WQMAWQMADefinitionDefinition
An area covering the same physiographic unit An area covering the same physiographic unit which affects the physicowhich affects the physico--chemical and chemical and biological reactions and diffusion of pollutants biological reactions and diffusion of pollutants in the bodies of water draining the said area.in the bodies of water draining the said area.
NAANAABodies of water where specific pollutants have Bodies of water where specific pollutants have already exceeded water quality guidelines and already exceeded water quality guidelines and therefore in need of rehabilitation.therefore in need of rehabilitation.
The Philippine Clean Water Act 2004 The Philippine Clean Water Act 2004 (Republic Act No. 9275)(Republic Act No. 9275)
11
22
44
33
DESIGNATION OF DESIGNATION OF WQMAsWQMAs
AIMS TO IMPROVE WATER QUALITY AIMS TO IMPROVE WATER QUALITY THROUGH FOCUSED INTERVENTIONS THROUGH FOCUSED INTERVENTIONS
OR ACTIONS TO ADDRESS WQ OR ACTIONS TO ADDRESS WQ PROBLEM(S) OF THE AREA PROBLEM(S) OF THE AREA
IDENTIFICATION IDENTIFICATION OF NAAsOF NAAs
WATER QUALITYMANAGEMENT
SYSTEM
WATER QUALITYWATER QUALITYMANAGEMENT MANAGEMENT
SYSTEMSYSTEMPREPARATION AND PREPARATION AND IMPLEMENTATION IMPLEMENTATION OF WQMA ACTION OF WQMA ACTION
PLANSPLANS
Objectives of Designating WQMAObjectives of Designating WQMA
WQMA is a significant tool in enforcing the WQMA is a significant tool in enforcing the CWA.CWA.
Aims for the improvement of water quality to Aims for the improvement of water quality to meet the guidelines (DAO 34, s 1990) under meet the guidelines (DAO 34, s 1990) under which they have been classified or to improve which they have been classified or to improve their classification so that it meets its their classification so that it meets its projected or potential use.projected or potential use.
Creation of GB who will be responsible in the Creation of GB who will be responsible in the preparation of WQMA Action Plan. The Plan preparation of WQMA Action Plan. The Plan is is prepared and implemented that provides prepared and implemented that provides focused interventions to address specific focused interventions to address specific water quality problems in the area.water quality problems in the area.
The WQMA Action PlanThe WQMA Action Plan
more stringent effluent standards (IRR Rule 6.1.3) and more stringent effluent standards (IRR Rule 6.1.3) and expansion of permit coverage for point sources (IRR expansion of permit coverage for point sources (IRR Rule 13.6);Rule 13.6);limiting new sources without a reduction in discharges limiting new sources without a reduction in discharges from existing sources (IRR Rule 6.3.1), its relocation from existing sources (IRR Rule 6.3.1), its relocation (CWA Section 6), and its effluent quota allocation (IRR (CWA Section 6), and its effluent quota allocation (IRR Rule 14.17);Rule 14.17);
proper land use planning and zoning;proper land use planning and zoning;
best management practices for nonbest management practices for non--point sources; andpoint sources; andtechnologies that promote waste minimization and technologies that promote waste minimization and cleaner production.cleaner production.
Coverage of WQMA DesignationCoverage of WQMA Designation
Surface waters Surface waters –– natural , mannatural , man--mademadestreams (rivers and creeks) streams (rivers and creeks) lakeslakesmarine waters marine waters
Land within the hydrologic unitLand within the hydrologic unitresidential, industrial, commercial, agricultural,residential, industrial, commercial, agricultural,tourism, forest and protection areastourism, forest and protection areas
(Groundwater resource not included)(Groundwater resource not included)
Conditions for WQMA DesignationConditions for WQMA Designation
1. The WQMA to use the appropriate physiographic unit such as a watershed, river basin, water resource region, or sub-basin, micro-watershed.
2. The WQMA shall have similar hydrological, hydrogeological, meteorological or geographic conditions which affect the physicochemical, biological and bacteriological reactions and diffusions of pollutants in the water bodies.
3. The WQMA may share common interest, or face similar development programs, prospects or problems.
THE USE OF APPROPRIATE PHYSIOGRAPHIC UNIT
WATER QUALITY OF WATER BODIES IS
AFFECTED
SHARES COMMON INTEREST, PROGRAMS,
PROSPECTS, PROBLEMS
Conditions for WQMA DesignationConditions for WQMA Designation
4. The water quality of specific water body/ies within that physiographic unit may be:a. A non-attainment area (NAA) that needs immediate WQ management interventions to improve WQ.b. A combination of NAA and Attainment Area (AA). This is applicable when there is a need to improve WQ and the management of the existing and potential pollution sources must be addressed through specific interventions.c. An AA but WQ management interventions are needed to improve and/or preserve its condition.
