design and construction of the machico---caniÇal … · of the machico---caniÇal -caniÇal...
TRANSCRIPT
DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION OF THE MACHICOOF THE MACHICOOF THE MACHICOOF THE MACHICO----CANIÇAL CANIÇAL CANIÇAL CANIÇAL
EXPRESSWAY TUNNELSEXPRESSWAY TUNNELSEXPRESSWAY TUNNELSEXPRESSWAY TUNNELS
Carlos BaiãoCarlos BaiãoCarlos BaiãoCarlos BaiãoCenorgeoCenorgeoCenorgeoCenorgeo
[email protected]@[email protected]@cenor.pt
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PRESENTATION LAYOUT
• Overall considerations
• Geological conditions
• Geological-geotechnical survey
• Caniçal Double Tunnel
• Conclusions
• Acknowledgments
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
OVERALL CONSIDERATIONS
• Geotechnical works in Madeira Island, in particular road tunnels, are greatly affected by:
– The extensive geological heterogeneity
– The structural and lithological complexity of the volcanic formations
– The rugged terrain – The rugged terrain
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
OVERALL CONSIDERATIONS
• This was overcome with the use of:
– Powerful means of earth removal with impressive production rates
– Sprayed concrete and soil nailing applied as temporary tunnel linings
– Large amounts of concrete as definitive tunnel linings using large-scale metallic formworks metallic formworks
– The jet-grouting technique at affordable costs
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
OVERALL CONSIDERATIONS
• This presentation will focus on the region of Machico, namely on the Machico--Caniçal Expressway (about 8 kilometers long), located on the southeastern part of Madeira Island
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
OVERALL CONSIDERATIONS
• The Machico-Caniçal Expressway comprises six tunnels (all of which aredouble) and two access roads; Caniçal Double Tunnel is the longest of the sixtunnels (2 x 2100 m) and remains the longest double tunnel in Portugal
Fazenda Tunnel
Queimada II Tunnel
(and Access Road A)
Fazenda Tunnel
(and Access Road E)
CaniçalCaniçalCaniçalCaniçal
Double TunnelDouble TunnelDouble TunnelDouble Tunnel Palmeira
TunnelPortais
Tunnel
Piquinho
Tunnel
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
OVERALL CONSIDERATIONS
DESIGNATIONDESIGNATIONDESIGNATIONDESIGNATIONWIDTH WIDTH WIDTH WIDTH
(m)(m)(m)(m)AREA OF EXCAVATED AREA OF EXCAVATED AREA OF EXCAVATED AREA OF EXCAVATED CROSSCROSSCROSSCROSS----SECTION (mSECTION (mSECTION (mSECTION (m2222))))
TOTAL TOTAL TOTAL TOTAL LENGTH (m)LENGTH (m)LENGTH (m)LENGTH (m)
MAXIMUM MAXIMUM MAXIMUM MAXIMUM COVERING (m)COVERING (m)COVERING (m)COVERING (m)
• The table below lists the main characteristics of the six tunnels (and its roadaccesses, when applicable) included in the Machico-Caniçal Expressway
Queimada II Tunnel 9,0 75 745 95
Access Road A 7,0 57 202 70
Piquinho Tunnel (double) 9,0 75 2 x 449 35
Fazenda Tunnel (double) 9,0 75 2 x 163 30
Access Road E 7,0 57 185 40
Caniçal Double Tunnel 9,0 75 2 x 2100 > 300
Portais Tunnel (double) 9,0 75 2 x 682 100
Palmeira Tunnel (double) 9,6 83 2 x 915 60
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
OVERALL CONSIDERATIONS
Total length of expressway (m) 7 770
• Along the short stretch of expressway between Machico and Caniçal, tunnelsaccount for a very significant part - 66% of the route corresponds tounderground construction
Total length of expressway (m) 7 770
Total number of tunnels (including double tunnels andaccess roads in tunnels) 14
Total development of tunnels (including double tunnelsand access roads in tunnels) (m) 10 493
Total development of tunnel layout (including doubletunnels and access roads in tunnels) (m) 5 096
RELATIONSHIPRELATIONSHIPRELATIONSHIPRELATIONSHIP BETWEENBETWEENBETWEENBETWEEN THETHETHETHE DEVELOPMENTDEVELOPMENTDEVELOPMENTDEVELOPMENT OFOFOFOF TUNNELTUNNELTUNNELTUNNELLAYOUTLAYOUTLAYOUTLAYOUT ANDANDANDAND TOTALTOTALTOTALTOTAL DEVELOPMENTDEVELOPMENTDEVELOPMENTDEVELOPMENT OFOFOFOF EXPRESSWAYEXPRESSWAYEXPRESSWAYEXPRESSWAY ((((%%%%)))) 66666666
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
GEOLOGICAL CONDITIONS
• The expressway crosses the volcanic complexes ß1 and ß2, as shown on theplant below:
β1: comprises different pyroclasticmaterials, as well as intercalations ofbasaltic lava flow, always very weathered.The pyroclastic formations are coarse,The pyroclastic formations are coarse,chaotic, with great angular blocks,volcanic bombs, lapilli and ashes.Sometimes fine pyroclastic materials(tuffs with bombs) are predominant
β2: very heterogeneous complex formedby alternate irregular layers of basalticlava flow and breccia pyroclasticmaterials, generally interstratified, withless significant intercalations of compacttuffs. Sometimes alternate layers ofdisaggregate and compact brecciaspresent significant thickness, but alwaysvariable and irregular
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
GEOLOGICAL CONDITIONS
• The following photos illustrate both complexes (ß1 and ß2):
ß1 - Tuffs with volcanic bombs
