DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION OF THE MACHICO OF THE MACHICO OF THE MACHICO OF THE MACHICO- - -CANIÇAL CANIÇAL CANIÇAL CANIÇAL EXPRESSWAY TUNNELS EXPRESSWAY TUNNELS EXPRESSWAY TUNNELS EXPRESSWAY TUNNELS Carlos Baião Carlos Baião Carlos Baião Carlos Baião Cenorgeo Cenorgeo Cenorgeo Cenorgeo [email protected] [email protected] [email protected] [email protected]

Upload: dinhnhu

Post on 26-Dec-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION DESIGN AND CONSTRUCTION OF THE MACHICOOF THE MACHICOOF THE MACHICOOF THE MACHICO----CANIÇAL CANIÇAL CANIÇAL CANIÇAL

EXPRESSWAY TUNNELSEXPRESSWAY TUNNELSEXPRESSWAY TUNNELSEXPRESSWAY TUNNELS

Carlos BaiãoCarlos BaiãoCarlos BaiãoCarlos BaiãoCenorgeoCenorgeoCenorgeoCenorgeo

[email protected]@[email protected]@cenor.pt

Page 2: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PRESENTATION LAYOUT

• Overall considerations

• Geological conditions

• Geological-geotechnical survey

• Caniçal Double Tunnel

• Conclusions

• Acknowledgments

Page 3: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

OVERALL CONSIDERATIONS

• Geotechnical works in Madeira Island, in particular road tunnels, are greatly affected by:

– The extensive geological heterogeneity

– The structural and lithological complexity of the volcanic formations

– The rugged terrain – The rugged terrain

Page 4: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

OVERALL CONSIDERATIONS

• This was overcome with the use of:

– Powerful means of earth removal with impressive production rates

– Sprayed concrete and soil nailing applied as temporary tunnel linings

– Large amounts of concrete as definitive tunnel linings using large-scale metallic formworks metallic formworks

– The jet-grouting technique at affordable costs

Page 5: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

OVERALL CONSIDERATIONS

• This presentation will focus on the region of Machico, namely on the Machico--Caniçal Expressway (about 8 kilometers long), located on the southeastern part of Madeira Island

Page 6: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

OVERALL CONSIDERATIONS

• The Machico-Caniçal Expressway comprises six tunnels (all of which aredouble) and two access roads; Caniçal Double Tunnel is the longest of the sixtunnels (2 x 2100 m) and remains the longest double tunnel in Portugal

Fazenda Tunnel

Queimada II Tunnel

(and Access Road A)

Fazenda Tunnel

(and Access Road E)

CaniçalCaniçalCaniçalCaniçal

Double TunnelDouble TunnelDouble TunnelDouble Tunnel Palmeira

TunnelPortais

Tunnel

Piquinho

Tunnel

Page 7: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

OVERALL CONSIDERATIONS

DESIGNATIONDESIGNATIONDESIGNATIONDESIGNATIONWIDTH WIDTH WIDTH WIDTH

(m)(m)(m)(m)AREA OF EXCAVATED AREA OF EXCAVATED AREA OF EXCAVATED AREA OF EXCAVATED CROSSCROSSCROSSCROSS----SECTION (mSECTION (mSECTION (mSECTION (m2222))))

TOTAL TOTAL TOTAL TOTAL LENGTH (m)LENGTH (m)LENGTH (m)LENGTH (m)

MAXIMUM MAXIMUM MAXIMUM MAXIMUM COVERING (m)COVERING (m)COVERING (m)COVERING (m)

• The table below lists the main characteristics of the six tunnels (and its roadaccesses, when applicable) included in the Machico-Caniçal Expressway

Queimada II Tunnel 9,0 75 745 95

Access Road A 7,0 57 202 70

Piquinho Tunnel (double) 9,0 75 2 x 449 35

Fazenda Tunnel (double) 9,0 75 2 x 163 30

Access Road E 7,0 57 185 40

Caniçal Double Tunnel 9,0 75 2 x 2100 > 300

Portais Tunnel (double) 9,0 75 2 x 682 100

Palmeira Tunnel (double) 9,6 83 2 x 915 60

Page 8: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

OVERALL CONSIDERATIONS

Total length of expressway (m) 7 770

• Along the short stretch of expressway between Machico and Caniçal, tunnelsaccount for a very significant part - 66% of the route corresponds tounderground construction

