Updated 05/24/2018Printed 06/28/2019 Page 1 of 1 Project No. 45743-C
DESIGN & CONSTRUCTION GROUPTHE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZAALBANY, NY 12242
CONSTRUCTION WORK PROVIDE LEAD MITIGATION
TROY STATE ARMORY99 SOUTH LAKE AVENUE
TROY, NEW YORK
ADDENDUM NO. 1 TO PROJECT NO. 45743
July 11, 2019
NOTE:This Addendum forms a part of the Contract Documents.Insert it in the Project Manual.Acknowledge receipt of this Addendum in the space provided on the Bid Form.
1. Revised Drawing: Drawing Nos. H-201 through H-204 noted “REVISED DRAWING 06/20/2019”accompany this Addendum and supersede the same numbered originally issues drawings.
END OF ADDENDUM
Erik T. Deyoe, P.E.Director, Division of DesignDesign & Construction
UNEXCAVATED
UNEXCAVATED
PROVIDE CONCRETE INFILL IN THIS
AREA OF ROOM B9 TO MATCH
EXISTING CONCRETE FLOOR LEVEL.
DESIGN & CONSTRUCTION
45743-C
H-201
PHASE 1 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 10'
BASEMENT FLOOR
H-201
1
LEGEND
PHASE LIMITS
Phase 1 - Finish ScheduleRoom Room Function Floor Wall Ceiling Window Systems Miscellaneous
B1 NYG Supply Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell
B3 NYG Supply Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell
B4 Female Locker Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell
B6 Boiler Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell
B7 Storage Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell
B8 Storage Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell
B9 Storage Closet Infill with Concrete, Epoxy withGrit Additive*
Encapsulant Encapsulant -
B10 Stairs Epoxy Floor with Grit Additive* Paint - -B10A Corridor Epoxy Floor with Grit Additive* Paint Paint -B10B Corridor Epoxy Floor with Grit Additive* Paint Paint -B10C Outside Stair (Not in Contract)
B10D Corridor Epoxy Floor with Grit Additive* Paint Paint -*In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application ontobrick or concrete block walls, provide epoxy cove base up to the horizontal grout seam closest to 4".
RUBBER
FLOOR THIS
AREA ONLY
DESIGN & CONSTRUCTION
45743-C
H-202
PHASE 2 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 10'
FIRST FLOOR
H-202
1
LEGEND
PHASE LIMITS
Phase 2 - Finish ScheduleRoom Number Room Function Floor Wall Ceiling Window Systems Miscellaneous
A-1 Drill Hall
Entire Floor - Epoxy with GritAdditive*
- - Provide (3) EntranceRunners at DoorwaysArea With Exercise Equipment -
Interlocking Rubber Tiles - 700square feet (as shown)
A-2 Provide Wax on Existing VCT - - -A-2.1 - - - -A-3 - - - -
A-3.1 - - - -A-4 - - - -A-5 - - - -A-6 - - - -
A-7 - - Provide Drop Ceiling andReattach all Light Fixtures - Provide (3) Entrance
Runners at Doorways
Corridor Outside Rm A-2 - - Provide Drop Ceiling andReattach all Light Fixtures - Provide (2) Entrance
Runners at Doorways
A-8 - - - - -A-9 - - - - -
A-10 Epoxy with Grit Additive* - - - -*In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or concreteblock walls, provide epoxy cove base up to the horizontal grout seam closest to 4".
DESIGN & CONSTRUCTION
45743-C
H-203
PHASE 3 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 10'
FIRST FLOOR
H-203
1
LEGEND
PHASE LIMITS
Phase 3 - Finish ScheduleRoom Number Room Function Floor Wall Ceiling Window Systems Miscellaneous
102 - - - -103 - - - -
103-1 Carpet Tile and 4" Rubber Cove Base - - Provide New Window Blinds103-2 - - - -103-4 - - - -104 - - - -
104-1 - - - -104-2 - - - -105 Carpet Tile and 4" Rubber Cove Base - - Provide New Window Blinds
106 - - - -Provide (1) Entrance
Runners at Stair Landing/ Entrance
106-A - - Provide Drop Ceiling andReattach all Light Fixtures -
Provide (1) EntranceRunners at Main
Entrance106-B - - - -106-C - - - -107 - - - -108 - - - -109 - - - -110 Carpet Tile and 4" Rubber Cove Base - - Provide New Window Blinds
DESIGN & CONSTRUCTION
45743-C
H-204
PHASE 4 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 10'
SECOND FLOOR
H-204
2
SCALE: 1" = 10'
THIRD FLOOR
H-204
3
LEGEND
PHASE LIMITS
Phase 4 - Finish ScheduleRoom Number Room Function Floor Wall Ceiling Window Systems
First Floor106 - - - -
Second Floor201 - - - -
201A - - - -201B - - - -202 VCT and 4" Rubber Cove Base - - -
203 - - Provide Drop Ceiling andReattach all Light Fixtures -
203A VCT and 4" Rubber Cove Base - - Provide New Window Blinds203B - - - -204 VCT and 4" Rubber Cove Base - - Provide New Window Blinds205 VCT and 4" Rubber Cove Base - - Provide New Window Blinds206 VCT and 4" Rubber Cove Base - - Provide New Window Blinds
206-1 VCT and 4" Rubber Cove Base - - -207 VCT and 4" Rubber Cove Base - - Provide New Window Blinds
208 VCT and 4" Rubber Cove Base - Provide Drop Ceiling andReattach all Light Fixtures Provide New Window Blinds
208-A VCT and 4" Rubber Cove Base - - Provide New Window Blinds209 VCT and 4" Rubber Cove Base - - Provide New Window Blinds210 - - - -211 - - - -212 - - - -213 VCT and 4" Rubber Cove Base - - Provide New Window Blinds
213A VCT and 4" Rubber Cove Base - - -214 VCT and 4" Rubber Cove Base - - Provide New Window Blinds215 - - - -
215A - - - -215B - - - -216 - - - -217 - - - -
217A VCT and 4" Rubber Cove Base - - -217B - - - -217C - - - -
217D Provide Wax on Existing VCT - Provide Drop Ceiling andReattach all Light Fixtures -
217E - - - -217F - - -217G - - - -
Third Floor301 - - - Provide New Window Blinds
301-A Provide Wax on Existing VCT - Provide Drop Ceiling andReattach all Light Fixtures -
301-B - - - Provide New Window Blinds302 - - - Provide New Window Blinds303 - - - Provide New Window Blinds304 - - - Provide New Window Blinds305 - - - Provide New Window Blinds
305.1 - - - -306 - - - Provide New Window Blinds307 - - - Provide New Window Blinds
SCALE: 1" = 15'
FIRST FLOOR
H-204
1