ß2 - Basaltic lava flow
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
GEOLOGICAL CONDITIONS
• The following photos illustrate both complexes (ß1 and ß2):
ß2 - Pyroclastic lappili deposit
ß2 - Pyroclastic fine tuffs
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
GEOLOGICAL-GEOTECHNICAL SURVEY
• The geotechnical investigation carried out was based on detailed geologicalsurface surveys and geological prospecting using trenches and boreholescomprised basically of rotation boring
• A total of 146 borings were made along the expressway, making up 3071meters of drillingmeters of drilling
• Considering the average costs of the investigation works, the followingconclusions can be drawn:
– To each kilometer of expressway corresponds an average of 100 000€ ofprospecting work
– Each tunnel has associated an average of 40 000€ of prospecting work
– These costs correspond to around 0.5 to 1.0% of the total cost of theconstruction network
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
QUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNEL
Year of opening 2004
Total length (m) 745
Lay-bys -
Connecting galleries for vehicles
-
VIEW OF THE SOUTHERN PORTAL
vehicles
Pedestrian evacuation galleries
-
ACCESS ROAD AACCESS ROAD AACCESS ROAD AACCESS ROAD A
Total length (m) 202
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
Access Road AQueimada II Tunnel
Queimada I Tunnel
QUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNEL
Year of opening 2004
Total length (m) 745
Lay-bys -
Connecting galleries for vehicles
-
VIEW OF THE NORTHERN PORTAL
Access Road Avehicles
Pedestrian evacuation galleries
-
ACCESS ROAD AACCESS ROAD AACCESS ROAD AACCESS ROAD A
Total length (m) 202
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNEL
Year of opening 2004
VIEW OF THE SOUTHERN PORTAL
Year of opening 2004
Total length (m) 2x449
Lay-bys -
Connecting galleries for vehicles
-
Pedestrian evacuation galleries
2
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x449
Lay-bys -
Connecting galleries for vehicles
-
Pedestrian evacuation galleries
2
VIEW OF THE NORTHERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
Access Road EFazenda Tunnel
FAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNEL
Year of opening 2004
Total length (m) 2x163
Lay-bys -
Connecting galleries for vehicles
-Access Road E
Fazenda Tunnelvehicles
Pedestrian evacuation galleries
-
ACCESS ROAD EACCESS ROAD EACCESS ROAD EACCESS ROAD E
Total length (m) 185
VIEW OF THE SOUTHERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
Access Road EFazenda Tunnel
FAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNEL
Year of opening 2004
Total length (m) 2x163
Lay-bys -
Connecting galleries for vehicles
-vehicles
Pedestrian evacuation galleries
-
ACCESS ROAD EACCESS ROAD EACCESS ROAD EACCESS ROAD E
Total length (m) 185
VIEW OF THE NORTHERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x2100
Lay-bys 3
Connecting galleries for vehicles
1
Pedestrian evacuation galleries
8
VIEW OF THE WESTERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x2100
Lay-bys 3
Connecting galleries for vehicles
1
Pedestrian evacuation galleries
8
VIEW OF THE EASTERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x682
Lay-bys 1
Connecting galleries for vehicles
-
Pedestrian evacuation galleries
4
VIEW OF THE WESTERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x682
Lay-bys 1
Connecting galleries for vehicles
-
Pedestrian evacuation galleries
4
VIEW OF THE EASTERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x915
Lay-bys 1
Connecting galleries for vehicles
1
Pedestrian evacuation galleries
4
VIEW OF THE WESTERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
PALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNEL
Year of opening 2004Year of opening 2004
Total length (m) 2x915
Lay-bys 1
Connecting galleries for vehicles
1
Pedestrian evacuation galleries
4
VIEW OF THE EASTERN PORTAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• The Caniçal Double Tunnel figures as the most representative and emblematictunnel constructed along the Machico-Caniçal Expressway
• The tunnel comprises two galeries 15 m apart in a straight direction with anaverage distance of 2100 m and a constant inclination of 3,5% in the northerngallery and 3,65% in the southern gallerygallery and 3,65% in the southern gallery
• West Portal is located at level 70 on Machico side and East Portal is located atlevel 140 on Caniçal side
• The opening of this tunnel, in 2004, set an alternative to the Old CaniçalTunnel to get from Machico to Caniçal
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
Location of the Western Portals of the Old Caniçal Tunnel(in light blue) and of the Double Caniçal Tunnel (in yellow)
Old Caniçal Tunnel tansversetype cross-section
Eastern Portal of the OldCaniçal Tunnel
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• The transverse type cross-section of each gallery of the Caniçal Double Tunnelhas a working width between walls of 9,0 m and a maximum height of 7,75 m,ensuring a minimum clearance of 5,0 m
