34.
Rietfontein / KWSAP - Repairs, replacement and
supply of manhole de-watering pump
35.Grootdraai - Repairs, replacement and supply
of manhole de-watering pump 36.
Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 37.
Rietfontein - Refurbishment of Motor No 1 at RFT
Pump Station 38.
Geelhoutboom – Syphon project
39. Onverwacht pipe set (Usutu River)
40. Westoe – upgrading access road (Usutu River)
41. Boschkop – Upgrading of the server at
VRESAP
42. Tutuka – Replacement of shaft and cabling for
pump No.1 with similar equipment 43.
Rietfontein – Supply, installation and
commissioning VSD at KWSAP
44. Rietfontein – Refurbishment of 1x DN600
Control Valve 45.
Grootdraai Pump Station-Commissioning of
powerpack & setting of upper limits radial gate
12
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration2.4.3 Percentage unscheduled maintenance
projects completed as a proportion of planned
maintenance projects
≤10% ≤10% 0% 0% 0% 0% n/a n/a Achieved
2.4.4 Number of kilometres of conveyance systems
rehabilitated per annum
15km 5km 1.335km 1.335km 1.335km 1) Productivity levels on Nzhelele canal,
Ncora Lei Dams,
Qamata Lei Dams and Boskop
canal were impacted by high
production costs.
2) Some project on tender stage
require re-tendering SCM Preferential
Procurement Regulations (PPR) of
2017, these include Hoeklip Siphon
and Ncora canal.
1) Reprioritised the budget according to
performing projects and those with high
potential to achieve APP targets.
2) Projects that will be accelerated from
the reprioritised funds include:
- Nzhelele canal additional budget
of R20million allocated to have a total of
R40million to achieve 6km by 31 March
2018;
- Lower Sunday Emergency Canal
allocated R21million to achieve 5km;
- Boskop Canal extra 10million for to
achieve 4km
- Qamata and Ncora Lei Damsat a total of
R18million to give 6km .
Not achieved PoE accepted for Nzhelele and
Boskop progress report
3.4.1 Number of job opportunities created through
implementing operations of water resources
infrastructure projects
270 jobs
opportunities
67 jobs opportunities 69 jobs were created 69 jobs were created 69 jobs were created 69 jobs were created Over achieved PoE accepted for 69 as four (4) ID's
were unclear as indicated on the
schedule.
Number of mega regional
bulk infrastructure project
phases under construction
15 15 7 10 Under by 5 Under by 33.33% 10
1 1 1 1 1 n/a n/a
OR Tambo King Sabata
Dalindyebo (KSD) Water Supply
Phase 2 of 2
• OR Tambo King Sabata Dalindyebo
(KSD) Water Supply Phase 2 of 2
OR Tambo King Sabata Dalindyebo (KSD) Water
Supply Phase 2 of 2
OR Tambo King Sabata Dalindyebo (KSD) Water
Supply Phase 2 of 2
n/a n/a OR Tambo King Sabata Dalindyebo (KSD) Water
Supply Phase 2 of 2
n/a n/a PoE accepted.
Please provide the Performance
Evaluation Reports
4 4 0 1 3 1
Sebokeng Wastewater Treatment
Works (WWTW) Phase 1 of 2
• Sebokeng Wastewater Treatment
Works (WWTW) Phase 1 of 2
Not achieved • Sebokeng Wastewater Treatment Works
(WWTW) Phase 1 of 2
n/a n/a • Sebokeng Wastewater Treatment Works
(WWTW) Phase 1 of 2
n/a n/a PoE accepted
• Sebokeng Wastewater Treatment
Works Phase 2 of 2
• Sebokeng Wastewater Treatment
Works Phase 2 of 2
Not achieved Not achieved • Sebokeng
Wastewater Treatment
Works Phase 2 of 2
Not achieved The designs for module 7 had to be
reviewed due to time lapse of the initial
designs as a result of budget constraints
and will be finalised by December 2017
IA to finalise designsThe designs will be
finalised by December 2017
PoE accepted
Sedibeng Wastewater Treatment
works – Rietspruit and Leeuwkuil
WWTW
• Sedibeng Wastewater Treatment
works – Rietspruit and Leeuwkuil
WWTW
Not achieved Not achieved • Sedibeng
Wastewater Treatment
works – Rietspruit and
Leeuwkuil WWTW
Not achieved The project was stopped in favour of
refurb of Rietspruit and Leeuwkuil
WWTW as a cheaper option
To finalise designs for the refurb of
Rietspruit and Leeuwkuil WWTW as a
cheaper option
PoE accepted
Westonaria WWTW Phase 2
(Zuurbekom)
• Westonaria WWTW Phase 2
(Zuurbekom)
Not achieved • Westonaria WWTW
Phase 2 (Zuurbekom)
Not achieved The projects (Zuurbekom and
Mohlakeng) were put on hold owing to
uncertainties around funding and
linkages to other projects (Syferfontein) in
the immediate vicinity.
The project to be implemented subject to
budget availability and approval of
budget Bids by National Treasury .
PoE accepted
1 5 2 4 1 4
Jozini (Pongolapoort) BWS
(pipeline)
• Jozini (Pongolapoort) BWS
(pipeline)
• Jozini (Pongolapoort) BWS (pipeline) • Jozini (Pongolapoort) BWS (pipeline) n/a • Jozini (Pongolapoort) BWS (pipeline) n/a n/a PoE accepted.
- • Greater Mthonjaneni BWS • Greater Mthonjaneni BWS • Greater Mthonjaneni BWS n/a • Greater Mthonjaneni BWS n/a n/a PoE accepted.
- • Ngcebo BWS Not achieved • Ngcebo BWS n/a • Ngcebo BWS n/a n/a PoE accepted.
- • Spienkop to Ladysmith BWS Not achieved • Spienkop to
Ladysmith BWS
Not achieved Implementation protocol agreement not
yet finalised. It will be finalised by end
November
The implementation protocol will be
finalised by end November 2017
PoE accepted
- • Umshwathi BWS Not achieved • Umshwathi BWS n/a • Umshwathi BWS n/a n/a PoE accepted
4 4 3 3 1 3
Mogalakwena BWS Phase 1 of 2 • Mogalakwena BWS Phase 1 of 2 • Mogalakwena BWS Phase 1 of 3 • Mogalakwena BWS Phase 1 of 3 n/a • Mogalakwena BWS Phase 1 of 3 n/a n/a PoE accepted.
- • Giyani Water Supply Phase 1
(Emergency)
• Giyani Water Supply Phase 1
(Emergency)
• Giyani Water Supply Phase 1
(Emergency)
n/a • Giyani Water Supply Phase 1
(Emergency)
n/a n/a PoE accepted.
- • Polokwane BWS Phase 1 • Polokwane BWS Phase 2 • Polokwane BWS Phase 2 n/a • Polokwane BWS Phase 2 n/a n/a PoE accepted.
Regional Bulk Infrastructure Grant
2.3.4 Partially achieved
EC
GP
LP
KZN
13
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration- • Polokwane WWTW Phase 1 Not achieved Not achieved • Polokwane WWTW
Phase 1
Not achieved Construction has not commenced as the
implementation readiness study has not
been completed.
Fast Track the finalisation of the IRS PoE accepted
2.3.4 Partially achieved
LP
14
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration1 1 1 1 1
Vaal Gamagara BWS Phase 1 of 2 • Vaal Gamagara BWS Phase 1 of 2 • Vaal Gamagara BWS Phase 1 of 2 • Vaal Gamagara BWS Phase 1 of 2 n/a • Vaal Gamagara BWS Phase 1 of 2 n/a n/a PoE accepted.
Number of mega regional bulk infrastructure
project phases completed
3 No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter
1
OR Tambo KSD
BWS Phase 2 of 2
No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter
1
Sebokeng
WWTW Phase
1 of 2
No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter
1
Jozini
(Pongolapoort) BWS
No milestone No milestone No milestone No milestone No milestone n/a n/a No milestone for the quarter
Number of large regional
bulk infrastructure project
phases under construction
53 53 43 46 Under by 7 Under by 13.20% 46
7 7 8 8 Over by 1 8
Ndlambe bulk water supply phase 1 • Ndlambe bulk water supply phase
1
• Ndlambe bulk water supply phase 1 • Ndlambe bulk water supply phase 1 n/a • Ndlambe bulk water supply phase 1 n/a n/a PoE accepted.
• Cluster 4 Chris Hani DM phase 2
of 2
• Cluster 4 Chris Hani DM phase 2
of 2
• Cluster 4 Chris Hani DM phase 2 of 2 • Cluster 4 Chris Hani DM phase 2 of 2 n/a • Cluster 4 Chris Hani DM phase 2 of 2 n/a n/a PoE accepted.
• Cluster 6 Chris Hani DM • Cluster 6 Chris Hani DM • Cluster 6 Chris Hani DM • Cluster 6 Chris Hani DM n/a • Cluster 6 Chris Hani DM n/a n/a PoE accepted.
• Cluster 9 Chris Hani DM • Cluster 9 Chris Hani DM • Cluster 9 Chris Hani DM • Cluster 9 Chris Hani DM n/a • Cluster 9 Chris Hani DM n/a n/a PoE accepted.
• Xonxa BWS • Xonxa BWS • Xonxa BWS • Xonxa BWS n/a • Xonxa BWS n/a n/a PoE accepted.
• Xhora BWS • Xhora BWS • Xhora BWS • Xhora BWS n/a • Xhora BWS n/a n/a PoE accepted.
• Refurbishment of 6 existing plants
and downstream infrastructure
(Binfield water
treatment works (WTW),
Masincedane WTW, Debe
WTW,and Sandile WTW)
• Refurbishment of 6 existing plants
and downstream infrastructure
(Binfield water
treatment works (WTW),
Masincedane WTW, Debe
WTW,and Sandile WTW)
• Refurbishment of 6 existing plants and
downstream infrastructure (Binfield water
treatment works (WTW), Masincedane
WTW, Debe WTW,and Sandile WTW)
• Refurbishment of 6 existing plants and
downstream infrastructure (Binfield water
treatment works (WTW), Masincedane
WTW, Debe WTW,and Sandile WTW)
n/a • Refurbishment of 6 existing plants and
downstream infrastructure (Binfield water
treatment works (WTW), Masincedane
WTW, Debe WTW,and Sandile WTW)
n/a n/a PoE accpepted
0 Nooitgedaght Nooitgedaght Nooitgedaght Nooitgedaght n/a n/a PoE accepted.This is not an APP
target .
Please provide the Peformance
Evaluation Reports
6 6 3 3 3 3
• Tokologo BWS Phase 2 of 2 • Tokologo BWS Phase 2 of 2 • Tokologo BWS Phase 2 of 2 • Tokologo BWS Phase 2 of 2 n/a • Tokologo BWS Phase 2 of 2 n/a n/a PoE accepted.
• Masilonyana BWS Phase 2 of 2 • Masilonyana BWS Phase 2 of 2 Not achieved Not achieved • Masilonyana BWS
Phase 2 of 2
Not achieved Municipality is busy with the finalisation of
designs, Delays were caused by change
of the municipal administrator.
Designs will be finalised in November PoE accepted
• Nketoana BWS Phase 1 of 2 • Nketoana BWS Phase 1 of 2 • Nketoana BWS Phase 1 of 2 • Nketoana BWS Phase 1 of 2 n/a • Nketoana BWS Phase 1 of 2 n/a n/a PoE accepted.
• Ngwathe Bulk Water Supply
Phase 3 of 3
• Ngwathe Bulk Water Supply
Phase 3 of 3
Not achieved Not achieved • Ngwathe Bulk Water
Supply Phase 3 of 3
Not achieved There is a budget shortfall, contractor will
only be appointment in quarter 4 of the
municipal financial year
contractor will only be appointment in
quarter 4 of the municipal financial year
PoE accepted
• Ngwathe Bulk Sewer Phase 2 of 2
(Parys)
• Ngwathe Bulk Sewer Phase 2 of 2
(Parys)
Not achieved Not achieved • Ngwathe Bulk Sewer
Phase 2 of 2 (Parys)
Not achieved Finalisation of designs, Consultant has
been appointed
Consultant has been appointed PoE accepted
• Welbedacht pipeline (Mangaung) • Welbedacht pipeline (Mangaung) • Welbedacht pipeline (Mangaung) • Welbedacht pipeline (Mangaung) n/a • Welbedacht pipeline (Mangaung) n/a n/a PoE accepted.
1 1 1 1 1
• Meyerton wastewater treatment
works
• Meyerton wastewater treatment
works• Meyerton wastewater treatment works • Meyerton wastewater treatment works n/a • Meyerton wastewater treatment works n/a n/a PoE accepted.
2.3.5
EC
Partially Achieved
2.3.4 Partially achieved
No milestone
EC
GP
KZN
GP
2.3.6
NC
FS
15
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration6 6 5 5 5
• Driefontein Indaka BWS • Driefontein Indaka BWS • Driefontein Indaka BWS • Driefontein Indaka BWS n/a • Driefontein Indaka BWS n/a n/a PoE accepted.
Please provide the Peformance
Evaluation Reports
• Greytown BWS Phase 2 • Greytown BWS Phase 2 • Greytown BWS Phase 2 • Greytown BWS Phase 2 n/a • Greytown BWS Phase 2 n/a n/a PoE accepted.
Please provide the Peformance
Evaluation Reports
• Nongoma BWS • Nongoma BWS • Nongoma BWS • Nongoma BWS n/a • Nongoma BWS n/a n/a PoE accepted.
Please provide the Peformance
Evaluation Reports
• Middledrift BWS • Middledrift BWS • Middledrift BWS • Middledrift BWS n/a • Middledrift BWS n/a n/a PoE accepted.
Please provide the Peformance
Evaluation Reports
• Mandlakazi BWS Phase 5 • Mandlakazi BWS Phase 5 • Mandlakazi BWS Phase 5 • Mandlakazi BWS Phase 5 n/a • Mandlakazi BWS Phase 5 n/a n/a PoE accepted.
Please provide the Peformance
Evaluation Reports
• Maphumulo BWS Phase 3 • Maphumulo BWS Phase 3 Not achieved Not achieved • Maphumulo BWS
Phase 3
Not achieved n/a n/a
15 15 15 14 1 14
• Sekhukhune BWS Phases 7 to 15
(i.e. 9 Phases)
• Sekhukhune BWS Phases 7 to 15
(i.e. 9 Phases)
• Sekhukhune BWS Phases 7 to 15 (i.e. 9 Phases) • Sekhukhune BWS Phases 7 to 15 (i.e. 9 Phases) n/a • Sekhukhune BWS Phases 7 to 15 (i.e. 9 Phases) n/a n/a PoE accepted.
• Moutse BWS Phase 1 and 5 (i.e.
2 Phases)
• Moutse BWS Phase 1 and 5 (i.e. 2
Phases)
• Moutse BWS Phase 1 and 5 (i.e. 2 Phases) • Moutse BWS Phase 1 and 5 (i.e. 2 Phases) n/a • Moutse BWS Phase 1 and 5 (i.e. 2 Phases) n/a n/a PoE accepted.
• Giyani BWS - Drought Relief • Giyani BWS - Drought Relief Not achieved Not achieved • Giyani BWS -
Drought Relief
Not achieved The Contractor suspended works on site
due to late payments of invoice
Payment issues were resolved, the
contractor is back on site
PoE accepted.
• Mametja Sekororo BWS Phase 1
of 2
• Mametja Sekororo BWS Phase 1
of 2
• Mametja Sekororo BWS Phase 1 of 2 • Mametja Sekororo BWS Phase 1 of 2 n/a • Mametja Sekororo BWS Phase 1 of 2 n/a n/a PoE accepted
• Sinthumule Kutama BWS
Augmentation Phase 3 of 3
• Sinthumule Kutama BWS
Augmentation Phase 3 of 3
• Sinthumule Kutama BWS Augmentation Phase 3
of 3
• Sinthumule Kutama BWS Augmentation Phase 3
of 3
n/a • Sinthumule Kutama BWS Augmentation Phase 3
of 3
n/a n/a PoE accepted.
• Nebo BWS • Nebo BWS • Nebo BWS n/a • Nebo BWS n/a n/a PoE accepted.
4 4 2 2 2
• Northern Nsikazi BWS Phase 1 of
2
• Northern Nsikazi BWS Phase 1 of 2 Northern Nsikazi BWS Phase 1 of 2 Northern Nsikazi BWS Phase 1 of 2 n/a Northern Nsikazi BWS Phase 1 of 2 n/a n/a PoE accepted.
• Emalahleni BWS Phase 3 of 4 • Emalahleni BWS Phase 3 of 4 Not achieved Not achieved • Emalahleni BWS Phase 3 of
4
Not achieved Delays in finalisation of the feasibililty
studies by IA
DWS planning to fast track feasibility
studies.
PoE accepted
• Musikaligwa / Driekoppies BWS
Phase 1 of 3
• Musikaligwa / Driekoppies BWS Phase 1
of 3
Not achieved Not achieved • Musikaligwa / Driekoppies
BWS Phase 1 of 3
Not achieved Delays in the finalisation of the Tripatite
Service Level Agreement for the
implementation of the Driekopies project
SLA was finalised in October 2017. PoE accepted
• Balfour/ Siyathemba BWS Phase
1 of 4
• Balfour/ Siyathemba BWS Phase 1 of 4 Balfour/ Siyathemba BWS Phase 1 of 4 Balfour/ Siyathemba BWS Phase 1 of 4 n/a Balfour/ Siyathemba BWS Phase 1 of 4 n/a n/a PoE accepted.
1 1 1 1 1
• Namakwa BWS Phase 2 • Namakwa BWS Phase 2 • Namakwa BWS Phase 2 • Namakwa BWS Phase 2 n/a • Namakwa BWS Phase 2 n/a n/a PoE accepted.
11 11 6 10 Undr by 1 Under by 9.09% 10 PoE accepted.
Madibeng BWS Phase 2 Madibeng BWS Phase 2 Madibeng BWS Phase 2 Madibeng BWS Phase 2 n/a Madibeng BWS Phase 2 n/a n/a PoE accepted.
• Pilanesberg BWS Phase 2 and
Phase 3 (i.e. 2 phases)
• Pilanesberg BWS Phase 2 and
Phase 3 (i.e. 2 phases)
Not achieved • Pilanesberg BWS Phase 2 Pilanesberg BWSPhase 3 • Pilanesberg BWS Phase 2 n/a n/a PoE accepted.
• Ratlou BWS Phase 1 (Setlagole)
and Phase 2 (Madibogo) (i.e. 2
phases)
• Ratlou BWS Phase 1 (Setlagole)
and Phase 2 (Madibogo) (i.e. 2
phases)
• Ratlou BWS Phase 1 (Setlagole) • Ratlou BWS Phase 1 (Setlagole) and
- Phase 2 (Madibogo) (i.e. 2 phases)
n/a • Ratlou BWS Phase 1 (Setlagole) and
- Phase 2 (Madibogo) (i.e. 2 phases)
n/a n/a PoE accepted.
• Mafikeng South BWS Phase 2
(upgrade WTW)
• Mafikeng South BWS Phase 2
(upgrade WTW)
• Mafikeng South BWS Phase 2 (upgrade WTW) • Mafikeng South BWS Phase 2 (upgrade WTW) n/a • Mafikeng South BWS Phase 2 (upgrade WTW) n/a n/a PoE accepted.
• Greater Mamusa BWS Phase 2
(Abstraction Bloemhof) and Phase
3 (Upgrade of WTW) (i.e. 2 phases)
• Greater Mamusa BWS Phase 2
(Abstraction Bloemhof) and Phase 3
(Upgrade of WTW) (i.e. 2 phases)
• Greater Mamusa BWS Phase 2 (Abstraction
Bloemhof) and Phase 3 (Upgrade of WTW) (i.e. 2
phases)
• Greater Mamusa BWS Phase 2 (Abstraction
Bloemhof) and Phase 3 (Upgrade of WTW) (i.e. 2
phases)
n/a • Greater Mamusa BWS Phase 2 (Abstraction
Bloemhof) and Phase 3 (Upgrade of WTW) (i.e. 2
phases)
n/a n/a PoE accepted.
• Taung Naledi BWS Phase 2D • Taung Naledi BWS Phase 2D Not achieved • Taung Naledi BWS Phase 2D n/a • Taung Naledi BWS Phase 2D n/a n/a PoE accepted.
LP
MP
NC
NW
Partially Achieved
KZN
2.3.6
16
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration• Moretele South BWS Phase 1
(Klipdrift) and Phase 2 (Babelegi)
(i.e. 2 phases)
• Moretele South BWS Phase 1
(Klipdrift) and Phase 2 (Babelegi)
(i.e. 2 phases)
• Moretele South BWS Phase 1 (Klipdrift) and
Phase 2 (Babelegi) (i.e. 2 phases)
• Moretele South BWS Phase 1 (Klipdrift) and
Phase 2 (Babelegi) (i.e. 2 phases)
n/a • Moretele South BWS Phase 1 (Klipdrift) and
Phase 2 (Babelegi) (i.e. 2 phases)
n/a n/a PoE accepted.
2 2 2 2 0 2
• Stellenbosch WWTW Phase 2 of
2
• Stellenbosch WWTW Phase 2 of 2 • Stellenbosch WWTW Phase 2 of 2 • Stellenbosch WWTW Phase 2 of 2 n/a • Stellenbosch WWTW Phase 2 of 2 n/a n/a PoE accepted.
• Paarl Bulk Sewer Phase 3 of 3 • Paarl Bulk Sewer Phase 3 of 3 • Paarl Bulk Sewer Phase 3 of 3 • Paarl Bulk Sewer Phase 3 of 3 n/a • Paarl Bulk Sewer Phase 3 of 3 n/a n/a PoE accepted.
26 2 2 2 N/A n/a PoE accepted for Mooihoek BWS
and Moretele South BWS
5 N/A N/A N/A N/A N/A
• Ndlambe BWS phase 1 N/A N/A N/A N/A N/A
• Xhora BWS N/A N/A N/A N/A N/A
• Xonxa BWS N/A N/A N/A N/A N/A
• Cluster 6 Chis Hani DM N/A N/A N/A N/A N/A
• Cluster 4 Chris Hani DM N/A N/A N/A N/A N/A
12 1 1 N/A N/A
• Sekhukhune BWS Phases 7 to 15
(i.e. 9 phases)
N/A N/A N/A N/A N/A
• Moutse BWS Phases 1 and 5 (i.e.
2 phases)
N/A N/A N/A N/A N/A
Mooihoek Mooihoek Mooihoek n/a Mooihoek Mooihoek BWS was not part of the
original plan however the project is
funded in this financial year.
Mooihoek was not APP target
• Mametja Sekororo BWS Phase 1
of 2
N/A N/A N/A N/A N/A
4 0 0 0 0
• Northern Nsikazi BWS Phase 1 of
2
N/A N/A N/A N/A N/A
• Emalahleni BWS Phase 3 of 4 N/A N/A N/A N/A N/A
• Musikaligwa / Driekoppies BWS
Phase 1 of 3
N/A N/A N/A N/A N/A
• Balfour/ Siyathemba BWS Phase
1 of 4
N/A N/A N/A N/A N/A
4 1 1 1
• Ratlou BWS Phase 1 (Setlagole)
• Greater Mamusa BWS Phase 2
(Abstraction Bloemhof)• Mafikeng South BWS Phase 2
(upgrade WTW)• Moretele South BWS Phase 1
(Klipdrift)
• Moretele South BWS Phase 1 (Klipdrift) • Moretele South BWS Phase
1 (Klipdrift)
• Moretele South BWS Phase 1 (Klipdrift) N/A N/A Moretele South BWS was planned
to be completed Q4
1 0 0 0 0 0
• Paarl Bulk Sewer Phase 3 of 3 N/A N/A N/A N/A N/A
NW
WC
Partially Achieved
2.3.7 Number of large regional bulk infrastructure
project phases completed
No milestone
2.3.6
Achieved
17
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNumber of small regional bulk infrastructure
project phases under construction
41 41 19 26 Under by 15 Under by 36.58% 26
Schedule 6B (RBIG) 19 19 15 26 PoE accepted for 19
8 8 4 5 4 5
Matatiele BWS • Matatiele BWS • Matatiele BWS • Matatiele BWS n/a • Matatiele BWS n/a n/a PoE accepted.
• Middleburg Ground Water Supply • Middleburg Ground Water Supply Not achieved Not achieved • Middleburg Ground Water
Supply
Not achieved This project is delayed by procurement
processes of the Chris Hani District
Municipality. There is a possibility that the
project will be re advertised as the tender
validity period expired
The tender response were higher than the
available budget. The tender will be re-
advertised after reviewing the cost
estimates.
PoE accepted.
• Graaf Reinet GWS • Graaf Reinet GWS • Graaf Reinet GWS • Graaf Reinet GWS n/a • Graaf Reinet GWS n/a n/a PoE accepted.
• James Kleynhans BWS • James Kleynhans BWS • James Kleynhans BWS • James Kleynhans BWS n/a • James Kleynhans BWS n/a n/a PoE accepted.
• Sundays River BWS • Sundays River BWS (Patterson) Not achieved Not achieved • Sundays River
BWS(Patterson)
Not achieved Insufficient funds to implement Phase 6 The tender response were higher than the
available budget. The tender will be re-
advertised after reviewing the cost
estimates.
PoE accepted.
• Mount Ayliff Peri-urban water
supply
• Mount Ayliff Peri-urban water supply • Mount Ayliff Peri-urban water supply • Mount Ayliff Peri-urban water supply n/a • Mount Ayliff Peri-urban water supply n/a n/a PoE accepted.
• Makana Bulk Sewer • Makana Bulk Sewer Not achieved Not achieved • Makana Bulk Sewer Not achieved Awaiting appointment of contractor Fast track the appointment of the
contractor
PoE accepted.
• Mayfield WWTW • Mayfield WWTW Not achieved Not achieved • Mayfield WWTW Not achieved The application to source contractors
from DWS Water Trading Entity has been
suspended
Submission is underway for
readvertisement
PoE accepted.
Hofmayer Ground Water Hofmayer Ground Water n/a Hofmayer Ground Water n/a n/a PoE accepted.
11 11 10 10 1 10
• Tswelopele BWS • Tswelopele BWS • Tswelopele BWS • Tswelopele BWS n/a • Tswelopele BWS n/a n/a PoE accepted
• Mantsopa BWS Phase 1 of 2 • Mantsopa BWS Phase 1 of 2 • Mantsopa BWS Phase 1 of 3 • Mantsopa BWS Phase 1 of 3 n/a • Mantsopa BWS Phase 1 of 3 n/a n/a PoE accepted
• Phumelela BWS Phase 2 of 2 • Phumelela BWS Phase 2 of 2 • Phumelela BWS Phase 2 of 3 • Phumelela BWS Phase 2 of 3 n/a • Phumelela BWS Phase 2 of 3 n/a n/a PoE accepted
• Setsoto BWS Phase 2 of 4 • Setsoto BWS Phase 2 of 4 • Setsoto BWS Phase 2 of 5 • Setsoto BWS Phase 2 of 5 n/a • Setsoto BWS Phase 2 of 5 n/a n/a PoE accepted
• Rouxville/ Smithfield/ Zastron
BWS (Mohokare BWS)
• Rouxville/ Smithfield/ Zastron BWS
(Mohokare BWS)
• Rouxville/ Smithfield/ Zastron BWS
(Mohokare BWS)
• Rouxville/ Smithfield/ Zastron BWS
(Mohokare BWS)
n/a • Rouxville/ Smithfield/ Zastron BWS (Mohokare
BWS)
n/a n/a PoE accepted
• Maluti-a-Phofung BWS Phase 2 of
4
• Maluti-a-Phofung BWS Phase 2 of
4
• Maluti-a-Phofung BWS Phase 2 of 5 • Maluti-a-Phofung BWS Phase 2 of 5 n/a • Maluti-a-Phofung BWS Phase 2 of 5 n/a n/a PoE accepted
• Maluti-a-Phofung BWS Phase 3 of
4
• Maluti-a-Phofung BWS Phase 3 of
4
• Maluti-a-Phofung BWS Phase 3 of 5 • Maluti-a-Phofung BWS Phase 3 of 5 n/a • Maluti-a-Phofung BWS Phase 3 of 5 n/a n/a PoE accepted
• Metsimaholo Bulk Sewer • Metsimaholo Bulk Sewer • Metsimaholo Bulk Sewer • Metsimaholo Bulk Sewer n/a • Metsimaholo Bulk Sewer n/a n/a PoE accepted
• Mafube Bulk Sewer Phase 1 of 2
(Frankfort)
• Mafube Bulk Sewer Phase 1 of 2
(Frankfort)
• Mafube Bulk Sewer Phase 1 of 2
(Frankfort)
• Mafube Bulk Sewer Phase 1 of 2
(Frankfort)
n/a • Mafube Bulk Sewer Phase 1 of 2 (Frankfort) n/a n/a PoE accepted
• Mafube Bulk Sewer Phase 2 of 2
(Frankfort)
• Mafube Bulk Sewer Phase 2 of 2
(Frankfort)
Not achieved not achieved • Mafube Bulk Sewer
Phase 2 of 2
(Frankfort)
Not achieved Budget not approved due to budget
constraints within the department
Project cannot commence due to budget
constraints. Awaiting the approval of bids.
PoE accepted
• Moqhaka Bulk Water Supply
(Steynrus) Phase 1 of 2
• Moqhaka Bulk Water Supply
(Steynrus) Phase 1 of 2
• Moqhaka Bulk Water Supply (Steynrus)
Phase 1 of 2
• Moqhaka Bulk Water Supply (Steynrus)
Phase 1 of 2
n/a • Moqhaka Bulk Water Supply (Steynrus) Phase 1
of 2
n/a n/a PoE accepted
7 7 3 3 3 3
• Hoxani WTW • Hoxani WTW • Completed in Q1 • Completed in Q1 • Completed in Q1 • Completed in Q1 n/a n/a PoE was accepted in Q1 therefore
not counted again
• Sibange BWS Phase 1 of 2 • Sibange BWS Phase 1 of 2 Not achieved Not achieved • Sibange BWS Phase
1 of 2
Not achieved Delays in the finalisation of the Tripatite
Service Level Agreement for the
implementation of the Driekopies project
SLA was finalised in October 2017 PoE accepted
• Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1
of 2
• Lushushwane BWS Phase 1 of 2 n/a n/a PoE accepted.
• Upgrading of Balfour WWTW
phase 2 of 2
• Upgrading of Balfour WWTW
phase 2 of 2
Not achieved Not achieved • Upgrading of Balfour
WWTW phase 2 of 2
Not achieved Delays in finalisation of designs by
Implementing Agent
Fastrack the finalisation of designs by
end October.2017.
PoE accepted
• Upgrading of Delmas WWTW
Phase 2 of 2
• Upgrading of Delmas WWTW
Phase 2 of 2
Not achieved Not achieved • Upgrading of Delmas
WWTW Phase 2 of 2
Not achieved Delays in finalisation of Feasibility
Studies by Implementing Agent
Facilitate a meeting between DWS
Planning & the IA to fastrack the
finalisation of the Feasibility Studies
PoE accepted
• Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1 of 2 • Amsterdam WWTW Phase 1
of 2
• Amsterdam WWTW Phase 1 of 2 n/a n/a PoE accepted.
• Bushbuckridge Water Services
(Cunningmore)
• Bushbuckridge Water Services
(Cunningmore)
• Bushbuckridge Water Services
(Cunningmore)
• Bushbuckridge Water Services
(Cunningmore)
• Bushbuckridge Water
Services (Cunningmore)
• Bushbuckridge Water Services (Cunningmore) n/a n/a PoE accepted.
2.3.8
EC
FS
MP
Partially achieved
18
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration11 11 1 5 6 1
• Loeriesfontein BWS Phase 1
(pipeline) and Phase 2 (reservoir)
(i.e. 2 phases)
• Loeriesfontein BWS Phase 1
(pipeline) and Phase 2 (reservoir)
(i.e. 2 phases)
Not achieved • Loeriesfontein BWS Phase 1 (pipeline)
-Phase 2 (reservoir) (i.e. 2 phases)
n/a • Loeriesfontein BWS Phase 1 (pipeline)
and
-Phase 2 (reservoir) (i.e. 2 phases)
n/a n/a PoE accepted
• Van Wyksvlei Groundwater Phase
1 (pipeline upgrade) and Phase 2
(boreholes) (i.e. 2 phases)
• Van Wyksvlei Groundwater Phase
1 (pipeline upgrade) and Phase 2
(boreholes) (i.e. 2 phases)
Not achieved Not achieved • Van Wyksvlei Groundwater
Phase 1 (pipeline upgrade)
and
- Phase 2 (boreholes) (i.e. 2
phases)
Not achieved Procurement delay for phase 1 & 2
Contractors
The IA has advertised the tender PoE accepted
• Windsorton to Holpan BWS
Phase 1 (pipeline) and Phase 2
(reservoir) (i.e.2 phases)
• Windsorton to Holpan BWS Phase
1 (pipeline) and
-Phase 2 (reservoir) (i.e.2 phases)
• Windsorton to Holpan BWS Phase 1 (pipeline)
and Phase 2 (Water treatment Plant)
• Windsorton to Holpan BWS Phase 1 (pipeline)
and
-Phase 2 (Water treatment Plant)
n/a • Windsorton to Holpan BWS Phase 1 (pipeline)
and
- Phase 2 (Water treatment Plant)
n/a n/a PoE accepted.
• Rietchie Phase 1 (pipeline) and
Phase 2 (reservoir) (i.e. 2 phases)
• Rietchie Phase 1 (pipeline) and
Phase 2 (reservoir) (i.e. 2 phases)
Not achieved • Rietchie Phase 1 (pipeline) • Rietchie Phase 2 (reservoir) • Rietchie Phase 1 (pipeline) Rietchie phase 2 delayed the
appoinment of contractor.
Rietchie upgrading of bulk water raising
main Phase 1 is complete, Phase 2 site
handover meeting will be held in the first
week of October 2017.
PoE accepted
• Kameelmond/ Upington WWTW
Phase 1 (ponds)
• Kameelmond/ Upington WWTW
Phase 1 (ponds)
Not achieved Not achieved • Kameelmond/
Upington WWTW
Phase 1 (ponds)
Not achieved The Consultant has been appointed,
evaluation for contractors have been
done
Finalise appointmnet of contractor PoE accpeted
• Warrenton WTW Phase 1 (ponds) • Warrenton WTW Phase 1 (ponds) Not achieved Not achieved • Warrenton WTW
Phase 1 (ponds)
Not achieved Delay with approval of IRS due not being
able to secure Co-funding by
Municipality
Meeting on Co-Funding between DWS,
Municipality, CoGHSTA and FBDM was
held on the 21 September 2017.
PoE accepted.
• De Aar Boreholes Phase 1 • De Aar Boreholes Phase 1 Not achieved Not achieved • De Aar Boreholes
Phase 1
Not achieved No Funds allocated for project in the
2017/18 FY
Funding for the project will be sourced
from adjustments from other projects
within the province
PoE accepted
3 3 1 3 3
• Wolmaransstad WWTW • Wolmaransstad WWTW • Wolmaransstad WWTW • Wolmaransstad WWTW n/a • Wolmaransstad WWTW n/a n/a PoE accepted.
• Koster WWTW • Koster WWTW • Koster WWTW • Koster WWTW n/a • Koster WWTW n/a n/a PoE accepted
• Tlokwe WTW Phase 1
(Potchefstroom)
•Tlokwe WTW Phase 1
(Potchefstroom)
•Tlokwe WTW Phase 1 (Potchefstroom) •Tlokwe WTW Phase 1 (Potchefstroom) n/a •Tlokwe WTW Phase 1 (Potchefstroom) n/a n/a PoE accepted
1 1 0 0 1 0
WC • Citrusdal WWTW Phase 2 of 2 • Citrusdal WWTW Phase 2 of 2 Not achieved Not achieved • Citrusdal WWTW Phase 2 of
2
Not achieved Delays in Appointment of contractor Tender for appointment of contractor is
expected to be awarded in quarter 3
PoE accepted
Number of small regional bulk infrastructure
project phases completed
20 2 0 1 0 1 PoE accepted
Schedule 6B (RBIG) 0 0 0
EC 4 0 0 0 0
• Middleburg Ground Water Supply n/a n/a n/a n/a n/a n/a n/a
• Sundays River BWS n/a n/a n/a n/a n/a n/a n/a
• Matatiele BWS n/a n/a n/a n/a n/a n/a n/a
• James Kleynhans BWS n/a n/a n/a n/a n/a n/a n/a
FS 5 0 0 0 0
• Mafube Bulk Sewer Phase 1 of 2 n/a n/a n/a n/a n/a n/a n/a
• Moqhaka Bulk Water Supply
(Steynrus) Phase 1 of 2
n/a n/a n/a n/a n/a n/a n/a
• Tswelopele BWS n/a n/a n/a n/a n/a n/a n/a
• Rouxville/ Smithfield/ Zastron
BWS (Mohokare BWS)
n/a n/a n/a n/a n/a n/a n/a
• Maluti-a-Phofung BWS Phase 2 of
4
n/a n/a n/a n/a n/a n/a n/a
MP 7 0 0 0 0
• Hoxani WTW • Hoxani WTW Completed in quarter 1 Completed in quarter 1 (Hoxani) Completed in quarter 1 Completed in quarter 1 n/a n/a Hoxani was completed Q1
• Sibange BWS Phase 1 of 2 N/A n/a n/a n/a n/a n/a
• Lushushwane BWS Phase 1 of 2 • Lushushwane BWS Phase 1 of 40 Not achieved Not achieved • Lushushwane BWS Phase 1
of 40
Not achieved The site was flooded and caused delays
on the construction
The project is currently at 70%
construction and the completion date is
November 2017
PoE accepted
• Upgrading of Balfour WWTW
phase 2 of 2
n/a n/a n/a n/a n/a n/a n/a
• Upgrading of Delmas WWTW
Phase 2 of 2
n/a n/a n/a n/a n/a n/a n/a
• Amsterdam WWTW Phase 1 of 2 n/a n/a n/a n/a n/a n/a n/a
• Bushbuckridge Water Services
(Cunningmore)
n/a n/a n/a n/a n/a n/a n/a
NW 3 0 0 n/a 0 0
• Wolmaransstad WWTW n/a n/a n/a n/a n/a n/a n/a
• Koster WWTW n/a n/a n/a n/a n/a n/a n/a
• Tlokwe WTW Phase 1
(Potchefstroom)
n/a n/a n/a n/a n/a n/a n/a
WC 1 0 0 n/a 0 0 0 0
• Citrusdal WWTW Phase 2 of 2 n/a n/a n/a n/a n/a n/a n/a
2.3.9
2.3.8
MP
NC
NW
Partially achieved
Partially achieved
19
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNumber of existing bucket sanitation backlog
systems in formal settlements replaced with
adequate sanitation services per year
25 382 7868 1137 Under by 6731 Under by 85.5% 1137 Slow progress on site due to limited
budget.
