SCOPE OF WORK:

1. Wiring and installation of underground electrical feederline of DPWH Building

2. Excavation of Underground Feederline Wire

3. Certification of Insulation Resistance Test

ITEM

NO.UNIT QTY. UNIT COST TOTAL COST

A GENERAL REQUIREMENTS

Temporary lighting & water facilities days 60 P P

Steel Barricade with Caution tape (rental) each 41

pc 1

Construction Safety and Health

pcs 9

pcs 9

pcs 7

pcs 7

pcs 9

pcs 7

pcs 7

Direct Cost A P

B INSTALLATION OF ELECTRICAL SYSTEM

I

63mm0 Entrance Cap Diecast (US) pcs 2

63mm0x 10' IMC Pipe pc 1

75mm0 x 10' IMC Pipe pcs 20

75mm0 PVC Long Elbow pcs 3

75mm0 PVC Adaptor pcs 4

63mm0Locknut and Bushing pairs 4

75mm0 Malleable Iron Clamp mtrs 12

125mm0 Solderless Connector wl two Bolt pcs 3

5/80 x 1/2"0 x 2 1/2@ Expansion Shield w/ lug screw pairs 12

1/2"0 x 3/8"0 x 2" Expansion Shield w/lug screw pairs 4

12" x 12" x 8" Fabricated Pulibox Ga.18 pc 1

II

mtrs 315

III

set 1

Material Cost P

Labor Cost

Direct Cost B P

PANEL BOARD

Roughing-ins

WIRES & CABLES

125mm2 THHN Wire

Vest

Face Mask

Harness

Goggles

Billboard

Safety Helmet

Safety Shoes

Safety Gloves

PROGRAM OF WORK

Moulded Case Circuit Breaker 250 AT, 2P, 230V Enclosure

Weather Proof Type w/ Ground Terminal in Nema 3R

QC INFRA PROJECT

DETAILED COST ESTIMATE

WORK DESCRIPTION & SCOPE OF WORKS

PROJECT TITLE : PROPOSED INSTALLATION OF ELECTRICAL SYSTEM OF EMILIO

JACINTO NATIONAL HIGH SCHOOL

LOCATION : BARANGAY PASONG TAMO, DISTRICT 6, QUEZON CITY

Page 1 of 3

ITEM

NO.UNIT QTY. UNIT COST TOTAL COST

IV MISCELLANEOUS & CONSUMABLES

roll 1 P P

roll 2

unit 1

C

cum 6

cum 20

cum 6

Direct Cost C P

D CONCRETE WORKS

Concrete Hollow Blocks (CHB) with Leveling Sand sq.m 20

Materials Cost P

Labor Cost

Direct Cost D P

E INSULATION OF RESISTANCE TESTING

Certification of Insulation Resistance Test lot 1

Direct Cost E P

P

P

Duly authorized to sign Bid/Quote for and on behalf of

Pipe/Conduit Supports, Brackets and Other Accessories

SITE WORKS

Excavation

Chipping and Disposal of Concrete

Backfill

Rubber Tape

Electrical Tape

Total Direct Cost

OCM

Profit

VAT

[Signature Over Printer Name] [in the capacity of]

WORK DESCRIPTION & SCOPE OF WORKS

Page 2 of 3

A P

B

C

D

E

P

P

Amount in Words: ________________________________________________________________________________

NAME OF COMPANY: _____________________________________________________________________

ADDRESS: _____________________________________________________________________

_____________________________________________________________________

Duly authorized to sign Bid/Quote for and on behalf of

INSTALLATION OF ELECTRICAL SYSTEM

SITE WORKS

CONCRETING WORKS

INSULATION RESISTANCE TESTING

TOTAL DIRECT COST

Name of Project: PROPOSED INSTALLATION OF ELECTRICAL SYSTEM OF EMILIO

GENERAL REQUIREMENT

SUMMARY

OCM

[Signature Over Printer Name] [in the capacity of]

JACINTO NATIONAL HIGH SCHOOL

Location: BARANGAY PASONG TAMO, DISTRICT 6, QUEZON CITY

ABC: P957,332.46

PROFIT

VAT

TOTAL ESTIMATED COST

Page 3 of 3

Item of Work MATERIALS INDIRECT AGGREGATE

(Description) COST COST COST

A GENERAL REQUIREMENT

B INSTALLATION OF ELECTRICAL SYSTEM

C SITE WORKS

D CONCRETING WORKS

E INSULATION RESISTANCE TESTING

T O T A L

Amount in Words: ______________________________________________________________________________________

NAME OF COMPANY: _______________________________________________________________________

ADDRESS: ______________________________________________________________________________

Duly authorized to sign Bid/Quote for and on behalf of

Name of Project: PROPOSED INSTALLATION OF ELECTRICAL SYSTEM OF EMILIO

BREAKDOWN OF COST

LABOR COST

JACINTO NATIONAL HIGH SCHOOL

Location: BARANGAY PASONG TAMO, DISTRICT 6, QUEZON CITY

ABC: P957,332.46