• The roadway profile is comprised of a two-lane carriageway (2 x 3,25 m), anouter shoulder of 0,75 m wide and an inner hard shoulder of 0,25 m wide, plusouter shoulder of 0,75 m wide and an inner hard shoulder of 0,25 m wide, plustwo passing places which form the limits of the platform
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• At the eastern end of its stretch the tunnel galleries have a widened sectionwhose working width between walls at the start of the stretch varies from 9,0 mto 12,25 m, remaining constant at 12,25 m until the end of the stretch
• The widening of the section was performed in order to enable the constructionof an additional traffic lanes which comprise the exit and the entry lanes to theof an additional traffic lanes which comprise the exit and the entry lanes to theCaniçal road junction
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• Given its large extension, the tunnel was equipped with 3 emergency parkinglay-bys in each gallery (in yellow), 1 connecting gallery between the two centrallay-bys which enables light vehicles to reverse in the event of an accident (inblue) and 8 pedestrian evacuation galleries (in red)
KM 2+780 KM 2+980 KM 3+180 KM 3+380 KM 3+580
KM 3+780 KM 3+980 KM 4+180 KM 4+380
FUNCHAL
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• Layout of the central emergency parking lay-by and its connecting gallery:
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• Overall view of the lay-by during the application of the waterproofing system(on the left) and after the completion of the secondary lining (on the right)
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• Based on the lithological and structural characteristics of the formationscrossed by the tunnel, geotechnical zoning of the rock mass was carried out
• 4 zones were defined, covering all foreseeable situations, each correspondingto a level of rock mass quality and behaviour:
– ZG1 zone: essentially comprised of compact basalts and compact breccia
– ZG2 zone: comprised of resistant rocks (faulted basalts) ocasionallyintercalated with layers of materials of poorer characteristics
– ZG3 zone: comprised of rocks of weak resistance and compacted orloosely consolidated soils, such as disaggregated breccia, compact tuffand compact tufa with volcanic bombs
– ZG4 zone: encompassed all the formations of geotechnical zone ZG3 butwas associated with stretches of shallow covering or with an importantpresence of water
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• Primary and secondary linings were defined for each geotechnical zone asfollows:
ZG1ZG1ZG1ZG1 ZG2ZG2ZG2ZG2 ZG3 and ZG4ZG3 and ZG4ZG3 and ZG4ZG3 and ZG4(1)(1)(1)(1)
PRIM.PRIM.PRIM.PRIM.
LININGLININGLININGLINING
OccasionalOccasionalOccasionalOccasional
4 m Swellex rock bolts and 5 cm
of shotcrete
4 m Swellex rock bolts at 2 m intervals in the vault and 5 to 10 cm of shotcrete with metallic
fibers
HEB160 steel ribs, AQ50 electro-welded steel mesh and 10cm of shotcrete
SEC. SEC. SEC. SEC. LININGLININGLININGLINING
Reinforced concrete layer 0.25 m thick Reinforced concrete layer 0.4 m thick
(1) ZG4 differs from ZG3 in the spacing of steel ribs: at 1m intervals in ZG3 and 0.70m intervals in ZG4
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CANIÇAL DOUBLE TUNNEL
• Safety concerns were given great emphasis and an evolved system,comprising the installation of the following control and safety equipments, wasimplemented:
– Power supply
– Lighting– Lighting
– Ventilation
– Signalization
– Communications
– Control systems CCTV
– Auscultation
– Fire detection and fire extinguisher systems
– Fire hydrants
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
CONCLUSIONS
• Tunnels play a major role in the development of road networks under conditionssuch as the ones found in Madeira Island; the percentage of tunnel length of theMachico-Caniçal Expressway is unique (66%), mainly due to the vigorous relief ofthe island
• Concerning the design, although considering the significant limitations• Concerning the design, although considering the significant limitationsassociated with the nature of the volcanic rock mass of Madeira Island, it ispossible to improve the geological recognition in order to obtain the necessaryguidelines to define the geotechnical zoning and the primary and secondarylinings
•The construction of expressways in geotechnical and topographical conditions asunfavorable as those of this case can only be successful if, from the initial designstage, the geological and geotechnical constraints are exhaustively incorporated
DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS
ACKNOWLEDGMENTS
• The authors are greatly indebted to Estradas da Madeira of the RegiãoAutónoma da Madeira for authorizing the publication of this paper, as well as allthe entities involved in the construction of the Machico-Caniçal Expresswaytunnels
THANK YOU VERY MUCH
FOR YOUR ATTENTION