37 - -
Makana - -
4 202 - 179 179
Griekwastad - 407 134
Maranteng - 134 -
Rosedale - 801 45
Louisvale - 477 -
Postdene - 149 -
Victoria west - 524 -
Campbell - 596 -
Fraser Moleketi - 458 -
Motswedimosa - 656 -
Breipal - - -
Paballelo - - -
Dakotaweg - - -
21143 - 21143 944 944
Ficksburg - 218 - -
Arlington - 1 192 - -
Lindley - 820 - -
Clocolan - 3379 - -
Senekal - 2435 - -
Petrus steyn - 960 - -
Hertzogville - 1020 - -
Reitz - 739 - -
Dealesville - 1290 - -
Rouxville - 50 49 49
Dewetsdorp - 191 - -
Henneman - 1123 - -
Virginia (Khothalong) - 1371 32 32
Theunissen - 62 159 159
Heibron - 1100 - -
Vredefort - 698 - -
Frankfort - - -
Villiers - 1842 - -
Ntswanatsatsi( Cornelia) - 338 82 82
Tweeling - 304 - -
Memel - 568 29 29
Marquard - 583 81 81
Meloding(Mathjabeng) - 512 512
LP (LNW) - 14 14
Charlotte Maxeke - 14 14
Partially achiedved Poe accepted
Water Services Infrastructure Grant
2.5.1
EC
FS
NC
The project to be implemented subject to
budget availability and approval of
budget Bids by National Treasury
20
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNumber of rural households served to
eradicate sanitation backlogs as per norms
and standards
10032 No milestone No milestone No milestone Poe accepted
1921 1921
Mbhashe / Amathole
Mnquna /Amathole
Joe Gqabi
Alfred Nzo
O.R Tambo
Chris Hani
Bumbane
Celani
Fumbatha 9 9
Kobodi
742 742
Dejagersdrift 8 8
Eerstelingand Borelen 4 4
Ekuthuleni 7 7
Esixhobeni 25 25
Ethembeni 5 5
Ikhezi farm 7 7
Insuzeqcwensa 94 94
Masakhane 6 6
Mazakhele 4 4
Mdimane 10 10
Mpukane 16 16
Mthethofanayo 13 13
Ndwendwe 24 24
Ntibane 41 41
Ntokozweni 15 15
Siyaphumula 27 27
Sizanani 10 10
Tayside 12 12
Thuthukani 6 6
Umzimkhulu 114 114
Vumbuka 23 23
Wewe 30 30
Strijbank 241 241
Shayamoya
778 778
Ga- moretsele 53 53
Mavhunga 168 168
Sekgopokgopong
Gedroogte 134 134
Makhushane 195 195
Machenga 182 182
Mashishimale 46 46
70 70
Bona bona
Madipaleseng
Tlapeng 70 70
322 322
Bankhara 322 322
No milestone
NW
NC
2.5.2
KZN
LP
EC
21
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration2.3.12 Number of small WSIG projects under
construction
182 86 108 Under by 66 Under by 51.56% 108 Partially achieved
Schedule 5B 174 174 86 104
23 23 9 17 Under by 6 17
Alfred Nzo (4) Alfred Nzo (4) Alfred Nzo (3) Alfred Nzo (4) n/a Alfred Nzo (4) N/A n/a PoE accepted for 4,
Chris Hani (5) Chris Hani (5) Chris Hani (0) Chris Hani (7) n/a Chris Hani (7) N/A n/a PoE accepted for 7
Joe Gqabi (3) Joe Gqabi (3) Joe Gqabi (2) Joe Gqabi (2) Joe Gqabi (1) Joe Gqabi (2) Delays in procurement processes for the
appointment of contractor
WSA to submit acceleration plans PoE accepted for 2,
OR Tambo (6) OR Tambo (6) OR Tambo (0) Not achieved OR Tambo (6) OR Tambo (0) Delays in procurement processes for the
appointment of contractor
WSA to submit acceleration plans PoE accepted
Amathole (4) Amathole (4) Amathole (4) Amathole (4) n/a Amathole (4) N/A n/a PoE accepted for 4
Blue Crane (1) Blue Crane (1) Blue Crane (0) Not achieved Blue Crane (0) Blue Crane (0) Delays in procurement processes for
appointment of contractor
WSA to submit acceleration plans PoE accepted
14 14 15 15 Over by 1 15 PoE accepted for 15
Letsemeng (1) Letsemeng (1) Letsemeng (2) Letsemeng (2) n/a Letsemeng (2) Oppermansgronde WTW and Petrusburg
boreholes are a carry over that could not
be completed due to litigation issues
between contractors and the WSA
PoE accepted for 2
Mohokare (2) Mohokare (2) Mohokare (1) Mohokare (1) n/a Mohokare (1) The Consultant has been appointed, the
Municipality is waiting for Eskom to
committ on the upgrade of the electricity
supply to commence with the
appointment of the contractor
PoE accepted
Kopanong (2) Kopanong (2) Kopanong (5) Kopanong (5) n/a Kopanong (5) n/a n/a PoE accepted for 5
Maluti (2) Maluti (2) Maluti (1) Maluti (1) n/a Maluti (1) The consultant has been appointed, the
tender for Contractor closed on the 29th
September 2017.
Finalise appointmnet of contractor PoE accepted for 1
Matjhabeng (1) Matjhabeng (1) Matjhabeng (0) Matjhabeng (0) Matjhabeng (1) Matjhabeng (0) The Municipality is busy with the tender
evaluations to appoint the consultant
Finalise appointmnet of consultant and
contractor
PoE accepted
Dihlabeng (1) Dihlabeng (1) Dihlabeng (4) Dihlabeng (4) Over by 3 Dihlabeng (4) PSP for the Upgrading of Betlehem WTW
and Fouriesburg WS Pumpstation was
appointed by the WSA in 2014 hence
implementation commenced earlier than
anticipated
N/A PoE accepted for 4
Phumelela (1) Phumelela (1) Phumelela (0) Phumelela (0) Phumelela (1) Phumelela (0) The consultant has been appointed, the
municipality is currently busy with the
tender evaluations to appoint the
contractor
Finalise appointmnet of contractor PoE for under achievement
accepted
Setsoto (1) Setsoto (1) Setsoto (1) Setsoto (1) n/a Setsoto (1) The project is under construction the
progress is at 7%
N/A PoE accepted for 1
Moqhaka (1) Moqhaka (1) Moqhaka (0) Moqhaka (0) Moqhaka (1) Moqhaka (0) The Municipality is busy with the tender
evaluations to appoint the contractor
Finalise appointmnet of contractor PoE for under achivement accepted
Ngwathe (1) Ngwathe (1) Ngwathe (0) Ngwathe (0) Ngwathe (1) Ngwathe (0) The consultant has been appointed, the
tender for contractor closed on the 04th
October 2017
Finalise appointmnet of contractor PoE accepted
Metsimaholo (1) Metsimaholo (1) Metsimaholo (0) Metsimaholo (0) Metsimaholo (1) Metsimaholo (0) The Municipality is busy with the tender
evaluations to appoint the consultant
Finalise appointmnet of consultant and
contractor
PoE for under achivement accepted
8 8 8 9 Over by 1 9
Emfuleni (2) Emfuleni (2) Emfuleni (3) Emfuleni (3) Over by 1 Emfuleni (3) n/a n/a PoE accepted for 3
Midvaal (1) Midvaal (1) Midvaal (0) Midvaal (1) n/a Midvaal (1) n/a n/a PoE accepted for 1
Lesedi (1) Lesedi (1) Lesedi (1) Lesedi (1) n/a Lesedi (1) n/a n/a PoE accepted for 1
Mogale City (2) Mogale City (2) Mogale City (0) Mogale City (2) n/a Mogale City (2) n/a n/a PoE accepted for 2
Merafong (1) Merafong (1) Merafong (0) Merafong (1) n/a Merafong (1) n/a n/a PoE accepted for 1
Rand West (1) Rand West (1) Rand West (1) Rand West (1) n/a Rand West (1) n/a n/a PoE accepted for 1
34 34 30 29 Under by 5 29
Amajuba (3) Amajuba (3) Amajuba (3) Amajuba (3) n/a Amajuba (3) n/a n/a PoE accepted for 3
Harry Gwala (4) Harry Gwala (4) Harry Gwala (3) Harry Gwala (3) Under by 1 Harry Gwala (3) Business Plan for the project was
submitted late, awaiting approval prior to
commencement
Regional P&I is expediting approval of
the project BP
PoE accepted for 3
iLembe (4) iLembe (4) iLembe (4) iLembe (4) n/a iLembe (4) n/a n/a PoE accepted for 4
King Cetshwayo (3) King Cetshwayo (3) King Cetshwayo (3) King Cetshwayo (3) n/a King Cetshwayo (3) n/a n/a PoE accepted for 3
uMsunduzi (2) uMsunduzi (2) uMsunduzi (2) uMsunduzi (2) n/a uMsunduzi (2) n/a n/a PoE accepted for 2
Newcastle (1) Newcastle (1) Newcastle (1) Newcastle (1) n/a Newcastle (1) n/a n/a PoE accepted for 1
Ugu (2) Ugu (2) Ugu (2) Ugu (2) n/a Ugu (2) n/a n/a PoE accepted for 1
uMgungundlovu (1) uMgungundlovu (1) uMgungundlovu (1) uMgungundlovu (1) n/a uMgungundlovu (1) n/a n/a PoE accepted for 1
uMhlathuze (2) uMhlathuze (2) uMhlathuze (2) uMhlathuze (2) n/a uMhlathuze (2) n/a n/a PoE accepted for 2
uMkhanyakude (4) uMkhanyakude (4) uMkhanyakude (2) uMkhanyakude (2) Under by 2 uMkhanyakude (2) Delays in advertisement of Tenders for
Rudimentary Programme Phase 6 and
KwaZibi Water Supply Phase 1
The IA to ensure that the contractor put as
much resources as possible in order to
shorten construction periods.
PoE accepted for 2
Mzinyathi (2) Mzinyathi (2) uMzinyathi (0) uMzinyathi (0) Under by 2 uMzinyathi (0) Delays in commencement with SCM
processes
Fast track SCM processess PoE accepted
Uthukela (2) Uthukela (2) UThukela (2) UThukela (5) Over by 3 UThukela (5) N/A PoE accepted for 6
Zululand (4) Zululand (4) Zululand (2) Zululand (2) Under by 2 Zululand (2) Delays in procurement for Dindi and
Godlankomo Water Supply Projects
Fastrack tender adjudication processes
for Dindi and Godlankomo projects
PoE accepted for 2
32 32 4 5 Under by 27 4
EC
FS
GP
KZN
LP
22
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationSekhukhune (5) Sekhukhune (5) Sekhukhune (0) Sekhukhune (0) Under by 5 Sekhukhune (0) Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
PoE accepted
Mopani DM (4) Mopani DM (4) Mopani DM (0) Mopani DM (0) Under by 4 Mopani DM (0) Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
PoE accepted
Vhembe DM (3) Vhembe DM (3) Vhembe DM (0) Vhembe DM (0) Under by 3 Vhembe DM (0) Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
PoE accepted
Capricorn DM (5) Capricorn DM (5) Capricorn DM (0) Capricorn DM (0) Under by 5 Capricorn DM (0) Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
PoE accepted
Mogalakwena LM (5) Mogalakwena LM (5) Mogalakwena LM (1) Mogalakwena LM (3) Under by 2 Mogalakwena LM (3) Delays in appointmnet of contractors Mogalakwena Municipalty accelerated the
appointment of contractors using the term
contracts.
PoE accepted
Lephalale LM (3) Lephalale LM (3) Lephalale LM (0) Lephalale LM (0) Under by 3 Lephalale LM (0) Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
PoE accepted
Bela-Bela LM (2) Bela-Bela LM (2) Bela-Bela LM (3) Bela-Bela LM (2) n/a Bela-Bela LM (2) Bela bela municipality accelerated the
procurement of contractors and
construction commenced early
PoE accepted
Lim368 (5) Lim368 (5) Lim368 (0) Lim368 (0) Under by 5 Lim368 (0) Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
Projects planned for 2017-18 financial
year are targeted for implementation in
the 3rd quarter
PoE accepted
LP
23
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration21 21 12 9 Under by 12 9
Albert Luthuli (2) Albert Luthuli (2) Albert Luthuli (0) Albert Luthuli (0) Under by 2 Albert Luthuli (0) Funding could not be transferred in
quarter 1 and this delayed the
appointment of contractors.
Fastrack tranfer of funds. PoE accepted
Mkhondo (2) Mkhondo (2) Mkhondo (0) Mkhondo (0) Under by 2 Mkhondo (0) Delays in finalisation of designs Tender for appointmnet of contractor has
been advertised.
PoE accepted
Lekwa (1) Lekwa (1) Lekwa (0) Lekwa (0) Under by 1 Lekwa (0) Funding could not be transferred in
quarter 1 and this delayed the
appointment of contractors
Fastrack tranfer of funds. PoE accepted
Emakhazeni (2) Emakhazeni (2) Emakhazeni (2) Emakhazeni (2) n/a Emakhazeni (2) N/A PoE accepted
Thembisile Hani (4) Thembisile Hani (4) Thembisile Hani (3) Thembisile Hani (3) Under by 1 Thembisile Hani (3) Delays in finalisation of designs Tender for appointmnet of contractor has
been advertised.
PoE accepted
Dr JS Moroka (1) Dr JS Moroka (1) Dr JS Moroka (0) Dr JS Moroka (0) Under by 1 Dr JS Moroka (0) The initial project was reprioritised and a
Business Plan for another project in a
hotspot are had to be approved
Fastrack the Procurement of contractor. PoE accepted
Thaba Chweu (2) Thaba Chweu (2) Thaba Chweu (0) Thaba Chweu (0) Under by 2 Thaba Chweu (0) Funding could not be transferred in
quarter 1 and this delayed the
appointment of contractors
Fastrack tranfer of funds. PoE accepted
Nkomazi (2) Nkomazi (2) Nkomazi (2) Nkomazi (2) n/a Nkomazi (2) n/a n/a PoE accepted for 2
Bushbuckridge (3) Bushbuckridge (3) Bushbuckridge (3) Bushbuckridge (0) Under by 3 Bushbuckridge (0) n/a n/a PoE accepted
Mbombela (2) Mbombela (2) Mbombela (2) Mbombela (2) n/a Mbombela (2) n/a n/a PoE accepted for2
25 25 6 8 Under by 17 8
Richtersveld (1) Richtersveld (1) Richtersveld (0) Richtersveld (0) Richtersveld (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Nama Khoi (1) Nama Khoi (1) Nama Khoi (0) Nama Khoi (0) Nama Khoi (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Kamiesberg (1) Kamiesberg (1) Kamiesberg (0) Kamiesberg (0) Kamiesberg (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Hantam (1) Hantam (1) Hantam (0) Hantam (0) Hantam (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Karoo Hoogland (1) Karoo Hoogland (1) Karoo Hoogland (0) Karoo Hoogland (0) Karoo Hoogland (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Khai-Ma (1) Khai-Ma (1) Khai-Ma (0) Khai-Ma (0) Khai-Ma (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Ubuntu (1) Ubuntu (1) Ubuntu (0) Ubuntu (0) Ubuntu (0) Consultant has been appointed, Tender
has been advertised for contractors,
construction will commence in Quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Msobomvu (1) Msobomvu (1) Msobomvu (0) Msobomvu (0) Msobomvu (0) Contractors have been appointed,
construction will commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Emthanjeni (1) Emthanjeni (1) Emthanjeni (0) Emthanjeni (0) Emthanjeni (0) Tender advertisement has been finalised,
awaiting final appointmnet of contractor
Follow up with IA to ensure construction is
achieved
PoE accepted
Kareeberg (1) Kareeberg (1) Kareeberg (0) Kareeberg (0) Kareeberg (0) Tender advertisement has been finalised,
awaiting final appointmnet of contractor
Follow up with IA to ensure construction is
achieved
PoE accepted
Renosberg (1) Renosberg (1) Renosberg (1) Renosberg (0) Renosberg (0) PoE accepted
Thembelihle (1) Thembelihle (1) Thembelihle (0) Thembelihle (0) Thembelihle (1) Thembelihle (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Siyancuma (1) Siyancuma (1) Siyancuma (0) Siyancuma (0) Siyancuma (1) Siyancuma (0) Contractors have been appointed,
construction will commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Kai Garib (1) Kai Garib (1) Kai Garib (0) Kai Garib (0) Kai Garib (1) Kai Garib (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Kheis (1) Kheis (1) Kheis (0) Kheis (0) Kheis (1) Kheis (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Tsatsabane 1 Tsatsabane 1 Tsatsabane (0) Tsatsabane (0) Tsatsabane 1 Tsatsabane (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Kgatelopele 1 Kgatelopele 1 Kgatelopele (0) Kgatelopele (0) Kgatelopele 1 Kgatelopele (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
MP
NC
24
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationKhara Heist 1 Khara Heist 1 Khara Heist (0) Khara Heist (0) Khara Heist 1 Khara Heist (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Sol Plaatjie 1 Sol Plaatjie 1 Sol Plaatjie (0) Sol Plaatjie (0) Sol Plaatjie 1 Sol Plaatjie (0) Contractors have been appointed,
construction will commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Phokwane 1 Phokwane 1 Phokwane (0) Phokwane (0) Phokwane 1 Phokwane (0) Tender for appointmnet of contractor has
been advertised, construction will
commence in quarter 3
Follow up with IA to ensure construction is
achieved
PoE accepted
Joe Morolong 2 Joe Morolong 2 Joe Morolong (2) Joe Morolong (4) Over by 2 Joe Morolong (4) PoE accepted
Ga-Segonyana 2 Ga-Segonyana 2 Ga-Segonyana (2) Ga-Segonyana (3) n/a Ga-Segonyana (3) PoE accepted
Gamagara 1 Gamagara 1 Gamagara (1) Gamagara (1) n/a Gamagara (1) PoE accepted
14 14 2 13 Under by 1 13
Moretele (3) Moretele (3) Moretele (0) Moretele (0) Under by 3 Moretele (0) Delays in submission of Business Plans
by the WSA
Finalise approval of Business Plan PoE accepted
Rustenburg (3) Rustenburg (3) Rustenburg (0) Rustenburg (1) Under by 2 Rustenburg (1) Delays in submission of Business Plans
by the WSA
Finalise approval of Business Plan PoE accepted
Kgetlengrivier (1) Kgetlengrivier (1) Kgetlengrivier (0) Kgetlengrivier (0) under by1 Kgetlengrivier (0) Delays in submission of Business Plans
by the WSA
Finalise approval of Business Plan PoE accepted
Moses Kotane (2) Moses Kotane (2) Moses Kotane (0) Moses Kotane (1) Under by 1 Moses Kotane (1) Delays in submission of Business Plans
by the WSA
Finalise approval of Business Plan PoE accepted
Dr Ruth Mompati (3) Dr Ruth Mompati (3) Dr Ruth Mompati (0) Dr Ruth Mompati (8) Over by 5 Dr Ruth Mompati (8) Delays in submission of Business Plans
by the WSA
Finalise approval of Business Plan PoE accepted
Maquassi Hills (1) Maquassi Hills (1) Maquassi Hills (1) Maquassi Hills (1) n/a Maquassi Hills (1) PoE accepted
Ventersdorp/ Tlokwe (1) Ventersdorp/ Tlokwe (1) Ventersdorp/ Tlokwe (1) Ventersdorp/ Tlokwe (2) Over by 1 Ventersdorp/ Tlokwe (2) PoE accepted
3 3 0 0 0
Matzikama (1) Matzikama (1) Matzikama (0) Matzikama (0) Under by 1 Matzikama (0) The consultant is appointed, however
thre are challenges as the tender amount
is more than the allocated amount.
Tender readvertised with changed
specification.
PoE accepted
Cederberg (1) Cederberg (1) Cederberg (0) Cederberg (0) Under by 1 Cederberg (0) Consultant will be appointed by end
October.
Follow up with Municipality to ensure
appointment of the contractor
PoE accepted
Oudtshoorn (1) Oudtshoorn (1) Oudtshoorn (0) Oudtshoorn (0) Under by 1 Oudtshoorn (0) Consultant is appointed, construction will
commence in November 2017.
Follow up with IA to ensure construction is
achieved
PoE accepted
Schedule 6B 8 8 3 3 3
3 3 0 0
Polokwane LM (2) Polokwane LM (2) Polokwane LM (0) Polokwane LM (0) Under by 2 Polokwane LM (0) Funds are available but not accessible as
they will be used to pay accruals.
The planned projects will be Implemented
in the 2018/19 financial year
PoE accepted
Thabazimbi LM (1) Thabazimbi LM (1) Thabazimbi LM (0) Thabazimbi LM (0) Under by 1 Thabazimbi LM (0) Funds are available but not accessible as
they will be used to pay accruals.
The planned projects will be Implemented
in the 2018/19 financial year
PoE accepted
5 5 2 2 2 PoE accepted
Madibeng (2) Madibeng (2) Madibeng (2) Madibeng (2) n/a Madibeng (2) n/a n/a PoE accepted
Ngaka Modiri Molema (3) Ngaka Modiri Molema (3) Ngaka Modiri Molema (0) Ngaka Modiri Molema (0) Under by 3 Ngaka Modiri Molema (0) Funding was reprioritised to adress
hotspots
The planned projects will be Implemented
in the 2018/19 financial year
PoE accepted
1 1 1 1 PoE accepted
KZN Nongoma LM (1)= Abaqulusi Nongoma LM (1)= Abaqulusi Nongoma LM (1)= Abaqulusi n/a Nongoma LM (1)= Abaqulusi PoE accepted
NC
NW
WC
LP
NW
25
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNumber of small WSIG projects completed 5 0 0 0 0 No milestone
Schedule 5B 33 0 0 0 0
9 No milestone No milestone No milestone No milestone
Alfred Nzo (2) n/a n/a n/a n/a n/a
Chris Hani (1) n/a n/a n/a n/a n/a
Joe Gqabi (1) n/a n/a n/a n/a n/a
OR Tambo (2) n/a n/a n/a n/a n/a
Amathole (2) n/a n/a n/a n/a n/a
Blue Crane (1) n/a n/a n/a n/a n/a
3 0 0 0 0
Kopanong (1) n/a n/a n/a n/a
Dihlabeng (1) n/a n/a n/a n/a
Metsimaholo (1) n/a n/a n/a n/a
1 n/a n/a n/a n/a
Rand West (1) 0 0 0 0
5 n/a n/a n/a N/A
Newcastle (1) n/a n/a n/a N/A
Zululand (4)
2 n/a n/a n/a n/a
Bela-Bela LM (2) 0 0 0 0
MP 2 0 1 0 0
0 0 Bushbuckridge (1) n/a n/a
Albert Luthuli (2) n/a n/a n/a n/a
9 0 0 0 0
Hantam (1) n/a n/a n/a n/a
Karoo Hoogland (1) n/a n/a n/a n/a
Khai-Ma (1) n/a n/a n/a n/a
Ubuntu (1) n/a n/a n/a n/a
Emthanjeni (1) n/a n/a n/a n/a
Kareeberg (1) n/a n/a n/a n/a
Renosberg (1) n/a n/a n/a n/a
Tsatsabane (1) n/a n/a n/a n/a
Kgatelopele (1) n/a n/a n/a n/a
1 0 0 0 0
Moses Kotane (1) n/a N/A N/A N/A
1 0 0 0 0
Cederberg (1) n/a N/A N/A N/A
Schedule 6B 8 0 1 0 0
0 0 1 0 0
Nongoma LM (1)= Abaqulusi n/a n/a
3 0
Polokwane LM (2) N/A n/a n/a N/A
Thabazimbi LM (1) N/A n/a n/a N/A
5 0
Madibeng (2) N/A n/a n/a N/A
Ngaka Modiri Molema (3) N/A n/a n/a N/A
Number of small ACIP projects under
construction
55 55 1 1 Under by 54 1
Water Conservation and Demand
Management
7 7 0 0 7 0
3 3 0 0 3 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Sundays River WCDM Sundays River WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Makana WCDM Makana WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Ndlambe WCDM Ndlambe WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
1 1 0 0 1 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mafube WCDM Mafube WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
2 2 0 0 2 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Lesedi WCDM Lesedi WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Merafong WCDM Merafong WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
1 1 0 0 1 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Magareng WCDM Magareng WCDM 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Accelerated Community Infrastructure
GP
NC
LP
NC
NW
WC
KZN
LP
EC
FS
NW
Not achieved2.3.10
No milestone
EC
FS
GP
KZN
2.3.13
26
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationWATER SUPPLY 17 17 0 0 17 0
3 3 0 0 3 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Waterford Community Water
Supply
Waterford Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Blue Crane Route Community
Water Supply
Blue Crane Route Community Water
Supply
0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Blue Crane Route Community
Water Supply
Blue Crane Route Community Water
Supply
0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
5 5 0 0 5 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Letsemeng Community Water
Supply
Letsemeng Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Letsemeng Community Water
Supply
Letsemeng Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mafube Community Water Supply Mafube Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Phumelela Community Water
Supply
Phumelela Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mafube Community Water Supply Mafube Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
1 1 0 0 1 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Delmas Water supply and Water
conservation demand and demand
management
Delmas Water supply and Water
conservation demand and demand
management
0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
2 2 0 0 2 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Emthanjeni Community Water
Supply
Emthanjeni Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Siyathemba Community Water
Supply
Siyathemba Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
1 1 0 0 1 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Tshilidzini Community Water
Supply
Tshilidzini Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
1 1 0 0 1 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Ventersdorp Water Community
Supply
Ventersdorp Water Community
Supply
0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
4 4 0 0 4 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
George Community Water Supply George Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Laingsburg
Community Water Supply
Laingsburg
Community Water Supply
0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Kannaland Community Water
Supply
Kannaland Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mossel Bay Community Water
Supply
Mossel Bay Community Water Supply 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
EC
MP
NC
Not achieved2.3.10
FS
LP
NW
WC
27
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationWASTE WATER TREATMENT WORKS 31 31 0 0 30 0
5 5 0 0 5 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Ndlambe WWTW Ndlambe WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Nkonkobela WWTW Nkonkobela WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Kouga WWTW Kouga WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Dr Beyer Naude WWTW Dr Beyer Naude WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Koukamma WWTW Koukamma WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
6 6 0 0 6 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Kopanong WWTW Kopanong WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Moqhaka WWTW Moqhaka WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mantsopa WWTW Mantsopa WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Masilonyana WWTW Masilonyana WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Phumelela WWTW Phumelela WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mohokare WWTW Mohokare WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
2 2 0 0 2 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Randfontein WWTW Randfontein WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Emfuleni WWTW Emfuleni WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
3 3 1 1 2 1
Ingwavuma WWTW Ingwavuma WWTW Ingwavuma WWTW Ingwavuma WWTW Ingwavuma WWTW n/a n/a PoE accepted
Manguzi WWTW Manguzi WWTW 0 0 0 0 The IA delayed appointment of
contractors
WSA to fast track appointmnet of
contractors
Hluhluwe WWTW Hluhluwe WWTW 0 0 0 0 The IA delayed appointment of
contractors
WSA to fast track appointmnet of
contractors3 3 0 0 3 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mkhondo WWTW Mkhondo WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Dr Pixley Ka Sema WWTW Dr Pixley Ka Sema WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Dr Pixley Ka Sema WWTW Dr Pixley Ka Sema WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
4 4 0 0 4 -4 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Tzaneen WWTW Tzaneen WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Mutale WWTW Mutale WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Not achieved2.3.10
EC
FS
GP
KZN
MP
LP
28
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationCapricorn WWTW Capricorn WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Lephalale WWTW Lephalale WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
2 2 0 0 2 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Khai Ma WWTW Khai Ma WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Sol Plaatjie WWTW Sol Plaatjie WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
3 3 0 0 3 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
City of Matlosana WWTW City of Matlosana WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Ventersdorp WWTW Ventersdorp WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
City of Matlosana WWTW City of Matlosana WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
3 3 0 0 3 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Kannaland WWTW Kannaland WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Cederberg WWTW Cederberg WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Kannaland WWTW Kannaland WWTW 0 0 0 0 The budget has been reprioritised to pay
for the bucket eradication programme.
N/A
Number of small ACIP projects under
completed
55 No milestone No milestone No milestone No milestone n/a n/a
Water Conservation and Demand
Management
7 n/a n/a
3 n/a n/a
Sundays River WCDM n/a n/a
Makana WCDM n/a n/a
Ndlambe WCDM n/a n/a
1 n/a n/a
Mafube WCDM n/a n/a
2 n/a n/a
Lesedi WCDM n/a n/a
Merafong WCDM n/a n/a
1 n/a n/a
Magareng WCDM n/a n/a
WATER SUPPLY 17 n/a n/a
3 n/a n/a
Waterford Community Water
Supply
n/a n/a
Blue Crane Route Community
Water Supply
n/a n/a
Blue Crane Route Community
Water Supply
n/a n/a
No milestoneNo milestone No milestone No milestone
NW
WC
Not achieved2.3.10
EC
FS
GP
NC
No milestone
No milestone
NC
2.3.11
LP
EC
29
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationFS 5 n/a n/a
Letsemeng Community Water
Supply
n/a n/a
Letsemeng Community Water
Supply
n/a n/a
Mafube Community Water Supply n/a n/a
Phumelela Community Water
Supply
n/a n/a
Mafube Community Water Supply n/a n/a
1 n/a n/a
Delmas Water supply and Water
conservation demand and demand
management
n/a n/a
2 n/a n/a
Emthanjeni Community Water
Supply
n/a n/a
Siyathemba Community Water
Supply
n/a n/a
1 n/a n/a
Tshilidzini Community Water
Supply
n/a n/a
1 n/a n/a
Ventersdorp Water Community
Supply
n/a n/a
4 n/a n/a
George Community Water Supply n/a n/a
Laingsburg
Community Water Supply
n/a n/a
Kannaland Community Water
Supply
n/a n/a
Mossel Bay Community Water
Supply
n/a n/a
WASTE WATER TREATMENT WORKS 31 n/a n/a
5 n/a n/a
Ndlambe WWTW n/a n/a
Nkonkobela WWTW n/a n/a
Kouga WWTW n/a n/a
Dr Beyer Naude WWTW n/a n/a
Koukamma WWTW n/a n/a
6 n/a n/a
Kopanong WWTW n/a n/a
Moqhaka WWTW n/a n/a
Mantsopa WWTW n/a n/a
Masilonyana WWTW n/a n/a
Phumelela WWTW n/a n/a
Mohokare WWTW n/a n/a
2 n/a n/a
Randfontein WWTW n/a n/a
Emfuleni WWTW n/a n/a
3 n/a n/a
Ingwavuma WWTW n/a n/a
Manguzi WWTW n/a n/a
Hluhluwe WWTW n/a n/a
3 n/a n/a
Mkhondo WWTW n/a n/a
Dr Pixley Ka Sema WWTW n/a n/a
Dr Pixley Ka Sema WWTW n/a n/a
No milestone
KZN
MP
No milestone No milestone No milestone No milestone
MP
NC
LP
NW
WC
EC
FS
GP
No milestone2.3.11
30
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration4 n/a n/a
Tzaneen WWTW n/a n/a
Mutale WWTW n/a n/a
Capricorn WWTW n/a n/a
Lephalale WWTW n/a n/a
2 n/a n/a
Khai Ma WWTW n/a n/a
Sol Plaatjie WWTW n/a n/a
3 n/a n/a
City of Matlosana WWTW n/a n/a
Ventersdorp WWTW n/a n/a
City of Matlosana WWTW n/a n/a
3 n/a n/a
Kannaland WWTW n/a n/a
Cederberg WWTW n/a n/a
Kannaland WWTW n/a n/a
Number of job opportunities created through
water services infrastructure programmes.
166 241 241 PoE accepted for 241
EC 104 76 76 n/a n/a
FS 32 0 0 n/a n/a
GP 0 0 0
KZN 21 0 0 n/a n/a
MP 0 0 0
LP 0 117 117
NC 9 0 0 n/a n/a
NW 0 48 48
WC 0 0 0
Number of Resource Poor Farmers financially
supported to enhance access to water
706 357 103 Under by 254 Under by 71.14% 103
EC 268 0 0 The Q 2 target was achieved in Q1.
FS 15 7 7 Not applicable
GP 14 0 0 None Not applicable
KZN 80 4 4 KZN was delayed due to delays in the
approval of transfer agreements.
KZN transfer agreements have since
been approved and thus implementation
will commence in Q3.
Please provide PoE for the transfer
agreements
LP 41 0 0 LP: implementation was delayed due to
the procurement processes.
LP to utilize DWS construction to
implement the projects.
Please provide PoE to substantiate
the reason for variance
MP 102 0 0 Delay to appoint contractors to
commenced with the implementation of
RPF projects.
MP Provincial Office to fast track the
appointment of Contractors
Please provide PoE to substantiate
the reason for variance
NC 40 0 0 None Not applicable
NW 22 21 21 One beneneficiary will no longer be
supported as there is no additional water
to be allocated in his area.
Please provide PoE to substantiate
the reason for variance
WC 124 71 71 None Not applicable PoE accepeted for 71,
Please note that 53 IDs were not
counted as they were not included in
the schedule provided.
No milestone
Over achieved
3.2.1
3.4.1
LP
NC
NW
WC
No milestone No milestone No milestone No milestone
No milestone2.3.11
Not achieved
31
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNumber of tanks installed to harvest water for
food production and other household
productive use
1500 425 42 Under by 383 Under by 90.11% 42
EC 180 0 0
FS 100 0 0
GP 100 0 0
KZN 220 0 0
LP 240 0 0
MP 140 0 0
NC 120 0 0
NW 220 42 42
WC 180 0 0
3.2.3 Number of job opportunities created through
the ResourcePoor Farmer and Water
Harvesting programmes
247 84 0 Under by 84 Under by 100% 0 Please provide reasons for variance Please provide recovery plan Not achieved
1.5.1 Number of WMAs assessed for Acid Mine
Drainage (AMD)
1 WMA
(Crocodile (West), Limpopo)
100% platinum mines assessed in
Crocodile (West), Limpopo
100% platinum mines assessed in Crocodile
(West), Limpopo
100% platinum mines assessed in Crocodile
(West), Limpopo
n/a n/a Achieved PoE accepted for Platinum mines
assessed in Crocodile Limpopo 1
and 2
1.5.2 Number of WMAs in which mitigation
strategies for potential AMD are developed
1
Inkomati-Usutu WMA
Draft 2 strategy for
Inkomati-Usutu
100% Draft 2 strategy for Inkomati-Usutu 100% Draft 2 strategy for Inkomati-Usutu n/a n/a Achieved PoE accepted for Inkomati Usutu
mitigation strategy
1.5.3 Completion of the Witwatersrand AMD long
term project
EIA completed EIA public
participation
concluded
Target not achieved. However, EIA Practitioner
appointed and EIA Inception Report produced
Target not achieved. However, EIA Practitioner
appointed and EIA Inception Report produced
Single source procurement of an EIA
Practitioner was not approved by the
National Treasury. Single source
procurement was motivated to expedite
the EIA process
On critical path. Limited opportunity for
recovery due to timeframes prescribed in
EIA regulations. However, DWS and DEA
will make every attempt to expedite
processes as is legally permissible
Not achieved PoE accepted for EIA appointment.
National Treasury SCM Instruction
Note 3 OF 2016-2017 and
DIGBY WELLS
1.5.4 Mine water management technologies
assessed
Assessment of 5 AMD treatment
technologies
Site establishment
finalised
MoA returned to TCTA for finalisation MoA returned to TCTA for finalisation Delays in incoperating all comments from
all the relavant parties involved
The process will be expedited once MoA
is signed.
Not achieved PoEaccepted for Signed ToR, TDP
meeting 04 Aug 2017 minutes, TDP
meeting 04 Aug 2017 attendance
register
4.2.5 Water economic regulator established Approved business case for the
establishment of the independent
economic regulator
Consultations on the
draft business case
for the independent
economic regulator
Not achieved Not achieved External consultation could not take
place, the business case was presented
to Top Management on the 14 August
and recommended for Ministeial approval
Follow up on the Ministerial approval and
deferred the external consultation to
October
Not achieved PoE accepted for PPI 4 2 5 1
Business Case POE for Aug 2017,
PPI 4.2.5.1 Business Case, August
PPI 4.2.7.2 RWPS, August PPI
4.2.7.1 N&S, 4.2.5.1, 4.2.5.2
4.2.6 Water tariffs in the value chain approved 2018/19 Raw water charges and bulk tariffs
approved
Raw water charges
for 2018/19
approved
Achieved Achieved n/a n/a n/a n/a Achieved PoE accepted Raw Water POE for
August 2017, PPI 4. 2 .6. 2 Bulk
Water POE for Aug 2017, August
PPI 4.2.6.2 Bulk Water, August PPI
4.2.6.1 Raw Water and POE 4.2.6.2
folder
4.2.7 Water pricing regulations implemented Pricing Strategy & Norms and
Standards monitored
Implementation of
the revised pricing
strategy monitored
during the 2018/19
raw water charge
determination
Achieved Achieved n/a n/a n/a n/a Achieved PoE accepted for PPI 4.2.7. 1 NS
POE for Aug 2017, PPI 4. 2.7. 2
RWPS POE for AUG 2017,4.2.7.1
and 4.2.7.2
3.1.1 Percentage of applications for water use
authorisation finalised within 300 days
80% 80% 63% (85/136) 63% (85/136) Under by 17% Recruitment and capacity building of
additional officials to provide specialist
inputs is currently underway
Finalise the recruitment of Specialist and
also building capacity
Partially achieved PoE accepted for 85 applications.
Please sign the schedule and also
provide a schedule that reflects the
outstanding 51 that was not
processed.