INTENSITY OF POLLUTION PROBLEM AS IT IMPACTS ON PUBLIC HEALTH AND
THE REGIONAL ECONOMY
All four basic conditions must be present
All four basic conditions must be present
when the WQMA is designated.
when the WQMA is designated.
Conditions for WQMA DesignationConditions for WQMA Designation
Even if the WQMA without a NAA is justified Even if the WQMA without a NAA is justified given the above conditions,given the above conditions, PRIORITYPRIORITY should should be given to the areas where water quality has be given to the areas where water quality has already exceeded the water quality guidelines already exceeded the water quality guidelines to ensure that limited resources is efficiently to ensure that limited resources is efficiently used. used.
Watershed/Sub-basin
WQMA
NAA
WQMA may consists of:1. NAA2. Combination of NAA
and AA3. AA (Area for protection
and conservation)
WQMA – Conceptual Framework
AA
WQMA Conceptual FrameworkWQMA Conceptual Framework
AAAA
AAAA
NAANAA: River Channel
: River Basin Boundary
: Boundary of Catchment Area for Tributary or River Channel Section
A Hypothetical Watershed / SubA Hypothetical Watershed / Sub--basinbasin
NAA
AA
AA
AA
WQMA = Catchment + NAA + AA
WQMA, NAA and AA DesignationWQMA, NAA and AA Designation
Initiating ProcessInitiating Process
Process of WQMA Designation Process of WQMA Designation
Initiated by Concerned Government Initiated by Concerned Government Agency or Civil SocietyAgency or Civil Society
OROR
Initiated by DENR Regional Office Initiated by DENR Regional Office thru EMB ROthru EMB RO
Evaluation by EMB RO
a. Criteria for Boundary Setting- Need Rehabilitation & Protection- Establish most affected waterbody/ies
b. Other Factors- Manageability- Similar Development Plans
Coordination with NWRB
a.Data Requirements
b.Review Justification
c.Recommend Designation
1.1.1. 2.2.2. 3.3.3.Convene
Stakeholdersa. Identification of
Key Stakeholders
b. Conduct of Information Dissemination Activities
c. Conduct of Meetings
4.4.4.
Designation of the WQMADesignation of the WQMA
Data GatheringMapsMajor Threats to Water PollutionCommon InterestStakeholders SupportWQMA Socio-economic Profile
1.Specify a water body/dies with a water quality problem.2.Specify the water classification/use.3.Specify and/or describe the type of water quality problem.
1.1.Specify a water body/dies with a water quality problem.Specify a water body/dies with a water quality problem.2.2.Specify the water classification/use.Specify the water classification/use.3.3.Specify and/or describe the type of water quality problem.Specify and/or describe the type of water quality problem.
Evaluation of Proposal by EMB CO
Based on the Following:
Completion of all Data RequirementsResults of Key
Stakeholders MeetingsResults of PublicConsultations
Evaluation of Evaluation of Proposal by Proposal by EMB CO EMB CO
Based on the Based on the Following:Following:
Completion of Completion of all Data all Data RequirementsRequirementsResults of KeyResults of Key
Stakeholders Stakeholders MeetingsMeetingsResults of PublicResults of PublicConsultationsConsultations
Recommend WQMA Designation and GB Composition to DENR Secretary
5.5.5. 6.6.6. 7.7.7.
Designation of the WQMADesignation of the WQMA
Conduct Public Consultations
a. Identification of the “Public”
b. Information Dissemination Activities
c. Conduct of Public Consultations
Designate Designate the WQMAthe WQMAby DENR by DENR SecretarySecretary
(DAO)(DAO)
8.
Inform the LGUs, Inform the LGUs, NGAs, Business, NGAs, Business, Civil Society/NGOsCivil Society/NGOsAnd Water UtilityAnd Water UtilitySectors to SubmitSectors to SubmitNominations in Nominations in GB.GB.
DENR shall sit DENR shall sit as Chairman of as Chairman of the Board.the Board.
9.9.
Submit Names to DENR of GB Membership.Names of permanent and alternate members of the GB shall be submitted to DENR Secretary for approval
10.10.
ReRe--designation designation of WQMAof WQMAby DENR by DENR SecretarySecretary
(DAO)(DAO)
11.11.
