detach here and staple to the storage ... - loft insulation · fit around the loft leg lay the...
TRANSCRIPT
Loft Leg YOU WILL NEED...
STEP 2... STEP 3... STEP 4...
STEP 1...
TOP PLATFORM
PILOT HOLES
ELECTRIC DRIVER / SCREWDRIVER
No. 8 x 1 1/4”
MULTIPURPOSESCREWS
(4 x 30mm)
POSITION LOFT LEGS AT WIDTHS TO SUIT THE PANELS.
MAXIMUM RECOMMENDED DISTANCE BETWEEN LOFT LEG
CENTRES IS 610MM.
LAY OUT YOUR INSULATION
A SMALL VERTICAL SLIT IN THE BLANKET WILL ALLOW FOR A BETTER
FIT AROUND THE LOFT LEG
LAY THE PANELS ON THE TOP PLATFORM,
SCREW THROUGH PANEL AND LOFT LEG
TO SECURE.
CHIPBOARD OR MDF PANELS
MINIMUM 18MM THICK PANELS
BASE
STEP 3.
IMPORTANT:LOFT LEGS RAISE THE HEIGHT OF A STORAGE DECK TO PREVENT COMPRESSION OF INSULATION.THIS DECK SHOULD BE USED FOR LOFT STORAGE ONLY. LOADING LIMIT OF EXISTING CEILING STRUCTURE SHOULD BE CONFIRMED BY A STRUCTURAL ENGINEER.THIS PRODUCT IS DESIGNED FOR DOMESTIC USE ONLY. DO NOT USE IN DAMP CONDITIONS.SAFETY INSTRUCTIONS: ENSURE ADEQUATE VENTILATION. USE OF MASKS AND GLOVES RECOMMENDED.
USING THE PILOT HOLES SECURE LOFT
LEG ONTO CEILING STRUCTURE.
STEP 2...
POSITION LOFT LEGS AT WIDTHS TO SUIT THE PANELS.
MAXIMUM RECOMMENDED DISTANCE BETWEEN LOFT LEG
Manufactured in the UK by Loft Leg | Email: [email protected] | Website: www.loftleg.co.uk
WARNINGTHIS IS A RAISED STORAGE PLATFORM
DO NOT OVERLOADCaution: Max weight loading 50kg per square metre. Ceiling joists or trusses are normally designed for light domestic storage. It is the fitters responsibility to
ensure that the existing ceiling structure and the new timber storage deck are capable of taking the necessary loads.
When installing insulation follow recomendations from the insulation manufacturer.
DETACH HERE AND STAPLE TO THE STORAGE DECK