Number of wastewater systems assessed for
compliance with the Green Drop Regulatory
standards
963 No milestone No milestone No milestone n/a n/a n/a n/a n/a
Sasol Synfuels WSA
Sasol Synfuels WSA
Sun City Resort WSA
Nedbank WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Water Supply Services and Sanitation Regulation
Economic and Social Regulation sub-programme
Water Use Authorisation and Administration sub-programme
Kruger National Park
Not achieved3.2.2
No milestone for the
quarter
1.1.1
Programme 4 : Water Sector Regulation
32
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationKruger National Park WSA
Kruger National Park WSA
Kruger National Park WSA
Eskom Power Station WSA Camden Power Station WWTW
Eskom Power Station WSA Matla Power Station WWTW
Department of Public Works
Eastern Cape Mthatha
Cofimvaba CS
Department of Public Works
Eastern Cape Mthatha
Elliotdale CS
Department of Public Works
Eastern Cape Mthatha
Elliotdale SAPS
Department of Public Works
Eastern Cape Mthatha
Engcobo CS
Department of Public Works
Eastern Cape MthathaFlagstaff CS
Department of Public Works
Eastern Cape Mthatha
Libode CS
Department of Public Works
Eastern Cape MthathaLusikisiki CS
Department of Public Works
Eastern Cape Mthatha Maluti SAPS (Military base)
Department of Public Works
Eastern Cape MthathaMthatha ACCU SAPS
Department of Public Works
Eastern Cape MthathaMthatha CS
Department of Public Works
Eastern Cape Mthatha
Mthatha 14SAI
Department of Public Works
Eastern Cape Mthatha
Mount Fletcher CS
Department of Public Works
Eastern Cape Mthatha
Mqanduli CS
Department of Public Works
Eastern Cape Mthatha
Mzamba SAPS
Department of Public Works
Eastern Cape Mthatha
Ngqamakhwe DCS
Department of Public Works
Eastern Cape Mthatha
Qunu Museum
Department of Public Works
Eastern Cape Mthatha
Ntabankulu CS
Department of Public Works
Eastern Cape Mthatha
Willowvale CS
Department of Public Works
Eastern Cape Port Elizabeth
Middeldrift Prison
Department of Public Works
Eastern Cape Port Elizabeth
Heald Town Police Station
Department of Public Works
Eastern Cape Port Elizabeth
Debe Nek Police Station
Department of Public Works
Eastern Cape Port Elizabeth
Die Blaar Housing Complex
Department of Public Works
Eastern Cape Port Elizabeth
Storms River Police Station
Department of Public Works
Eastern Cape Port Elizabeth
Kwaaibrandt Housing Complex
Department of Public Works
Eastern Cape Port Elizabeth
Patensie Prison
Department of Public Works
Eastern Cape Port Elizabeth
Kirkwood Prison
Department of Public Works
Eastern Cape Port Elizabeth
Middleburg/ GrootfonteinAgric College
Department of Public Works
Eastern Cape Port Elizabeth
Albany Prison
Department of Public Works
Eastern Cape Port Elizabeth
Bulembu SAPS Airport
Department of Public Works Free
State
Bloemspruit
Department of Public Works Free
State
Caledonspoort
Department of Public Works Free
State
Goedemoed
Department of Public Works
Eskom
Kruger National Park
No milestone for the
quarter
1.1.1
33
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationDepartment of Public Works Free
State
Groenpunt
Department of Public Works Free
State
Grootvlei
Department of Public Works Free
State
Maseru Bridge
Department of Public Works Free
State
22 Field Unit
Department of Public Works Free
State
Debrig/ DOD Mob Center
Department of Public Works
Gauteng Pretoria
Zonderwater CS
Department of Public Works
Gauteng Pretoria
Boekenhoutkloof Military Base
Department of Public Works
Gauteng Pretoria
CAT Military Base
Department of Public Works
Gauteng Pretoria
Ditholo Military Base
Department of Public Works
Gauteng Pretoria
Roodeplaat Dog School (SAPS)
Department of Public Works
Gauteng Pretoria
Thabatshwane Military Base
Department of Public Works
Gauteng Pretoria
Toitskraal
Department of Public Works
Gauteng Pretoria
Wallmansthal Military Base
Department of Public Works
Gauteng JHB Devon
Department of Public Works
Limpopo
Acornhoek SAPS
Department of Public Works
Limpopo
Beit Bridge Border Post
Department of Public Works
Limpopo
Hoedspruit Military Base-Main Works
Department of Public Works
Limpopo
Hoedspruit Boston Military Base
Department of Public Works
Limpopo
Hoedspruit Military Base-BVVA
Department of Public Works
Limpopo
Hoedspruit Military Base - HQ
Department of Public Works
Limpopo
Hoedspruit Military Base - 8SQ
Department of Public Works
Limpopo
Hoedspruit Military Base - 19SQ
Department of Public Works
Limpopo
Hoedspruit Military Base - 85SQ
Department of Public Works
Limpopo
Hoedspruit Military Base - 400SQ
Department of Public Works
Limpopo
Hoedspruit Military Base - 514SQ
Department of Public Works
Limpopo
Leboeng SAPS
Department of Public Works
Limpopo
Makhado Military Base
Department of Public Works
Limpopo
Matatshe CS
Department of Public Works
Limpopo
Naboomspruit Military Base
Department of Public Works
Limpopo
Soekmekaar Magistrate Court
Department of Public Works
Limpopo
Vuwane Military Base
Department of Public Works
Mpumalanga
Barberton CS
Department of Public Works
Mpumalanga
Camden Military Base
Department of Public Works
Mpumalanga
Daggakraal SAPS
Department of Public Works
Mpumalanga
Geluk CS
Department of Public Works
Mpumalanga
Lebombo Port of Entry
Department of Public Works
Mpumalanga
Mahamba Port of Entry
Department of Public Works
Mpumalanga
Oshoek Port of Entry
Department of Public Works
Mpumalanga
Sand River Military Base
Department of Public Works
Mpumalanga
Witbank CS
Department of Public Works
Mpumalanga
Zonestraal Military Base
Department of Public Works
Mpumalanga
Acornhoek
Department of Public Works
Mpumalanga
Barberton CS
Department of Public Works North
West
Bray SAPS
Department of Public Works North
West
Boshoek SAPS
Department of Public Works North
West
Klipdrift MB
Department of Public Works North
West
Losperfontein CS
Department of Public Works
No milestone for the
quarter
1.1.1
34
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationDepartment of Public Works North
West
Molopo MB
Department of Public Works North
West
Ramatlabama BC
Department of Public Works North
West
Rooigrond CS
Department of Public Works North
West
Skilpad BC
Department of Public Works North
West
Swartkopfontein BC
Department of Public Works North
West
Welgegend
Department of Public Works
Western Cape
Brandvlei Prison
Department of Public Works
Western Cape
Buffeljagsrivier Prison
Department of Public Works
Western Cape
Drakenstein Prison
Department of Public Works
Western Cape
Dwarsrivier Prison
Department of Public Works
Western Cape
Helderstroom Prison
Department of Public Works
Western Cape
Langebaan Road Central Flight School
Department of Public Works
Western Cape
Paardeberg Prison
Department of Public Works
Western Cape
Riebeek West Prison
Department of Public Works
Western Cape
Robben Island
Department of Public Works
Western Cape
Saldanha Naval Base
Department of Public Works
Western Cape
Test Flight & Development Centre
Department of Public Works
Western Cape
Voorberg Prison
Department of Public Works
Northern Cape
Lohatlha Military Base
Department of Public Works
Northern Cape
Louisvale Military Base
Department of Public Works
Northern Cape
Middelputs Border Post
Department of Public Works
Northern Cape
Nakop
Department of Public Works
Northern Cape
Olifantshoek Radio Station
Department of Public Works
Northern Cape
Vioolsdrift Port of Entry
Department of Public Works
Eastern Cape
Onverwacht Border Post
Department of Public Works
Eastern Cape
Mtubatuba SANDF
Department of Public Works
Eastern Cape
Esibayeni SAPS
Department of Public Works
Eastern Cape
Ubombo SAPS
Department of Public Works
Eastern Cape
Golela Border Post
Department of Public Works
Eastern Cape
Ingwavuma SAPS
Department of Public Works
Eastern Cape
Ndumo SANDF
Department of Public Works
Eastern Cape
Emanguzi SAPS
Department of Public Works
Eastern Cape
Glencoe Prison
Department of Public Works
Eastern Cape
Hlobane SAPS
Department of Public Works
Eastern Cape
Ncome Prison
Department of Public Works
Eastern Cape
Waterval Prison
Department of Public Works
Eastern Cape
Ekuseni Youth Centre
Department of Public Works
Eastern Cape
Sevontein Prison
Department of Public Works
Eastern Cape
Wartburg SAPS
Department of Public Works
Eastern Cape
Nkandla Prestige Project
Department of Public Works
Eastern Cape
New Hanover Prison
Department of Public Works
Eastern Cape
Kranskop Prison
Department of Public Works
Eastern Cape Mthunzini Prison
Alfred Nzo Local Municipality Cedarville
Alfred Nzo Local Municipality Matatiele
Alfred Nzo Local Municipality Mount Ayliff
Alfred Nzo Local Municipality Mount Frere
Alfred Nzo Local Municipality Bizana
Alfred Nzo Local Municipality Ntabankulu
Department of Public Works
Eastern Cape
No milestone for the
quarter
1.1.1
35
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationAmathole District Municipality Adelaide
Amathole District Municipality Alice-Fort Hare
Amathole District Municipality Amabele
Amathole District Municipality Bedford
Amathole District Municipality Butterworth
Amathole District MunicipalityCathcart
Amathole District Municipality Cinsta East
Amathole District Municipality Fort Beaufort
Amathole District Municipality Idutywa
Amathole District Municipality Kei Mouth
Amathole District Municipality Keiskammahoek
Amathole District Municipality Komga
Amathole District Municipality Middledrift
Amathole District Municipality Peddie
Amathole District Municipality Seymour
Amathole District Municipality Stutterheim
Baviaans Local Municipality Steytlerville WWTW
Baviaans Local Municipality Willowmore WWTW
Baviaans Local Municipality Rietbron WWTW
Blue Crane Route Local
Municipality
Cookhouse
Blue Crane Route Local
Municipality
Pearston
Blue Crane Route Local
Municipality
Somerset East
Buffalo City Local Municipality Amalinda Central
Buffalo City Local Municipality Berlin
Buffalo City Local Municipality Breidbach
Buffalo City Local Municipality Bisho
Buffalo City Local Municipality Dimbaza
Buffalo City Local Municipality East Bank
Buffalo City Local Municipality Gonubie
Buffalo City Local Municipality Keyser’s Beach
Buffalo City Local Municipality Kidd’s Beach
Buffalo City Local Municipality Mdantsane East
Buffalo City Local Municipality Postdam
Buffalo City Local Municipality Reeston
Buffalo City Local Municipality Schornville KWT
Buffalo City Local Municipality West Bank
Buffalo City Local Municipality Zwelitcha
Camdeboo Local Municipality Aberdeen
Camdeboo Local Municipality Graff Reniet
Camdeboo Local Municipality NieuBethseda
Chris Hani District Municipality Cala
Chris Hani District Municipality Cofimvaba
Chris Hani District Municipality Cradock
Chris Hani District MunicipalityDordrecht
Chris Hani District Municipality Elliot
Chris Hani District Municipality Engcobo
Chris Hani District Municipality Hofmeyr
Chris Hani District Municipality Indwe
Chris Hani District Municipality Lady Frere
Chris Hani District Municipality Molteno
Eastern Cape
No milestone for the
quarter
1.1.1
36
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationChris Hani District Municipality Middleburg
Chris Hani District Municipality Queenstown
Chris Hani District Municipality Sada
Chris Hani District Municipality Sterkstroom
Chris Hani District Municipality Tarkastad
Chris Hani District Municipality Tsomo
Ikwezi Local Municipality Kliplaats
Ikwezi Local Municipality Jansenville
Joe Gqabi District Municipality Aliwal North
Joe Gqabi District Municipality Barkley East (Old Plant)
Joe Gqabi District Municipality Barkley East (New Plant)
Joe Gqabi District Municipality Burgersdorp
Joe Gqabi District Municipality Nerchle
Joe Gqabi District Municipality Jamestown
Joe Gqabi District Municipality Lady Grey
Joe Gqabi District Municipality Maclear (AS)
Joe Gqabi District Municipality Maclear (OP)
Joe Gqabi District Municipality Mount Fletcher
Joe Gqabi District Municipality Oviston
Joe Gqabi District Municipality Prenjiesberg
Joe Gqabi District Municipality Sterkspruit
Joe Gqabi District Municipality Steynsburg
Joe Gqabi District Municipality Ugie
Joe Gqabi District Municipality Venterstad
Kouga Local Municipality Hankey
Kouga Local Municipality Humansdorp
Kouga Local Municipality Jeffreys Bay
Kouga Local Municipality Kruisfontein
Kouga Local Municipality Loerie
Kouga Local Municipality St Francis
Kouga Local Municipality Thornhill
Koukamma Local Municipality Blikkiesdorp
Koukamma Local Municipality Clarkson
Koukamma Local Municipality Coldstream 1
Koukamma Local Municipality Coldstream 2 / Laaurel Ridge
Koukamma Local Municipality Joubertina / Ravinia
Koukamma Local Municipality Kareedouw
Koukamma Local Municipality Krakeel River
Koukamma Local Municipality Louter Water
Koukamma Local Municipality Misgund
Koukamma Local Municipality Nompumelelo / Sandrift Mandelapark
Koukamma Local Municipality Stormsriver
Koukamma Local Municipality Woodlands
Makana Local Municipality Alicedale
Makana Local Municipality Belmont Valley
Makana Local Municipality Mayfield
Ndlambe Local Municipality Alexandria / Kwanonkqubela
Ndlambe Local Municipality Bathurst / Molukhanyo
Ndlambe Local Municipality Boesman river Mouth / Marselle
Ndlambe Local Municipality Kenton on Sea / Ekuphumleni
Ndlambe Local Municipality Port Alfred
Nelson Mandela Metropolitan
Municipality
Cape Receife
Eastern Cape
No milestone for the
quarter
1.1.1
37
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNelson Mandela Metropolitan
Municipality
Despatch
Nelson Mandela Metropolitan
Municipality
Driftsands
Nelson Mandela Metropolitan
Municipality
Fishwater Flats-Domestic
Nelson Mandela Metropolitan
Municipality
Fishwater Flats Industrial
Nelson Mandela Metropolitan
Municipality
Kelvin Jones
Nelson Mandela Metropolitan
Municipality
KwaNobuhle
Nelson Mandela Metropolitan
Municipality
Rocklands
OR Tambo District Municipality Bizana
OR Tambo District Municipality Flagstaff
OR Tambo District Municipality Lusikisiki
OR Tambo District Municipality Mqanduli
OR Tambo District Municipality Mthatha
OR Tambo District Municipality Ngqeleni
OR Tambo District Municipality Ntabankulu
OR Tambo District Municipality Port St Johns
OR Tambo District Municipality Qumbu
OR Tambo District Municipality Tsolo
Sundays River Valley Local
Municipality
Enon/ Bersheba
Sundays River Valley Local
Municipality
Greater Kirkwood
Sundays River Valley Local
Municipality
Peterson
Dihlabeng Local Municipality Bethlehem
Dihlabeng Local Municipality Clarens/ Kgubetswana
Dihlabeng Local Municipality Fouriesburg/ Mashaeng
Dihlabeng Local Municipality Paul Roux
Dihlabeng Local Municipality Rosendal/ Mautse
Kopanong Local Municipality Bethulie
Kopanong Local Municipality Edenburg
Kopanong Local Municipality Fauresmith
Kopanong Local Municipality Gariep Dam
Kopanong Local Municipality Jagersfontein
Kopanong Local Municipality Philipolis
Kopanong Local Municipality Reddersburg
Kopanong Local Municipality Springfontein
Kopanong Local Municipality Trompsburg
Letsemeng Local Municipality Jacobsdal
Letsemeng Local Municipality Luckhoff
Letsemeng Local Municipality Koffiefontein
Letsemeng Local Municipality Oppermansgronde
Letsemeng Local Municipality Petrusburg
Mafube Local Municipality Cornelia
Mafube Local Municipality Frankfort
Mafube Local Municipality Tweeling
Mafube Local Municipality Namahadi
Mafube Local Municipality Villiers/QalaMoedingbotjha
Maluti Elandsriver
Maluti Kestell
Maluti Makwane/Matsegeng
Maluti Moeding
Maluti Phuthaditjaba
Maluti Tshiame
Maluti Wilge/Harrismith
Mangaung Metropolitan
Municipality
Bainsvlei
Mangaung Metropolitan
Municipality
Bloemindustria
Mangaung Metropolitan
Municipality
Blowmspruit
Eastern Cape
Free State
No milestone for the
quarter
1.1.1
38
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMangaung Metropolitan
Municipality
Bothsabelo
Mangaung Metropolitan
Municipality
Northern Works
Mangaung Metropolitan
Municipality
Sterkwater
Mangaung Metropolitan
Municipality
Thaba Nchu
Mangaung Metropolitan
Municipality
Welvaart
Mantsopa Local Municipality Excelsior
Mantsopa Local Municipality Hobhouse
Mantsopa Local Municipality Lady Brand
Mantsopa Local Municipality Thaba Patdisa
Mantsopa Local Municipality Tweespruit
Masilonyana Local Municipality Brandfort
Masilonyana Local Municipality Soutpan
Masilonyana Local Municipality Theunissen
Masilonyana Local Municipality Verkeerdevlei
Masilonyana Local Municipality Winburg
Matjhabeng Local Municipality Allanridge
Matjhabeng Local Municipality Henneman
Matjhabeng Local Municipality Kutlwanong
Matjhabeng Local Municipality Mmamahabane-Mbabane
Matjhabeng Local Municipality Odendaalsrust
Matjhabeng Local Municipality Phomolong
Matjhabeng Local Municipality Thabong
Matjhabeng Local Municipality Theronia
Matjhabeng Local Municipality Ventersburg
Matjhabeng Local Municipality Virginia
Matjhabeng Local Municipality Witpan
Metsimaholo Local Municipality Deneysville
Metsimaholo Local Municipality Sasolburg
Metsimaholo Local Municipality Oranjeville
Metsimaholo Local Municipality Rouxville
Mohokare Local Municipality Smithfield
Mohokare Local Municipality Zastron
Mohokare Local Municipality Kroonstad
Moqhaka Local Municipality Steynsrus
Moqhaka Local Municipality Viljoenskroon
Nala Local Municipality Bothaville
Nala Local Municipality Wesselsbron
Naledi Local Municipality Dewetsdorp
Naledi Local Municipality Van Stadensrus
Naledi Local Municipality Wepener
Ngwathe Local Municipality Edenville
Ngwathe Local Municipality Heibron
Ngwathe Local Municipality Koppies
Ngwathe Local Municipality Parys
Ngwathe Local Municipality Vredefort
Nketoana Local Municipality Arlington
Nketoana Local Municipality Lindley/Ntha
Nketoana Local Municipality Petrus Stern
Nketoana Local Municipality Reitz
Phumelela Local Municipality Memel
Phumelela Local Municipality Vrede
Phumelela Local Municipality Warden
Setsoto Local MunicipalityClocolan
Setsoto Local Municipality Ficksburg
Free State
No milestone for the
quarter
1.1.1
39
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationSetsoto Local Municipality Marquard
Setsoto Local Municipality Senekal
Tokologo Local Municipality Boshoff
Tokologo Local Municipality Dealesville
Tokologo Local Municipality Hertzogville
Tswelopele Local Municipality Bultfontein
Tswelopele Local Municipality Hoopstad
City of Johannesburg Driefontein
City of Johannesburg Ennerdale
City of Johannesburg Goukoppies
City of Johannesburg Bushkoppies
City of Johannesburg Northern Works
City of JohannesburgOlifantvlei
City of Tshwane Babelegi
City of Tshwane Baviaanspoort
City of Tshwane Daspoort
City of Tshwane Ekangala Oxidation Ponds
City of Tshwane Godrich
City of Tshwane Klipgat
City of Tshwane Rayton
City of Tshwane Refilwe
City of Tshwane Rethabiseng
City of Tshwane Rietgat
City of Tshwane Rooiwal East
City of Tshwane Rooiwal North
City of TshwaneSandspruit
City of Tshwane Summersplace
City of Tshwane Sunderland Ridge
City of Tshwane Temba
City of Tshwane Zeekoegat
Ekurhuleni Anchor
Ekurhuleni Benoni
Ekurhuleni Carl Grunding
Ekurhuleni Dekema
Ekurhuleni Daveyton
Ekurhuleni Esther Park
Ekurhuleni Hartebeesfontein
Ekurhuleni Herbert Bickley
Ekurhuleni Jan Smuts
Ekurhuleni JP Marais
Ekurhuleni Olifantsfontein
Ekurhuleni Rondebult
Ekurhuleni Rynfield
Ekurhuleni Tsakane
Ekurhuleni Vlakplaats
Ekurhuleni Waterval
Ekurhuleni Welgedacht
Emfuleni Leeukuil
Emfuleni Rietspruit
Emfuleni Sebokeng
Lesedi Hiedelburg
Lesedi Ratanda
Merafong LM Khutsong
Merafong LM Kokosi-Fochville
Merafong LM Oberholzer
Merafong LM Welverdiend
Merafong LM Wedela
Midvaal Meyerton
Free State
Gauteng
No milestone for the
quarter
1.1.1
40
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMidvaal OheniMuri
Midvaal Vaal Marina
Mogale City Flip Human
Mogale City Magaliesburg
Mogale City Percy Stewart
Randfontein Hannes Van Niekerk
Amajuba Local Municipality Utrecht
Amajuba Local Municipality Tweediedale
Amajuba Local Municipality Welgedacht
Amajuba Local Municipality Durnacol
eThekwini Metropolitan Municipality Amanzimtoti
eThekwini Metropolitan Municipality Cato Ridge
eThekwini Metropolitan Municipality Central
eThekwini Metropolitan Municipality Craigieburn
eThekwini Metropolitan Municipality Dassenhoek
eThekwini Metropolitan MunicipalityFredville
eThekwini Metropolitan Municipality Genazzano
eThekwini Metropolitan Municipality Glenwood Road
eThekwini Metropolitan Municipality Hammarsdale
eThekwini Metropolitan Municipality Hillcrest
eThekwini Metropolitan Municipality Isipingo
eThekwini Metropolitan Municipality Kingsburgh
eThekwini Metropolitan Municipality KwaMashu
eThekwini Metropolitan Municipality KwaNdengezi
eThekwini Metropolitan Municipality Magabeni
eThekwini Metropolitan Municipality Mpumalanga
eThekwini Metropolitan Municipality New Germany
eThekwini Metropolitan Municipality Northern Works
eThekwini Metropolitan Municipality Phoenix
eThekwini Metropolitan Municipality Southern
eThekwini Metropolitan Municipality Tongaat Central
eThekwini Metropolitan Municipality Umbilo
eThekwini Metropolitan Municipality Umdloti
eThekwini Metropolitan Municipality Umhlanga
eThekwini Metropolitan Municipality Umhlatuzana
eThekwini Metropolitan Municipality Umkomaas
eThekwini Metropolitan Municipality Verulam
ILembe District Municipality Vukile
ILembe District Municipality Darnall
ILembe District Municipality Frasers
ILembe District Municipality Gledhow
ILembe District Municipality Mandeni
ILembe District Municipality Maphumulo Hospital
ILembe District Municipality Montebello Hospital
ILembe District Municipality Ntumjambili Hospital
ILembe District Municipality Shakaskraal
ILembe District Municipality Stanger-Kwadukuza
ILembe District Municipality Sundumbili
ILembe District Municipality Tugela
ILembe District Municipality Vukile
Gauteng
No milestone for the
quarter
KwaZulu-Natal
1.1.1
41
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNewcastle Local Municipality Charlestown Ponds
Newcastle Local Municipality Kilbarchin-Ngagane
Newcastle Local Municipality Madadeni
Newcastle Local Municipality Newcastle
Newcastle Local Municipality Osizweni
Sisonke District Municipality Bulwer
Sisonke District Municipality Franklin
Sisonke District Municipality Ixopo
Sisonke District Municipality Kokstad
Sisonke District Municipality Polela
Sisonke District Municipality Riverside Ponds
Sisonke District Municipality St Appollonaris
Sisonke District Municipality uMzimkhulu
Sisonke District Municipality Underberg
Ugu District Municipality Eden Wilds
Ugu District Municipality Gamalakhe
Ugu District Municipality Harding
Ugu District Municipality KwaMbonwa
Ugu District Municipality Malangeni
Ugu District Municipality Margate
Ugu District Municipality Umbango
Ugu District Municipality Melville
Ugu District Municipality Munster
Ugu District Municipality Ramsgate
Ugu District Municipality Red Dessert
Ugu District Municipality Scottburgh
Ugu District Municipality Shelley Beach
Ugu District Municipality Skogheim-Bhobhoyi
Ugu District Municipality Southbroom
Ugu District Municipality Umzinto
Ugu District Municipality Uvongo
uMgungundlovu District
Municipality
Applebosch Hospital
uMgungundlovu District
Municipality
Camperdown
uMgungundlovu District
Municipality
Coolair
uMgungundlovu District
Municipality
Howick
uMgungundlovu District
Municipality
Mooi River
uMgungundlovu District
Municipality
Richmond
uMhlathuze Local Municipality Empangeni
uMhlathuze Local Municipality Esikhawini
uMhlathuze Local Municipality Ngwelezana
uMhlathuze Local Municipality Nseleni
uMhlathuze Local Municipality Vulindlela
uMkhanyakude District Municipality Bethesda Hospital-Ubombo
uMkhanyakude District Municipality Hlabisa Hospital
uMkhanyakude District Municipality Hluhluwe
uMkhanyakude District Municipality Ingwavuma-Mosvold Hospital
uMkhanyakude District Municipality Jozini
uMkhanyakude District Municipality KwaMsane
uMkhanyakude District Municipality Manguzi Hospital
uMkhanyakude District Municipality Mtubatuba
uMkhanyakude District Municipality Mkhuze
uMkhanyakude District Municipality St Lucia Ponds
uMsunduzi Local Municipality Darvill
No milestone for the
quarter
KwaZulu-Natal
1.1.1
42
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationuMsunduzi Local Municipality Lynnfield Park
uMzinyathi District Municipality Dundee-Glencoe
uMzinyathi District Municipalit Greytown
uMzinyathi District Municipalit Nqutu New
uMzinyathi District Municipalit Pomeroy Ponds
uMzinyathi District Municipalit Tugela Ferry
uThukela District Municipality Ladysmith
uThukela District Municipality Estcourt
uThukela District Municipality Colenso
uThukela District Municipality Bergville
uThukela District Municipality Winterton
uThukela District Municipality Ekuvukeni
uThukela District Municipality Ezakheni
uThukela District Municipality Weenen
uThukela District Municipality Wembezi
uThungulu District Municipality Catherine Booth Hospital
uThungulu District Municipality Ekhombe Hospital
uThungulu District Municipality Ekuphumuleni Hospital
uThungulu District Municipality Gingindlovu Ponds
uThungulu District Municipality King Dinizulu
uThungulu District Municipality KwaBadala
uThungulu District Municipality Mbongolwane Hospital
uThungulu District Municipality Melmoth Ponds
uThungulu District Municipality MpushiniPonds
uThungulu District Municipality Mtunzini
uThungulu District Municipality Nkandla
uThungulu District Municipality Oceanview
Zululand District Municipality Owen Sithole Agriculture College
Zululand District Municipality Ceza Hospital
Zululand District Municipality Coronation
Zululand District Municipality eDumbe-Paul Pietersburg
Zululand District Municipality eMondlo
Zululand District Municipality Hlobane
Zululand District Municipality Itselejuba Hospital
Zululand District Municipality Ulundi
Zululand District Municipality Nkonjeni Hospital Ponds
Zululand District Municipality Nongoma
Zululand District Municipality Pongola
BelaBela Local Municipality Pienaarsrivier
BelaBela Local Municipality Radium
Capricorn Local Municipality Warmbath
Capricorn Local Municipality Alldays
Capricorn Local Municipality Lebowakgomo AS Plant
Capricorn Local Municipality Mogwadi
Capricorn Local Municipality Lebowakgamo Ponds
Greater Sekhukhune District
Municipality
Senwabarwana
Greater Sekhukhune District
Municipality
Burgersfort
Greater Sekhukhune District
Municipality
Dennilton
No milestone for the
quarter
KwaZulu-Natal
Limpopo
1.1.1
43
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationGreater Sekhukhune District
Municipality
Elandskraal
Greater Sekhukhune District
Municipality
Groblersdal
Greater Sekhukhune District
Municipality
Jane Furse Ponds
Greater Sekhukhune District
Municipality
LeeuwfonteinMokganyaka
Greater Sekhukhune District
Municipality
Mapokile ponds
Greater Sekhukhune District
Municipality
Marle Hall
Greater Sekhukhune District
Municipality
MecklebergMoreke ponds
Greater Sekhukhune District
Municipality
Monsterslus-Hlogotlou
Greater Sekhukhune District
Municipality
Motetema
Greater Sekhukhune District
Municipality
Nebo ponds
Greater Sekhukhune District
Municipality
Penge
Greater Sekhukhune District
Municipality
Phokwane ponds
Greater Sekhukhune District
Municipality
Roosenenkal
Greater Sekhukhune District
Municipality
Steelpoort
Lephalale Local Municipality Tubatse ponds
Lephalale Local Municipality Paarl
Lephalale Local Municipality Witpoort
Modimolle Local Municipality Zongesien
Modimolle Local Municipality Modimolle
Mogalakwena Local Municipality Vaalwater
Mogalakwena Local Municipality Mokopane old & New
Mookgophong Local Municipality Rebone
Mookgophong Local Municipality Naboomspruit
Mopani District Municipality Thusanag Ponds (Roedtan)
Mopani District Municipality Lulekani
Mopani District Municipality Namakgale
Mopani District Municipality Phalaborwa
Mopani District Municipality Ga-Kgapane
Mopani District Municipality Giyani
Mopani District Municipality Lenyenye
Mopani District Municipality Modjadjiskoolf-Duiwelskloof
Mopani District Municipality Nkowankowa
Mopani District Municipality Senwamokgope
Mopani District Municipality Tzaneen
Mopani District Municipality Phafhudi hospital
Polokwane Local Municipality Shilubane hospital
Polokwane Local Municipality Mankweng
Polokwane Local Municipality Polokwane Pasveer
ThabazimbiLocal Municipality Seshego
Thabazimbi Local Municipality Northam
Thabazimbi Local Municipality Rooiberg
Vhembe District Municipality Thabazimbi
Vhembe District Municipality Louis Trichardt Makhado
Vhembe District Municipality Makhado Dzanani
Vhembe District Municipality Malamulele
Vhembe District Municipality Mhinga
Vhembe District Municipality Musina
Vhembe District Municipality Mutale ponds
Vhembe District Municipality Nancefield
Vhembe District Municipality Thohoyandou
Vhembe District Municipality Tshifulanani ponds
Vhembe District Municipality Vleifontein ponds
Vhembe District Municipality Vuwani ponds
Vhembe District Municipality Waterval Makhado
No milestone for the
quarter
Limpopo
1.1.1
44
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationAlbert Luthuli Local Municipality Carolina
Albert Luthuli Local Municipality Ekulendeni-Kromdraai
Albert Luthuli Local Municipality Elukwatini-Eerstehoek
Albert Luthuli Local Municipality Mpuluzi-Mayflower
Bushbuckridge Local Municipality Badplaas
Bushbuckridge Local Municipality Dwarsloop
Bushbuckridge Local Municipality Mkhuhlu
Bushbuckridge Local Municipality Thulamahashe
Bushbuckridge Local Municipality Hoxane
Bushbuckridge Local Municipality Maviljan
Bushbuckridge Local Municipality Tintswalo
Bushbuckridge Local Municipality Acornhoek
Dipaleseng Local Municipality Manghwazi
Dipaleseng Local Municipality Balfour
Dipaleseng Local Municipality Groutvlei Eskom
Dipaleseng Local Municipality Grootvlei Mine
Dr JS Moroka Local Municipality Greylingstad
Dr JS Moroka Local Municipality Siyabuswa
Dr JS Moroka Local Municipality Vaalbank/Libangeni
Emakhazeni Local Municipality Toitskraal
Emakhazeni Local Municipality Machadodorp
Emakhazeni Local Municipality Belfast
Emakhazeni Local Municipality Dullstroom
Emakhazeni Local Municipality Emthonjeni
Emalahleni Local Municipality WatervalBoven-Mgwenwa
Emalahleni Local Municipality Riverviw
Emalahleni Local Municipality Ferrobank
Emalahleni Local Municipality Klipspruit
Emalahleni Local Municipality Naauwpoort
Emalahleni Local Municipality Kriel-Ganala
Emalahleni Local Municipality Phola-Ogies
Govan Mbeki Local Municipality Rietspruit
Govan Mbeki Local Municipality Embalenhle
Govan Mbeki Local Municipality Kinross
Govan Mbeki Local Municipality Leandra-Leslie
Govan Mbeki Local Municipality Bthal
Govan Mbeki Local Municipality Evander
Lekwa Local Municipality Trichardt
Lekwa Local Municipality Standerton
Mbombela Local Municipality Morgenzon
Mbombela Local Municipality Kabokweni
Mbombela Local Municipality Kingstonvale
Mbombela Local Municipality White river
Mbombela Local Municipality Kanyamanzane
Mbombela Local Municipality Hazyview
Mbombela Local Municipality Matsulu
Mbombela Local Municipality Rockys Drift
Mbombela Local Municipality Davel
Mbombela Local Municipality Lothair
Mpumalanga
No milestone for the
quarter
1.1.1
45
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMbombela Local Municipality Hectorspruit
PixleykaSeme Local Municipality Malelane
PixleykaSeme Local Municipality Volksrust
PixleykaSeme Local Municipality Vukuzakhe
PixleykaSeme Local Municipality Wakkerstroom
PixleykaSeme Local Municipality Amersfoort
Steve Tshwete Local Municipality Perdekop
Steve Tshwete Local Municipality Boskrans-Mlhuzi-Middelburg
Steve Tshwete Local Municipality KwaZamokuhle-hendrina
Steve Tshwete Local Municipality Komati
Thaba Cheuw Local Municipality BlinkTweefonteinpan-Mine Village
Thaba Cheuw Local Municipality Lydenburg
Thaba Cheuw Local Municipality Sabie
Thembisile Local Municipality Graskop
Thembisile Local Municipality KwaMhlanga Ponds East
Umjindi Local Municipality KwaMhlanga West
Victor Khanye Local Municipality Barberton
Victor Khanye Local Municipality Botleng
Victor Khanye Local Municipality Delmas
Dr Ruth S Mompati Local
Municipality
Bloemhof
Dr Ruth S Mompati Local
Municipality
Scweizer-Reinecker
Dr Ruth S Mompati Local
Municipality
Vryburg
Kgetleng river Local Municipality Christiana
Kgetleng river Local Municipality Koster
Madibeng Local Municipality Swartruggens
Madibeng Local Municipality Brits
Madibeng Local Municipality Letlhabile
Madibeng Local Municipality Haartbeespoort
Maquassi hills Local Municipality Mothotlung
Maquassi hills Local Municipality Leeudoringstad
Matlosana Local Municipality Wolmaranstad
Matlosana Local Municipality Klerksdorp
Matlosana Local Municipality Orkney
Matlosana Local Municipality Stilfontein
Moretele Local Municipality Haartbeesfontein
Moses Kotane Local Municipality Ga MotlaSwartdam
Moses Kotane Local Municipality Madikwe
Ngaka Modiri Molema Local
Municipality
Mogwase
Ngaka Modiri Molema Local
Municipality
Mmabatho
Ngaka Modiri Molema Local
Municipality
Lichtenburg
Ngaka Modiri Molema Local
Municipality
Daleryville
Ngaka Modiri Molema Local
Municipality
Lehurutshe-Welbedacht
Ngaka Modiri Molema Local
Municipality
Ottosdal
Ngaka Modiri Molema Local
Municipality
Sannieshof
Ngaka Modiri Molema Local
Municipality
Zeerust
Ngaka Modiri Molema Local
Municipality
Itsoseng
Ngaka Modiri Molema Local
Municipality
Mafikeng
Ngaka Modiri Molema Local
Municipality
Atamelang
Rustenburg Local Municipality Coligny
North West
Mpumalanga
No milestone for the
quarter
1.1.1
46
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationRustenburg Local Municipality Boitekong
Rustenburg Local Municipality Rustenburg
Rustenburg Local Municipality Lethabong
Tlokwe Local Municipality Monakato
Ventersdorp Local Municipality Potchefstroom-Tlokwe
