design services a&e contract outreach … right of way requirements
TRANSCRIPT
DESIGN SERVICESA&E CONTRACT OUTREACHDISTRICT 10September 7, 20171:30-3:00 pmDistrict 10 Office1603 South B Street Stockton, CA 95206
AGENDA
2
1:30 pm
1:55 pm
2:25 pm
2:45 pm
Welcome & Purpose of the Outreach
Scope, Schedule, Utilization
DPAC Process
Questions and Answers
1:40 pm Roundtable Introductions
2:05 pm Networking
3:00 pm Adjourn
PURPOSE OF THIS OUTREACH Networking & Partnering Opportunity
Contract Overview
Information Sharing
Question and Answer Session
3
ROUNDTABLE INTRODUCTION Participant Name, Title (Plan to be a Prime or Sub)
Name of Firm/Affiliations/Certifications
Any previous experiences and area of expertise
Goals for attending this event
4
GENERAL INFORMATION
• Location: Caltrans District 10 boundary (Alpine, Amador, Calaveras, Mariposa, Merced, San Joaquin, Stanislaus and Tuolumne Counties)
• Scope: The Consultant shall perform consultation, research, professional and technical services required for Roadway Design and related Project Development and Construction Support Services, on an on-call basis.
• Cost: Contract Estimated value is $7 - 11 million
• Duration: Contract term will be 5 years, New task Orders first 36 months and last 2 years to complete work.
• Existing Contract is 06A2033 – Current Prime Consultant is NCM ENGINEERING CORP
5
SCOPE OF SERVICES Deliverables include the following type of work, but not limited to:
Project Approval & Environmental Document Phase (PA&ED) “Phase 0” Engineering studies and preliminary design during the PA&ED phase that will support the environmental evaluation and project approval.
Approved PID Review
Develop Geometric Plans for Project Alternatives
Environmental Studies Request
Determine Utility Locations for Preliminary Engineering
Hydraulic Analysis
Storm Water Data Report
Highway Planting Design Concepts
Update R/W Data Sheet
Fact Sheets for Design Exceptions
Updated Transportation Management Plan
Draft Project Report (DPR)
Final Project Report (PR)
10
SCOPE OF SERVICES CONTINUED Deliverables include the following type of work, but not limited to: Plans, Specifications and Estimate (PS&E) “Phase 1”
Prepare Base Maps and Plan Sheets for PS&E Development Produce Plan Sheets (30%, 60%, 95% draft plans) Functional Unit Request Update SWDR, TMP and RWDS Prepare Roadway Standard Special Provisions (SSP’s) Attain High/Low Risk Utility Policy and other Certifications. Calculate Preliminary Engineer’s Estimate Final District PS&E (100% PS&E) Prepare Resident Engineer Pending File Produce Survey File Produce Slope Staking Notes Prepare Design Project History File
10
SCHEDULE ACTIVITIES
1. WBS 100 Project Management2. WBS 185 Prepare Base Maps and Plan Sheets for PS&E3. WBS 205 Obtain Permits, Agreements, Etc.. During PS&E4. WBS 230 Prepare Draft PS&E5. WBS 255 Circulate, Review, and Prepare Final District PS&E Package6. WBS 260 Ready to List Contract Bid Documents7. WBS 265 Contract Award8. WBS 270 Construction Support and Administration (RFI,s, Design Updates)9. WBS 285 Review Contract Change Orders and make Recommendations10. WBS 295 Accept Final Construction Report
11
FIELD REVIEWS
GATHER INPUT FROM VARIOUS REPRESENTATIVES / FUNCTIONAL
UNITS INVOLVED.. I.E. MAINTENANCE PERSONAL AND
CONSTRUCTION..
SITE VISIT – IDENTIFY CHANGES TO SITE CONDITIONS (I.E. PAVEMENT
CONDITIONS)
12
IDENTIFY CHANGE IN SITE CONDITIONS, PROBLEM AREAS, RIGHT OF WAY
CONSTRAINTS. SECURE AGREEMENT ON DESIGN FEATURES OR ALTERNATIVES
Key : Communicate with Project Team, identify and document risk, and focus on the addressing the project’s purpose and need. Avoid scope creep.
UTILITY FIELD REVIEWS AND POSITIVE LOCATION (POS-LOC) OF INVOLVED UTILITIES
FIELD REVIEW OF UTILITIES AND POTENTIAL UTILITY CONFLICT RESOLUTION. CONFIRM UTILITY LOCATION BY POSITIVE-LOCATION.
SCOPE OUT CONDITIONS OF UTILITIES INVOLVED IN THE FIELD AND POTENTIAL RIGHT OF WAY ISSUES.
13
MILESTONES M200 PA&ED
M210 Begin Design
M224 Right of Way Requirements
M225 Regular Right of Way
M310 Design Safety Review Meeting
M313 60% Design Constructability Review
M315 95% Design Constructability Review
M377 Final PS&E to District Office Engineer
M410 Right of Way Certification
M460 Ready to List
M495 Award
M500 Approve Contract
14
TYPES OF PROJECTS
16
CAPM EAST OF BUCK MEADOWSSTANISLAUS AUXILIARY LANEDRAINAGE RESTORATIONALPINE CULVERT REHABALP/AMA/TUO CULVERT REHAB
SR120 MVP & ROADSIDE PAVING
SR108 INTERSECTION IMPROVEMENT
TUOLUMNE DRAINAGE RESTORATIONINSTALL TRAFFIC SIGNALSJ CULVERTSSR99 MERCED REHAB (2R)MER, MPA, STA Rumble Strips
SR99 STA DECELACCEL LANES PMR18.9
SR4 MVP and ROADSIDE PAVINGSR 120 SLOPE REPAIRSSR 108 TUOLUMNE WIRE MESHRAMP REALIGNMENTSTA/SJ SIGNS AND LIGHTINGDRAINAGE SYSTEM RESTORATIONSR4 SR26 RUMBLE STRIPMER-152, 165 ADA FACILITIESSR 205 SMART CORRIDOR
TENTATIVE SCHEDULE
Advertisement Week of 9/28/17SOQ Due Week of 10/27/17Interview Week of 11/9/17Cost Negotiation Week of 11/30/17Award & Execution Week of 12/5/17
18
OFFICE OF BUSINESS & ECONOMIC OPPORTUNITY (OBEO)
DBE Participation Goal is 18-22%
Voluntary Use of Small Businesses
17
NETWORKING
Time to meet and connect with fellow conference attendees to establish subcontracting and partnering connections
19
ENHANCED SELECTION PROCESS
Presentation available on DPAC’s website at:
http://www.dot.ca.gov/hq/dpac/enhancedprocessdocuments.htm
8
DPAC WEBSITE
For information and procedures on Caltrans A&E contracts, visit the Division of Procurements and Contracts (DPAC) website:
http://www.dot.ca.gov/hq/dpac/aeinfo.htm
http://www.dot.ca.gov/hq/dpac/ae/doc/lookahead.pdf
20
QUESTION AND ANSWER SESSION
Outreach information including questions and answers will be posted on DPAC A&E website.
http://www.dot.ca.gov/hq/dpac/aeinfo.htm
21