DESIGNATION OF
MEYCAUAYAN-MARILAO-OBANDO (MMO) RIVER
SYSTEM as WQMA
DENR
Activities Undertaken Leading toWQMA Designation
1. Initiated the identification and evaluation of candidate sites
2. Identified water quality problems and possible actions to address the problems
3. Verified Water Classification and Use of the proposed WQMA
Activities Undertaken Leading toWQMA Designation
4. Gathered relevant data (primary & secondary)
Maps – Topo, Drainage, Land Use, Satellite ImageryWater Quality Monitoring DataPollution sources data including GPS reading of industry locatorsCensus and socio-economic dataListing of various stakeholders
Activities Undertaken Leading toWQMA Designation
5. Evaluated data for boundary setting
Established the most affected part of the river systemsDetermined the sources of pollutionPlotted and mapped the physical boundary of the WQMA
Activities Undertaken Leading toWQMA Designation
6. Convened Key Stakeholders
Introductory Meeting – 24 July 2007
1st Stakeholders’ Mtg. – 13 Aug. 2007
2nd Stakeholders’ Mtg. – 11 Sep. 2007
3rd Stakeholders’ Mtg. – 4 Oct. 2007
Public Consultation – 23 Oct. 2007
Information Disseminated to the Key Stakeholders
Overview JICA-EMB CDPWQMSalient features of the CWA and its IRRWQMA, NAA and AA ConceptsComposition and Role of WQMA GBBackground on the National & Area WQ Management FundWQMA Action Planning and LGU Compliance SchemeThe Proposed MMO River System WQMA
The immediate need for water quality management interventions to revive the river systems;
Has an active group of NGOs fully supported by the LGUs, concerned NGAs, and the private sector; and
Availability of water quality monitoring data.
SELECTION OF MARILAOSELECTION OF MARILAO--MECAUAYANMECAUAYAN--OBANDO OBANDO RIVER SYSTEM WQMARIVER SYSTEM WQMA
Current Problems
The catchment area of MMO River System has numerous settlements and industries, most of which discharge their untreatedwastewater into the river.
Chromium, lead and cadmium which areconsidered as toxic substances were detected in water samples.
High levels of domestic sewage contamination was also detected.
MMO River System as WQMA
PROBLEMPROBLEMwater water
quality quality
SOLUTIONSOLUTIONwater water
quality quality managementmanagement
PROBLEMPROBLEMwater water
quality quality
SOLUTIONSOLUTIONwater water
quality quality managementmanagement
1. WQMA Designated Name– Meycauayan-Marilao-Obando River System
WQMA (based on NWRB recommendation)
2. River Systems– Meycauayan River– Marilao River– Obando River– Tributaries of the 3 rivers which are within the
WQMA boundary
The Proposed WQMAThe Proposed WQMA
Meycauayan-Marilao-ObandoRiver System
Marilao River
Meycauayan RiverObando River
Manila Bay
River Network
Quezon City
Bocaue
Bulacan
Political Boundaries
MarilaoMeycauayan
Sta MariaSJDM
Caloocan
ValenzuelaObando
Important Tributaries
Initial Proposed WQMA Boundary
Excluded Caloocan City
Stakeholders Participation in Boundary Setting
Points of consideration in boundary setting based from Stakeholders’ Responses:
Exclusion of Caloocan and Valenzuela (NCR) could result to failure in the implementation of Action Plans due to their pollution load contribution to the river system.
Inclusion of Caloocan and Valenzuelacould result to issues relating to “manageability” and inter-agency/ institution working relationships.
Consensus Among the Key Stakeholders
Valenzuela and Caloocan should be included in the proposed WQMA.
City of Caloocan to be represented by LLDA.
MMO River System WQMA(DENR AO 2008-7)
Watershed boundary of Marilao River
Boundary w/ Navotas
Bounded by Road
Bounded by line from end of road to SJDM Boundary
MarilaoMeycauayan
Sta Maria
SJDM
Caloocan
ValenzuelaObando
Geographic Extent of ConcernsGeographic Extent of Concerns
Administrative Authorities: Administrative Authorities:
Provincial Government of Provincial Government of BulacanBulacanCity Governments of:City Governments of:oo MeycauayanMeycauayanoo San Jose Del MonteSan Jose Del Monteoo ValenzuelaValenzuelaoo CaloocanCaloocan (LLDA)(LLDA)
Municipal Governments of:Municipal Governments of:oo MarilaoMarilaooo ObandoObandoo o Sta. MariaSta. Maria
WQMA GOVERNING BOARDWQMA GOVERNING BOARDWQMA GOVERNING BOARD
DDCCAA BB EE DDCCAA BB EEDDCCAA BB EE
LGUsLGUs NGAs/NGAs/GOCCsGOCCs
Civil Society/Civil Society/NGOsNGOs
WaterWaterUtilitiesUtilities BusinessBusiness
SubSub--sectorssectors SubSub--sectorssectors SubSub--sectorssectors
Other SectorsOther Sectors
Other agencies / organizations /associations having relevant concerns with the proposed WQMA designation.
o Academeo PAMBs, FARMCs, Watershed Councilso Indigenous Peoples
Associations/Organizations
Other agencies / organizations /Other agencies / organizations /associations having relevant concerns associations having relevant concerns with the proposed WQMA designation.with the proposed WQMA designation.
oo AcademeAcademeoo PAMBsPAMBs, , FARMCsFARMCs, Watershed Councils, Watershed Councilsoo Indigenous Peoples Indigenous Peoples
Associations/OrganizationsAssociations/Organizations
Next Steps
Convening of the MMO RS WQMA Governing Board Members;
Provision of the Multi-sectoral Group for WQ monitoring and surveillance; and
Preparation and implementation of the WQMA Action Plan.