Ventersdorp Local Municipality Ventersdorp
Kai Garib Local Municipality Kakamas
Kai Garib Local Municipality Keimoes
iKheis Local Municipality Kenhardt
iKheis Local Municipality Groblershoop
iKheis Local Municipality Brandboom
iKheis Local Municipality Wegdraai
iKheis Local Municipality Topline
Dikgatlong Local Municipality Grootdrink
Dikgatlong Local Municipality Barkly West
Dikgatlong Local Municipality Delpoortshoop
Emthanjeni Local Municipality Windsorton
Emthanjeni Local Municipality De Aar
Emthanjeni Local Municipality Britstown
Gamagara Local Municipality Hanover
Gamagara Local Municipality Olifantshoek
Gamagara Local Municipality Dibeng
Gamagara Local Municipality Dingleton
Ga-Segonyana Local Municipality Kathu
Ga-Segonyana Local Municipality Kuruman
Hantam Local Municipality Mothibistad
Hantam Local Municipality Brandvlei
Hantam Local Municipality Calvinia
Hantam Local Municipality Loeriesfontein
Hantam Local Municipality Nieuwoudtville
Joe Morolong Local Municipality Middelpos
Joe Morolong Local Municipality Hotazel
Kamiesberg Local Municipality Van Zylsrus
Kamiesberg Local Municipality Garies
Kareeberg Local Municipality Kamieskroon
Kareeberg Local Municipality Carnarvon
Kareeberg Local Municipality Vanwyksvlei
Karoo Hoogland Local Municipality Vosburg
Karoo Hoogland Local Municipality Williston
Karoo Hoogland Local Municipality Fraserburg
Kgatelopele Local Municipality Sutherland
Khai Ma Local Municipality Danielskuil
KharaHais Local Municipality Pofadder
KharaHais Local Municipality Kameelmond
Magareng Local Municipality Louisvaleweg
Mier Local Municipality Warrenton
Mier Local Municipality Rietfontein
Mier Local Municipality Askham
NamaKhoi Local Municipality Loubos
NamaKhoi Local Municipality Bergsig
NamaKhoi Local Municipality Carolusberg
North West
Northern Cape
No milestone for the
quarter
1.1.1
47
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNamaKhoi Local Municipality Concordia
NamaKhoi Local Municipality Komaggas
NamaKhoi Local Municipality Nababeep
NamaKhoi Local Municipality Okiep
NamaKhoi Local Municipality Springbok
Phokwane Local Municipality Steinkopf
Phokwane Local Municipality Pampierstad
Phokwane Local Municipality Jan Kempdorp
Renosterberg Local Municipality Hartswater
Renosterberg Local Municipality Vanderkloof
Renosterberg Local Municipality Petrusville
Richtersveld Local Municipality Philipstown
Siyancuma Local Municipality Port Nolloth
Siyancuma Local Municipality Douglas
Siyancuma Local Municipality Griekwastad
Siyathemba Local Municipality Schmidtsdrift
Siyathemba Local Municipality Prieska
Siyathemba Local Municipality Marydale
Sol Plaatjie Local Municipality Niekerkshoop
Sol Plaatjie Local Municipality Beaconsfield
Sol Plaatjie Local Municipality Homevale
Thembelihle Local Municipality Ritchie
Thembelihle Local Municipality Hopetown (Old)
Thembelihle Local Municipality Hopetown (New)
Thembelihle Local Municipality Strydenburg (Old)
Tsantsabane Local Municipality Strydenburg (New)
Tsantsabane Local Municipality Postmasburg
Ubuntu Local Municipality Jenn-Haven
Ubuntu Local Municipality Loxton
Ubuntu Local Municipality Richmond
Umsobomvu Local Municipality Victoria West
Umsobomvu Local Municipality Colesberg
Umsobomvu Local Municipality Norvalspont
Umsobomvu Local Municipality Noupoort
Witzenberg Local Municipality Ceres
Witzenberg Local Municipality Tulbagh
Witzenberg Local Municipality Wolseley
Theewaterskloof Local Municipality Op-de-Berg
Theewaterskloof Local Municipality Botrivier
Theewaterskloof Local Municipality Caledon
Theewaterskloof Local Municipality Grabouw
Theewaterskloof Local Municipality Riviersonderend
Theewaterskloof Local Municipality Genadendal
Theewaterskloof Local Municipality Villiersdorp
Swellendam Local Municipality Greyton
Swellendam Local Municipality Klipperivier
Swellendam Local Municipality Koornlands
Swellendam Local Municipality Buffeljags
Swellendam Local Municipality Suurbraak
Swartland Local Municipality Barrydale
Northern Cape
No milestone for the
quarter
Western Cape
1.1.1
48
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationSwartland Local Municipality Malmesbury
Swartland Local Municipality Darling
Swartland Local Municipality Chatsworth
Swartland Local Municipality Kalbaskraal
Swartland Local Municipality RiebeeckKasteel
Swartland Local Municipality Riebeeck Wes
Swartland Local Municipality Moorreesburg
Swartland Local Municipality Koringberg
Stellenbosch Local Municipality Ongegund (PPC)
Stellenbosch Local Municipality Stellenbosch
Stellenbosch Local Municipality Raithby
Stellenbosch Local Municipality Pniel
Stellenbosch Local Municipality Wemmershoek
Stellenbosch Local Municipality Franschhoek
Saldanha Bay Local Municipality Klapmus
Saldanha Bay Local Municipality Hopefield
Saldanha Bay Local Municipality Langville
Saldanha Bay Local Municipality Langebaan
Saldanha Bay Local Municipality Paternoster
Saldanha Bay Local Municipality Saldanha
Saldanha Bay Local Municipality Sandy Point
Prince Albert Local Municipality Vredanburg
Prince Albert Local Municipality Prince Albert
Prince Albert Local Municipality Leeeugamka
Overstrand Local Municipality Klaarstroom
Overstrand Local Municipality Gansbaai
Overstrand Local Municipality Hauston
Overstrand Local Municipality Hermanus
Overstrand Local Municipality Kleinmond
Oudtshoorn Local Municipality Stranford
Oudtshoorn Local Municipality De Rust
Oudtshoorn Local Municipality Oudtshoorn
Mossel Bay Local Municipality Dysseldorp
Mossel Bay Local Municipality Mossel Bay
Mossel Bay Local Municipality Friermersheim B
Mossel Bay Local Municipality Grootbrak
Mossel Bay Local Municipality Herbertsdale
Mossel Bay Local Municipality Pinnacle point
Mossel Bay Local Municipality Ruiterbos
Matzikama Local Municipality Brandwag
Matzikama Local Municipality Doringbaai
Matzikama Local Municipality Bitterfontein
Matzikama Local Municipality Ebannarser
Matzikama Local Municipality Klawre
Matzikama Local Municipality Koekenaap
Matzikama Local Municipality Lutzville
Matzikama Local Municipality Lutzvillewes
Matzikama Local Municipality Nuwerus
Matzikama Local Municipality Strandfontein
Matzikama Local Municipality Van Rhynsdorp
No milestone for the
quarter
Western Cape
1.1.1
49
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMatzikama Local Municipality Vredendal North
Matzikama Local Municipality Vredendal South
Matzikama Local Municipality Ashton
Langeberg Local Municipality Bonnievale
Langeberg Local Municipality McGregor
Langeberg Local Municipality Montague
Langeberg Local Municipality Robertson
Laingsburg Local Municipality Laingsburg
Knysna Local Municipality Belvedere
Knysna Local Municipality Brenton on sea
Knysna Local Municipality Karatara
Knysna Local Municipality Knysna ASP
Knysna Local Municipality Knysna SBR
Knysna Local Municipality Rheenendal
Knysna Local Municipality Sedgefield
Kannaland Local Municipality Ladismith
Kannaland Local Municipality Calitzdorp
Kannaland Local Municipality Zoar
Hessequa Local Municipality Albertina
Hessequa Local Municipality Garcia
Hessequa Local Municipality Gouritzmand
Hessequa Local Municipality Heidelberg
Hessequa Local Municipality Jongensfontein
Hessequa Local Municipality Melkhoutfontein
Hessequa Local Municipality Riversdale
Hessequa Local Municipality Slanghuis
Hessequa Local Municipality Stilbaai
Hessequa Local Municipality Witsand
George Local Municipality Gwaing
George Local Municipality Haarlem
George Local Municipality Harold’s Bay
George Local Municipality Outeniqua
George Local Municipality Uniondale
George Local Municipality Kleinkranz
Drakenstein Local Municipality Gouda
Drakenstein Local Municipality Hermon
Drakenstein Local Municipality Kliprug
Drakenstein Local Municipality Paarl
Drakenstein Local Municipality Saron
Drakenstein Local Municipality wellington
City of Cape town Athlone
City of Cape town Bellville
City of Cape town Greenpoint
City of Cape town Camp,s Bay
City of Cape town Cape Flats
City of Cape town Gordon’s Bay
City of Cape town Borcherd’sQuarrry
City of Cape town Groot Springfontein
City of Cape town Hout Bay
City of Cape town Klipheuwel
City of Cape town Kraaifontein
City of Cape town Llandudno
City of Cape town Macassar
No milestone for the
quarter
Western Cape
1.1.1
50
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationCity of Cape town Melbosstrand
City of Cape town Milller’s point
City of Cape town Mitcheels plain
City of Cape town Oudekraal
City of Cape town Potsdam
City of Cape town Scottdene
City of Cape town Simon’s town
City of Cape town Wesfleur Atlantis
City of Cape town WesfleurIndustria
City of Cape town Wildevoelvlei
City of Cape town Zandvliet
City of Cape town philadephia
City of Cape town Parow
Cederberg Local Municipality Citusdal
Cederberg Local Municipality Clanwilliam
Cederberg Local Municipality Eland’s Bay
Cederberg Local Municipality Graaafwater
Cederberg Local Municipality Lambert;s Bay
Cederberg Local Municipality Wupperthal
Cederberg Local Municipality Algeria
Cape Agulhas Local municipality Bradasdorp
Cape Agulhas Local municipality Waenhuiskruins
Cape Agulhas Local municipality Napier
Cape Agulhas Local municipality Struisbaai
Breede Valley local Municipality De Doorns
Breede Valley local Municipality Worcester
Breede Valley local Municipality Rawsonville
Breede Valley local Municipality Touwrivier
Bitou Local Municipality Kurland
Bitou Local Municipality Pletternberg Bay
Berg River Local Municipality Velddrift
Berg River Local Municipality Porterville
Berg River Local Municipality Pikertberg
Berg River Local Municipality Eeendekuil
Berg River Local Municipality Dwarskersbos
Beaufort West Local Municipality Murraysburg
Beaufort West Local Municipality Beaufort West
Beaufort West Local Municipality Nelspoort
Beaufort West Local Municipality Merweville
260 100 182 182 Over by 82 Over by 82% Over achieved PoE accepted for 18228 28
HarrismithNgwathe WWTW
Nala LM Bothaville WWTW Bothaville WWTW Bothaville WWTW Moqhaka LM Reitz WWTW Viljoenskroon WWTW Viljoenskroon WWTWNketoana Local Municipality Reitz WWTW
Arlington Phumelela Local Municipality Vrede WWTWDihlabeng LM BethlehemSetsoto LM Senekal
Theronia Henneman WWTW Henneman WWTWKutlwanong WWTW Kutlwanong WWTWThabong WWTW Thabong WWTWPhomolong WWTW Phomolong WWTW
Witpan Witpan WWTW Witpan WWTW Sol Plaatje Municipality Homevalle WWTWDipaleseng Local Municipality Balfour WWTW Balfour WWTW Balfour WWTWNaledi WepenerNala LM BothavilleMafube LM Namahadi Frankfort WWTW Frankfort WWTW
Villiers WWTW Villiers WWTW
Letsemeng LM Jacobsdal Petrusburg WWTW Petrusburg WWTW
Letsemeng LM Koffiefontein Mohokare Local Municipality Zastron
No milestone for the
quarter
FS
Western Cape
Matjhabeng Local Municipality
Number of non-compliant wastewater systems
monitored against the Green Drop Regulatory
tool
1.1.1
1.1.2
51
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationKopanong Local Municipality Reddersburg Reddersburg Reddersburg Kopanong Local Municipality SpringfonteinKopanong Local Municipality TrompsburgNketoana LM Lindley-Ntha Lindley WWTW Lindley WWTW
Rosendal RosendalNketoana LM Petrus SteynNketoana LM ReitzTswelopele LM HoopstadSetsoto Local Municipality Clocolan Ngwathe Local Municipality Heilbron Moqhaka Local Municipality Steynsrus MasilonyanaLocal Municipality Brandfort MasilonyanaLocal Municipality MasiloDihlabeng LM Mautse
RosendalTheroniaAllanridgeOdendaalsrus Sterkwater Sterkwater SterkwaterBainsvlei Dewetsdorp WWTW Dewetsdorp WWTW
Botshabelo Seloshela WWTW Seloshela WWTW
Northern Works Wepener WWTW Wepener WWTWVan Stadensrus WWTW Van Stadensrus WWTW
Naledi Dewtsdorp, Nala LM Wesselsbron Wesselsbron WesselsbronMafube Local Municipalit Tweeling,Mafube Local Municipalit CorneliaLetsemeng Local Municipality Luckhoff, Mohokare LM Rouxville Mohokare LM SmithfieldKopanong Local Municipality Edenberg Edenberg Edenberg Kopanong Local Municipality Fauresmith Fauresmith FauresmithSetsoto Local Municipality Marquard Setsoto Local Municipality SenekalNgwathe Local Municipality KoppiesNgwathe Local Municipality Parys MasilonyanaLocal Municipality Theunissen MasilonyanaLocal Municipality Soutpan
Verkeerdevlei Naledi Van Stadensrus,Letsemeng Local Municipality Oppermans, Letsemeng Local Municipality PetrusburgSetsoto Local Municipality Ficksburg Ficksburg FicksburgKopanong LM Gariep Dam Gariep WWTW Gariep WWTWKopanong LM Jagersfontein, Kopanong LM PhilippolisMasilonyana LM WinburgNgwathe Local Municipality VredefortPhumelela Local Municipality
Boshof Hertzogville WWTW Hertzogville WWTWDealesville Paul Roux WWTW Paul Roux WWTW
Maluti a Phofung LM WilgeTshiame
Dithlabeng LM Clarens Paul Roux
Koppies WWTW Koppies WWTW
Heilbron WWTW Heilbron WWTW
FS
Matjhabeng Local Municipality
Mangaung Metro
Tokologo LM
Fezile Dabi DM
1.1.2
52
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration37 35Lekwa Local Municipality Standerton WWTW Standerton WWTW Standerton WWTW Govan Mbeki eMbalenhle WWTW(Secunda)Msukaligwa Ermelo WWTW Ermelo WWTW Ermelo WWTW Govan Mbeki Kinross WWTWLekwa Local Municipality Morgenzon Morgenzon WWTW Morgenzon WWTWDipaleseng LM Greylingstad Greylingstad WWTW Greylingstad WWTWPixley ka Seme LM Volksrust Volksrust WWTW Volksrust WWTWPixley ka Seme LM Vukuzakhe Vukuzakhe WWTW Vukuzakhe WWTWMsukaligwa LM Breyten PondsEmalahleni Ferrobank Ferrobank WWTW Ferrobank WWTWEmalahleni Phola-Ogies Emalahleni Kriel-Ganala Kriel-Ganala WWTW Kriel-Ganala WWTWMkhondo Amsterdam Amsterdam WWTW Amsterdam WWTWMkhondo Piet Retief Piet Retief WWTW Piet Retief WWTWGovam Mbeki Trichardt
KwaMhlanga Ponds East KwaMhlanga Ponds East KwaMhlanga Ponds EastKwaMhlanga Ponds West KwaMhlanga Ponds WestTwefontein k WWTW Twefontein k WWTW
Albert Luthuli Ekulendeni-Kromdraai Carolina WWTW Carolina WWTWElukwatini WWTW Elukwatini WWTWEmpuluzi WWTW Empuluzi WWTWBadplaas WWTW Badplaas WWTW
Dr JS Moroka Vaalbank Vaalbank WWTW Vaalbank WWTWBushbuckridge Dwarsloop Mbombela KabokweniPixley ka Seme LM Amersfoort, Amersfoort WWTW Amersfoort WWTW
Breyten AS, Breyten WWTW Breyten WWTWChrissesmeer Chrissesmeer Chrissesmeer
Emalahleni Klipspruit, Klipspruit, Klipspruit, EvanderLeandra-Leslie
Balfour WWTW Balfour WWTWAlbert Luthuli Local Municipality Mpuluzi-MayflowerDipaleseng Grootvlei Mine Grootvlei Mine WWTW Grootvlei Mine WWTWDipaleseng Grootvlei Eskom Grootvlei Eskom WWTW Grootvlei Eskom WWTWPixley ka Seme Perdekop, Perdekop, Perdekop,Pixley ka Seme Wakkerstroom Wakkerstroom WakkerstroomMsukaligwa Davel, Davel WWTW Davel WWTWMsukaligwa Lothair Lothair WWTW Lothair WWTW
Rietspruit, Rietspruit WWTW Rietspruit WWTWRiverview, Riverview WWTW Riverview WWTW
Naauwpoort WWTW Naauwpoort WWTWEmakhazeni Emthonjeni-MachadorpBushbuckridge Thulamahshe, Bushbuckridge Mangwaza, ManghwaziBushbuckridge Tintiswalo HospitalMbombela LM HazyviewThaba Chweu Lydenburg Lydenburg Lydenburg
Delmas WWTW Delmas WWTWBotleng WWTW Botleng WWTW
4 4Vaal Marina WWTWMeyrton
Emfuleni Leeukuil WWTWCity of Johannesburg Bushkoppies WWTW Bushkoppies WWTW Bushkoppies WWTWCity of Johannesburg Ennedale WWTWCity of Johannesburg Goudkoppies WWTWCity of Tshwane Rooivaal WWTW City of Tshwane Baviaanspoort Baviaanspoort WWTW Baviaanspoort WWTWCity of Tshwane Sunderland Ridge Mogale City Flip Human Flip Human WWTW Flip Human WWTWEmfuleni SebokengLesedi HeidelbergMidvaal Oheni MuriEkurhuleni Metro Tsakane
Welgedacht Rynfield WWTW Rynfield WWTWDekemaAncorRondebultHerbert Bickley JP Marais
City of Tshwane Ekangala City of Tshwane Rethabiseng
24 24Gamagara Local Municipality Kathu Waste Water Treatment Works
Debeng WWTWGammagara Local Municipality Olifantshoek WWTWSiyancuma Douglas WWTW Douglas WWTW Douglas WWTWMagareng Warrenton WWTWGammagara Dingleton WWTWPhokwane Local Municipality Jan Kemp Dorp WWTWDikgatlong Local Municipality Delport hoop WWTWRenosterberg VanderkloofRenosterberg Petrusville Petrusville Petrusville Renosterberg PhillipstownRichtersveld Port NollothThembelihle Hopetown Old Hopetown Old Hopetown Old Ga-Segonyana KurumanMier Askham Mier Loubos
Noupoort Noupoort NoupoortNorvalspoort Norvalspoort
Ubuntu Richmond Richmond RichmondThembelihle Hopetown New,Kai Garib Local Municipality KenhardtKaroo Hoogland Local Municipality Williston
CarnavonVosburgVan WykvleiDe Aar De Aar De Aar
Hanover HanoverBriststown Briststown
Prieska Prieska PrieskaMarydale MarydaleNiekershoop Niekershoop
Emthanjeni
Siyathemba
NC
GP
MP
Umsombomvu
Kareeberg
Thembisile
Msukaligwa LM
Govan Mbeki LM
Emalahleni
Midvaal
Ekurhuleni
1.1.2
53
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationBergsig Bergsig BergsigOkiep OkiepSteikopf SteikopfConcordia ConcordiaNababeep NababeepCarolusberg CarolusbergSpringbok SpringbokKomaggas Komaggas
!Kheis Groblershoop Brandboom BrandboomGrootdrink GrootdrinkTopline ToplineWegraai Wegraai
David Kruiper LM Rietfontein16 16
Kouga Weston HankeyBarkely WWTW Barkely East Pond 1 Barkely East Pond 1 PoE not provided
Barkely East Pond 2 Barkely East Pond 2 PoE not providedNdlambe LM Alexandria-KwaNonkqubelaNdlambe LM Bushmans River Mouth, O.R Tambo DM Nqgeleni, Nqgeleni, Nqgeleni, PoE acceptedO.R.Tambo District Municipality Port St John, Port St John, Port St John, PoE acceptedO.R.Tambo District Municipality Qumbu, Qumbu, Qumbu, PoE acceptedO.R.Tambo District Municipality Tsolo Tsolo Tsolo PoE acceptedO.R.Tambo District Municipality Lusikisiki, O.R.Tambo District Municipality MqanduliChris Hani DM Molteno, Lukhanji Local Municipality Queenstown, Chris Hani DM Sada, Chris Hani DM Sterkstroom, Chris Hani DM Tsomo Chris Hani DM EngcoboKoukamma LM KareedouwKoukamma LM Krakeel RiverNdlambe Bathurst-Nolukhanyo, Ndlambe MarselleO.R Tambo DM FlagstaffO.R Tambo DM Mthatha,Chris Hani District Municipality Cala, Chris Hani District Municipality Cofimvaba, Molteno Molteno PoE not providedChris Hani District Municipality Cradock, Chris Hani District Municipality ElliotKoukamma Local Municipality ClarksonKoukamma Local Municipality Louterwater Louterwater Louterwater PoE acceptedNdlambe Kenton on Sea - Ekuphunleni, Ndlambe Port AlfredKou-Kamma Sanddrift PoE acceptedKou-Kamma Stormsriver Stormsriver StormsriverBaviaans RietbronAlfred Nzo Bizana Bizana Bizana PoE accepted Alfred Nzo Cedarville,Alfred Nzo NtanbankuluBlue Crane Route Cookhouse, Cookhouse, Cookhouse, PoE acceptedBlue Crane Route Pearston Pearston Pearston PoE not providedBlue Crane Route Somerset East Somerset East Somerset East PoE acceptedChris Hani Hofmeyr Hofmeyr Hofmeyr PoE not providedChris Hani Middelburg Middelburg Middelburg PoE not providedChris Hani Tarkastad Tarkastad Tarkastad PoE not providedKouga LM
11 11 PoE accepted for 11Oarkney WWTW Oarkney WWTW Oarkney WWTW PoE accepted
Klerksdorp Klerksdorp PoE acceptedDr Ruth S Mompati Local Bloemhof WWTWDr Ruth S Mompati Local Christiana WWTW
Rulaganyang Rulaganyang Rulaganyang PoE acceptedMoretele SwartdamNgaka Modiri Sannieshof, Sannieshof Sannieshof PoE acceptedNgaka Modiri Mafikeng Ngaka Modiri Delareyville, Delareyville Delareyville PoE acceptedNgaka Modiri Lehurutshe-Welbedacht Lehurutshe-Welbedacht Lehurutshe-Welbedacht PoE accepted but not on scheduleNgaka Modiri AtamelangVentersdorp VentersdorpNgaka Modiri ZeerustCity of Matlosana Hartebeesfontein Hartebeesfontein Hartebeesfontein PoE acceptedDr Ruth Mompati BloemhofDr Ruth Mompati Schweizer-Reinecke Dr Ruth Mompati Vryburg
KosterSwartruggens
Moses Kotane MogwaseNgakaModiriMolema Local LichetenburgNgaka Modiri Molema Local Coligny, Ngaka Modiri Molema Local Ottosdal Ottosdal Ottosdal PoE acceptedNgaka Modiri Molema Local Itsoseng,Matlosana Local Municipality Stilfontein, Stilfontein, Stilfontein, PoE acceptedMaquassi Hills Wolmaranstad Makwasi Makwasi PoE acceptedMaquassi Hills Leeudoringstad Leeudoringstad Leeudoringstad PoE accepted
BoitekongRustenburgMonakatoLethabong
Madibeng LM Mothutlung 4 4
Harry Gwala DM Franklin WWTW Franklin WWTW PoE acceptedUthukela District Municipality Weenen Weenen WWTW Weenen WWTW PoE accepteduThungulu District Municipality Mbongolwane Ulundi ThulasizweSisonke DM FranklinUthukela DM LadysmithuThukela District Municipality Wembezi Wembezi WWTW Wembezi WWTW PoE accepteduThukela District Municipality Estcourt Estcourt WWTW Estcourt WWTW PoE accepteduThungulu District Municipality Nkandla, uThungulu District Municipality OceanviewUgu District Municipality Mbango, Ugu District Municipality MargateuThungulu DM Owen Sithole Agric CollegeuMzinyathi District Municipality Tugela Ferry
Nama Khoi
Joe Gqabi DM
Camdeboo LM
Matlosana Local Municipality
NC
NW
EC
KZN
Ketlengrivier
Rustenburg LM
1.1.2
54
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationILembe District Municipality Vukile,
KZN
1.1.2
55
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationILembe District Municipality Montebello HospitalUmkhanyakude St Lucia
8 8Greater Sekhukhune NeboGreater Sekhukhune District PhokwaneGreater Sekhukhune District Tubatse Tubatse WWTW Tubatse WWTW PoE not providedGreater Sekhukhune District Monsterlus (Hlogotlou) Greater Sekhukhune District Motetema Motetema WWTW Motetema WWTW PoE acceptedGreater Sekhukhune District ReboneLephalale Local Municipality Zongesien Zongesien WWTW Zongesien WWTW PoE acceptedMookgophong Thusang (Roedtan)Thabazimbi Local Municipality ThabazimbiMopani District Municipality Modjadji (Duiwelskloof) Vhembe District Municipality MutaleVhembe District Municipality MhingaBelaBela Local Municipality Radium Greater Sekhukhune District Leeuwfontein (Mokganyaka),Greater Sekhukhune District Meckleberg (Moroke), Meckleberg (Moroke) WWTW Meckleberg (Moroke) WWTW PoE acceptedMopani District Municipality Senwamokgope, Senwamokgope WWTW Senwamokgope WWTW PoE acceptedVhembe District Municipality Musina, Musina Nancefield WWTW Musina Nancefield WWTW PoE acceptedGreater Sekhukhune DM Burgersfort,Greater Sekhukhune DM Elandskraal, Elandskraal WWTW Elandskraal WWTW PoE acceptedGreater Sekhukhune DM Groblersdal Groblersdal WWTW Groblersdal WWTW PoE acceptedGreater Sekhukhune DM Jane Furse Jane Furse WWTW Jane Furse WWTW PoE acceptedGreater Sekhukhune DM DeniltonGreater Sekhukhune DM Marble HallGreater Sekhukhune DM Roosenekaal Roosenekaal WWTW Roosenekaal WWTW PoE not providedVhembe District Municipality Thohoyandou Thohoyandou WWTW Thohoyandou WWTW PoE not providedVhembe District Municipality DzananiVhembe District Municipality Siloam PondsMopani District Municipality NamakgaleVhembe District Municipality Nancefiled, Vhembe Tshifulanani
LP
KZN
1.1.2
56
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration57 57Kannaland Local Municipality ZoarMatzikama Nuwerus Cederberg Algeria, Cederberg Local Municipality WupperthalBergrivier LM Dwarskerboss Dwarskerboss PoE acceptedBergrivier LM Eendekuil Eendekuil PoE acceptedBergrivier LM Piketburg Piketburg PoE acceptedBergrivier LM Porteville Porteville PoE acceptedBergrivier LM Veldrift Veldrift PoE acceptedCape Agulhas LM Bredasdorp Bredasdorp PoE acceptedCape Agulhas LM Napier Napier PoE acceptedCape Agulhas LM Struisbaai Struisbaai PoE acceptedCape Agulhas LM Armiston Armiston PoE acceptedBitou LM Breede Valley LMBreede Valley LMBreede Valley LMBreede Valley LMBreede Valley LM Worcester WWTW Worcester WWTW PoE acceptedDrakenstein LM De Doorns WWTW De Doorns WWTW PoE acceptedDrakenstein LM Towsrivier WWTW Towsrivier WWTW PoE acceptedDrakenstein LMDrakenstein LMDrakenstein LM Gouda WWTW Gouda WWTW PoE acceptedDrakenstein LM Hermon WWTW Hermon WWTW PoE acceptedGeorge LM Paarl WWTW Paarl WWTW PoE acceptedGeorge LM Pearl Valley WWTW Pearl Valley WWTW PoE acceptedGeorge LM Saron WWTW Saron WWTW PoE acceptedGeorge LM Wellington WWTW Wellington WWTW PoE acceptedGeorge LM Haarlem WWTW Haarlem WWTW PoE acceptedGeorge LM Kleinkrantz WWTW Kleinkrantz WWTW PoE acceptedHessequa LM Gwaing WWTW Gwaing WWTW PoE acceptedHessequa LM Heroldsbay WWTW Heroldsbay WWTW PoE acceptedHessequa LM Outeniqua WWTW Outeniqua WWTW PoE acceptedHessequa LM Unio-dale WWTW Unio-dale WWTW PoE acceptedHessequa LM Albetina WWTW Albetina WWTW PoE acceptedHessequa LM Garcia WWTW Garcia WWTW PoE acceptedHessequa LM Gouritzmond WWTW Gouritzmond WWTW PoE acceptedHessequa LM Heidelberg WWTW Heidelberg WWTW PoE acceptedHessequa LM Jongensfontein WWTW Jongensfontein WWTW PoE acceptedHessequa LM Melkhoutfontein WWTW Melkhoutfontein WWTW PoE acceptedKnysna LM Riversdale WWTW Riversdale WWTW PoE acceptedKnysna LM Slangrivier WWTW Slangrivier WWTW PoE acceptedKnysna LM Stillbay WWTW Stillbay WWTW PoE acceptedKnysna LM Witsand WWTW Witsand WWTW PoE acceptedKnysna LM Belvidere WWTW Belvidere WWTW PoE acceptedKnysna LM Brenton WWTW Brenton WWTW PoE acceptedLaingsburg LM Karatakon WWTW Karatakon WWTW PoE acceptedLaingsburg LM Knysna WWTW Knysna WWTW PoE acceptedLangeberg LM Rheenendal WWTW Rheenendal WWTW PoE acceptedLangeberg LM Sedge Field WWTW Sedge Field WWTW PoE acceptedLangeberg LM Laingsburg Laingsburg PoE acceptedLangeberg LM Matjiesfontein Matjiesfontein PoE acceptedLangeberg LM Robertson WWTW Robertson WWTW
Langeberg LM Bonnievale WWTW Bonnievale WWTW
Matzikama LM McGregor WWTW McGregor WWTW
Matzikama LM Montagu WWTW Montagu WWTW
Matzikama LM Ashton WWTW Ashton WWTW
Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Matzikama LM Mosselbay LMMosselbay LMMosselbay LMMosselbay LMMosselbay LM Friemersheim WWTW Friemersheim WWTW PoE acceptedMosselbay LM Brandwatch WWTW Brandwatch WWTW PoE acceptedMosselbay LM Grootbrak WWTW Grootbrak WWTW PoE acceptedBeaufort West LM Hartenbos WWTW Hartenbos WWTW PoE acceptedBeaufort West LM Harbertsdale WWTW Harbertsdale WWTW PoE acceptedBeaufort West LM Pinnacle Point WWTW Pinnacle Point WWTW PoE acceptedBeaufort West LM Ruiterbos WWTW Ruiterbos WWTW PoE acceptedBeaufort West LM City of Cape Town City of Cape Town City of Cape Town Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Saldanha Bay LM Stellenbosch LMStellenbosch LMStellenbosch LMStellenbosch LMStellenbosch LM Stellenbosch WWTW Stellenbosch WWTW PoE acceptedTheewaterkloof LM Klapmuts WWTW Klapmuts WWTW
Theewaterkloof LM Raithby WWTW Raithby WWTW
Theewaterkloof LM Priel WWTW Priel WWTW
Theewaterkloof LMTheewaterkloof LM Villiesdorp WWTW Villiesdorp WWTW
Theewaterkloof LM Grabouw WWTW Grabouw WWTW
Theewaterkloof LM Caledon WWTW Caledon WWTW
Theewaterkloof LM Botrivier WWTW Botrivier WWTW
Theewaterkloof LM Greyton WWTW Greyton WWTW
Witzenburg LM Riviersonderend WWTW Riviersonderend WWTW
Witzenburg LM Genadendal WWTW Genadendal WWTW
Witzenburg LM
1.1.2
WC
57
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationWitzenburg LMWitzenburg LM Ceres WWTW Ceres WWTW PoE accepted Witzenburg LM Op Die berg WWTW Op Die berg WWTW PoE accepted Witzenburg LM Tulbagh WWTW Tulbagh WWTW PoE accepted Witzenburg LM Wolseleg WWTW Wolseleg WWTW PoE accepted Oudtshoorn LM De rust WWTW De rust WWTW PoE accepted Oudtshoorn LM Dysselsdorp WWTW Dysselsdorp WWTW PoE accepted Oudtshoorn LM Oudtshoorn WWTW Oudtshoorn WWTW PoE accepted
Number of warer supply systems assessed for
compliance with Blue Drop regulatory
standards
1036 No milestone No milestone No milestone No milestone n/a n/a n/a n/a
Alfred Nzo DM Matatiele LM - Belfort TwAlfred Nzo DM Matatiele LM - Matatiele TwAlfred Nzo DM Mbizana LM - Borehole Systems (Rural)Alfred Nzo DM Mbizana LM - Mbizana Tw SystemAlfred Nzo DM Mbizana LM - Nomlacu Tw SystemAlfred Nzo DM Ntabankulu LM - Borehole Systems (Rural)Alfred Nzo DM Ntabankulu LM - Ntabankulu TwAlfred Nzo DM Umzimvubu LM - Kwabhaca TwAlfred Nzo DM Umzimvubu LM - Mount Ayliff TwAmatole Dm Amahlahti LM - Kei RoadAmatole DM Amahlathi LM - CathcartAmatole DM Amahlathi LM - StutterheimAmatole DM Binfield Network SupplyAmatole DM Debe Nek Network SupplyAmatole DM Glenmore Network Supply Amatole DM Great Kei LM - Kei Bridge WtwAmatole DM Great Kei LM - Cinsta EastAmatole DM Great Kei LM - Haga- HagaAmatole DM Great Kei LM - Kei Mouth Amatole DM Great Kei LM - Morgans Bay Amatole DM Masincedane Network SupplyAmatole DM Mbashe LM - CwebeAmatole DM Mbashe LM - DutywaAmatole DM Mbashe LM - DwesaAmatole DM Mbashe LM - ElliotdaleAmatole DM Mbashe LM - MenduAmatole DM Mbashe LM - Willowvale Amatole DM Mbhashe LM - Qwaninga WtwAmatole DM Mbhashe LM - Mbhashe North WtwAmatole DM Mbhashe LM - Nqadu WtwAmatole DM Mbhashe-Mncwasa Wtw Stellenbosch WWTW Stellenbosch WWTW
Amatole DM Mnquma LM - Nqamakwe Wtw Klapmuts WWTW Klapmuts WWTW
Amatole DM Mnquma LM - Kotana/Ehlobo Raithby WWTW Raithby WWTW
Amatole DM Mnquma LM - Qolorha Priel WWTW Priel WWTW
Amatole DM Mnquma LM - TholeniAmatole DM Mnquma LM -Butterworth Wtw Villiesdorp WWTW Villiesdorp WWTW
Amatole DM Ngqanda Borehole Water Supply Grabouw WWTW Grabouw WWTW
Amatole DM Nkonkobe LM - Alice Wtw Caledon WWTW Caledon WWTW
Amatole DM Nkonkobe LM - Fort Beaufort Wtw Botrivier WWTW Botrivier WWTW
Amatole DM Nkonkobe LM - Hogsback Greyton WWTW Greyton WWTW
Amatole DM Nkonkobe LM - Seymor Riviersonderend WWTW Riviersonderend WWTW
Amatole DM Nxuba LM - Adelaide Genadendal WWTW Genadendal WWTW
Amatole DM Nxuba LM - BedfordAmatole DM Peddie Network SupplyAmatole DM Sandile Network Supply Ceres WWTW Ceres WWTW
Amatole DM Upper Mnyameni Network Supply Op Die berg WWTW Op Die berg WWTW
Baviaans LM Miller Tulbagh WWTW Tulbagh WWTW
Baviaans LM Rietbron Wolseleg WWTW Wolseleg WWTW
Baviaans LM Sewefontein De rust WWTW De rust WWTW
Baviaans LM Steytleville Dysselsdorp WWTW Dysselsdorp WWTW
Baviaans LM Vondeling Oudtshoorn WWTW Oudtshoorn WWTW
Baviaans LM WillowmoreBaviaans LM ZaaimanshoekBlue Crane Route LM CookhouseBlue Crane Route LM PearstonBlue Crane Route LM Sommerset EastBuffalo City LM HanoverBuffalo City LM Kei Road SystemBuffalo City LM Kidds Beach (Borehole) SchemeBuffalo City LM King Williams Town ( Kwt Water Treatment Buffalo City LM Laing Network SupplyBuffalo City LM Majali (Borehole) SystemBuffalo City LM Mdantsane Supply Scheme (Umz, Nahoon, Buffalo City LM Peddie Supply SchemeBuffalo City LM Sandile Network SupplyBuffalo City LM Umzonyana Wtw (East London)Camdeboo LM AberdeenCamdeboo LM Graaf-ReinetCamdeboo LM Nieu-BethesdaChris Hani DM Emalahleni - Indwe Supply SystemChris Hani DM Emalahleni - Machubeni Supply SystemChris Hani DM Emalahleni (Rural & Farms - Untreated)Chris Hani DM Emalahleni- Dordrecht Supply SystemChris Hani DM Engcobo - Engcobo Town Supply SystemChris Hani DM Engcobo - Gqaga Supply SystemChris Hani DM Engcobo (Rural Treated Boreholes)Chris Hani DM Engcobo-Nkobongo Supply SystemChris Hani DM Inkwanca - Molteno Supply SystemChris Hani DM Inkwanca - Sterkstroom Supply SystemChris Hani DM Intsika Yethu - Tsojana Supply SystemChris Hani DM Intsika Yethu (Untreated)Chris Hani DM Intsika Yethu -Tsomo Service SystemChris Hani DM Inxuba Yethemba - Cradock Supply SystemChris Hani DM Inxuba Yethemba - Middelburg Supply Chris Hani DM Lukhanji - Queenstown Supply SystemChris Hani DM Lukhanji - Whittlesea Supply SystemChris Hani DM Lukhanji (Rural & Farms - Untreated)Chris Hani DM Sakhisizwe - Cala Supply SystemChris Hani DM Sakhisizwe - (Farms & Rural - Treated)Chris Hani DM Sakhisizwe - Elliot Supply SytemChris Hani DM Sakhisizwe- Xhalanga Supply SystemChris Hani DM Sakhisizwe-Cala Package SystemChris Hani DM Tsolwana: Hofmeyer Supply SystemChris Hani DM Tsolwana: Ntabathemba Supply SystemChris Hani DM Tsolwana: Tarkastad Supply SystemIkwezi LM Jansenville
EC
1.1.3
1.1.2
No milestone for the
quarter
WC
58
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationIkwezi LM KlipplaatIkwezi LM WaterfordIkwezi LM WolwefonteinJoe Gqabi DM Elundini LM - Maclear (Aucamp Wtp) And Joe Gqabi DM Elundini LM - Maclear Rural (Boreholes & Joe Gqabi DM Elundini LM - Ugie (Ugie Wtp)Joe Gqabi DM Elundini LM - Ugie Rural (Boreholes & Joe Gqabi DM Elundini LM -Mount Fletcher Rural Joe Gqabi DM Elundini LM -Mt Fletcher (Mount Fletcher Joe Gqabi DM Gariep LM - Burgersdorp (Burgersdorp Wtp)Joe Gqabi DM Gariep LM - Oviston (Oviston Wtp)Joe Gqabi DM Gariep LM - Steynsburg (Steynsburg Wtw)Joe Gqabi DM Maletswai LM - Aliwal North (Aliwal North Joe Gqabi DM Maletswai LM - Jamestown (Jamestown Joe Gqabi DM Senqu LM - Barkly East (Barkly East Wtp)Joe Gqabi DM Senqu LM - Lady Grey (Lady Grey Wtw)Joe Gqabi DM Senqu LM - Rhodes (Rhodes Wtp)Joe Gqabi DM Senqu LM - Sterkspruit Rural (Boreholes & Joe Gqabi DM Senqu LM -Rossouw (Boreholes)Joe Gqabi DM Senqu LM -Sterkspruit (Sterkspruit Wtp)Kouga LM HankeyKouga LM HumansdorpKouga LM Jeffreys BayKouga LM LoerieKouga LM Oyster BayKouga LM PatensieKouga LM St. Francis BayKouga LM ThornhillKou-Kamma LM BilikiesdorpKou-Kamma LM ClarksonKou-Kamma LM ColdstreamKou-Kamma LM JoubetinaKou-Kamma LM KareedouwKou-Kamma LM KrakeelKou-Kamma LM LouterwaterKou-Kamma LM MisgundKou-Kamma LM SanddrifKou-Kamma LM Storms RiverKou-Kamma LM WoodlandsMakana LM AlicedaleMakana LM GrahamstownMakana LM Riebeeck EastNdlambe LM Albany Coast NetworkNdlambe LM Alexandria WtwNdlambe LM Bathurst WtwNdlambe LM Cannon Rock WtwNdlambe LM Port AlfredNdlambe LM Seafield / KleinemondeNelson Mandela MM Churchill Nelson Mandela MM ElandsjagtNelson Mandela MM GroendalNelson Mandela MM LintonNelson Mandela MM Loerie Nelson Mandela MM Nelson Mandela Metropolitan MunicipalityNelson Mandela MM NooitgedachtNelson Mandela MM RocklandsNelson Mandela MM SpringsOR Tambo DM Coffee Bay WtwOR Tambo DM Corana WtwOR Tambo DM Flagstaff WtwOR Tambo DM Ingquza Hill Lm - BhOR Tambo DM Mhlahlane WtwOR Tambo DM Mhlanga WtwOR Tambo DM Mhlontlo Lm-BhOR Tambo DM Mqanduli WtwOR Tambo DM Mvumelwano WtwOR Tambo DM Ngqeleni WtwOR Tambo DM Nyandeni Lm -BhOR Tambo DM Port St Johns WtwOR Tambo DM Psj Lm-BhOR Tambo DM Sidwadweni WtwOR Tambo DM Thornhill WtwOR Tambo DM Tsolo WtwOR Tambo DM Umzimvubu WtwOR Tambo DM Upper Chulunca WtwSunday's River Valley LM Addo WtwSunday's River Valley LM Enon / Bersheba WtwSunday's River Valley LM Glenconnor BoreholeSunday's River Valley LM Kirkwood WtwSunday's River Valley LM Kleinpoort BoreholeSunday's River Valley LM Paterson BoreholesDihlabeng LM Bethlehem Water Supply SystemDihlabeng LM Clarens Water Supply SystemDihlabeng LM Fouriesburg Water Supply SystemDihlabeng LM Rosendal Water Supply SystemKopanong LM Bethulie Supply System (supplied by Bloem Kopanong LM Edenburg Supply System (supplied by Kopanong LM Fauresmith Supply System (supplied by Kopanong LM Gariep Water Supply System (supplied by Kopanong LM Jagersfontein Supply System (supplied by Kopanong LM Philippolis Supply System (supplied by Kopanong LM Reddersburg Supply System (supplied by Kopanong LM Springfontein Supply System (supplied by Kopanong LM Trompsburg Supply System (supplied by Letsemeng LM Jacobsdal WTWLetsemeng LM KoffiefonteinLetsemeng LM LuckhoffLetsemeng LM OppermangrondeLetsemeng LM PetrusburgMafube LM FrankfortMafube LM TweelingMafube LM VilliersMaluti a Phofung LM Qwaqwa (Makwane WTW)Maluti a Phofung LM Harrismith (Wilge WTW)Maluti a Phofung LM QWAQWA (Fika - Patso WTW)Mangaung LM BloemfonteinMangaung LM BOTSHABELOMangaung LM Thaba Nchu