Total length of expressway (m) 7 770

Total number of tunnels (including double tunnels andaccess roads in tunnels) 14

Total development of tunnels (including double tunnelsand access roads in tunnels) (m) 10 493

Total development of tunnel layout (including doubletunnels and access roads in tunnels) (m) 5 096

RELATIONSHIPRELATIONSHIPRELATIONSHIPRELATIONSHIP BETWEENBETWEENBETWEENBETWEEN THETHETHETHE DEVELOPMENTDEVELOPMENTDEVELOPMENTDEVELOPMENT OFOFOFOF TUNNELTUNNELTUNNELTUNNELLAYOUTLAYOUTLAYOUTLAYOUT ANDANDANDAND TOTALTOTALTOTALTOTAL DEVELOPMENTDEVELOPMENTDEVELOPMENTDEVELOPMENT OFOFOFOF EXPRESSWAYEXPRESSWAYEXPRESSWAYEXPRESSWAY ((((%%%%)))) 66666666

Page 9: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

GEOLOGICAL CONDITIONS

• The expressway crosses the volcanic complexes ß1 and ß2, as shown on theplant below:

β1: comprises different pyroclasticmaterials, as well as intercalations ofbasaltic lava flow, always very weathered.The pyroclastic formations are coarse,The pyroclastic formations are coarse,chaotic, with great angular blocks,volcanic bombs, lapilli and ashes.Sometimes fine pyroclastic materials(tuffs with bombs) are predominant

β2: very heterogeneous complex formedby alternate irregular layers of basalticlava flow and breccia pyroclasticmaterials, generally interstratified, withless significant intercalations of compacttuffs. Sometimes alternate layers ofdisaggregate and compact brecciaspresent significant thickness, but alwaysvariable and irregular

Page 10: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

GEOLOGICAL CONDITIONS

• The following photos illustrate both complexes (ß1 and ß2):

ß1 - Tuffs with volcanic bombs

ß2 - Basaltic lava flow

Page 11: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

GEOLOGICAL CONDITIONS

• The following photos illustrate both complexes (ß1 and ß2):

ß2 - Pyroclastic lappili deposit

ß2 - Pyroclastic fine tuffs

Page 12: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

GEOLOGICAL-GEOTECHNICAL SURVEY

• The geotechnical investigation carried out was based on detailed geologicalsurface surveys and geological prospecting using trenches and boreholescomprised basically of rotation boring

• A total of 146 borings were made along the expressway, making up 3071meters of drillingmeters of drilling

• Considering the average costs of the investigation works, the followingconclusions can be drawn:

– To each kilometer of expressway corresponds an average of 100 000€ ofprospecting work

– Each tunnel has associated an average of 40 000€ of prospecting work

– These costs correspond to around 0.5 to 1.0% of the total cost of theconstruction network

Page 13: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

QUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNEL

Year of opening 2004

Total length (m) 745

Lay-bys -

Connecting galleries for vehicles

-

VIEW OF THE SOUTHERN PORTAL

vehicles

Pedestrian evacuation galleries

-

ACCESS ROAD AACCESS ROAD AACCESS ROAD AACCESS ROAD A

Total length (m) 202

Page 14: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

Access Road AQueimada II Tunnel

Queimada I Tunnel

QUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNELQUEIMADA II TUNNEL

Year of opening 2004

Total length (m) 745

Lay-bys -

Connecting galleries for vehicles

-

VIEW OF THE NORTHERN PORTAL

Access Road Avehicles

Pedestrian evacuation galleries

-

ACCESS ROAD AACCESS ROAD AACCESS ROAD AACCESS ROAD A

Total length (m) 202

Page 15: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNEL

Year of opening 2004

VIEW OF THE SOUTHERN PORTAL

Year of opening 2004

Total length (m) 2x449

Lay-bys -

Connecting galleries for vehicles

-

Pedestrian evacuation galleries

2

Page 16: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNELPIQUINHO TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x449

