design of desilting chamber
DESCRIPTION
Design of silting basinTRANSCRIPT
Hydraulic Design of Sedimentation chamber
Parameters
Design discharge (including Flushing and Overload Discharge)= 5.76
Particle size to be removed = +0.20 mm
= 0.20 m/sec
= 0.019 m/sec
Design calculations
Width proposed(W) = 7 mDepth required(D) = Q( Full supply depth)
= 4.18 m
Moderated settling velocity =
= 0.018 m/sec
Settling length =Settling velocity
= 43.31 m
Length = 45.00 mWidth = 7.00 mDepth = 5.00 m
Cumecs
Flow through velocity Vf
Settling velocity Vs
Wxvf
Vs-0.132xVs
D^1/2
Flow through velocityxDepth
Provide desilting tank-