EC
FS
1.1.3 No milestone for the
quarter
59
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMantsopa LM Excelsior Water Supply SystemMantsopa LM Hobhouse Water supply systemMantsopa LM Ladybrand Water Supply SystemMantsopa LM Thaba Phatchoa Water Supply SystemMantsopa LM Tweespruit Water Supply SystemMasilonyana LM Brandfort Supply SystemMasilonyana LM Soutpan Supply SystemMasilonyana LM The Greater Masilonyana Local MunicipalityMasilonyana LM Theunissen Supply SystemMasilonyana LM Verkeerdevlei Supply SystemMasilonyana LM Winburg Supply SystemMatjhabeng LM Allanridge Water supply SystemMatjhabeng LM Hennenman Water Supply SystemMatjhabeng LM Odendaalsrus Water Supply SystemMatjhabeng LM Ventersburg Water Supply SystemMatjhabeng LM Virginia Water Supply SystemMatjhabeng LM Welkom Water Supply SystemMetsimaholo LM DeneysvilleMetsimaholo LM OranjevilleMetsimaholo LM SasolburgMohokare LM Rouxville Conventional Water Treatment Mohokare LM Smithfield Conventional Water Treatment Mohokare LM Zastron Conventional Water Treatment Moqhaka LM Kroonstad Moqhaka LM SteynsrusMoqhaka LM ViljoenskroonNala LM Balkfontein (Sedibeng Water)Naledi LM Dewetsdorp Supply System (Bloem Water)Naledi LM Vanstadensrus WTWNaledi LM Wepener Supply System (Bloem Water)Ngwathe LM Heilbron (WSA)Ngwathe LM Koppies (WSA)Ngwathe LM Parys (WSA)Ngwathe LM Vredefort (WSA)Nketoana LM ArlingtonNketoana LM LindleyNketoana LM Petrus SteynNketoana LM ReitzPhumelela LM Memel Supply systemPhumelela LM Vrede Supply systemPhumelela LM WardenSetsoto LM Clocolan (Clocolan TW)Setsoto LM Ficksburg (Ficksburg TW)Setsoto LM Marquard (Marquard TW)Setsoto LM Senekal (Cyferfontein and De Put TW)Tokologo LM Boshof Water Supply SystemTokologo LM Dealesville Water Supply SystemTokologo LM Hertzogville Water Supply SystemTswelopele LM Bultfontein Supply ZoneTswelopele LM Hoopstad Supply ZoneAmajuba DM Dannhauser LM - Buffalo Flats - (Ngagane Amajuba DM Dannhauser LM - Dannhauser Amajuba DM Dannhauser LM - Durnacol (Durnacol TW) - Amajuba DM Dannhauser LM - Rudimentary Boreholes - Amajuba DM Utrecht LM - Waterval Prison (Ngagane Amajuba DM Utrecht LM- Utrecht (Utrecht TW) - uTW Amajuba DM Utrecht LM-Rudimentary Boreholes -uTW eThekwini MM eThekwini Main (Umgeni,Kloof TW,Mdhloti eThekwini MM Ogunjini (Ogunjini TW)eThekwini MM Rural BoreholeseThekwini MM TongaatiLembe DM AmatiguluiLembe DM Blythedale Water supplyiLembe DM Darnall Water Supply SchemeiLembe DM DedankivaneiLembe DM DriefonteiniLembe DM Esidumbini supply systemiLembe DM EthembeniiLembe DM GlendaleiLembe DM Gogovuma WTWiLembe DM Groutville Water Supply iLembe DM HlangananiiLembe DM Hlimbithwa Water SchemeiLembe DM IfalethuiLembe DM IsiminyaiLembe DM Isithundu WTWiLembe DM KwaSathaneiLembe DM LambothiiLembe DM Madundube Water Treatment WorksiLembe DM MakwaniniiLembe DM Mandeni WTWiLembe DM Maqumbi BoreholeiLembe DM Masibambisane WWiLembe DM Mayelisweni water supplyiLembe DM MazitapeleiLembe DM Mbitane WTWiLembe DM Montebello hospital supplyiLembe DM Mphumulo iLembe DM Mushane WTWiLembe DM Ndulinde water schemeiLembe DM Ndwedwe iLembe DM NgceboiLembe DM Ntabaskop water supplyiLembe DM Ntunjambili iLembe DM OhwebedeiLembe DM Phambela iLembe DM San souciiLembe DM Sundumbili iLembe DM Sundumbili ReticulationiLembe DM Umvoti/kwaDukuza iLembe DM Uthukela Mouth BHiLembe DM Uthukela WTWiLembe DM Vukile High School WTWiLembe DM WaterfalliLembe DM Wosiyane Water SupplyiLembe DM Zinkwazi water supplyNewcastle LM Charlestown Water System (Pixle ka Sema Harry Gwala DM Bulwer
FS
1.1.3 No milestone for the
quarter
KZN
60
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationHarry Gwala DM Creighton Harry Gwala DM Donnybrook Borehole SchemesHarry Gwala DM Esiqandulweni Harry Gwala DM Franklin Harry Gwala DM Highflats/SpornetHarry Gwala DM Hlanganani/PolelaHarry Gwala DM Ibisi Harry Gwala DM Ixopo Harry Gwala DM Jolivet/UguHarry Gwala DM Kokstad Harry Gwala DM NokwejaHarry Gwala DM RiversideHarry Gwala DM St ApollinarisHarry Gwala DM UmzimkhuluHarry Gwala DM Underberg Harry Gwala DM Washbank/HighlandsMsunduzi LM UmsunduziUgu DM AssissiUgu DM BhobhoyiUgu DM Boreholes Ugu DM HardingUgu DM HlokoziUgu DM KwaFodoUgu DM KwaHlongwaUgu DM KwaLembeUgu DM KwaMbothoUgu DM KwaNdeluUgu DM KwaNyuswa 1Ugu DM KwaNyuswa 2Ugu DM PhungasheUgu DM UmtamvunaUgu DM UmtwalumeUgu DM UmzintoUgu DM VulamehloUgu DM Weza Umgungundlovu DM Appelsbosch Umgungundlovu DM Boreholes (Untreated)Umgungundlovu DM EmbuthweniUmgungundlovu DM Gomane BoreholesUmgungundlovu DM Impendle SpringUmgungundlovu DM Lidgetton WestUmgungundlovu DM Makeni Umgungundlovu DM Mpofana Umgungundlovu DM Mtulwa Umgungundlovu DM Ntanzi Umgungundlovu DM Nzinga Umgungundlovu DM Richmond Umgungundlovu DM Rosetta Umgungundlovu DM Umgeni Bulk Supply uMhlathuze LM Esikhaleni WTWuMhlathuze LM Mzingazi WTWuMhlathuze LM Ngwelezane WTWuMhlathuze LM Nsezi WTWUmkhanyakude DM Block 6Umkhanyakude DM Borehole ClustersUmkhanyakude DM EnkanyeziniUmkhanyakude DM HlabisaUmkhanyakude DM Hluhluwe Phase1Umkhanyakude DM Hluhluwe Phase2Umkhanyakude DM IngwavumaUmkhanyakude DM Jozini (New)Umkhanyakude DM Jozini (Old) Makhonyeni MakhonyeniUmkhanyakude DM MalobeniUmkhanyakude DM ManguziUmkhanyakude DM Manguzi Airfield Umkhanyakude DM MbazwanaUmkhanyakude DM Mjindi CentralUmkhanyakude DM MkuzeUmkhanyakude DM Mpembeni Umkhanyakude DM MseleniUmkhanyakude DM MshuduUmkhanyakude DM MtubatubaUmkhanyakude DM NkolokothoUmkhanyakude DM NondubuyaUmkhanyakude DM OthobothiniUmkhanyakude DM ShemulaUmkhanyakude DM ThenganeUmzinyathi DM Msinga LM - Fabeni WTWUmzinyathi DM Msinga LM - Keat`s Drift (Ethembeni ) WTWUmzinyathi DM Msinga LM - Pomeroy WTWUmzinyathi DM Msinga LM - Sampofu WTWUmzinyathi DM Nqutu LM - Isandlwana WTWUmzinyathi DM Nqutu LM - Nondweni WTPNqutu LM - Nqutu (Vant`s Drift) Nqutu LM - Nqutu (Vant`s Drift) WTWNqutu LM - Qudeni WTW Nqutu LM - Qudeni WTWUmvoti LM - Amakhabaleni WTW Umvoti LM - Amakhabaleni WTWUmvoti LM - Greytown WTW Umvoti LM - Greytown WTWUmvoti LM - Muden WTW Umvoti LM - Muden WTWUMVOTI LM Kranskop WTW UMVOTI LM Kranskop WTWUthukela DM Emnambithi /Ladysmith - Colenso TownUthukela DM Emnambithi /Ladysmith - EzakheniUthukela DM Emnambithi /Ladysmith - Ladysmith TownUthukela DM Imbabazane - Loskop Uthukela DM Imbabazane - Loskop (rural scheme)Uthukela DM Indaka - Ekuvukeni Township and Uthukela DM Indaka - Tugela EstatesUthukela DM Okhahlamba - Bergville Town and Uthukela DM Okhahlamba - Langkloof Uthukela DM Okhahlamba -Moyeni/ Zwelisha Uthukela DM Okhahlamba - Winterton Town, Khethani Uthukela DM Umtshezi - Archie RodelUthukela DM Umtshezi - George CrossUthukela DM Umtshezi - Weenen Town Uthungulu DM EshoweUthungulu DM Gingindlovu (Gingindlove WTW)Uthungulu DM Greater MthonjaneniUthungulu DM Mbonambi Bulk supply ( Nsezi plant WTW-
1.1.3 No milestone for the
quarter
KZN
61
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationUthungulu DM Melmoth ( Melmoth WTW)Uthungulu DM MiddledriftUthungulu DM Mtunzini( City of uMhlathuze)Uthungulu DM Nkandla ( Package plants)Uthungulu DM Nkandla (Nkandla WTW)Uthungulu DM Nkandla Rudementary (Boreholes)Uthungulu DM Ntambanana(Package plants)Uthungulu DM Rudimentary Schemes- Mthonjaneni Uthungulu DM Rudimentary Schemes- Ntambanana Uthungulu DM Rudimentry Schemes- Umlalazi(boreholes)Uthungulu DM Umlalazi ( Package plants)Zululand DM BabanangoZululand DM BelgradeZululand DM Belgrade NewZululand DM Ceza Water SupplyZululand DM CoronationZululand DM eDumbeZululand DM eMakhosiniZululand DM eMondlo TownZululand DM Enyathi TownZululand DM Enyokeni PalaceZululand DM Frischgewaagd BilanyoniZululand DM Gumbi Rural Supply SchemeZululand DM HlobaneZululand DM Itshelejuba hospitalZululand DM KhambiZululand DM Khangela PalaceZululand DM KhiphunyawoZululand DM KombuziZululand DM LouwsbergZululand DM MandlakaziZululand DM MasokaneniZululand DM Mountain ViewZululand DM MpungamhlopeZululand DM MsibiZululand DM MvuziniZululand DM Nkonjeni HospitalZululand DM NkosentshaZululand DM NongomaZululand DM OphuzaneZululand DM OsingisinginiZululand DM PongolaZululand DM Purim Rural Water SupplyZululand DM SidinsiZululand DM SpekboomZululand DM TholakeleZululand DM Thulasizwe hospitalZululand DM Ulundi NkonjeniZululand DM Usuthu Zululand DM VryheidAlbert Luthuli LM Badplaas Albert Luthuli LM BettysgoedAlbert Luthuli LM CarolinaAlbert Luthuli LM Ekulindeni Albert Luthuli LM ElukwatiniAlbert Luthuli LM Empuluzi/MayflowerAlbert Luthuli LM FernieAlbert Luthuli LM Rudimentary BoreholesBushbuckridge LM Bushbuckridge- CorkBushbuckridge LM Bushbuckridge- DingleydaleBushbuckridge LM Bushbuckridge MariteBushbuckridge LM Bushbuckridge- SigaguleBushbuckridge LM Bushbuckridge- ThorndaleBushbuckridge LM Bushbuckridge- ZoeknogBushbuckridge LM BWB Edinburg BBushbuckridge LM Rand Water Mpumalanga Bushbuckridge - Bushbuckridge LM Rand Water Mpumalanga Bushbuckridge - Bushbuckridge LM Rand Water Mpumalanga Bushbuckridge - Dipaleseng LM The Greater Dipaleseng Local MunicipalityDr JS Moroka LM WeltervredenEmakhazeni LM Belfast (Belfast Water Treatment Plant)Emakhazeni LM Dullstroom (Dullstroom Water Treatment Emakhazeni LM Emgwenya (Waterval Boven Water Emakhazeni LM Entokozweni (Machadodorp Water Emalahleni LM Kendal Emalahleni LM Kriel/GanalaEmalahleni LM Rietspruit Emalahleni LM WitbankGovan Mbeki LM The Greater Govan Mbeki Local Lekwa LM Morgenzon WTWLekwa LM Standerton WTWMbombela LM Elandshoek (Elandshoek Package Plant)Mbombela LM Hazyview (Hazyview TW)Mbombela LM Karino (TW Sembcorp Silulumanzi)Mbombela LM Matsulu (Matsulu TW - Sembcorp Mbombela LM Nelspruit (Nelspruit Old & New TW - Mbombela LM Rand Water Mpumalaga Mbombela -Mbombela LM Rand Water Mpumalanga Mbombela -Mbombela LM Rand Water Mpumalanga Mbombela -Mbombela LM Rand Water Mpumalanga Mbombela- Mbombela LM Rand Water Mpumalanga Mbombela -Mbombela LM Rand Water Mpumalanga Mbombela-Mbombela LM Rand Water Mpumulanga Mbombela - Mbombela LM Tekwane ( Primkop TW - Sembcorp Mbombela LM White River (White River TW)Mbombela LM White River Country Estates (White River Mkhondo M Amsterdam Water Supply SystemMkhondo M Mkhondo Water Supply SystemMkhondo M Rural Water Supply SystemMkhondo M Saul Mkhize Water Supply SystemMkhondo M The Greater Mkhondo Local MunicipalityMsukaligwa LM Breyten water treatment worksMsukaligwa LM Davel water teatment worksMsukaligwa LM Douglas dam water worksMsukaligwa LM Eskom Camden Msukaligwa LM Lothair water treatment worksMsukaligwa LM South works (noitgedacht farm)Nkomazi LM Driekoppies/ Shoemansdal/ Buffelspruit/
1.1.3 No milestone for the
quarter
KZN
MP
62
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNkomazi LM Fig Tree/ Masibekele WSSNkomazi LM Hectorspruit WSSNkomazi LM Malalane WSSNkomazi LM Marloth Park WSSNkomazi LM Mbuzini WSSNkomazi LM Naas/Block C WSSNkomazi LM Nkomazi Rudimentary BoreholesNkomazi LM Ntunda WSSNkomazi LM Nyathi WSSNkomazi LM Sibange WSSNkomazi LM Tonga WSSPixley K Seme LM AmesfoortPixley K Seme LM Volkrust WTWPixley K Seme LM VukuzakhePixley K Seme LM WakkerstroomSteve Tshwete LM Borehole: Doornkop #1 CPA WSSSteve Tshwete LM Borehole: Mafube/ Sikhululiwe WSSSteve Tshwete LM ESKOM:Komati/ Blinkpan WSSSteve Tshwete LM Middelburg/ Mhluzi WSSSteve Tshwete LM Presidentsrus WSSSteve Tshwete LM Steve Tshwete/ Hendrina WSS-optimum Thaba Chweu LM Coromandel Water Treatment PlantThaba Chweu LM Graskop Water Supply SystemThaba Chweu LM Lydenburg Water Treatment PlantThaba Chweu LM Rural Water Supply SystemThaba Chweu LM Sabie Water Supply SystemThembisile LM Machipe (Goederede)Thembisile LM Engwenyameni (Klipfontein)Thembisile LM Kwaggafontein SystemThembisile LM KwamhlangaThembisile LM LangkloofThembisile LM Moloto Thembisile LM ThembalethuUmjindi LM Emjindini Trust water supply scheme Umjindi LM Rimer`s water treatment works / Barberton Umjindi LM Sheba water supply schemeVictor Khanye LM 1. Victor Khanye WaterVictor Khanye LM Delmas Rand WaterKai Garib LM AlheitKai Garib LM AughrabiesKai Garib LM BloemsmondKai Garib LM CillieKai Garib LM CurrieskampKai Garib LM Kakamas Bulk WaterKai Garib LM Keimoes Bulk WaterKai Garib LM LennertsvilleKai Garib LM LutzburgKai Garib LM MarchandKai Garib LM Riemvasmaak - SendingKai Garib LM Riemvasmaak - VredesvalleiKai Garib LM SoverbyKheis LM Brandboom/BoegoebergKheis LM Gariep Kheis LM Groblershoop Kheis LM Grootdrink Kheis LM Topline Kheis LM Wegdraai Khara Hais LM AH September (Upington)Khara Hais LM Karos Supply SystemKhara Hais LM LambrechtsdriftKhara Hais LM LeerkransKhara Hais LM LesedingKhara Hais LM LouisvaleKhara Hais LM NtsikeleloKhara Hais LM RaaswaterDikgatlong LM Barkley WestDikgatlong LM Blikfontein (Borehole)Dikgatlong LM Boetsap SAP (Borehole)Dikgatlong LM Dan Carl (Borehole)Dikgatlong LM Delportshoop and Longlands (Sedibeng Dikgatlong LM District Management Area - OtherDikgatlong LM Eierfontein (Borehole)Dikgatlong LM Gong-Gong (Borehole)Dikgatlong LM Holpan (Borehole)Dikgatlong LM Kalkfontein (Borehole)Dikgatlong LM KoopmansfonteinDikgatlong LM Longlands (Sedibeng Water)Dikgatlong LM Longlands Clinic (Borehole)Dikgatlong LM OlierivierDikgatlong LM Pniel (Borehole)Dikgatlong LM Pniel Estate (Borehole)Dikgatlong LM Spitskop (Borehole)Dikgatlong LM Stillwater Dikgatlong LM Ulco (Mine)Dikgatlong LM WindsortonEmthanjeni LM Britstown Borehole SchemeEmthanjeni LM De Aar Borehole SchemeEmthanjeni LM Hanover Borehole SchemeGamagara LM Dibeng(boreholes)Gamagara LM Dingleton (Vaalgamagara bulk supply Gamagara LM Kathu (kathu WTW, Boreholes, Gamagara LM Olifantshoek (Vaal gamagara Bulk Supply Ga-Segonyana LM Bankhara-Bodulong (Managed by Ga-Ga-Segonyana LM Lokaleng (GLM Boreholes_Sedibeng Ga-Segonyana LM Magobe/Magojaneng (GLM Ga-Segonyana LM Sedibeng (GLM Boreholes_Sedibeng Ga-Segonyana LM Seven miles (GLM Boreholes_Sedibeng Ga-Segonyana LM Slouya (GLM Boreholes_Sedibeng Water)Ga-Segonyana LM Thamoyanche (GLM Boreholes_Sedibeng Ga-Segonyana LM Vergenoeg (GLM Boreholes_Sedibeng Hantam LM BrandvleiHantam LM CalviniaHantam LM LoerisfonteinHantam LM MiddelposHantam LM NieuwoudtvilleHantam LM SwartkopJoe Morolong LM Black RockJoe Morolong LM Hotazel
1.1.3 No milestone for the
quarter
MP
NC
63
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationJoe Morolong LM Kikahela Groundwater Management Area: Joe Morolong LM Laxey Groundwater Management Area Joe Morolong LM Maipeng Groundwater Management Area Joe Morolong LM Mamatwan/Hotazel Ground water Joe Morolong LM Manyeding A Groundwater Management Joe Morolong LM Manyeding Lower Groundwater Joe Morolong LM Mc Carthy`s Rus (Boreholes)Joe Morolong LM Metsetswaneng Groundwater Management Joe Morolong LM Middelputz (Boreholes)Joe Morolong LM Severn SAPS (Borehole)Joe Morolong LM Severn School (Borehole)Joe Morolong LM Tsineng Groundwater Management Area: Joe Morolong LM Van Zylsrus (Boreholes)Joe Morolong LM Ward 1 Heuningvlei AreaKamiesberg LM GariesKamiesberg LM HondeklipbaaiKamiesberg LM KamassiesKamiesberg LM KamieskroonKamiesberg LM Kharkams Kamiesberg LM KheisKamiesberg LM Klipfontein Kamiesberg LM KoiingnaasKamiesberg LM LeliefonteinKamiesberg LM LepelfonteinKamiesberg LM NourivierKamiesberg LM PaulshoekKamiesberg LM RooifonteinKamiesberg LM SoebatsfonteinKamiesberg LM SpoegrivierKamiesberg LM TweerivierKareeberg LM CarnarvonKareeberg LM VanwyksvleiKareeberg LM VosburgKaroo Hoogland LM Fraserburg Karoo Hoogland LM Sutherland Karoo Hoogland LM Williston Kgatelopele LM Danielskuil (Boreholes)Kgatelopele LM Idwala (Boreholes)Kgatelopele LM Lime Acres De Beers (Sedibeng)Kgatelopele LM Owendale (Boreholes)Khai-Ma LM Onseepkans (Melkbosrand TW)Khai-Ma LM Onseepkans (RK)Khai-Ma LM Pofadder / Aggeneys (Pelladrift)Khai-Ma LM WitbankMagareng LM WarrentonMier LM AndriesvaleMier LM AskhamMier LM LoubosMier LM Mier (Boorgate)Mier LM Noenieput (Boorgat)Mier LM PhilandersbronMier LM Rietfontein Mier LM SwartkopdamMier LM WelkomNama kHoi LM BergsigNama kHoi LM BuffelsrivierNama kHoi LM BulletrapNama kHoi LM MatjieskloofNama kHoi LM NababeepNama kHoi LM Okiep SystemNama kHoi LM RooiwalNama kHoi LM SpringbokNama kHoi LM SteinkopfNama kHoi LM VioolsdriftPhokwane LM HartswaterPhokwane LM Jan KempdorpPhokwane LM Pampierstad (Managed by Sedibeng Water)Renosterberg LM Petrusville (from Vanderkloof)Renosterberg LM Phillipstown BoreholesRenosterberg LM Vanderkloof Richtersveld LM EksteenfonteinRichtersveld LM KuboesRichtersveld LM LekkersingRichtersveld LM Port Nolloth / Alexander Baai (Alexcor & 8 Richtersveld LM SanddriftSiyancuma LM Campbell Supply SystemSiyancuma LM DouglasSiyancuma LM Griekwastad Supply SystemSiyancuma LM Schmidtsdrift Supply SystemSiyathemba LM Marydale Borehole systemSiyathemba LM Niekerkshoop Borehole SystemSiyathemba LM Prieska Orange RiverSol Plaatjie LM Kby Zone 16 : RivertonSol Plaatjie LM Kby Zone A-E : RitchieThembelihle LM Hopetown (Orange River)Thembelihle LM Strydenburg (Boreholes)Tsantsabane LM Groen Water Supply SystemTsantsabane LM Jenn Heaven Supply SystemTsantsabane LM Postdene Supply SystemTsantsabane LM PostmasburgTsantsabane LM Skeyfontein Supply SystemTsantsabane LM Tsantsabane Local MunicipalityTsantsabane LM Vaal GamagaraUbuntu LM HutchinsonUbuntu LM LoxtonUbuntu LM merrimanUbuntu LM RichmondUbuntu LM Victoria WestUmsobomvu LM Colesberg (TW &boreholes)Umsobomvu LM NORVALSPONT (TW)Umsobomvu LM Noupoort (boreholes)Beaufort West LM Beaufort WestBeaufort West LM MerwevilleBeaufort West LM Murraysburg BWMBeaufort West LM NelspoortBergrivier LM AuroraBergrivier LM EendekuilBergrivier LM Piketberg
WC
1.1.3
NC
64
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationBergrivier LM PotervilleBergrivier LM Redeling-huysBergrivier LM VelddrifBitou LM KurlandBitou LM Nature`s ValleyBitou LM Plettenberg BayBreede Valley LM Bokrivier (Touwsrivier)Breede Valley LM De Doorns
WC
1.1.3
65
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationBreede Valley LM De Koppen (Fairyglen)Breede Valley LM RawsonvilleBreede Valley LM WorcesterCape Agulhas LM Aniston/WaenhuskransCape Agulhas LM BredasdorpCape Agulhas LM Elim Fountain WaterCape Agulhas LM KlipdaleCape Agulhas LM L` AgulhasCape Agulhas LM NapierCape Agulhas LM ProtemCape Agulhas LM spanjaardskloofCape Agulhas LM StruisbaaiCape Agulhas LM SuiderstrandCederberg LM AlgeriaCederberg LM CitrusdalCederberg LM ClanwilliamCederberg LM Elands BayCederberg LM GraafwaterCederberg LM Lambert`s BayCederberg LM LeipoldtvilleCederberg LM PaleisheuwelCity of Cape Town M Cape Town Drakenstein LM Bainskloof (Bainskloof TW)Drakenstein LM Drakenstein (Paarl Mountain TW & Cape Drakenstein LM Gouda (West Coast DM)Drakenstein LM Hermon Drakenstein LM Saron (Saron TW)George LM George Water WorksGeorge LM Haarlem Water WorksGeorge LM Uniondale Water Treatment WorksGeorge LM Wilderness Water WorksHessequa LM AlbertiniaHessequa LM GarciaHessequa LM GouritsmondHessequa LM HeidelbergHessequa LM VermaaklikheidHessequa LM WitsandKannaland LM CalitzdorpKannaland LM LadismithKannaland LM Van Wyksdorp WTWKannaland LM Zoar TownKnysna LM BelvidereKnysna LM Brenton -On-SeaKnysna LM Brenton-On-LakeKnysna LM Buffalo BayKnysna LM KarataraKnysna LM Knysna WTW and Desal PlantKnysna LM RheenendalKnysna LM Sedgefield WTW, Desal Plant, Emergency Laingsburg LM LaingsburgLaingsburg LM MatjiesfonteinLangeberg LM AshtonLangeberg LM BonnievaleLangeberg LM McGregorLangeberg LM MontaguLangeberg LM RobertsonMatzikama LM Bitterfontein DMAMatzikama LM EbenhaezerMatzikama LM KlawerMatzikama LM KliprandMatzikama LM KoekenaapMatzikama LM LutzivilleMatzikama LM Lutziville West Matzikama LM VredendalMossel Bay LM Friemersheim WSSMossel Bay LM Hebertsdale WSSMossel Bay LM Lodewykstenk WSSMossel Bay LM Mosselbaai/ Grootbrak/ Kleinbrak WSSMossel Bay LM Ruiterbos WSSOudtshoorn LM De RustOudtshoorn LM Klein Karoo Water Supply SchemeOudtshoorn LM OudtshoornOverstrand LM Baardskeerdersbos Supply SystemOverstrand LM Buffeljags Bay Supply SystemOverstrand LM Buffelsrivier Supply SystemOverstrand LM Greater Gansbaai Supply SystemOverstrand LM Greater Hermanus Supply SystemOverstrand LM Kleinmond Supply SystemOverstrand LM Pearly Beach Supply SystemOverstrand LM Stanford Supply SystemPrince Albert LM KlaarstroomPrince Albert LM LeeugamkaPrince Albert LM Prince AlbertSaldanha Bay LM Saldanda Bay Supply SystemsStellenbosch LM Blackheath (City Of Cape Town)Stellenbosch LM Faure System (City of Cape Town)Stellenbosch LM FranschhoekStellenbosch LM StellenboschStellenbosch LM Wemmershoek (City of Cape Town)Swartland LM Malmesbury Supply SystemSwartland LM Moorreesburg Supply SystemSwellendam LM BarrydaleSwellendam LM BuffelsjagrivierSwellendam LM SuurbraakSwellendam LM SwellendamTheewaterskloof LM BereavilleTheewaterskloof LM BotrivierTheewaterskloof LM CaledonTheewaterskloof LM Genadendal-WTWTheewaterskloof LM Grabouw WTWTheewaterskloof LM GreytonTheewaterskloof LM Riviersonderend WTWTheewaterskloof LM Tesselaarsdal WTWTheewaterskloof LM Villiersdorp WTWTheewaterskloof LM VoorstekraalWitzenberg LM Ceres Water Care WorksWitzenberg LM Op die Berg Water Care worksWitzenberg LM Prince Alfred Hamlet Water Care Works
WC
1.1.3
66
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationWitzenberg LM Tulbagh Water Treatment Works
WC
1.1.3
67
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationWitzenberg LM Wolseley Water Care WorksBeaufort West LM Beaufort WestBeaufort West LM MerwevilleBeaufort West LM Murraysburg BWMBeaufort West LM NelspoortBergrivier LM AuroraBergrivier LM EendekuilBergrivier LM PiketbergBergrivier LM PotervilleBergrivier LM Redeling-huysBergrivier LM VelddrifBitou LM KurlandBitou LM Nature`s ValleyBitou LM Plettenberg BayBreede Valley LM Bokrivier (Touwsrivier)Breede Valley LM De DoornsBreede Valley LM De Koppen (Fairyglen)Breede Valley LM RawsonvilleBreede Valley LM WorcesterCape Agulhas LM Aniston/WaenhuskransCape Agulhas LM BredasdorpCape Agulhas LM Elim Fountain WaterCape Agulhas LM KlipdaleCape Agulhas LM L` AgulhasCape Agulhas LM NapierCape Agulhas LM ProtemCape Agulhas LM spanjaardskloofCape Agulhas LM StruisbaaiCape Agulhas LM SuiderstrandCederberg LM AlgeriaCederberg LM CitrusdalCederberg LM ClanwilliamCederberg LM Elands BayCederberg LM GraafwaterCederberg LM Lambert`s BayCederberg LM LeipoldtvilleCederberg LM PaleisheuwelCity of Cape Town M Cape Town Drakenstein LM Bainskloof (Bainskloof TW)Drakenstein LM Drakenstein (Paarl Mountain TW & Cape Drakenstein LM Gouda (West Coast DM)Drakenstein LM Hermon Drakenstein LM Saron (Saron TW)George LM George Water WorksGeorge LM Haarlem Water WorksGeorge LM Uniondale Water Treatment WorksGeorge LM Wilderness Water WorksHessequa LM AlbertiniaHessequa LM GarciaHessequa LM GouritsmondHessequa LM HeidelbergHessequa LM VermaaklikheidHessequa LM WitsandKannaland LM CalitzdorpKannaland LM LadismithKannaland LM Van Wyksdorp WTWKannaland LM Zoar TownKnysna LM BelvidereKnysna LM Brenton -On-SeaKnysna LM Brenton-On-LakeKnysna LM Buffalo BayKnysna LM KarataraKnysna LM Knysna WTW and Desal PlantKnysna LM RheenendalKnysna LM Sedgefield WTW, Desal Plant, Emergency Laingsburg LM LaingsburgLaingsburg LM MatjiesfonteinLangeberg LM AshtonLangeberg LM BonnievaleLangeberg LM McGregorLangeberg LM MontaguLangeberg LM RobertsonMatzikama LM Bitterfontein DMAMatzikama LM EbenhaezerMatzikama LM KlawerMatzikama LM KliprandMatzikama LM KoekenaapMatzikama LM LutzivilleMatzikama LM Lutziville West Matzikama LM VredendalMossel Bay LM Friemersheim WSSMossel Bay LM Hebertsdale WSSMossel Bay LM Lodewykstenk WSSMossel Bay LM Mosselbaai/ Grootbrak/ Kleinbrak WSSMossel Bay LM Ruiterbos WSSOudtshoorn LM De RustOudtshoorn LM Klein Karoo Water Supply SchemeOudtshoorn LM OudtshoornOverstrand LM Baardskeerdersbos Supply SystemOverstrand LM Buffeljags Bay Supply SystemOverstrand LM Buffelsrivier Supply SystemOverstrand LM Greater Gansbaai Supply SystemOverstrand LM Greater Hermanus Supply SystemOverstrand LM Kleinmond Supply SystemOverstrand LM Pearly Beach Supply SystemOverstrand LM Stanford Supply SystemPrince Albert LM KlaarstroomPrince Albert LM LeeugamkaPrince Albert LM Prince AlbertSaldanha Bay LM Saldanda Bay Supply SystemsStellenbosch LM Blackheath (City Of Cape Town)Stellenbosch LM Faure System (City of Cape Town)Stellenbosch LM FranschhoekStellenbosch LM StellenboschStellenbosch LM Wemmershoek (City of Cape Town)Swartland LM Malmesbury Supply SystemSwartland LM Moorreesburg Supply SystemSwellendam LM Barrydale
WC
WC
1.1.3
68
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationSwellendam LM BuffelsjagrivierSwellendam LM SuurbraakSwellendam LM SwellendamTheewaterskloof LM BereavilleTheewaterskloof LM BotrivierTheewaterskloof LM CaledonTheewaterskloof LM Genadendal-WTWTheewaterskloof LM Grabouw WTWTheewaterskloof LM GreytonTheewaterskloof LM Riviersonderend WTWTheewaterskloof LM Tesselaarsdal WTWTheewaterskloof LM Villiersdorp WTWTheewaterskloof LM VoorstekraalWitzenberg LM Ceres Water Care WorksWitzenberg LM Op die Berg Water Care worksWitzenberg LM Prince Alfred Hamlet Water Care WorksWitzenberg LM Tulbagh Water Treatment WorksWitzenberg LM Wolseley Water Care WorksBela Bela Local Municipality Bela Bela/magalies water supply systemBela Bela Local Municipality Radium borehole water system Bela Bela Local Municipality Rapotokwane borehole water systemCapricorn District Municipality Alldays Water Supply systemCapricorn District Municipality Botlokwa Regional Water Supply SystemCapricorn District Municipality Lebowakgomo Water Supply SystemCapricorn District Municipality Mashashane Water Supply SystemCapricorn District Municipality Mogwadi Water Supply SystemCapricorn District Municipality Olifantspoort Water Supply SystemCapricorn District Municipality Senwabarwana Water Supply SystemsCapricorn District Municipality Zebidiela Water Supply SystemGreater Sekhukhune District Burgersfort Water Supply SystemGreater Sekhukhune District Fetakgomo Supply SystemGreater Sekhukhune District Flag Boshielo Water Supply SystemGreater Sekhukhune District Moroke BoreholeGreater Sekhukhune District Moutse Water Supply SystemGreater Sekhukhune District Ngwaabe Supply SystemGreater Sekhukhune District Nkosini Water Supply SystemGreater Sekhukhune District Roosenekal Water Supply SystemGreater Sekhukhune District Penge Water Supply SystemGreater Sekhukhune District TubatseGreater Sekhukhune District Vergelegen Water Supply SystemLephalale Local Municipality Lephalale LM/ Matimba WTP - Reticulation Lephalale Local Municipality Lephalale LM/ Zeeland WTP - Reticulation Lephalale Local Municipality Mokuruanyane Regional Water Supply Lephalale Local Municipality Seleka Water Supply SchemeLephalale Local Municipality Shongoane Water Supply SchemeLephalale Local Municipality Witpoort Regional Water Supply SchemeModimolle Local Municipality Mabaleng Res(Borehole MM 006/2010)Modimolle Local Municipality Mabatlane Res (Borehole MM 007/2010)Modimolle Local Municipality Modimolle/Magalies Water SystemMokgalakwena Local Municipality Mokopane MahwelerngMopani District Municipality DrakensigMopani District Municipality Ebenezer Mopani District Municipality FinaleMopani District Municipality Giyani Water supply areaMopani District Municipality Greater Tzaneen MunicipalityMopani District Municipality Letaba Politsi and ModjadjiMopani District Municipality LetsiteleMopani District Municipality MapuveMopani District Municipality Middle LetabaMopani District Municipality Muyexe Reverse OsmosisMopani District Municipality NkambakoMopani District Municipality NkowankowaMopani District Municipality NondweniMopani District Municipality Phalaborwa, Lulekani and NamakgaleMopani District Municipality SekororoMopani District Municipality SemarelaMopani District Municipality ThabinaMopani District Municipality ThapaneMopani District Municipality The OaksMopani District Municipality Tours Water Supply SystemMopani District Municipality Zava Package PlantPolokwane Local Municipality ChuenemajaPolokwane Local Municipality City PolokwanePolokwane Local Municipality Mankweng AreaPolokwane Local Municipality MolepoPolokwane Local Municipality Moletjie AreaPolokwane Local Municipality SeshegoThabazimbi Local Municipality Leeupoort Water SchemeThabazimbi Local Municipality Northam Water SupplyThabazimbi Local Municipality Rooiberg Water SchemeThabazimbi Local Municipality Schilpadnest Water SchemeThabazimbi Local Municipality The Greater Thabazimbi MagaliesVhembe District Municipality Elim Water SystemVhembe District Municipality Kutama Sinthumule Water SystemVhembe District Municipality Makhado (Louis Trichardt) Water SystemVhembe District Municipality Musekwa Water SystemVhembe District Municipality Musina Water SystemVhembe District Municipality Mutale water systemVhembe District Municipality Mutshedzi Water SystemVhembe District Municipality Nzhelele Water SystemVhembe District Municipality Thohoyandou Water SystemVhembe District Municipality Tshedza water supply systemVhembe District Municipality Tshifhire Murunwa Water SystemDr Ruth Segomotsi District Bogosing (Greater Taung LM - Managed by Dr Ruth Segomotsi District Buxton (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Dikhuting (Greater Taung LM Dr Ruth Segomotsi District Diretsaneng (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Draaihoek (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Leshobo (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Lokgabeng (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Longaneng (Greater Taung LM Dr Ruth Segomotsi District Loselong (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Lothwanyeng (Greater Taung LM Dr Ruth Segomotsi District Lotlhapong (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Madipelesa (Greater Taung LM Boreholes_ Dr Ruth Segomotsi District Mokasa 1 (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Mokasa 2 (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Mokgareng (Greater Taung LM Borehole_
WC
1.1.3
LP
NW
69
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationDr Ruth Segomotsi District Molelema (Greater Taung LM Dr Ruth Segomotsi District Morokweng (Greater Taung LM Dr Ruth Segomotsi District Tamasikwa (Greater Taung LM Borehole_ Dr Ruth Segomotsi District Tlapeng 1&2 (Greater Taung LM Dr Ruth Segomotsi District Vaaltuin (Greater Taung LM Boreholes_ Kgetleng River Local Municipality Derby B/HMadibeng Local Municipality Koster Madibeng Local Municipality SwartruggensMadibeng Local Municipality BritsMadibeng Local Municipality HartbeespoortMadibeng Local Municipality Rand WaterMaquassi Hills Local Municipaity Leeudoringstad-Witpoort SystemMaquassi Hills Local Municipaity Tswellelang-Lebaleng SystemMaquassi Hills Local Municipaity Wolwaransstad Bore hole SystemMatlosana Local Municipality City of Matlosana..Moretele Local Municipality Temba Treatment plantMoses Kotana Local Municipality Madikwe water treament plantMoses Kotana Local Municipality Molatedi water treatment plantMoses Kotana Local Municipality Pella water treatment worksMoses Kotana Local Municipality Vaalkop water treatment plantNgaka Modiri Molema District Ditsobotla:Itsoseng B/H / LichtenburgNgaka Modiri Molema District Mafikeng B/H + WTW: Combine in the Ngaka Modiri Molema District Ramotshere Moiloa: Dinokana + Ngaka Modiri Molema District Ramotshere Moiloa: Motswedi + GopaneNgaka Modiri Molema District Ramotshere-Moiloa Great Marico Package Rustenburg Local Muncipality Marikana SystemRustenburg Local Muncipality Rustenburg Boreholes SystemRustenburg Local Muncipality Rustenburg Town System Rustenburg Local Muncipality Vaalkop SystemTlokwe Local Municipality Potchefstroom (Tlokwe WTW) Ventersdorp Local Municipality Boikhutso Village (Bore Hole Supply Ventersdorp Local Municipality Boikhutsong village (Bore Hole Supply Ventersdorp Local Municipality Gamogopa village (Bore Hole Supply Ventersdorp Local Municipality Goedgevonden Village (Bore Hole Supply Ventersdorp Local Municipality Tsetse village (Bore Hole Supply System)Ventersdorp Local Municipality Ventersdorp (Water Treatment Works Ventersdorp Local Municipality Welgevonden village (Bore Hole Supply
Number of non-compliant water supply
systems monitored against the Blue Drop
Regulatory tool
250 144 144 Over by 44 Over by 44% Over achieved The reported total achievement per
region needs to be broken down as
per the list given in column D, and
Additional achievement to the APP
list not included in the list needs to
be reported as additionals.