Lay-bys -

Connecting galleries for vehicles

-

Pedestrian evacuation galleries

2

VIEW OF THE NORTHERN PORTAL

Page 17: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

Access Road EFazenda Tunnel

FAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNEL

Year of opening 2004

Total length (m) 2x163

Lay-bys -

Connecting galleries for vehicles

-Access Road E

Fazenda Tunnelvehicles

Pedestrian evacuation galleries

-

ACCESS ROAD EACCESS ROAD EACCESS ROAD EACCESS ROAD E

Total length (m) 185

VIEW OF THE SOUTHERN PORTAL

Page 18: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

Access Road EFazenda Tunnel

FAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNELFAZENDA TUNNEL

Year of opening 2004

Total length (m) 2x163

Lay-bys -

Connecting galleries for vehicles

-vehicles

Pedestrian evacuation galleries

-

ACCESS ROAD EACCESS ROAD EACCESS ROAD EACCESS ROAD E

Total length (m) 185

VIEW OF THE NORTHERN PORTAL

Page 19: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x2100

Lay-bys 3

Connecting galleries for vehicles

1

Pedestrian evacuation galleries

8

VIEW OF THE WESTERN PORTAL

Page 20: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNELCANIÇAL DOUBLE TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x2100

Lay-bys 3

Connecting galleries for vehicles

1

Pedestrian evacuation galleries

8

VIEW OF THE EASTERN PORTAL

Page 21: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x682

Lay-bys 1

Connecting galleries for vehicles

-

Pedestrian evacuation galleries

4

VIEW OF THE WESTERN PORTAL

Page 22: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNELPORTAIS TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x682

Lay-bys 1

Connecting galleries for vehicles

-

Pedestrian evacuation galleries

4

VIEW OF THE EASTERN PORTAL

Page 23: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x915

Lay-bys 1

Connecting galleries for vehicles

1

Pedestrian evacuation galleries

4

VIEW OF THE WESTERN PORTAL

Page 24: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

PALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNELPALMEIRA TUNNEL

Year of opening 2004Year of opening 2004

Total length (m) 2x915

Lay-bys 1

Connecting galleries for vehicles

1

Pedestrian evacuation galleries

4

VIEW OF THE EASTERN PORTAL

Page 25: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• The Caniçal Double Tunnel figures as the most representative and emblematictunnel constructed along the Machico-Caniçal Expressway

• The tunnel comprises two galeries 15 m apart in a straight direction with anaverage distance of 2100 m and a constant inclination of 3,5% in the northerngallery and 3,65% in the southern gallerygallery and 3,65% in the southern gallery

• West Portal is located at level 70 on Machico side and East Portal is located atlevel 140 on Caniçal side

• The opening of this tunnel, in 2004, set an alternative to the Old CaniçalTunnel to get from Machico to Caniçal

Page 26: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

Location of the Western Portals of the Old Caniçal Tunnel(in light blue) and of the Double Caniçal Tunnel (in yellow)

Old Caniçal Tunnel tansversetype cross-section

Eastern Portal of the OldCaniçal Tunnel

Page 27: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• The transverse type cross-section of each gallery of the Caniçal Double Tunnelhas a working width between walls of 9,0 m and a maximum height of 7,75 m,ensuring a minimum clearance of 5,0 m

• The roadway profile is comprised of a two-lane carriageway (2 x 3,25 m), anouter shoulder of 0,75 m wide and an inner hard shoulder of 0,25 m wide, plusouter shoulder of 0,75 m wide and an inner hard shoulder of 0,25 m wide, plustwo passing places which form the limits of the platform

Page 28: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• At the eastern end of its stretch the tunnel galleries have a widened sectionwhose working width between walls at the start of the stretch varies from 9,0 mto 12,25 m, remaining constant at 12,25 m until the end of the stretch

• The widening of the section was performed in order to enable the constructionof an additional traffic lanes which comprise the exit and the entry lanes to theof an additional traffic lanes which comprise the exit and the entry lanes to theCaniçal road junction

Page 29: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• Given its large extension, the tunnel was equipped with 3 emergency parkinglay-bys in each gallery (in yellow), 1 connecting gallery between the two centrallay-bys which enables light vehicles to reverse in the event of an accident (inblue) and 8 pedestrian evacuation galleries (in red)