40 40 PoE accepted for 10
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Hessequa Local Municipality Albertinia (Q2)
Hessequa Local Municipality Garcia (Q2)
Hessequa Local Municipality Gouritsmond (Q2)
Hessequa Local Municipality Heidelberg (Q2)
Hessequa Local Municipality Jongensfontein (Q2)
Hessequa Local Municipality Melkhoutfontein (Q2)
Hessequa Local Municipality Vermaaklikheid (Q2)
Hessequa Local Municipality Witsand (Q2)
Hessequa Local Municipality Matjiesfontein (Q2)
Hessequa Local Municipality no milestone for the quarter
Hessequa Local Municipality no milestone for the quarter
Laingsburg Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Swellendam Local Municipality no milestone for the quarter
Matzikama Local Municipality no milestone for the quarter
Matzikama Local Municipality no milestone for the quarter
Oudtshoorn Local Municipality no milestone for the quarter
Oudtshoorn Local Municipality no milestone for the quarter
Oudtshoorn Local Municipality no milestone for the quarter
1.1.3
NW
1.1.4
WC
70
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationPrince Albert Local Municipality no milestone for the quarter
Stellenbosch Local Municipality no milestone for the quarter
Matzikama Local Municipality no milestone for the quarter
Bergrivier LM Aurora Aurora PoE accepted
Bergrivier LM Eendekuil Eendekuil PoE accepted
Bergrivier LM Piketberg Piketberg PoE accepted
Bergrivier LM Porterville Porterville PoE accepted
Bergrivier LM Redelinghuis Redelinghuis PoE accepted
Breede Valley LM De Doorns De Doorns PoE accepted
Breede Valley LM Touwsrivier Touwsrivier PoE accepted
Breede Valley LM Worcester (De Koppen) Worcester (De Koppen) PoE accepted
Breede Valley LM Worcester (Stettnyskloof) Worcester (Stettnyskloof) PoE accepted
Drakenstein LM Paarl Paarl PoE accepted
Drakenstein LM Saron Saron PoE accepted
George LM George George PoE accepted
George LM Haarlem Haarlem PoE accepted
George LM Uniondale Uniondale PoE accepted
George LM Wilderness Wilderness PoE accepted
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Cederberg Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Hessequa Local Municipality
Knysna LM Buffalo Bay Buffalo Bay PoE accepted
Knysna LM Katarata Katarata PoE accepted
Knysna LM Knysna Knysna PoE accepted
Knysna LM Rheenendal Rheenendal PoE accepted
Knysna LM Sedgefield Sedgefield PoE accepted
Laingsburg Local Municipality Laingsburg Laingsburg PoE accepted
Laingsburg Local Municipality Matjiesfontein Reservoir Matjiesfontein Reservoir PoE accepted
Langeberg LM Ashton Ashton PoE accepted
Langeberg LM Bonnievale Bonnievale PoE accepted
Langeberg LM McGregor McGregor PoE accepted
Langeberg LM Montagu Montagu PoE accepted
Langeberg LM Non compliance letter Non compliance letter PoE accepted
Langeberg LM Robertson Robertson PoE accepted
Matzikama Local Municipality Action Plan feedback letter Action Plan feedback letter PoE accepted
Mosselbay Friemersheim Friemersheim PoE accepted
Mosselbay Herbertsdale Herbertsdale PoE accepted
Mosselbay Lodewykstenk Lodewykstenk PoE accepted
Mosselbay Ruiterbos Ruiterbos PoE accepted
Mosselbay Grootbak Grootbak PoE accepted
Mosselbay Kleinbrak Kleinbrak PoE accepted
Mosselbay Sandhoogte Sandhoogte PoE accepted
Hessequa Local Municipality
Hessequa Local Municipality
Laingsburg Local Municipality
Swellendam Local Municipality
Swellendam Local Municipality
Swellendam Local Municipality
Swellendam Local Municipality
Matzikama Local Municipality
Matzikama Local Municipality
1.1.4
WC
71
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationOudtshoorn Local Municipality
Oudtshoorn Local Municipality
Oudtshoorn Local Municipality
Prince Albert Local Municipality
Stellenbosch Local Municipality Paradyskloof Paradyskloof PoE accepted
Stellenbosch Local Municipality Franshoek Franshoek PoE accepted
Stellenbosch Local Municipality Stellenbosch (Idas Valley) Stellenbosch (Idas Valley) PoE accepted
TWK NCL TWK NCL ALL WTWs TWK NCL ALL WTWs
20 20
Amatole District municipality Ngqanda Borehole Water Supply (Q1)
Amatole District municipality Nkonkobe LM - Fort Beaufort WTW (Q1)
Amatole District municipality Peddie Network Supply (Q1)
Amatole District municipality Upper Mnyameni Network Supply (Q1)
Alfred Nzo
Baviaans Local Municipality Miller (Q1)
Baviaans Local Municipality Vondeling (Q1)
Buffalo City Local Municipality Peddie Supply Scheme (Q2) Peddie Peddie PoE accepted
Chris Hani District municipality Intsika Yethu (untreated) (Q2)
Tsolwana: Ntabathemba supply system
(Q2)
Ntabethemba Ntabethemba PoE accepted
Nkobongo Nkobongo
Jansenville (Q2) PoE accepted
Klipplaat (Q2)
Elundini LM - Ugie Rural (Boreholes &
Springs) (Q2)
Wolwefontein (Q2)
Joe Gqabi District municipality Elundini LM -Mount Fletcher Rural
(Boreholes & Springs) (Q2)
Joe Gqabi District municipality Gariep LM - Oviston (Oviston WTP) (Q3)
Senqu LM -Rossouw (Boreholes)(Q3)
Ugie Ugie PoE accepted
Oyster Bay(Q3) Oyster Bay Oyster Bay PoE accepted
Humansdorp Humansdorp PoE accepted
Hankey Hankey PoE accepted
Kou-Kamma Local Municipality Bilikiesdorp (Q3) Blikiesdorp Blikiesdorp PoE accepted
Kou-Kamma Local Municipality Clarkson (Q3) Clarkson Clarkson PoE accepted
Kou-Kamma Local Municipality Coldstream (Q3) Coldstream Coldstream PoE accepted
Krakeel (Q3) Krakeel Krakeel PoE accepted
Kareedouw Kareedouw PoE accepted
Joubertina Joubertina PoE accepted
Sandrift Sandrift PoE accepted
Stormsrivier Stormsrivier PoE accepted
Woodlands Woodlands PoE accepted
Sunday`s River Valley Local
Municipality
Louterwater (Q4) Louterwater Louterwater PoE accepted
Coffee Bay Coffee Bay PoE accepted
Mqanduli Mqanduli PoE accepted
Thornhill Thornhill PoE accepted
18 18 PoE accepted for 18
!Kai! Garib Local Municipality Alheit (Q1)
!Kai! Garib Local Municipality Aughrabies (Q1)
!Kai! Garib Local Municipality Cillie (Q1)
!Kai! Garib Local Municipality Currieskamp (Q1)
!Kai! Garib Local Municipality Kakamas Bulk Water (Q1)
!Kai! Garib Local Municipality Keimoes Bulk Water (Q1)
!Kai! Garib Local Municipality Lennertsville (Q1)
!Kai! Garib Local Municipality Lutzburg (Q1)
!Kai! Garib Local Municipality Marchand (Q1)
!Kai! Garib Local Municipality Riemvasmaak - Sending (Q1)
Dihlabeng Local Municipality Clarens Water Supply System (Q1)
!Kai! Garib Local Municipality Riemvasmaak - Vredesvallei (Q2)
!Kai! Garib Local Municipality Soverby (Q2)
Chris Hani District municipality
Camdeboo LM
Ikwezi Local Municipality
1.1.4
NC
EC
Joe Gqabi District municipality
Kouga Local Municipality
Kou-Kamma Local Municipality
OR Tambo District Municipality
WC
72
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationDikgatlong Local Municipality Barkley West (Q2) Barkley West Barkley West PoE accepted
Dikgatlong Local Municipality Blikfontein (Borehole) (Q2) Blikfontein Blikfontein PoE accepted
Dikgatlong Local Municipality Boetsap SAP (Borehole) (Q2) Boetsap Boetsap PoE accepted
Dikgatlong Local Municipality Delportshoop and Longlands (Sedibeng
Water) (Q2)
Delportshoop Delportshoop PoE accepted
Dikgatlong Local Municipality Eierfontein (Borehole) (Q2)
Dikgatlong Local Municipality Gong-Gong (Borehole) (Q2) Gong-Gong Gong-Gong PoE accepted
Dikgatlong Local Municipality Holpan (Borehole) (Q2) Holpan Holpan PoE accepted
Dikgatlong Local Municipality Kalkfontein (Borehole) (Q2)
Koopmansfontein (Q2) Koopmansfontein Koopmansfontein PoE accepted
Longlands Longlands PoE accepted
Longlands Clinic (Borehole) (Q2) Longlands Clinic Longlands Clinic PoE accepted
Longlands Sedibeng Longlands Sedibeng PoE accepted
Dikgatlong Local Municipality Pniel (Borehole) (Q2) Pniel Pniel PoE accepted
Dikgatlong Local Municipality Pniel Estate (Borehole) (Q2) Pniel Estate Pniel Estate PoE accepted
Dikgatlong Local Municipality Spitskop (Borehole) (Q2) Spitskop Spitskop PoE accepted
Dikgatlong Local Municipality Stillwater (Q2) Stilwater Stilwater PoE accepted
Dikgatlong Local Municipality Ulco (Mine) (Q3)
Windsorton (Q3) Novalpont Novalpont PoE accepted
Vaal Gamagara Vaal Gamagara PoE accepted
Gamagara Local Municipality Dibeng (boreholes )(Q3) Noupoort Noupoort PoE accepted
Gamagara Local Municipality Dingleton (Vaal Gamagara bulk supply
pipeline & Dingleton WTW) (Q3)
Gamagara Local Municipality Kathu (kathu WTW, Boreholes,
Vaalgamagara Bulk Supply) (Q3)
Gamagara Local Municipality Olifantshoek (Vaal gamagara Bulk Supply
Pipeline) (Q3)
Ga-Segonyana Local Municipality Bankhara-Bodulong (Managed by Ga-
Segonyana LM) (Q3)
Ga-Segonyana Local Municipality Kuruman-Wrenchville (Managed by Ga-
Segonyana LM) (Q3)
Ga-Segonyana Local Municipality Lokaleng (GLM Boreholes_Sedibeng
Water) (Q3)
Joe Morolong Local Municipality Bothetheletsa Groundwater Management
Area: D41L-M2 (Q3)
Joe Morolong Local Municipality Bothithong Groundwater Management Area
D41G-04 (Q3)
Joe Morolong Local Municipality Churchill Groundwater Management Area:
D41L-M10 (Q3)
Joe Morolong Local Municipality Laxey Groundwater Management Area
D41G-05 (Q3)
Joe Morolong Local Municipality Maipeng Groundwater Management Area
D41L-K9 (Q3)
Joe Morolong Local Municipality Manyeding A Groundwater Management
Area: D41L-M5 (Q3)
Joe Morolong Local Municipality Misgund (Q4)
Joe Morolong Local Municipality Sanddrif (Q4)
Joe Morolong Local Municipality Addo Supply (Q4)
Kamiesberg Local Municipality Enon Supply (Q4)
Kareeberg Local Municipality Glenconnor (Q4)
Kareeberg Local Municipality Kirkwood (Q4)
Kareeberg Local Municipality Paterson (Q4)
Kgatelopele Local Municipality Tsineng Groundwater Management Area:
D41L-M11 (Q4)
Magareng Local Municipality Van Zylsrus (Boreholes) (Q4)
Magareng Local Municipality Ward 1 Heuningvlei Area (Q4)
Magareng Local Municipality Garies (Q4)
Magareng Local Municipality Carnarvon (Q4)
Nama Khoi Local Municipality Vanwyksvlei (Q4)
Richtersveld Local Municipality Vosburg (Q4)
Richtersveld Local Municipality Idwala (Boreholes) (Q4)
Richtersveld Local Municipality Majeng Water Tank (Private) (Q4)
Dikgatlong Local Municipality
Dikgatlong Local Municipality
Dikgatlong Local Municipality
1.1.4
NC
73
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationRichtersveld Local Municipality Malekos Farm (Private) (Q4)
Umsobomvu Local Municipality Nazareth House (Private) (Q4)
Umsobomvu Local Municipality Warrenton (Q4)
Umsobomvu Local Municipality Buffelsrivier (Q4)
Umsobomvu Local Municipality Eksteenfontein (Q4)
Umsobomvu Local Municipality Lekkersing (Q4)
Umsobomvu Local Municipality Port Nolloth / Alexander Baai (Alexcor & 8
Myl)(Q4)
Umsobomvu Local Municipality Sanddrift (Q4)
Umsobomvu Local Municipality Norvalspont (TW)(Q4)
Umsobomvu Local Municipality Noupoort (boreholes)(Q4)
Namakhoi Buffelsrivier Buffelsrivier PoE accepted
22 22
Dihlabeng Local Municipality Rosendal Water Supply System (Q1)
Letsemeng Local Municipality Jacobsdal WTW (Q1)
Letsemeng Local Municipality Koffiefontein (Q1)
Letsemeng Local Municipality Luckhoff (Q1)
Letsemeng Local Municipality Oppermangronde (Q2) Oppermangronde Oppermangronde PoE accepted
Letsemeng Local Municipality Petrusburg (Q2) Petrusburg Petrusburg PoE accepted
Mafube LM
Maluti a Phofung Local Municipality Qwaqwa (Makwane WTW) (Q2) Makwane Makwane PoE accepted
Maluti a Phofung Local Municipality Harrismith (Wilge WTW) (Q2) Wilge Wilge PoE accepted
Maluti a Phofung Local Municipality Qwaqwa (Fika - Patso WTW) (Q2) Fika Patso Fika Patso PoE accepted
Thaba Nchu (Q3)
Rustfontein Rustfontein PoE accepted
Van Stadensrus Van Stadensrus PoE accepted
Excelsior Water Supply System (Q3)
Thaba Phatchoa Water Supply System (Q3)
Tweespruit Water Supply System (Q3)
Brandfort Brandfort PoE accepted
Verkeerdevlei Verkeerdevlei PoE accepted
PoE accepted
Matjhabeng LM Balkfontein (Sedibeng Water) Balkfontein (Sedibeng Water) PoE accepted
Virginia (Sedibeng Water) Virginia (Sedibeng Water) PoE accepted
Moqhaka LM
Nketoana LM
Metsimaholo Local Municipality Deneysville Deneysville PoE accepted
Moqhaka LM Kroonstad Kroonstad PoE accepted
Viljoenskroon Viljoenskroon PoE accepted
Ngwathe LM Parys Parys PoE accepted
Lindley Lindley PoE accepted
Reitz Reitz PoE accepted
Phumelela LM Parys Parys PoE accepted
Setsoto LM Warden Warden PoE accepted
Tokolokgo LM Hertzogville Hertzogville PoE accepted
Nala Local Municipality Balkfontein (Sedibeng Water) (Q3)
Naledi Local Municipality Dewetsdorp Supply System (Bloem Water)
(Q3)
Ngwathe LM
Setsoto LM
Tswelopele Local Municipality Bultfontein Supply Zone (Q3)
Tswelopele Local Municipality Hoopstad Supply Zone (Q3)
Tokolokgo LM
Bethulie Bethulie
Gariep Gariep
13 13
Amajuba District municipality Dannhauser LM - Dannhauser
(Dannhauser TW) - uTW (WSP) (Q1)
Dannhauser Dannhauser
Amajuba District municipality Dannhauser LM - Durnacol (Durnacol TW) -
uTW (WSP)(Q1)
Durnacol Durnacol
Amajuba District municipality Utrecht LM - Waterval Prison (Ngagane
TW) - uTW (WSP) (Q1)
Amajuba District municipality Utrecht LM- Utrecht (Utrecht TW) - uTW
(WSP) (Q1)
Utrecht Utrecht
iLembe District municipality Hlanganani (Q1)
Kopanong LM
Kopanong LM
Mangaung Local Municipality
Mantsopa Local Municipality
Masilonyana LM
Nketoana LM
Phumelela LM
1.1.4
NC
FS
KZN
74
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationiLembe District municipality Hlimbithwa Water Scheme (Q2)
iLembe District municipality Ifalethu (Q2)
iLembe District municipality Makwanini (Q2)
iLembe District municipality Mushane WTW (Q2)
iLembe District municipality Ohwebede (Q2)
Newcastle Local Municipality Charlestown Water System (Pixle ka Sema
TW) (Q2)
Sisonke District municipality Bulwer (Q2)
Sisonke District municipality Esiqandulweni (Q2)
Sisonke District municipality Nokweja (Q2)
Ugu District municipality Boreholes (Q2)
UMgungundlovu District
municipality
Appelsbosch (Q2)
UMgungundlovu District
municipality
Boreholes (Untreated) (Q2)
UMgungundlovu District
municipality
Embuthweni (Q2)
UMgungundlovu District
municipality
Gomane Boreholes(Q2)
UMgungundlovu District
municipality
Impendle Spring (Q2)
UMgungundlovu District
municipality
Lidgetton West (Q2)
UMgungundlovu District
municipality
Makeni (Q2)
UMgungundlovu District
municipality
Mpofana (Q2)
UMgungundlovu District
municipality
Mtulwa (Q2)
UMgungundlovu District
municipality
Ntanzi (Q2)
UMgungundlovu District
municipality
Nzinga (Q2)
UMgungundlovu District
municipality
Richmond (Q2)
UMgungundlovu District
municipality
Rosetta (Q2)
UMgungundlovu District
municipality
Springs (Untreated) (Q2)
UMgungundlovu District
municipality
Umgeni Bulk Supply (Q2)
Umkhanyakude District municipality Borehole Clusters (Q3)
Umkhanyakude District municipality Hluhluwe Phase2 (Q3)
Umkhanyakude District municipality Ingwavuma (Q3)
Umkhanyakude District municipality Malobeni (Q3)
Umkhanyakude District municipality Manguzi (Q3)
Umkhanyakude District municipality Mkuze (Q3)
Umkhanyakude District municipality Mpembeni (Q3)
Umkhanyakude District municipality Mseleni (Q3)
Umzinyathi District municipality Isandlwana Isandlwana
Nqutu LM - Qudeni WTW (Q3) Qhudeni Qhudeni
Uthukela District municipality Imbabazane - Loskop (rural scheme) (Q3)
Uthukela District municipality Indaka - Ekuvukeni Township and
surrounding Rural areas (Q3)
Uthukela District municipality Indaka - Tugela Estates (Q3)
Uthukela District municipality Okhahlamba - Langkloof (Q4)
Moyeni Zwelisha
Zululand District municipality Coronation (Q4) Coronation Coronation
Zululand District municipality Hlobane (Q4) Hlobane Hlobane
Zululand District municipality Louwsberg (Q4) Louwsberg Louwsberg
Zululand District municipality Masokaneni (Q4)
Zululand District municipality Mpungamhlope (Q4) Osingisingini Osingisingini
Zululand District municipality Sidinsi (Q4) Sidinsi Sidinsi
Tholakele (Q4)
Ceza Ceza
Pongola Pongola
Usuthu Usuthu
7 7
Dr. Ruth S Mompati District
Municipality
Draaihoek (Greater Taung LM Borehole_
Sedibeng Water) Q1)
Draaihoek (Greater Taung LM Borehole_
Sedibeng Water) Q1)
Dr. Ruth S Mompati District
Municipality
Kagisano-Molopo LM, Kagisano (Boreholes
- Botshelo Water) (Q1)
Zululand District municipality
NW
1.1.4
KZN
75
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationDr. Ruth S Mompati District
Municipality
Kagisano-Molopo LM, Molopo (Boreholes -
Botshelo Water) (Q1)
Dr. Ruth S Mompati District
Municipality
Lekwa Teemane LM- Christiana (Lekwa
Teemane LM) (Q1)
Lekwa-Teemane LM - Bloemhof (Q1)
Granspan Granspan PoE accepted
Khudutlou Khudutlou PoE accepted
Leshobo Leshobo PoE accepted
Lokgabeng Lokgabeng PoE accepted
Buxton Buxton PoE accepted
Dikhuting Dikhuting PoE accepted
Dr. Ruth S Mompati District
Municipality
Mamusa LM (Boreholes, Reseivoirs -
Mamusa lm)
Dr. Ruth S Mompati District
Municipality
Naledi LM (Boreholes/ Reservoirs - Naledi
LM) (Q2)
Dr. Ruth S Mompati District
Municipality
Ntshwanahatshe (Greater Taung LM
Boreholes_ Sedibeng Water) (Q2)
Dr. Ruth S Mompati District
Municipality
Takapori (Greater Taung LM Borehole_
Sedibeng Water) (Q2)
Moses Kotane Local Municipality Madikwe water treament plant (Q2)
Moses Kotane Local Municipality Vaalkop water treatment plant (Q2)
Rustenburg Local Municipality Rustenburg Boreholes System (Q2)
Ventersdorp Local Municipality Boikhutso Village (Bore Hole Supply
System) (Q2)
Moses Kotane Local Municipality Molatedi water treatment plant (Q3)
Moses Kotane Local Municipality Pella water treatment works (Q3)
Ventersdorp Local Municipality Boikhutsong village (Bore Hole Supply
System) (Q4)
Ventersdorp Local Municipality Gamogopa village (Bore Hole Supply
System) (Q4)
Ventersdorp Local Municipality Goedgevonden Village (Bore Hole Supply
System) (Q4)
Ventersdorp Local Municipality Tsetse village (Bore Hole Supply System)
(Q4)
Ventersdorp Local Municipality Ventersdorp (Water Treatment Works
Supply System) (Q4)
Ventersdorp Local Municipality Welgevonden village (Bore Hole Supply
System) (Q4)
Ventersdorp Local Municipality Tonga WSS (Q4)
Ventersdorp Local Municipality Machipe (Goederede) (Q4)
Ngaka Modiri Molema DM
24 24
Badplaas Badplaas
Bettygood Bettygood
Carolina Carolina
Ekulindeni Ekulindeni
Elukwatini Elukwatini
Empuluzi Empuluzi
Ferni Ferni
Mooiplaas Mooiplaas
Dipaleseng Local Municipality Balfour Balfour
Amersfoort Amersfoort
Volkrust Volkrust
Vukuzakhe Vukuzakhe
Wakkerstroom Wakkerstroom
Morgenzon Morgenzon
Standerton Standerton
Amsterdam Water Supply System (Q1) Amsterdam Amsterdam
Driefontein Water Supply System (Q1) Driefontein Driefontein
Piet Retief Water Supply System (Q1) Piet Retief Piet Retief
Piet Retief (New) Piet Retief (New)
Rural Water Supply System (Q1)
The Greater Mkhondo Local Municipality
(Q2)
Breyten Breyten
Davel Davel
Ermelo Northern Ermelo Northern
Ermelo Southern Ermelo Southern
Lothair Lothair
Dipaleseng Local Municipality The Greater Dipaleseng Local Municipality
(Q1)
Mkhondo Local Municipality Amsterdam Water Supply System (Q1)
Mkhondo Local Municipality Driefontein Water Supply System (Q1)
Mkhondo Local Municipality Piet Retief Water Supply System (Q1)
Mkhondo Local Municipality Rural Water Supply System (Q1)
Dr. Ruth S Mompati District
Municipality
NW
Rustenburg LM
Madibeng LM
Chief Albert Luthuli
Dr Pixley ka Semme Local
Municipality
Lekwa Local Municipality
Mkhondo Local Municipality
MP
Msukaligwa Local Municipality
1.1.4
Greater Taung LM
76
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMkhondo Local Municipality The Greater Mkhondo Local Municipality
(Q2)
Nkomazi Local Municipality Driekoppies/ Shoemansdal/ Buffelspruit/
Shongwe WSS (Q2)
Nkomazi Local Municipality Fig Tree/ Masibekele WSS (Q2)
Nkomazi Local Municipality Hectorspruit WSS (Q2)
Nkomazi Local Municipality Komatipoort WSS(Q2)
Nkomazi Local Municipality Langeloop WSS(Q2)
Nkomazi Local Municipality Low Creek WSS(Q2)
Nkomazi Local Municipality Madadeni WSS(Q2)
Umjindi Local Municipality Engwenyameni (Klipfontein)(Q2)
Umjindi Local Municipality Kwaggafontein System(Q2)
Umjindi Local Municipality Kwamhlanga(Q2)
Umjindi Local Municipality Langkloof(Q2)
Umjindi Local Municipality Moloto (Q2)
Umjindi Local Municipality Thembalethu(Q2)
Umjindi Local Municipality Emjindini Trust water supply scheme
(Boreholes)(Q2)
Umjindi Local Municipality Rimer`s water treatment works / Barberton
water scheme (Q2)
Nkomazi Local Municipality Magudu WSS (Q2)
Nkomazi Local Municipality Malalane WSS (Q2)
Nkomazi Local Municipality Marloth Park WSS (Q2)
Nkomazi Local Municipality Mbuzini WSS (Q2)
Nkomazi Local Municipality Naas/Block C WSS (Q2)
Nkomazi Local Municipality Nkomazi Rudimentary Boreholes (Q2)
Nkomazi Local Municipality Ntunda WSS (Q2)
Nkomazi Local Municipality Nyathi WSS (Q2)
Sibange WSS (Q2)
Thaba Chweu
Greater Sekhukhune District
Municipality
Mapodile p. Station (Q1)
Greater Sekhukhune District
Municipality
Marishane Water Supply System (Q1)
Greater Sekhukhune District
Municipality
Moroke Borehole (Q1)
Greater Sekhukhune District
Municipality
Moutse Water Supply System (Q1)
Greater Sekhukhune District
Municipality
Ngwaabe Supply System (Q1)
Greater Sekhukhune District
Municipality
Vergelegen Water Supply System (Q3)
Lephalale Local Municipality Mokuruanyane Regional Water Supply
Scheme (Q3)
Mopani District municipality Semarele (Q3)
Mopani District municipality The Greater Mopani District municipality
(Q3)
Vhembe District municipality Elim Water System (Q4)
Vhembe District municipality Kutama Sinthumule Water System (Q4)
Emfuleni DM
LP
GP
MP
Nkomazi Local Municipality
Bushbuck ridge
1.1.4
77
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationNumber of dams evaluated for compliance
with dam safety regulations by Approved
Professional Persons (APPs)
160 36 Grand total: 65
27 (APP)
38 (Additional)
A total of 65 were monitored of which:
27 are in the APP &
38 are additional
Over by 29 45% A total of 65 were monitored of which:
27 are in the APP &
38 are additional
The actual number will fluctuate
depending on workload of Approved
Professional Persons who do the work.
Did submission to DG to request to
amend the target description (Waiting for
approval).
0 0 0 0 0
A211/52 Klipfontein No1 Reservoir
A211/54 Centurion Silt Dam
A211/57 Eskom Convention Centre Dam
4 4 4 4
A212/41 Emmarentia Dam
A212/46 Westdene Dam
A212/61 Leeukop-Korf Dam
A212/62 Leeukop-Skilpad Dam
A213/52 Hippo Dam
A230/08 Bon Accord Dam
A231/34 Primula Flood Structure
A231/35 Premier Mine No.7 Slimes Dam
A231/47 General Louis Botha Drive Flood
Attenuation Structure
A231/48 Bronberge Reservoir
A231/50 Devillebois Vloed Struktuur
C110/13 Bethal Dam
C110/16 Willem Brummer Dam
C111/58 Goedehoop Dam
C112/56 Rooijan Dam
C114/02 Grootdraai Dam
C114/49 Kromdraai Dam Kromdraai Dam Kromdraai Dam Kromdraai Dam
C120/01 Vaal Dam
C122/37 Rusticana Dam
C122/39 Rusticana Dam 2
C123/42 Grootvlei 453 Dam
C132/13 Kleinfontein 357 Dam
C133/12 Vrede/Thembalihle Dam
C211/27 Rietspruit Dam 1
C211/28 Rietspruit Dam 2
C212/21 Rietfontein Westelike Vloedvertragings Dam
C212/22 Rietfontein Oostelike Vloedvertragings Dam
C212/57 North Ridge Reservoir
C212/60 Brakpan No3 Reservoir
C212/64 Holfontein Cell 7
C221/51 Germiston Reservoir
C221/52 Klipriviersberg No 1 Reservoir
C221/53 Klipriviersberg No 2 Reservoir
C221/55 Forest Hill No 2 Reservoir
C222/36 Doornpoort Return Water Doornpoort Return Water Doornpoort Return Water Doornpoort Return Water
C223/43 Sasolburg Reservoir
C230/04 Boskop Dam
C231/42 Donaldson Dam
C231/77 Libanon No 3 Reservoir
C231/80 Adma Dam Adma Dam Adma Dam Adma Dam
C232/51 Deelkraal Dam
C232/53 Leeudoorn Return Water Dam
C801/10 Sterkfontein
C804/38 Emden Dam
C804/46 Morgenzon Dam
C805/44 Middelpunt Dam
C805/61 Miemiesrust Dam
C805/62 Boston A Dam
C121/75 Lang Dam Lang Dam Lang Dam Lang Dam Lang Dam is not in the APP
1 1 1
A215/47 Middelkraal Dam
A216/46 Crocodile River Mine Return Water Dam
A220/02 Olifantsnek Dam
A220/09 Swartruggens Dam
A223/51 Prison Dam
A224/28 Lengua Dam (Previously Bakubung Dam)
A224/30 Sun City Dam
A230/06 Bischoffs Dam
A232/35 Hartebeesthoek Reservoir
A233/31 Bospoort Dam
A233/34 Buffelspruit Dam
A234/28 Nooitgedacht Dam
A245/01 Amandelbult Tailings Return Water Dam
A300/03 Klein Maricopoort Dam
A301/18 Rietvallei Dam
A302/17 Roodesloot Dam
A304/22 Bloemfontein Dam (Was A303/17)
C301/23 Taung Dam
C301/31 Holfontein Dam
D410/02 Disaneng Dam Dam
D411/26 Lotlamoreng Dam
A233/24 Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam is not in the
APP
3 3 3
A401/07 Motlobo Dam
A402/42 Rietpoort Dam
A402/50 Inelkander Dam
A601/22 Suid-Holland Dam
A602/54 Rietfontein Dam 7
LP
GP
NW
LP
1.1.5
Compliance Monitoring and Enforcement
Over achieved
78
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationA703/30 Waterpoort Dam
A901/42 Damani Dam
A901/56 Moddervlei N02 Dam (Bush)
A901/58 Moddervlei Nr3 Dam(Mac)
A901/59 Moddervlei No1 Dam(Salani)
A901/65 Vis Dam No 2
B800/17 Dap Naude Dam No report received No report will report in Q3 Will report in Q3 No report - will report in Q3
B800/19 Duivelskloof Dam
B801/74 Fish Eagle Dam
B801/82 Thabina Dam
B801/AH Malole Dam
B801/AP Bo Cramer Dam
B801/AQ Tubb'shill-Bottom Dam
B801/DY Tubb's Hill Top Dam
B802/45 Leeudraai Dam
B901/03 Silwervis Dam
B901/06 Shingwidzi Dam
B902/09 Makuleke Dam
B800/15 Altenzur Dam Altenzur Dam Altenzur Dam Altenzur Dam Altenzur Dam is not in the APP
B801/BJ Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam Leonora (Tsjokwane) Dam is not in
the APP
B800/21 Hans Merensky Dam Hans Merensky Dam Hans Merensky Dam Hans Merensky Dam Hans Merensky Dam is not in the
APP
4 4 4
B101/84 Isibonela Attenuation
B102/58 Dam N0.5
B103/29 Kromdraai Dam
B103/33 Hendrina Powerstation Raw Water Terminal
Reservoirsno.1&2
B103/36 Hendrina-Dorps Dam
B103/68 Coastal Coal
B201/38 Goedgedacht Dam
B202/33 Kusile P.S. Raw Water Reservoir
B320/03 Roodepoort Dam
B321/43 S-Dam
B321/44 Winkel Dam
B323/16 Funda-Mlimi Middle Dam (Gemsbokfontein
No.1)
B400/26 De Hoop Dam
B401/44 Belfast Dam
B402/39 Tweefontein Mine Return Water Dam
B402/45 Helena Return Water Dam A
B403/39 Bendu Dam
B501/11 Flag Boshielo - Was Arabie Dam
X103/67 Dawn View Dam
X200/64 My Own
X201/89 River Dam
X202/84 Somerset Dam
X205/73 Maroela Dam
X205/92 Lochmseleni Dam Lochmseleni Dam Lochmseleni Dam Lochmseleni Dam
X205/AA Newu Dam
X205/AM Exotica
X301/96 Lake Panic 2 Dam
X301/AO Bongani Dam
X302/32 Acornhoek
B100/04 Witbank Dam Witbank Dam Witbank Dam Witbank Dam Witbank Dam is not in the APP
B501/14 Mahlangu Dam Mahlangu Dam Mahlangu Dam Mahlangu Dam Mahlangu Dam is not in the APP
B101/36 Rietspruit Dam Rietspruit Dam Rietspruit Dam Rietspruit Dam Rietspruit Dam is not in the APP
1 1 1
C241/17 Buffelsfontein Evaporation Dam
C241/37 (Chemwes) Kareerand Tailings Dam
C242/48 West Complex Storm Water Dam
C242/52 Ratzegaai Dam
C400/08 Mushroom Valley Dam
C401/34 Barolong Dam
C401/36 Eden Dam
C402/37 Wolwas Dam Nr. 1
C402/43 Wolwas Nr.2
C402/44 Sparta Dam
C402/48 Dresden Dam
C403/35 De Put Grond Dam
C403/36 De Put Keerwal
C403/45 Petra Dam
C404/80 Freegold New Return Water Dam
C404/AV Riebeeckstad Reservoir 1
C404/AW Riebeeckstad Reservoir 2
C404/BC Eendoorn Dam
C405/36 Cronjespruit Dam 1
C405/37 Abrahams Hof Dam
C405/38 Palmietfontein Dam
C510/09 Fouriespruit Dam
C514/36 Hk Balancing Dam
C520/02 Krugersdrift
C520/08 Mazelspoort
C521/37 Goedgenoeg Dam
C522/31 Quin-Se-Dam
C600/06 Strydom Dam
C600/15 Serfontein Dam
C601/01 Bloemhoek Dam
C601/29 Taaibosdal Dam
C602/22 Rietfontein
C700/06 Uniefees (Langdam)
MP
FS
LP
1.1.5
79
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationC702/18 Vliegenkraal Dam
D132/13 Holspruit Dam
D132/29 Oorlogspoort Dam (Same As D132/11
Amersham Dam)
D140/04 Molteno Dam
D142/21 Harmsfontein Dam
D142/23 Klipfontein
D142/25 Oudeklip-Modderfontein Dam
D142/26 Krompoort Dam
D142/28 Plat Dam
D142/44 Kraaifontein Dam
D200/10 Tweespruit Dam
D201/44 Verdun Dam
D201/51 Meulspruit
D202/54 Moperi Dam
D204/48 Donkerpoort Scheme Dam
D204/62 Sterkwater Sterkwater Sterkwater Sterkwater
D310/02 Hartebeestfontein Dam
D310/12 Knapsak Dam
D330/27 Petrusville Dam
D342/12 Rietfontein Dam
D350/21 Viljoens Dam
D350/32 Eselzhoek Dam
3 3 3
C900/07 Bloemhof Dam
D540/09 Masolkakop Dam Masolkakop Dam Masolkakop Dam Masolkakop Dam
D540/10 Jaskloof-Sedam
D550/03 Loxton Dam
D551/13 Helpmekaar Dam
D600/02 Aspeling Dam
D603/15 Wortelfontein Dam
D801/18 Lake Grappa Dam Lake Grappa Dam Lake Grappa Dam Lake Grappa Dam Lake Grappa Dam is not in the APP
D730/37 Neusberg Weir Neusberg Weir Neusberg Weir Neusberg Weir Neusberg Weir is not in the APP
42 42 42
E100/26 Trap Se Dam
E100/72 Driefontein Dam
E100/AA Olyvenboschkraal Dam
E100/AR Middeltuin Dam
E100/BA Bokant Huis Dam
E100/BD Vaalwater Dam
E200/12 Zeekoegat-Nuwe Dam
E201/38 Brakfontein Weir (Elandsvlei Dam)
E201/83 Uitkyk-Groot Dam Uitkyk-Groot Dam Uitkyk-Groot Dam Uitkyk-Groot Dam
E201/87 Weltevrede-Groot No.1-Dam
E201/88 Weltevrede-Groot No.3-Dam
E201/89 Weltevrede-Groot No9-Dam
E201/90 Weltevrede-Boonste Dam
E201/91 Weltevrede-Perdekloof Dam
E201/92 Weltevrede-Sekretaris Dam
E201/99 Morester-Heiveld Dam
E201/AC Disakloof (Formerly
Wydekloofkaffersdaldam)
E201/AI Sandfontein No.1-Dam
E201/AK Lang No.2-Dam
E201/AN Die Kloof Nuwe No.1 Dam Die Kloof Nuwe No.1 Dam Die Kloof Nuwe No.1 Dam Die Kloof Nuwe No.1 Dam
E201/CO Swart Dam
E201/DB Diep Dam
E201/DI Jakkalsfontein Dam
E201/DV Middel Dam
E304/12 Melkboom Dam
G100/27 Mountain Dam Mountain Dam Mountain Dam Mountain Dam
G100/29 Hermitage Dam(Previously Moutons Valley
Dam)
Hermitage Dam(Previously Moutons Valley Dam) Hermitage Dam(Previously Moutons Valley Dam) Hermitage Dam(Previously Moutons Valley Dam)
G101/97 Nieuwedorp Dam
G101/AD Dundarach Main Dam
G101/AG La Valle Dam
G101/AN Calais Dam
G101/AS Rachelsfontein Big Dam
G101/AZ Beaucoup-L'eau Dam
G101/BI Allendale Plaas Dam
G101/BL Hoenderhok Dam
G101/BR Simonsberg Dam H
G101/BT Stellengift Dam C
G101/BV Salomonsvlei
G101/BW Dal Weiding Stormwater Control Dam Dal Weiding Stormwater Control Dam Dal Weiding Stormwater Control Dam Dal Weiding Stormwater Control Dam
G101/CH Maritz Dam
G101/DE Donkerhoek Dam
G101/DG Roelanda Dam
G101/DL Top Dam (Was Backsberg Nr5 Dam)
G101/DY Smit Groot Dam
G101/EA Adrem Dam
G101/EB St Loucia Dam
G101/ED Rooiheuwel Dam
G101/EQ Bottom
G101/ES Middle
G101/EY Klein Normandie Dam
G101/EZ Vergesicht Dam
G101/FA De Hoop Dam
G102/87 Roodezands Dam
G102/89 Grootskuur Dam
G102/91 Blou Am
G102/95 Vlei Dam
G102/AD Modderasvlei-Huis Dam
G102/AE Diepkloof Dam
G102/AU Allesverloren-Boonste Dam
FS
NC
WC
1.1.5
80
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationG102/AV Allesverloren Groot Dam
G102/BB Steinthal Klipfontein Dam
G102/BC De Hof Dam De Hof Dam De Hof Dam De Hof Dam
G102/BX Rijk's Dam No 3
G102/BY Rijk's Dam No 4
G103/06 Januarieskraal Dam Januarieskraal Dam Januarieskraal Dam Januarieskraal Dam
G104/93 Langberg Main Dam
G104/94 Moutons Valley Upper Mountain Dam
G104/97 Diepkloof Rooiklip
G104/98 Achtervlei-Sement Dam
G104/AB Tierkloofno.2-Dam
G104/AE Voorstevlei-Groot No.3-Dam
G104/AF Vark Dam
G104/AI Voorberg-Bronberg Dam
G104/AK Voorberg-Wjm Dam
G104/AP Boplaas Dam
G104/AZ Sig Dam
G104/BG Perskeboord Dam
G104/BT Platkloof Dam
G104/BX Dasboschkloof Dam Dasboschkloof Dam Dasboschkloof Dam Out of scope Dasboschkloof Dam Out of scope Report not signed
G104/BY Platkloof Dam
G104/CD Groot Groot Groot Groot
G202/66 Goedgedacht No.1-Dam
G202/73 Weltevreden-Groot Dam
G202/84 Bordeaux Dam
G202/87 Kromrivier Dam
G202/89 Mollenbergkloof Dam
G202/93 Moreson Dam
G202/94 Weltevreden Dam
G202/AA Jenifer Dam
G202/AB Wynkeldershoek Nr2 Dam
G202/AE Marchese Dam
G202/AW Bergsig Dam (Previously
Joostenbergvlakte)
G202/AX Rooidraai
G203/73 Erf 20635 Belville Ds Dam (Same As
G203/77?)
G204/70 Simonsig Big Dam
G204/74 Helderberg-Kloof Dam
G204/89 Weltevrede Dam
G204/90 Nooitgedacht-Grootvlei Dam
G204/AC Neethlingshof Dam
G204/AX Zevenfontein Groot Dam
G204/BA Dennebos Dam
G204/BC Wemmershoek Dam
G204/BO Langverwacht Bottom Dam
G204/BT Thelema Dam
G204/BV Welgevallen Dam
G204/BZ Die Kom Dam
G204/CD Quoin Rock Dam A
G205/67 Knorhoek Dam
G301/13 Wagenboomsrivier-Onder Dam
G301/36 Kromantonie Nr2 Dam
G400/19 Saddle Dam
G400/31 Twaalffontein Dam Twaalffontein Dam Twaalffontein Dam Twaalffontein Dam
G400/36 Skaapkraal Dam
G401/61 Helderfontein Small Dam
G401/76 Kromriverdam
G401/81 Applethwaite Lake
G401/83 Pickstone Dam Pickstone Dam Pickstone Dam Pickstone Dam
G401/89 Beukesdal Dam
G401/95 Groenrug Dam Groenrug Dam Groenrug Dam Groenrug Dam
G401/AE Jakkalsrivier Dam
G401/AI Grand Canyon Dam
G401/AN Olifantsvlei Dam Olifantsvlei Dam Olifantsvlei Dam Olifantsvlei Dam
G402/52 Eerstehoop-Wit Dam
G402/54 Waboomskloof Dam
G402/62 Klei Dam
G402/70 Twaalffontein Top Dam Twaalffontein Top Dam Twaalffontein Top Dam Twaalffontein Top Dam
G402/74 Maremmana Dam Previously Botrivier Dam
G402/77 Highlands/Iona Dam
G404/62 New Dam (Was Waboomsrivier Top Dam)
G501/15 Klein-Sanddrif Klein-Sanddrif Klein-Sanddrif Klein-Sanddrif
G501/26 Uintjieskuil Dam Uintjieskuil Dam Uintjieskuil Dam Uintjieskuil Dam
H100/19 Paardekloof-Wit Dam
H101/64 Bos Dam
H101/70 Rooikloof Dam
H101/74 De Liefde Dam
H101/77 Rooiwal Dam
H101/87 Buchuland Upper Dam
H101/88 Buchuland Middle Dam
H101/91 Bordeaux Dam
H101/93 Hartebeestvalley Dubbel Dam
H101/95 Hartebeestvalley Fish Dam
H101/96 Wakkerstroom-Geel Dam
H101/97 Witsand Dam (Same As Groot Dam
H101/Cp)
H101/AD Waaihoek Dam
H101/AE Loxtonia Bo-Dam
H101/AT Meul Dam
H101/BD Romans River Dam
H101/BS Vadersgawe Dam
H101/BT Romansrivier Dam
H101/CS Kliprivier Dam
H101/CU Normandie 2
H200/47 Waltham Dam
H200/49 De Vlakte No.2-Dam
WC
1.1.5
81
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationH300/21 Uitkykdam
H300/22 Bergplaas Big Dam
H300/24 Valletjies Dam Valletjies Dam Valletjies Dam Valletjies Dam
H300/26 Riethoek-Groot Dam
H300/42 Goedemoed No.2-Dam
H400/02 Keerom Dam
H401/60 Memel-Huis Dam
H401/61 Wilgerboom Dam
H401/64 Voorregsvlei Dam
H401/68 Kalkbank Dam
H401/71 Moordkuilsdrif
H402/45 Dasbos Dam
H402/46 Zevenberg Dam
H402/62 Eureka
H402/63 Eureka No .2 Dam
H402/66 Mcgregor-Nuwe Dam No.1
H402/79 Brandvlei-Wit Dam
H402/99 Klipdrift (Modderriver) Dam
H402/AG Boskloof Dam
H402/AL Gat
H402/AQ Gannakloof Dam
H402/AT Bo-Dam
H500/09 Waterval-Groot Dam Waterval-Groot Dam Waterval-Groot Dam Waterval-Groot Dam
H500/12 Goudmyn Zuidr-Groot
H600/53 Meerlustkloof Dam
H600/63 Helderstroom-Donkerhoek Dam
H600/65 Waterkloof No.2 Dam
H600/79 Longdown Dam
H700/89 Sika Hoof Dam
H800/03 Duivenhoks Dam
J112/10 Damfontein Dam
J112/18 Dam-Met-Eiland No.1
J121/14 Karrona-Boonste Dam
J121/21 Aartappel Dam
J210/02 Stolsrivier Dam
J230/01 Oukloof Dam
J232/08 Angeliersbosch Dam
J240/03 Rietkloof Dam
J251/66 Rooi Dam
J251/68 Boonste Dam
J252/11 Rooikloof Dam
J331/41 Hooggenoeg-Ou Dam
J331/42 Standbeeld-Se-Dam
J332/11 Klaarstroom Dam
J332/13 Begrafplaas Dam
J333/18 Voelgesang-Bo Dam Voelgesang-Bo Dam Voelgesang-Bo Dam Voelgesang-Bo Dam
J333/19 Voelgesang-Kloof-Onder Dam Voelgesang-Kloof-Onder Dam Voelgesang-Kloof-Onder Dam Voelgesang-Kloof-Onder Dam
J333/22 Vergelegen Dam
Still Dam (Originally Called De Rust
Dam)
Still Dam (Originally Called De Rust Dam)
Breevlei No.1-Dam Breevlei No.1-Dam
Lentelus No.3-Dam Lentelus No.3-Dam
K300/33 Lakeview Dam Lakeview Dam Lakeview Dam Lakeview Dam
Hentie Henning Hentie Henning
Patrick Rawlings Dam Patrick Rawlings Dam
Buffelsrivier Dam 1 Buffelsrivier Dam 1
Buffelsrivier Dam Buffelsrivier Dam
K700/04 Buffelsrivier Dam 3
G400/06 Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal Dam1) Huisrivier Dam (Formerly Arieskraal
Dam1) not in the APP
H600/66 Panorama Dam, Panorama Dam Panorama Dam Panorama Dam Panorama Dam not in the APP
H500/08 Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam Joubertsdal-Vaalkops Dam not in
the APP
G204/AQ Chardonnay Dam Chardonnay Dam Chardonnay Dam Chardonnay Dam Chardonnay Dam not in the APP
G203/75 Doordekraal Dam Doordekraal Dam Doordekraal Dam Doordekraal Dam Doordekraal Dam not in the APP
H100/18 Stettynskloof Dam Stettynskloof Dam Stettynskloof Dam Stettynskloof Dam Stettynskloof Dam not in the APP
H200/25 Fairy Glen Fairy Glen Fairy Glen Fairy Glen Fairy Glen not in the APP
G101/87 Victoria Dam Victoria Dam Victoria Dam Victoria Dam Victoria Dam not in the APP
G401/90 Saal Dam Saal Dam Saal Dam Saal Dam Saal Dam not in the APP
G200/18 Idasvalley No2 Dam Idasvalley No2 Dam Idasvalley No2 Dam Idasvalley No2 Dam Idasvalley No2 Dam not in the APP
H401/73 Conradie Servituut Dam Conradie Servituut Dam Conradie Servituut Dam Conradie Servituut Dam Conradie Servituut Dam not in the
APP
J350/22 South Cape Produce Dam 1 (Previouly
South Hops Dam no3)
South Cape Produce Dam 1 (Previouly South
Hops Dam no3)
South Cape Produce Dam 1 (Previouly South
Hops Dam no3)
South Cape Produce Dam 1 (Previouly South
Hops Dam no3)
South Cape Produce Dam 1
(Previouly South Hops Dam no3) not
in the APPG400/09 Boomerang Dam Boomerang Dam Boomerang Dam Boomerang Dam Boomerang Dam not in the APP
H101/64 Bos Dam Bos Dam Bos Dam Bos Dam Bos Dam not in the APP
H900/27 Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove Dam) Melkhoutfontein Dam (Olive Grove
Dam) not in the APP
G100/25 Bethel Dam Bethel Dam Bethel Dam Bethel Dam Bethel Dam not in the APP
G100/30 Nantes Dam Nantes Dam Nantes Dam Nantes Dam Nantes Dam not in the APP
G205/74 Boskloof Dam Boskloof Dam Boskloof Dam Boskloof Dam Boskloof Dam not in the APP
H101/AU Kanet-Vlei Dam Kanet-Vlei Dam Kanet-Vlei Dam Kanet-Vlei Dam Kanet-Vlei Dam not in the APP
H402/BE Noreen Dam1 Noreen Dam1 Noreen Dam1 Noreen Dam1 Noreen Dam1 not in the APP
WC
1.1.5
82
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationH402/BF Noreen Dam2 Noreen Dam2 Noreen Dam2 Noreen Dam2 Noreen Dam2 not in the APP
G204/CF Shemara Dam Shemara Dam Shemara Dam Shemara Dam Shemara Dam not in the APP
K800/01 Landman Dam 4 4 4
K800/13 Dennegeur Dam (Also Fingo Ground Dam
See K800/09)
K800/19 Lieu Amor Dam
K800/59 Fingo Dam No.4 (Previously Nuwevlei Dam
K800/40)
K800/60 Fingo Dam No.6 (Previously Ben Dam
K800/38)
K800/69 Kromhout Dam
K800/81 Langfontein Dam 2
K901/78 Holding Reservoir
L112/03 The Vale Dam
L221/02 Kruidfontein No.3 Dam
L600/01 Klipfontein Dam
L700/41 Wolwefontein Dam
L820/01 Kouga Dam (Paul Sauer Dam)
L820/54 Jaydee Dam
L820/98 Black Ginger Dam
M100/07 Rietfontein Dam (Previously:Wally Holmes)
M100/11 Steyn's Dam
N110/01 Bloemhof
N140/18 De Hoop
P102/14 Table Hill Big Dam
P300/14 Le Grange Dam
P400/04 Rosslyn Dam
P400/05 Kenkele Dam
P400/06 Pinedale Dam
P400/24 Golden Ridge Dam
P400/25 Belmont Dam 1 (Was Fairyvale P400-02)
Q130/01 Grassridge Dam
Q921/12 Drieshof Dam
R102/02 Dimbaza Dam - Ciskei
R201/25 Rooikrans Dam-Ciskei
R202/18 Mdantsane Wwtw Effluent Dam 3
R302/22 Tanga Dam
S300/06 Waterdown Dam
S302/33 Glenbrock Dam
S302/49 Pensula Farm Dam
S600/05 Wriggleswade Dam
S702/08 Gcuwa Dam
T300/04 Mountain Dam
T301/24 Ugie Dam
T302/59 Cengane Dam
T304/26 Welbedacht Dam
T304/70 Mountain Lake Dam
T305/30 Roodeberg Dam
T305/36 Stryd-Kop Dam
T902/23 Nqadu Dam (Willowvale)
R402/12 Tomatoe Dam Tomatoe Dam Tomatoe Dam Tomatoe Dam Tomatoe Dam is not in the APP
W930/46 Sinqumeni Dam Sinqumeni Dam Sinqumeni Dam Sinqumeni Dam Sinqumeni Dam is not in the APP
R101/04 Pleasantview Dam Pleasantview Dam Pleasantview Dam Pleasantview Dam Pleasantview Dam is not in the APP
T201/06 Mabeleni Dam Mabeleni Dam Mabeleni Dam Mabeleni Dam Mabeleni Dam is not in the APP
3 3 3
T402/09 Brairglendam
T402/10 Roselandsdam
T501/24 Goxhill Dam
T501/37 Dartford Dam
T501/44 Castleburn Dam
T501/53 Scottston Dam
T501/73 Goxhill Dam 2
T502/21 Traveller's Rest Dam
T502/23 Amanzimnyama Dam
U100/14 Max Lake
U100/67 Donegal Dam
U100/71 Springbrook Dam
U201/45 Brookdales Dam
U201/86 Elderslie Dam No 14886
U201/91 Chiltern Dam
U201/BB Syndicate Dam
U203/56 Tedder No2 Dam
U302/15 Claremont Farm Dam
U401/34 Erica Dam
U402/10 Plaas Dam
U402/13 Hartebeesfontein Dam
U403/12 Essery
U500/01 Newsondela Dam (Nonoti)
V101/61 Kopanong Dam
V103/07 Qedusizi Dam
V105/35 Drakensberg Sun Dam Drakensberg Sun Dam Drakensberg Sun Dam Drakensberg Sun Dam
V201/36 Castle Howard Dam 1
V201/55 Springvale Bottom Dam
V201/58 Littlefalls Dam
V201/AD Berning Dam
V201/AO Spring Grove
V301/30 Mahawane Dam
V301/33 Torrington 7386 Dam No.1 (Same As
B193/2/V301/52?)
V301/34 Van Der Westhuizen Dam
V301/94 White House Dam
WC
EC
KZN
1.1.5
83
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationV301/AA Mrs Sampson Dam
V302/43 Ellies Glen Dam
V302/56 Mrs Theron Dam
V303/36 Grootspruit Dam Owned By Pr Steenkamp
V701/20 Lake Murray
W110/21 Ashill
W121/44 Melmoth Off-Channel Storage
W121/45 Bedhlane
W121/47 Wallenton
W122/07 Lake Mzingazi
W122/16 Lake Nhlabane
W221/11 Sankunzi Dam
W300/05 Vaalbank Dam
W301/21 Boulder Dam (Coronation)
W301/31 Uitschot Dam 6
W303/20 Mzinene Dam
W410/07 Mooihoek Dam
W421/08 'E Dumbe Dam
W430/01 Nduma Dam
W440/01 Pongolapoort Dam
W440/41 Koedoesberg No2 Dam Koedoesberg No2 Dam Koedoesberg No2 Dam Koedoesberg No2 Dam Koedoesberg No2 Dam is not in the
APP
W440/06 Koedoesberg Besproeings Koedoesberg Besproeings Koedoesberg Besproeings Koedoesberg Besproeings Koedoesberg Besproeings is not in
the APP
Number of water users monitored for
compliance
384 99 Grand total: 103 APP
103 (APP)
110 (Additional)
A grand total 213 water users were monitored of
which
103 are in the APP &
110 are additoinal
Over by 4 on the APP A grand total 213 water users were monitored of
which
103 are in the APP &
110 are additoinal
Over achieved due to recovery reports
from Q1 and amendments on APP
(Submission will be done to Act DG for
amendment of quarters and requests
from Provinces to replace users)
Submission will be done to Act DG
for amendment of quarters and
requests from Provinces to replace
users
20 6 6 6 6
Slabbert MJ
KZN Bracken Forestry: Ptn2, Maresdale Bracken Forestry: Ptn2, Maresdale Bracken Forestry: Ptn2, Maresdale Bracken Forestry: Ptn2, Maresdale
KZN Bracken Forestry: Ptn3, Maresdale Bracken Forestry: Ptn3, Maresdale Bracken Forestry: Ptn3, Maresdale Bracken Forestry: Ptn3, Maresdale
KZN Bracken Forestry: Remainer, Maresdale Bracken Forestry: Remainer, Maresdale Bracken Forestry: Remainer, Maresdale Bracken Forestry: Remainer, Maresdale
KZN Bracken Forestry: Ptn0, Geluk Bracken Forestry: Ptn0, Geluk Bracken Forestry: Ptn0, Geluk Bracken Forestry: Ptn0, Geluk
KZN Sappi Saiccor Sappi Saiccor Sappi Saiccor Sappi Saiccor
Mthethwa-Mhlana tribal Authority
Tongatt Hullets
Goeie Hoop Farming Pty Ltd: Weatherstone
farm
Goeie Hoop Farming Pty Ltd: Balmoral farm
Goeie Hoop Farming Pty Ltd: Vidy farm
Goeie Hoop Farming Pty Ltd: Langwies
farm
Nyeswa Forest Project
Likhetlane Community
Qhobosheaneng Community
Muofhe T.S
LP Khakhu SA Khakhu SA Khakhu SA Khakhu SA
Masikhwa N.M
Thagwana R.S
Mpact Piet Retief
Agriculture 104 30 49 49 49 Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
65 [Irrigation] 17 [Irrigation] 34 34 34
FS Mr Jan Augustinus vd Merwe Will be replaced with Mr Gert van Zyl Business
Trust - will include in submission to act DG
FS Pierre Ferreira Trust Will be replaced with Mrs SJ Spies - will include in
submission to act DG
FS Mrs SJ Spies Mrs SJ Spies Mrs SJ Spies Mrs SJ Spies
FS Osborne Boerdery (Pty) Ltd Will be replaced with JGL Wilken - will include in
submission to act DG
FS Danrika Boerdery (Pty) Ltd Not done to be replaced by FS - will include in
submission to act DG
Connie Cloetzee Familie
NC Burger Du Plessis Family Trust Burger Du Plessis Family Trust Burger Du Plessis Family Trust Burger Du Plessis Family Trust On APP in Q3 - Province done in Q2 On APP in Q3 - Province done in Q2
Mrs DJE Burger
NC WEJ Boerdery cc WEJ Boerdery cc WEJ Boerdery cc WEJ Boerdery cc On APP in Q3 - Province done in Q2 On APP in Q3 - Province done in Q2
Eldoreen Plase Truse 2.5.1
Ms M du Preez
CF Louw Nuwejaarskraal Testamentee
Trust
FS Tshepiso Farms (Pty) Ltd Move to Q3 Property falls under FS and not NC as
per APP. License is not captured
correctly on WARMS. Inspection will be
conducted in Q3 (Will include in
submission to act DG)
Property falls under FS and not NC
as per APP. License is not captured
correctly on WARMS. Inspection will
be conducted in Q3 (Will include in
submission to act DG)
Imonetix Acorn Creek Development
KZN
Over achieved 1.1.6
Forestry
(Irrigation)
1.1.5
84
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationFS Frank 1474/0 Frank 1474/0 Frank 1474/0 Frank 1474/0 Frank 1474/0 is not on APP
FS Rietvlei 112/2 Rietvlei 112/2 Rietvlei 112/2 Rietvlei 112/2 Rietvlei 112/2 is not on APP
FS Theronshoop 411/0 Theronshoop 411/0 Theronshoop 411/0 Theronshoop 411/0 Theronshoop 411/0 is not on APP
FS Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 Generous Trust: Besemko 1808/0 is
not on APP
WC Little River Trading Little River Trading Little River Trading Little River Trading
Spier Home farm
Leef op Hoop farm
EC Hillview Farm Control Hillview Farm Control Hillview Farm Control Hillview Farm Control This falls under EC and will be amended
in submission to act DG
This falls under EC and will be
amended in submission to act DG
WC Stillbaai Golf Course Stillbaai Golf Course Stillbaai Golf Course Stillbaai Golf Course Stillbaai Golf Course is not on APP
WC Mr Thiart Mr Thiart Mr Thiart Mr Thiart Mr Thiart is not on APP
WC Altus Baard Family Trust Altus Baard Family Trust Altus Baard Family Trust Altus Baard Family Trust Altus Baard Family Trust is not on
APP
WC AJ van Zyl Family Trust AJ van Zyl Family Trust AJ van Zyl Family Trust AJ van Zyl Family Trust AJ van Zyl Family Trust is not on
APP
WC Oubaai Golf Course Oubaai Golf Course Oubaai Golf Course Oubaai Golf Course Oubaai Golf Course is not on APP
AM van Schoor Trust
Valley Trust
Frans Meg Gerber Family Trust
EC Pienaar Familie Trust Pienaar Familie Trust Pienaar Familie Trust Pienaar Familie Trust
EC SM Fegen SM Fegen SM Fegen SM Fegen
Clisa 83 (Pty) Ltd
EC DL Collett DL Collett DL Collett DL Collett DL Collett is not on APP
EC JP Smith JP Smith JP Smith JP Smith JP Smith is not on APP
EC Joubertina Dam Normal Flow Joubertina Dam Normal Flow Joubertina Dam Normal Flow Joubertina Dam Normal Flow Joubertina Dam Normal Flow is not
on APP
NC VNB Boerdery (Pty) Ltd Move to Q3 Move to Q3 - will include in submission to
act DG
Move to Q3 - will include in
submission to act DG
GM van Heerden
Grootbosvoerkrale (Pty) Ltd
NC Loomar Boerdery (Pty) Ltd Move to Q3 Move to Q3 - will include in submission to
act DG
Move to Q3 - will include in
submission to act DG
Mrs C Kondos
JP Van den Berg
Zelpy 2102 (Pty) Ltd
Vlakpan Trust
GP Black Mongrove Trading Black Mongrove Trading Black Mongrove Trading Black Mongrove Trading Letter received - This will be revised as
more information received. Also when
checking with Revenue collection they
are faltering on the water levies payment.