KM 2+780 KM 2+980 KM 3+180 KM 3+380 KM 3+580

KM 3+780 KM 3+980 KM 4+180 KM 4+380

FUNCHAL

Page 30: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• Layout of the central emergency parking lay-by and its connecting gallery:

Page 31: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• Overall view of the lay-by during the application of the waterproofing system(on the left) and after the completion of the secondary lining (on the right)

Page 32: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• Based on the lithological and structural characteristics of the formationscrossed by the tunnel, geotechnical zoning of the rock mass was carried out

• 4 zones were defined, covering all foreseeable situations, each correspondingto a level of rock mass quality and behaviour:

– ZG1 zone: essentially comprised of compact basalts and compact breccia

– ZG2 zone: comprised of resistant rocks (faulted basalts) ocasionallyintercalated with layers of materials of poorer characteristics

– ZG3 zone: comprised of rocks of weak resistance and compacted orloosely consolidated soils, such as disaggregated breccia, compact tuffand compact tufa with volcanic bombs

– ZG4 zone: encompassed all the formations of geotechnical zone ZG3 butwas associated with stretches of shallow covering or with an importantpresence of water

Page 33: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• Primary and secondary linings were defined for each geotechnical zone asfollows:

ZG1ZG1ZG1ZG1 ZG2ZG2ZG2ZG2 ZG3 and ZG4ZG3 and ZG4ZG3 and ZG4ZG3 and ZG4(1)(1)(1)(1)

PRIM.PRIM.PRIM.PRIM.

LININGLININGLININGLINING

OccasionalOccasionalOccasionalOccasional

4 m Swellex rock bolts and 5 cm

of shotcrete

4 m Swellex rock bolts at 2 m intervals in the vault and 5 to 10 cm of shotcrete with metallic

fibers

HEB160 steel ribs, AQ50 electro-welded steel mesh and 10cm of shotcrete

SEC. SEC. SEC. SEC. LININGLININGLININGLINING

Reinforced concrete layer 0.25 m thick Reinforced concrete layer 0.4 m thick

(1) ZG4 differs from ZG3 in the spacing of steel ribs: at 1m intervals in ZG3 and 0.70m intervals in ZG4

Page 34: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CANIÇAL DOUBLE TUNNEL

• Safety concerns were given great emphasis and an evolved system,comprising the installation of the following control and safety equipments, wasimplemented:

– Power supply

– Lighting– Lighting

– Ventilation

– Signalization

– Communications

– Control systems CCTV

– Auscultation

– Fire detection and fire extinguisher systems

– Fire hydrants

Page 35: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

CONCLUSIONS

• Tunnels play a major role in the development of road networks under conditionssuch as the ones found in Madeira Island; the percentage of tunnel length of theMachico-Caniçal Expressway is unique (66%), mainly due to the vigorous relief ofthe island

• Concerning the design, although considering the significant limitations• Concerning the design, although considering the significant limitationsassociated with the nature of the volcanic rock mass of Madeira Island, it ispossible to improve the geological recognition in order to obtain the necessaryguidelines to define the geotechnical zoning and the primary and secondarylinings

•The construction of expressways in geotechnical and topographical conditions asunfavorable as those of this case can only be successful if, from the initial designstage, the geological and geotechnical constraints are exhaustively incorporated

Page 36: DESIGN AND CONSTRUCTION OF THE MACHICO---CANIÇAL … · OF THE MACHICO---CANIÇAL -CANIÇAL EXPRESSWAY TUNNELS Carlos Baião Cenorgeo carlos.baiao@cenor.pt. DESIGN AND CONSTRUCTION

DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE DESIGN AND CONSTRUCTION OF THE MACHICOMACHICOMACHICOMACHICO----CANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELSCANIÇAL EXPRESSWAY TUNNELS

ACKNOWLEDGMENTS

• The authors are greatly indebted to Estradas da Madeira of the RegiãoAutónoma da Madeira for authorizing the publication of this paper, as well as allthe entities involved in the construction of the Machico-Caniçal Expresswaytunnels

THANK YOU VERY MUCH

FOR YOUR ATTENTION