No inspection report - move inspection to
Q3
Letter received - This will be revised
as more information received. Also
when checking with Revenue
collection they are faltering on the
water levies payment. No inspection
report - move inspection to Q3
GP Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm Hague Fortress Bonsmaras Ptn2 Farm
Hague is not on APP
Wilgepoort Boerdery Trust
MP Fetakgomo Farming co operation Fetakgomo Farming co operation Fetakgomo Farming co operation Fetakgomo Farming co operation
MP Gerrit Trust Gerrit Trust Gerrit Trust Gerrit Trust
Moletele Communal property Association
Moletele Communal property Association
MP Kabakwe Estate 2 cc This falls under GP - will be done in Q3 as per
their BP and replaced with Four Rivers Trading -
will include in submission to actDG
This falls under GP - will be done in Q3
as per their BP and replaced with Four
Rivers Trading - will include in
submission to actDG
This falls under GP - will be done in
Q3 as per their BP and replaced with
Four Rivers Trading - will include in
submission to actDG
MP MBB Family Trust This falls under NW - will be done in Q3 and
replaced with NN Ligege (MP) as a follow-up - will
include in submission to actDG
This falls under NW - will be done in Q3
and replaced with NN Ligege (MP) as a
follow-up - will include in submission to
actDG
This falls under NW - will be done in
Q3 and replaced with NN Ligege
(MP) as a follow-up - will include in
submission to actDG
Ouniek Trust
Ilangabi Investments 12 (Pty) Ltd – Brinkor
Ltd
Obekilifa Farming sand and training projects
Mr RI Hulley
KZN Bondesio Brand Kraal Bondesio Brand Kraal Bondesio Brand Kraal Bondesio Brand Kraal
NP Blaker
Bret Latimar Family Trust
Indlovu Family cc
KZN Mr Lunga Mlungisi Ndwandwe Mr Lunga Mlungisi Ndwandwe Mr Lunga Mlungisi Ndwandwe Mr Lunga Mlungisi Ndwandwe
Mjindi Farming
ZZ2 Esmefour
ZZ2 Esmefour
LP Morane farms cc Morane farms cc Morane farms cc Morane farms cc Recovery: Done and signed in Q1 but
reported in Q2
Recovery: Done and signed in Q1
but reported in Q2
Tshikonela small farmer project
LP Maswiri Boerdery (Various Properties) Maswiri Boerdery (Various Properties) Maswiri Boerdery (Various Properties) Maswiri Boerdery (Various Properties)
LP Ba-Lephondo Agricultural Primary Co-
operative Ltd
Ba-Lephondo Agricultural Primary Co-operative
Ltd
Ba-Lephondo Agricultural Primary Co-operative
Ltd
Ba-Lephondo Agricultural Primary Co-operative
Ltd
LP Stilhoek Boerdery Stilhoek Boerdery Stilhoek Boerdery Stilhoek Boerdery
LP Mr PH Storm Mr PH Storm Mr PH Storm Mr PH Storm
Versamel Boerdery
Mr Nengovhela Thomani Simon
Over achieved 1.1.6
(Irrigation)
85
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationChatleka Communal Property Association
Maasstroom Eiendomme cc
Golden Creek Investment
NW Imberbe (Pty) Ltd Move to Q3 - will include in submission to act DG Move to Q3 - will include in submission to
act DG
Move to Q3 - will include in
submission to act DG
Rindveldt Eiendomme
Aalwynhoek Trust
NW Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP Ptn0) Wymer Investment (Erfdeel 41 KP
Ptn0) is not on APP
NW Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 Krokodilnest 21 Trust Pnt1 is not on
APP
NW Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15 Ptn3) Krokodilnest 21 Trust: Schwenin 15
Ptn3) is not on APP
LP Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP Bronkhorst) Koufontein Farm Ptn2 (JP
Bronkhorst) is not on APP
39 [Agro Processing] 13 AgroProcessing] 15 15 15
J Mcfarlane
EC JGL Boerdery cc JGL Boerdery cc JGL Boerdery cc JGL Boerdery cc
EC Amagasela Pork Producer Amagasela Pork Producer Amagasela Pork Producer Amagasela Pork Producer Amagasela Pork Producer is not on
APP
Groot Patrysvlei Boerdery
Eikenhof Poultry Farm
MP Silver Charm nvestments 14 (PTY) Ltd Silver Charm nvestments 14 (PTY) Ltd Silver Charm nvestments 14 (PTY) Ltd Silver Charm nvestments 14 (PTY) Ltd
Finbond (PTY) Ltd
LP Vusithemba Piggery Vusithemba Piggery Vusithemba Piggery Vusithemba Piggery
LP Ibis piggery Ibis piggery Ibis piggery Ibis piggery
Cavan Ranching Limpopo CC
Maremani nature Reserve
PS Le Roux
TJ Munyai
Autumn Star Trading 629 (PTY) Ltd
Buffshelf 15 Trust
NC Trans hex mynbou Replaced with Oange River Wine Cellars - will
include in submission to act DG
Replaced with Oange River Wine Cellars -
will include in submission to act DG
Replaced with Oange River Wine
Cellars - will include in submission to
act DGNC Orange River Wine Cellars Orange River Wine Cellars Orange River Wine Cellars Orange River Wine Cellars
NC Mr JM Fourie Mr JM Fourie Mr JM Fourie Mr JM Fourie
NC Die Nel Trust Die Nel Trust Die Nel Trust Die Nel Trust
NC AJJ Van Zyl AJJ Van Zyl AJJ Van Zyl AJJ Van Zyl
Sparta Baby Beef
FS Burger Geldenhuys Trust
NW Cronje Broers Boer Trust Cronje Broers Boer Trust Cronje Broers Boer Trust Cronje Broers Boer Trust
NW PH Theron PH Theron PH Theron PH Theron
Saldolite (Pty) Ltd
Porteville Olives
Ceres Fruit
Zandberg
Chalala Farms
WC Saamstaan Beleggings Trust Saamstaan Beleggings Trust Saamstaan Beleggings Trust
WC Graaf Fruit Move to Q4 - will include in submission to act DG Move to Q4 - will include in submission to
act DG
Move to Q4 - will include in
submission to act DG
WC Aqua Empower Aqua Empower Aqua Empower Aqua Empower
WC Noordhoek Noordhoek Noordhoek Noordhoek Reported under WC
WC Piketberg Sunrise farm Piketberg Sunrise farm Piketberg Sunrise farm Piketberg Sunrise farm Piketberg Sunrise farm is not on
APP
Amelia farms
Atlantis Foundaries
Bosman Adama
Sparrenberg
CACE farming
Bokkeveld Kwekery
Eikenhof Poultry farm
30 9 13 13 13 Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
MP Hendrina Power Station Hendrina Power Station Hendrina Power Station Hendrina Power Station
MP Arnot power station Arnot power station Arnot power station Arnot power station
Kusile Power Station
MP Tubatse Chrome Tubatse Chrome Tubatse Chrome Tubatse Chrome Tubatse Chrome is not on APP
Tutuka power
Matla Power Station
Duvha Power Station
Komati Power Station PoE outstanding
Kendal Power Station
Columbus Stainless(Pty)Ltd
Glencore Merafe Venture Operations –
Lydenburg Smelter
PoE outstanding
GP Samancor Samancor Samancor Samancor
Scaw Metals
ZINCOR: Exxaro Base Metal (Pty)Ltd
Tobivox (Pty) Ltd (Tom Burke Solar Park)
LP Matimba power station Matimba power station Matimba power station Matimba power station
Medupi power station
Polokwane Meturllical Complex
AEIC
NW Mine Omnia Fertilizer Mine Omnia Fertilizer Mine Omnia Fertilizer Mine Omnia Fertilizer
Dafne Energy Spitskop solar
KZN Eskom-Ingula Pump Storage Scheme Eskom-Ingula Pump Storage Scheme Eskom-Ingula Pump Storage Scheme Eskom-Ingula Pump Storage Scheme
Over achieved 1.1.6
(Irrigation)
(Agro-processing)
Industry
86
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationMission Kwasizabantu: hrdroponic system
Ekhamanzi Springs: Aquelle Bottling Plant
EC Da Gama Textiles Da Gama Textiles Da Gama Textiles Da Gama Textiles
EC Border Combing Company t/a Samil Natural
Fibres
Border Combing Company t/a Samil Natural
Fibres
Border Combing Company t/a Samil Natural
Fibres
Border Combing Company t/a Samil Natural Fibres Border Combing Company t/a Samil
Natural Fibres is not on APP
Bellatrix Solar
NC Garob Wind Farm (Pty) Ltd Garob Wind Farm (Pty) Ltd Garob Wind Farm (Pty) Ltd Garob Wind Farm (Pty) Ltd
NC DSP79 Solar Energy DSP79 Solar Energy DSP79 Solar Energy DSP79 Solar Energy
Kathu Solar Park Pty (Ltd): Kalahari Solar
Power Phase 1
ACWA Power SolarReserve Redstone
Solar Termal Power
Firefly Investments 230 (Pty) Ltd
WC Apollo Brick Clay Mine and brick
manufacturers: Brakkefontein Clay Products
Apollo Brick Clay Mine and brick manufacturers:
Brakkefontein Clay Products
Apollo Brick Clay Mine and brick manufacturers:
Brakkefontein Clay Products
Apollo Brick Clay Mine and brick manufacturers:
Brakkefontein Clay Products
Apollo Brick Clay Mine and brick
manufacturers: Brakkefontein Clay
Products is not on APP
WC Distell Distell Distell Distell Distell is not on APP
96 26 41 41 41 Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
Lafarge – Peak Quarry
WC Lafarge – Tygerberg Quarry Move to Q3 - unavailability of SHEQ Manager for
the mine - will include in submission to act DG
Move to Q3 - unavailability of SHEQ
Manager for the mine - will include in
submission to act DG
Move to Q3 - unavailability of SHEQ
Manager for the mine - will include in
submission to act DG
PPC – De Hoek
Cape Lime
WC PPC- Rhiebeck West Move to Q3 - will include in submission to act DG Move to Q3 - will include in submission to
act DG
Move to Q3 - will include in
submission to act DG
WC Tormin Mine Tormin Mine Tormin Mine Tormin Mine Tormin Mine is not on APP
WC Elandsfontein Exploration Mine Elandsfontein Exploration Mine Elandsfontein Exploration Mine Elandsfontein Exploration Mine Elandsfontein Exploration Mine is
not on APP
Afrisam South Africa (Pty) Ltd: Peninsula
Quarry
LP Boikarabelo Coal Mine (Ledjadja Coal
Mine)
Boikarabelo Coal Mine (Ledjadja Coal Mine) Boikarabelo Coal Mine (Ledjadja Coal Mine) Boikarabelo Coal Mine (Ledjadja Coal Mine)
LP Exxaro: Grootegeluk Coal Mine Exxaro: Grootegeluk Coal Mine (Additional) Exxaro: Grootegeluk Coal Mine (Additional) Exxaro: Grootegeluk Coal Mine (Additional) Additional - inspection done and reported
in Q1
Additional - inspection done and
reported in Q1
LP Tshikondeni Coal Mine Tshikondeni Coal Mine Tshikondeni Coal Mine Tshikondeni Coal Mine Additional - inspection done and reported
in Q1
Additional - inspection done and
reported in Q1
LP Vele Mine Vele Mine Vele Mine Vele Mine Additional - inspection done and reported
in Q1
Additional - inspection done and
reported in Q1
LP De Beer Venetia Mine De Beer Venetia Mine De Beer Venetia Mine De Beer Venetia Mine Additional - inspection done and reported
in Q1
Additional - inspection done and
reported in Q1
LP Mogalakwena Mogalakwena Mogalakwena Mogalakwena Additional - inspection done and reported
in Q1
Additional - inspection done and
reported in Q1
LP DMI Minerals SA (Pty) Ltd- Krone Endora
Dimond Mining Project
DMI Minerals SA (Pty) Ltd- Krone Endora Dimond
Mining Project
DMI Minerals SA (Pty) Ltd- Krone Endora Dimond
Mining Project
DMI Minerals SA (Pty) Ltd- Krone Endora Dimond
Mining Project
Additional - inspection done and reported
in Q1
Additional - inspection done and
reported in Q1
Thaba Chueu Mining (Pty) Ltd
Exxaro Coal (Pty) Ltd: Thabametsi Coal
mine
LP TivanI Mine (Pty) Ltd TivanI Mine (Pty) Ltd TivanI Mine (Pty) Ltd TivanI Mine (Pty) Ltd
Royal Bafokeng Resources (Pty) Ltd:
Bafokeng Rasimone Platinum Mine
NW Thaba Chronimet Chrome Mine Open Cast Thaba Chronimet Chrome Mine Open Cast Thaba Chronimet Chrome Mine Open Cast Thaba Chronimet Chrome Mine Open Cast
NW Thaba Chronimet Chrome Mine
Underground section
PoE outstanding
Samancor Chrome Limited: Western
Chrome Mines: Millsell and Waterkloof
SectionsHenric Ferrochrome (Pty) Ltd: Maroelabult
Sectio
Rustenburg Platinum Mines Limited-
Amandelbult Section
Rustenburg Platinum Mines Union Section
Phoenix Platinum Mining (Pty) Ltd
Eastern Chrome Mines Lannex Section
Modikwa Platinum Mine
Rhino Minerals(Pty)Ltd: Havercoft
Andalusite Mine
MP Glencore Xstrata Helena Section Glencore Xstrata Helena Section Glencore Xstrata Helena Section Glencore Xstrata Helena Section
MP Glencore Xstrata Thorncliffe Section Glencore Xstrata Thorncliffe Section Glencore Xstrata Thorncliffe Section Glencore Xstrata Thorncliffe Section
MP Glencore Xstrata Magareng Section Glencore Xstrata Magareng Section Glencore Xstrata Magareng Section Glencore Xstrata Magareng Section
Anglo Coal Greenside Colliery
MP Samancor Eastern Chrome
Mines(Steelpoort/Doornbosch Section)
Samancor Eastern Chrome
Mines(Steelpoort/Doornbosch Section)
Samancor Eastern Chrome
Mines(Steelpoort/Doornbosch Section)
Samancor Eastern Chrome
Mines(Steelpoort/Doornbosch Section)
Muhanga Mines(Pty)Ltd:Goedehoop Mine
Optimum Coal: Woestalleen Colliery
Over achieved 1.1.6
Industry
Mining
87
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationGlencore Operations SA (Pty) Ltd: Oogies
fontein Colliery
MP Linarox (Pty) Ltd: Welstand Colliery Linarox (Pty) Ltd: Welstand Colliery Linarox (Pty) Ltd: Welstand Colliery Linarox (Pty) Ltd: Welstand Colliery
MP Exxaro coal mpumalanga (pty) Ltd: North
Block complex-Glisa coal
Exxaro coal mpumalanga (pty) Ltd: North Block
complex-Glisa coal
Exxaro coal mpumalanga (pty) Ltd: North Block
complex-Glisa coal
Exxaro coal mpumalanga (pty) Ltd: North Block
complex-Glisa coal
MP Namane Anker Coal: Elandsfontein Colliery Namane Anker Coal: Elandsfontein Colliery Namane Anker Coal: Elandsfontein Colliery Namane Anker Coal: Elandsfontein Colliery
Anglo American Thermal Coal: Goedehoop
Colliery (South)
Analisa Mining and Industrial Services (Pty)
Ltd: Lefa Coal Mine
Bokoni Platinum Mine
Eyethu coal (pty) Ltd:Leewuwpoort colliery-
T&DB SECTION
Assmang Chrome Dwarsrivier Mine
Stuart Coal: East Block
MP Northam Platinum Ltd – Booysendal Mining Northam Platinum Ltd – Booysendal Mining Northam Platinum Ltd – Booysendal Mining Northam Platinum Ltd – Booysendal Mining
Anglo Coal Inyosi: Kriel Colliery
HCI Khusela: Palesa
BECSA: Khutala Colliery
MP Palabora Copper Mine (Pty) Ltd Palabora Copper Mine (Pty) Ltd Palabora Copper Mine (Pty) Ltd Palabora Copper Mine (Pty) Ltd
Nungu Trading 341 (Pty) Ltd; Elandspruit
Colliery
Idwala Crypts (Pty) Ltd: Vierfontein Colliery
Chromex Mining (Pty) Ltd: Mecklenburg
Chrome Mine
MP Anglo American Platinum: Rustenburg
Platinum Mines Limited: Mototolo Joint
Venture
Anglo American Platinum: Rustenburg Platinum
Mines Limited: Mototolo Joint Venture
Anglo American Platinum: Rustenburg Platinum
Mines Limited: Mototolo Joint Venture
Anglo American Platinum: Rustenburg Platinum
Mines Limited: Mototolo Joint Venture
HCI Coal (Pty) Ltd: Nokuhle Colliery
Vaalbult Mining Company (Pty) Ltd:
Vaalbult Colliery
BECSA: MMS Klipfontein Section
MP Just Coal: Bankfontein Colliery Just Coal: Bankfontein Colliery Just Coal: Bankfontein Colliery Just Coal: Bankfontein Colliery
BHP Billiton: Klipspruit Colliery
Delmas Coal: Kuyasa Coal
African Exploration: Vlakfontein Colliery
Phokathaba platinum mine
MP Kendal Colliery Kendal Colliery Kendal Colliery Kendal Colliery
MP Anglo Operations Elders Colliery Anglo Operations Elders Colliery Anglo Operations Elders Colliery Anglo Operations Elders Colliery Anglo Operations Elders Colliery is
not on APP
MP Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery Londani Coal: Nndanganeni Colliery
is not on APP
MP Two Rivers Platinum Mine Two Rivers Platinum Mine Two Rivers Platinum Mine Two Rivers Platinum Mine Two Rivers Platinum Mine is not on
APP
MP Wescoal Intbane Colliery Wescoal Intbane Colliery Wescoal Intbane Colliery Wescoal Intbane Colliery Wescoal Intbane Colliery is not on
APP
Hlagisa Mining : Wildfontein Colliery
Anglo American: Twickenham Platinum
Mine
Tendele Coal Mining (Pty) Ltd: Somkele
Anthracite Min
Treonox sands (Pty) Ltd; Fairbreeze Mine
Richards Bay Minerals: Zulti North, Tisand
and Smelter Site
Richards Bay Minerals: Zulti Services
corridor project
NC De Beers Consolidated Mines LTD:Finsch
Mine
De Beers Consolidated Mines LTD:Finsch Mine De Beers Consolidated Mines LTD:Finsch Mine De Beers Consolidated Mines LTD:Finsch Mine Recovery done and signed in Q1 but
reported in Q2
NC Sishen Mine Audit was done and reported in Q4 (16/17) after
complaints no audit was done for Q1 or Q2 but
administrative compliance actions are currently in
process
Audit was done and reported in Q4
(16/17) after complaints no audit was
done for Q1 or Q2 but administrative
compliance actions are currently in
process
Audit was done and reported in Q4
(16/17) after complaints no audit
was done for Q1 or Q2 but
administrative compliance actions
are currently in process
NC Black Mountain Mine Black Mountain Mine Black Mountain Mine Black Mountain Mine
NC Harmony Gold : Mareetsane Moved to Q3 - will include in submission to act DG Moved to Q3 - will include in submission
to act DG
Moved to Q3 - will include in
submission to act DG
Black Mountain Mine: Gamsberg Zinc Mine
Transhex
De Beers Consolidated Mines Ltd:
Namaqualand Mine
New Park Properties
NC Kgalogano Mining Exploration Kgalogano Mining Exploration Kgalogano Mining Exploration Kgalogano Mining Exploration Recovery done in Q1 but signed and
reported in Q2
NC Wide Investment 100 Mashwening Wide Investment 100 Mashwening Wide Investment 100 Mashwening Wide Investment 100 Mashwening Recovery done and signed in Q1 but
reported in Q2
NC Theta Mining Droogeveldt Theta Mining Droogeveldt Theta Mining Droogeveldt Theta Mining Droogeveldt Recovery done and signed in Q1 but
reported in Q2
Shiva Uranium
Over achieved 1.1.6
Mining
88
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationAnglo Gold Ashanti Vaal River operations
Chemwes
FS Koffiefontein Mine Joint Venture-
Koffiefontein Mine
Koffiefontein Mine Joint Venture- Koffiefontein
Mine
Koffiefontein Mine Joint Venture- Koffiefontein
Mine
Koffiefontein Mine Joint Venture- Koffiefontein
Mine
GP Xstrata Coal South Africa(Pty)Ltd (Spitzkop) Xstrata Coal South Africa(Pty)Ltd (Spitzkop) Xstrata Coal South Africa(Pty)Ltd (Spitzkop) Xstrata Coal South Africa(Pty)Ltd (Spitzkop) On APP in Q3 but done in Q2 due to high
possible care and maintenance during
the 3rd quarter hence it was expedited for
inspection in the 2nd quarter such that a
holistic view and information can be
sampled during the operational status
Sasol Mining (Pty) Ltd, Sigma Collieries,
Mooikraal Mine
GP Harmony Gold (Pty)Ltd: Evander Gold
Mined
Harmony Gold (Pty)Ltd: Evander Gold Mined Harmony Gold (Pty)Ltd: Evander Gold Mined Harmony Gold (Pty)Ltd: Evander Gold Mined
Coal Of Africa (Pty) Ltd, Mooiplaats Colliery
(Langcarel)
Crown Gold Recoveries (Pty) Ltd: Knights
Operations
Sibanye Gold Limited: Cooke Operations
Siding
Gold Fields - South Deep Mine
Vunene: Usutu West Colliery
GP GFI Mining SA(Pty) Ltd: Driefontein Gold
Mine
GFI Mining SA(Pty) Ltd: Driefontein Gold Mine GFI Mining SA(Pty) Ltd: Driefontein Gold Mine GFI Mining SA(Pty) Ltd: Driefontein Gold Mine
GP Anglo Gold Ashanti (West Wits Operations) Anglo Gold Ashanti (West Wits Operations) Anglo Gold Ashanti (West Wits Operations) Anglo Gold Ashanti (West Wits Operations)
GP Ergo Mining(Properiety)Limited Ergo Mining(Properiety)Limited Ergo Mining(Properiety)Limited Ergo Mining(Properiety)Limited Recovery: Done in Q1 but reported in Q2
per APP
GP New Kleinfontein Gold Mine New Kleinfontein Gold Mine New Kleinfontein Gold Mine New Kleinfontein Gold Mine New Kleinfontein Gold Mine is not
on APP
Grootvlei Proprietery Mines
Silver Lake Training 447 (Pty) Ltd – Silver
Lake Colliery Lelliefontein Operation
KZN RBM Zulti South RBM Zulti South RBM Zulti South RBM Zulti South RBM Zulti South is not on APP
KZN RBM Zulti North RBM Zulti North RBM Zulti North RBM Zulti North RBM Zulti North is not on APP
Muncipal 79 22 90 (21 APP and 69 Additional) 90 (21 APP and 69 Additional) 90 (21 APP and 69 Additional) Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
WWTW 45 12 73 (13 APP & 60 Additional) 73 (13 APP & 60 Additional) 73 (13 APP & 60 Additional)
Greater-Tubatse-Penge
MP Greater-Tubatse-Lebowakgomo Greater-Tubatse-Lebowakgomo Greater-Tubatse-Lebowakgomo Greater-Tubatse-Lebowakgomo
MP Burgersfort WWTW Burgersfort WWTW Burgersfort WWTW Burgersfort WWTW Burgersfort WWTW not on APP
MP Trichardt WWTW & pump station Trichardt WWTW & pump station Trichardt WWTW & pump station Trichardt WWTW & pump station Trichardt WWTW & pump station not
on APP
MP Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump station Kwazamokuhle WWTW and pump
station not on APP
Delareyville
Schweizer Reineke
NC Bestwood Estate Bestwood Estate Bestwood Estate Bestwood Estate
Bloemhof
Carnavon
Nketoana Local Municipality: Reitz
Wastewater Treatment Works
GP Merafong Local Municipality - Oberholzer Merafong Local Municipality - Oberholzer Merafong Local Municipality - Oberholzer Merafong Local Municipality - Oberholzer
Merafong Local Municipality – Kokosi
GP Midvaal Local Municipality – Vaal Marina Midvaal Local Municipality – Vaal Marina Midvaal Local Municipality – Vaal Marina Midvaal Local Municipality – Vaal Marina
ERWAT: (Herbet Bickly Waste Water
Treatment Works
Delareyville
Schweizer Reineke
GP Johannesburg Water (SOC) Ltd:
Bushkoppies WWTW
Johannesburg Water (SOC) Ltd: Bushkoppies
WWTW
Johannesburg Water (SOC) Ltd: Bushkoppies
WWTW
Johannesburg Water (SOC) Ltd: Bushkoppies
WWTW
GP Johannesburg Water (Pty) Ltd (Ennerdale
WWTWs)
Johannesburg Water (Pty) Ltd (Ennerdale
WWTWs)
Johannesburg Water (Pty) Ltd (Ennerdale
WWTWs)
Johannesburg Water (Pty) Ltd (Ennerdale
WWTWs)
Recovery: Done and signed in Q1 but
reported in Q2
Recovery: Done and signed in Q1
but reported in Q2
GP East Rand Water Care Company:
Rondebult WWTW
East Rand Water Care Company: Rondebult
WWTW
East Rand Water Care Company: Rondebult
WWTW
East Rand Water Care Company: Rondebult
WWTW
ERWAT: (Dekema Waste Water Treatment)
Works
Ekurhuleni Local Municipality (Klipportjie
and Sunward Pump stations upgrade)
GP East Rand Water Care Company (Ancor
WWTWs)
East Rand Water Care Company (Ancor WWTWs) East Rand Water Care Company (Ancor WWTWs) East Rand Water Care Company (Ancor WWTWs)
GP Kokosi WWTW Kokosi WWTW Kokosi WWTW Kokosi WWTW Kokosi WWTW not on APP
LP Musina Local Municipality (Musina WWTW) Musina Local Municipality (Musina WWTW) Musina Local Municipality (Musina WWTW) Musina Local Municipality (Musina WWTW)
LP Musina Local Municipality (Beitbridge
WWTW)
Musina Local Municipality (Beitbridge WWTW) Musina Local Municipality (Beitbridge WWTW) Musina Local Municipality (Beitbridge WWTW)
Lephalale Local Municipality (Zongezien
WWTW)
Thohoyandou WWTW
Over achieved 1.1.6
Mining
89
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationModimolle Local Municipality (Modimolle
WWTW)
Mookgophong Local Municipality
(Mookgophong WWTW)
Musina Local Municipality (Nancefield
Ponds)
Rustenburg LM: Rustenburg WWTW
Rustenburg LM: Monakato WWTW
Rustenburg LM: Lethabong WWTW
Rustenburg LM: Boitekong WWTW
Randfontein LM: Badirile WWTW
City of Joburg: Driefonteing WWTW
City of Tshwane Sunderland Ridge WWTW
NW Madibeng Local Municipality Brits Madibeng Local Municipality Brits Madibeng Local Municipality Brits Madibeng Local Municipality Brits
City of Tshwane Baviaanspoort WWTW and
Daspoort WWTW
City of Tshwane: Daspoort WWTS
WC Cederberg LM: Citrusdal Replaced with Outentique WWTW No audit as this plant will only be
completed with construction by
September 2017 (Will include in
submission to act DG to amend)
No audit as this plant will only be
completed with construction by
September 2017 (Will include in
submission to act DG to amend)
WC Outentiqua WWTW Outentiqua WWTW Outentiqua WWTW Outentiqua WWTW Replaced Cederberg; LM Citrusdal
WC Loeriesfontein WWTW Loeriesfontein WWTW Loeriesfontein WWTW Loeriesfontein WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Calvinia WWTW Calvinia WWTW Calvinia WWTW Calvinia WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Nieuwoudtville WWTW Nieuwoudtville WWTW Nieuwoudtville WWTW Nieuwoudtville WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Harkeville WWTW Harkeville WWTW Harkeville WWTW Harkeville WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Beervlei WWTW Beervlei WWTW Beervlei WWTW Beervlei WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Rooikraal WWTW Rooikraal WWTW Rooikraal WWTW Rooikraal WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Diepwalle WWTW Diepwalle WWTW Diepwalle WWTW Diepwalle WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Struisbaai WWTW Struisbaai WWTW Struisbaai WWTW Struisbaai WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Napier WWTW Napier WWTW Napier WWTW Napier WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Vaenhuiskrans/ Arniton WWTW Vaenhuiskrans/ Arniton WWTW Vaenhuiskrans/ Arniton WWTW Vaenhuiskrans/ Arniton WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Bredarsdorp WWTW Bredarsdorp WWTW Bredarsdorp WWTW Bredarsdorp WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Hartenbosch WWTW Hartenbosch WWTW Hartenbosch WWTW Hartenbosch WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Herbertsdale WWTW Herbertsdale WWTW Herbertsdale WWTW Herbertsdale WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Ruitersbos WWTW Ruitersbos WWTW Ruitersbos WWTW Ruitersbos WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Groot Brak WWTW Groot Brak WWTW Groot Brak WWTW Groot Brak WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Brandwatch WWTW Brandwatch WWTW Brandwatch WWTW Brandwatch WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Pinnicle Point WWTW Pinnicle Point WWTW Pinnicle Point WWTW Pinnicle Point WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Stillbaai WWTW Stillbaai WWTW Stillbaai WWTW Stillbaai WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Gouritsmond WWTW Gouritsmond WWTW Gouritsmond WWTW Gouritsmond WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Albertina WWTW Albertina WWTW Albertina WWTW Albertina WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Melkhotfontein WWTW Melkhotfontein WWTW Melkhotfontein WWTW Melkhotfontein WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
Over achieved 1.1.6
90
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationWC Heidelberg WWTW Heidelberg WWTW Heidelberg WWTW Heidelberg WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Witsand WWTW Witsand WWTW Witsand WWTW Witsand WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Slangrivier WWTW Slangrivier WWTW Slangrivier WWTW Slangrivier WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Riversdale WWTW Riversdale WWTW Riversdale WWTW Riversdale WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Gracia WWTW Gracia WWTW Gracia WWTW Gracia WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Jongensfontein WWTW Jongensfontein WWTW Jongensfontein WWTW Jongensfontein WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Dysselsdorp WWTW Dysselsdorp WWTW Dysselsdorp WWTW Dysselsdorp WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Oudtshoorn WWTW Oudtshoorn WWTW Oudtshoorn WWTW Oudtshoorn WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Beldvidere WWTW Beldvidere WWTW Beldvidere WWTW Beldvidere WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Brenton-on-Sea WWTW Brenton-on-Sea WWTW Brenton-on-Sea WWTW Brenton-on-Sea WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Karatara WWTW Karatara WWTW Karatara WWTW Karatara WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Knysna WWTW Knysna WWTW Knysna WWTW Knysna WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Rheenendal WWTW Rheenendal WWTW Rheenendal WWTW Rheenendal WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Sedgefield WWTW Sedgefield WWTW Sedgefield WWTW Sedgefield WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Gwaing WWTW Gwaing WWTW Gwaing WWTW Gwaing WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Uniondale WWTW Uniondale WWTW Uniondale WWTW Uniondale WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Haarlem WWTW Haarlem WWTW Haarlem WWTW Haarlem WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Kleinkrantz WWTW Kleinkrantz WWTW Kleinkrantz WWTW Kleinkrantz WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Harold's Bay WWTW Harold's Bay WWTW Harold's Bay WWTW Harold's Bay WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Oubaai WWTW Oubaai WWTW Oubaai WWTW Oubaai WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
WC Pine Lake Marine WWTW Pine Lake Marine WWTW Pine Lake Marine WWTW Pine Lake Marine WWTW This will reflect on individuals PA and
additional to Province BP
This will reflect on individuals PA
and additional to Province BP
EC Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW Middledrift Correctional Services WWTW Middledrift Correctional Services
WWTW not on APP
EC Dimbaza WWTW Dimbaza WWTW Dimbaza WWTW Dimbaza WWTW Dimbaza WWTW not on APP
EC Aberdeen WWTW Aberdeen WWTW Aberdeen WWTW Aberdeen WWTW Aberdeen WWTW not on APP
EC Somerset East WWTW Somerset East WWTW Somerset East WWTW Somerset East WWTW One report for Nompumelelo/
Coldstream/ Storms River - not on
APP
EC Nompumelelo WWTW Nompumelelo WWTW Nompumelelo WWTW Nompumelelo WWTW Nompumelelo WWTW not on APP
EC Coldstream WWTW Coldstream WWTW Coldstream WWTW Coldstream WWTW Coldstream WWTW not on APP
EC Storms River WWTW Storms River WWTW Storms River WWTW Storms River WWTW Storms River WWTW not on APP
EC Kelvin Jones (WGIV) Kelvin Jones (WGIV) Kelvin Jones (WGIV) Kelvin Jones (WGIV) Kelvin Jones (WGIV) not on APP
EC Engcobo Prison WWTW Engcobo Prison WWTW Engcobo Prison WWTW Engcobo Prison WWTW Engcobo Prison WWTW not on APP
EC Mthatha Prison WWTW Mthatha Prison WWTW Mthatha Prison WWTW Mthatha Prison WWTW Mthatha Prison WWTW not on APP
EC Kirkwood Department of Correctional
Service WWTW
Kirkwood Department of Correctional Service
WWTW
Kirkwood Department of Correctional Service
WWTW
Kirkwood Department of Correctional Service
WWTW
Kirkwood Department of
Correctional Service WWTW not on
APPEC Adelaide WWTW Adelaide WWTW Adelaide WWTW Adelaide WWTW Adelaide WWTW not on APP
EC Kei Mouth WWTW Kei Mouth WWTW Kei Mouth WWTW Kei Mouth WWTW Kei Mouth WWTW not on APP
KZN St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) St Lucia Ponds (WGIV) not on APP
Ethekwini: Phoenix
Ethekwini: Verulum
Emalahleni LM: Phola
Emalahleni LM: Klipspruit
Over achieved 1.1.6
91
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationGoven Mbeki LM: Bethal
Steve Tshwete LM: Kwazamokuhle
Emakhazeni LM: Belfast
NW Sun International: Sun City family resort Sun International: Sun City family resort Sun International: Sun City family resort
NW Madibeng
34 10 17 (8 APP & 9 Additional) 17 (8 APP & 9 Additional) 17 (8 APP & 9 Additional)
Senqu LM
Senqu LM
Senqu LM
Holfontein
FS Ventersdorp LM Ventersdorp LM Ventersdorp LM Ventersdorp LM
Kwadukuza
Nelspruit
Karwydeskraal
Marble hall
Thabazimbi
Phalaborwa
EC Port Elizabeth Will be replaced by King Williams Town Landfill
site
The region suggested that since there
have been inspections conducted on this
site in previous financial year, it will be
better to give attention to other sites that
have not been inspected before
The region suggested that since
there have been inspections
conducted on this site in previous
financial year, it will be better to give
attention to other sites that have not
been inspected before
EC King Williams Town King Williams Town King Williams Town King Williams Town
EC Koedoeskloof Will be replaced by Stutterheim Landfill site The region suggested that since there
have been inspections conducted on this
site in previous financial year, it will be
better to give attention to other sites that
have not been inspected before
The region suggested that since
there have been inspections
conducted on this site in previous
financial year, it will be better to give
attention to other sites that have not
been inspected before
EC Stutterheim WDS Stutterheim WDS Stutterheim WDS Stutterheim WDS
LP Medupi-Eskom Move to Q4 - will include in submission to act DG There has been a strategic inspection
conducted with DEA at Medupi on 7-9
Feb 2017 and the report was not yet
finalised - cannot conduct another
inspection while DEA is still finalising the
report.
There has been a strategic
inspection conducted with DEA at
Medupi on 7-9 Feb 2017 and the
report was not yet finalised - cannot
conduct another inspection while
DEA is still finalising the report.
LP Eskom Matimba Power Station Eskom Matimba Power Station Eskom Matimba Power Station Eskom Matimba Power Station Eskom Matimba Power Station not
on APP
KZN Bulbuldrive Bulbuldrive Bulbuldrive Bulbuldrive
KZN Arcelor Mittal Newcastle Construction
completion
Arcelor Mittal Newcastle Construction completion Arcelor Mittal Newcastle Construction completion Arcelor Mittal Newcastle Construction completion Arcelor Mittal Newcastle
Construction completion not on APP
KZN Lanxes Cisa Construction completion Lanxes Cisa Construction completion Lanxes Cisa Construction completion Lanxes Cisa Construction completion Lanxes Cisa Construction
completion not on APP
KZN Humberdale WDS Humberdale WDS Humberdale WDS Humberdale WDS Humberdale WDS not on APP
GP Mooiplaats Move to Q3 - Monitoring Committee Meeting was
postponed - Joint with DEA. Will include in
submission to act DG
Move to Q3 - Monitoring Committee
Meeting was postponed - Joint with DEA.
Will include in submission to act DG
Move to Q3 - Monitoring Committee
Meeting was postponed - Joint with
DEA. Will include in submission to
act DG
EC Jeffreys Bay Jeffreys Bay Jeffreys Bay Jeffreys Bay
EC Jansenville Solid WDS Jansenville Solid WDS Jansenville Solid WDS Jansenville Solid WDS Jansenville Solid WDS not on APP
EC Aberdeen Solid WDS Aberdeen Solid WDS Aberdeen Solid WDS Aberdeen Solid WDS Aberdeen Solid WDS not on APP
EC Pearston Solid WDS Pearston Solid WDS Pearston Solid WDS Pearston Solid WDS Pearston Solid WDS not on APP
EC Somerset East Solid WDS Somerset East Solid WDS Somerset East Solid WDS Somerset East Solid WDS Somerset East Solid WDS not on
APP
GP Betlhemem Betlhemem Betlhemem Betlhemem GP and not FS as per APP - will include
in submission to act DG
Klerksdorp
Ermelo
Shongweni
Assmang Cato Ridge
Nylstroom
Vrede
Sappi Ngodwana
Glencore
Compass Medical W
Sun city
Witbank
Bethal
Kleinzee
NC Kgalagadi Kgalagadi Kgalagadi Kgalagadi (Three inspections under Kgalagadi)
Prieska
Kuruman
Rietfontein - Ekurhuleni Metro Municipality
GP Holfontein Holfontein Holfontein Holfontein Reported in Q1 (Additional) Holfontein additional to APP
(reported in Q1)
GP Sasol Secunda Medium Term Vanadium
Facility Cell
Sasol Secunda Medium Term Vanadium Facility
Cell
Sasol Secunda Medium Term Vanadium Facility
Cell
Sasol Secunda Medium Term Vanadium Facility
Cell
Sasol Secunda Medium Term
Vanadium Facility Cell is additional
to APPGauteng Department of Housing
Over achieved 1.1.6
Waste/Landfill
92
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: Administration9 3 5 (3 APP and 2 Additional) 5 (3 APP and 2 Additional) 5 (3 APP and 2 Additional) Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
KZN Uthukela Water: Muden Waterworks Uthukela Water: Muden Waterworks Uthukela Water: Muden Waterworks Uthukela Water: Muden Waterworks
NC Transnet Transnet Transnet Transnet
Transnet
NW JHB Road Agency JHB Road Agency JHB Road Agency JHB Road Agency
WC Dept of Transport and Public Works Dept of Transport and Public Works Dept of Transport and Public Works Dept of Transport and Public Works Dept of Transport and Public Works
not on APP
MP Drive by: Eskom Pylon Towers removed in
wetland at Kusile
Drive by: Eskom Pylon Towers removed in
wetland at Kusile
Drive by: Eskom Pylon Towers removed in
wetland at Kusile
Drive by: Eskom Pylon Towers removed in wetland
at Kusile
Drive by: Eskom Pylon Towers
removed in wetland at Kusile not on
APPSanral upgrade of R37
Sanral Rehabilitation of N11
Rand Water
46 10 9 (APP) 9 (APP) 9 (APP) Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
WC Sonstraal Dam Sonstraal Dam Sonstraal Dam Sonstraal Dam
WC Doordekraal Dam Doordekraal Dam Doordekraal Dam Doordekraal Dam
Nantes Dam
Bethel Dam
Idasvalley No 2 Dam
WC Scottsdene Maturation Ponds Scottsdene Maturation Ponds Scottsdene Maturation Ponds Scottsdene Maturation Ponds
Porterville Lei Dam
Dal Weiding Stormwater Control Dam
Amandel Dam
Vygeboom Dam
Golfdam
Victoria Dam
Prison Dam
LP Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam Warmbad-Nuwe Dam
Lejwe La Metsi (Thabamanzi) Dam
Bospoort Dam
Bon Accord Dam
LP Rietspruit Dam (Failed In 2014) Rietspruit Dam (Failed In 2014) Rietspruit Dam (Failed In 2014) Rietspruit Dam (Failed In 2014)
Rietfontein N0.1(Lower) Dam
Kwaggasbult Dam
Bethel Dam
Nantes Dam
Dal Weiding Stormwater Control Dam
Gert Combrink Dam
Rietfontein No.2(Upper) Dam
LP Rietfontein Dam 7 Rietfontein Dam 7 Rietfontein Dam 7 Rietfontein Dam 7
Parma 40 Ms Dam
Lake Mzingazi
KZN Mahawane Dam Mahawane Dam Mahawane Dam Mahawane Dam
KZN Martins Dam Martins Dam Martins Dam Martins Dam
'E Dumbe Dam
Amanzimnyama Dam
Eshlazi Dam
Nuwe Dam
Kenhardtdam
Bon Accord Dam
Masolkakop Dam
Glen Una Eenzaamheid Dam
Amalinda Dam
Churchill Dam
Van Stadens Gorge Dam
First Falls Dam
Crystal Springs Dam
Sarel Hayward Dam
Bulkriver Dam
Bakers Dam
Umzoniana Dam
Joubertina Dam
EC Upper Van Stadens Dam Upper Van Stadens Dam Upper Van Stadens Dam Upper Van Stadens Dam
Sandriver Dam
31 9 9 (7 APP and 2 Additional) 9 (7 APP and 2 Additional) 9 (7 APP and 2 Additional) Amendment to APP users and quarters -
in process to draft submission to act DG
to amend
Amendment to APP users and
quarters - in process to draft
submission to act DG to amend
EC Lower Sundays River Water User
Association (Q1)
Lower Sundays River Water User Association (Q1) Lower Sundays River Water User Association (Q1) Lower Sundays River Water User Association (Q1) Recovery: No PoE received in Q1 but
reported in Q2
Recovery: No PoE received in Q1
but reported in Q2
EC Gamtoos River Irrigation Board (Q1) Gamtoos River Irrigation Board (Q1) Gamtoos River Irrigation Board (Q1) Gamtoos River Irrigation Board (Q1) Recovery: Done in Q1 but reported in Q2 Recovery: Done in Q1 but reported
in Q2
EC Klipplaat Klipplaat Klipplaat Klipplaat Klipplaat not on APP
FS Orange-Riet Water User Association (Q1) Orange-Riet Water User Association (Q1) Orange-Riet Water User Association (Q1) Orange-Riet Water User Association (Q1) Recovery: Done in Q1 but reported in Q2 Recovery: Done in Q1 but reported
in Q2
FS Kalkfontein Water User Association (Q1) Kalkfontein Water User Association (Q1) Kalkfontein Water User Association (Q1) Kalkfontein Water User Association (Q1) Recovery: Done in Q1 but reported in Q2 Recovery: Done in Q1 but reported
in Q2
Kakamas Water User Association (Q4)
Broadwater Farms (Orange - Vaal) (Q4)
Boegoeberg Water User Association (Q4)
Riemvasmaak Gemeenskapsontwikkelings
(Q4)
Over achieved 1.1.6
Public Institutions
1.1.7 Number of water management institutions
monitored for compliance with own water use
entitlements and effective monitoring of
affiliated water users
Dam Safety
93
Quarter 2 Target as per APP Disaggregated targets
per province / CMA
Quarter 2 output – preliminary Quarter 2 Actual Achievement Deviation (Actual) Deviation (%)
Indicators and target as per 2017/18 Annual Performance Plan (APP) Quarter 2 Analysis of perfomance Comments
09/November /2017
PPI No Performance Indicators Target for 2017/18 as per Annual
Performance Plan (APP)
Progress Description of Actual Achievement Reason for Deviation Planned Action Analysis
Programe1: AdministrationVaalharts Water User Association (Q1)
NC Kalahari East Water Board (Q2) Move to Q3 - will include in submission to act DG Move to Q3 - will include in submission to
act DG
Move to Q3 - will include in
submission to act DG
Vyfhoek Suid Nedersettingsraad (Q4)
Clisa 83 (Q4)
Guilford (Q4)
Crocodile River Major Irrigation Board (Q4)
Letaba Water User Association (Q4)
Komati River Irrigation Board (Q2)
Lomati River Irrigation Board (Q3)
Suidkaap River Irrigation Board (Q4)
IUCMA (Q4)
Loskop Irrigation Board (Q1)
Lower Blyde River Water User Association
(Q3)
Letsitelerivier Irrigation Board - Damararivier
(Q4)
Mokolo Water User Association (Q4)
Department Of Agriculture, Forestry And
Fisheries (Q4)
Hartbeespoort Irrigation Board (Q4)
NW Crocodile River W-Tvl Irrigation Board (Q4) Crocodile River W-Tvl Irrigation Board (Q4) Crocodile River W-Tvl Irrigation Board (Q4) Crocodile River W-Tvl Irrigation Board (Q4) Under NW but on APP this falls under LP
- Done in Q2 but in APP in Q4 - will
include in submission to act DG
Under NW but on APP this falls
under LP - Done in Q2 but in APP in
Q4 - will include in submission to act
DG
Bon Accord Irrigation Board (Q4)
WC Rondebosch WUA (Q1) Rondebosch WUA (Q1) Rondebosch WUA (Q1) Rondebosch WUA (Q1) Recover: Reported in Q2 by WC
province
WC Vyeboom WUA Vyeboom WUA Vyeboom WUA Vyeboom WUA
WC Northern Sandveld WUA (Q2) Will be replace and moved to Q3 - WUA not
functional - will include in submission to act DG
Will be replace and moved to Q3 - WUA
not functional - will include in submission
to act DG
Will be replace and moved to Q3 -
WUA not functional - will include in
submission to act DG
Koo IB (Q3)
WC Citrusdal WUA (Q3) Will be replaced by Vyeboom WUA and reported
in Q2 - will include in submission to act DG
Will be replaced by Vyeboom WUA and
reported in Q2 - will include in submission
to act DG
Will be replaced by Vyeboom WUA
and reported in Q2 - will include in
submission to act DG
BGCMA (Q4)
NC Friersdale IB Friersdale IB Friersdale IB Friersdale IB Friersdale IB not on APP
Percentage of reported non-compliant cases
investigated
81% (136/167) 81% (136/167) Over by 1% Over by 1% 81% (136/167) Poe accepted
7 7 7
24 24 24
GP 21 21 21
13 13 13
FS 1 1 1
34 34 34
1 1 1
14 14 14
21 21 21
13
9 water boards Business plans (BPs)
and Shareholder
Compacts (SHC)
analysed
Business plans (BPs) and Shareholder Compacts
(SHC) analysed
Business plans (BPs) and
Shareholder Compacts (SHC)
analysed
Business plans (BPs) and Shareholder Compacts
(SHC) analysed
PoE accepted
2 CMAs Annual Reports (ARs)
analysed and tabled
in Parliament
Annual Reports analysed and submitted for
approval for tabling
Annual Reports analysed and
submitted for approval for
tabling
Annual Reports analysed and submitted for
approval for tabling
PoE accepted
4.2.1 Number of public entities annually assessed
Achieved
Institutional Oversight
Over achieved
80% Over achieved
1.1.7 Number of water management institutions
monitored for compliance with own water use
entitlements and effective monitoring of
affiliated water users
80%1.1.8
EC
NC
NW
KZN
WC
MP
LP
94