    Some Guidelines

    A) Process Economics - Plant Cost Estimation

    B Process Control Methods

    th

    1

  • 7/31/2019 Design 2011 Ecocomics and Control

    2/22

    Income - from sales, annual/monthly Expenses

    fixed incl. cost of Ca ital

    variable (per unit sold)

    -30 years for process equipment)

    ro t oss c art o accounts, a st

    2

  • 7/31/2019 Design 2011 Ecocomics and Control

    3/22

    Account to 31 Au Bud et variance

    7-0415 New Site Preparations

    7-04151 Site- Concrete Pad & Prep 105,971.50 159,820.00 -53848.50

    7-04152 Site- Temp Services & Connect 372.90 14,200.00 -13827.10

    7-04153 Site - Utilities (Electricity) 71,737.88 150,000.00 -78262.12

    7-04154 Site - Utilities (Natural Gas) 42,577.27 90,000.00 -47422.73

    7-04155 Site - Utilities (Water) 5,537.92 12,000.00 -6462.08

    7-04156 Site - Fence Install & hire 0.00 29,010.00 -29010.00

    7-04157 Site - Miscellaneous & Advert. 4,269.11 5,000.00 -730.89

    7-04158 Site Office Set Up & Rental 17,947.38 48,350.00 -30402.62

    - , . , . .

    7-04160 Innova Labour & Proj. Mgmt 0.00 14,278.85 -14278.857-0415 New Site Preparations - Other 0.00 44,169.00 -44169.00

    Total 7-0415 New Site Preparations 304,459.14 611,827.85 -307368.71

    7-0420 Springvale Lab Treatability St

    7-0421 Springvale Soil Analysis 9,425.85

    7-0420 Springvale Lab Treatability St - Other 0.00 20,000.00 -20000.00

    Total 7-0420 Springvale Lab Treatability St 9,425.85 20,000.00 -10574.15

    7-0430 Mobilise, Transport & Set Up

    7-04301 Break Up Electrical Contractor 17,707.53 45,000.00 -27292.47

    3

  • 7/31/2019 Design 2011 Ecocomics and Control

    4/22

    Earnings before Interest and Taxation (EBIT)

    , ,Amortisation (EBITDA)

    Net Profit after Taxation (NPAT).

    Balance Sheet: Assets

    Liabilities

    Depreciation Net Tangible Assets (NTA).Fire sale

    J Lucas 2008 4

  • 7/31/2019 Design 2011 Ecocomics and Control

    5/22

    -

    Year End 30/06/2008 30/06/2009 30/06/2010 30/06/2011 30/06/2012

    Tonnes 10500 33000 110000 135000 155000

    % of Capacity 6% 19% 31% 39% 44%

    Sales ($'000) 4,471 7,616 25,445 32,825 38,875

    EBIT ($'000) -179 -636 5,200 7,755 12,922

    EBITDA ($'000) 15 -150 6,135 8,851 14,032

    NPAT ($'000) -125 -445 3,640 5,429 9,046

    Issued Shares (number) 15,707,255 23,707,255 23,707,255 23,707,255 23,707,255

    EPS (cents) -0.8 -1.9 15.4 22.9 38.2

    NTA's ($'000) 3,583 5,137 10,078 14,719 22,979

    NTA's/Share (cents) 22.8 21.7 42.5 62.1 96.9

    NET DEBT ($'000) 1,935 1,861 4,992 1,271 -2,389

    NET DEBT/NTA'S 0.54 0.36 0.50 0.09 N/A

    ENTERPRISE VALUE ($'000) - - 29,120 43,432 72,368

    5

    (Based on 8 x Earnings Multiple)

    ENTERPRISE VALUE/SHARE ($) - - $1.23 $1.83 $3.05

  • 7/31/2019 Design 2011 Ecocomics and Control

    6/22

    07/08 08/09 09/10 10/11 11/12

    NPAT ($'000) -125 -445 3,640 5,429 9,046

    EARNINGS

    MULTIPLE

    6 - - 21,840 32,574 54,276

    $0.92/share $1.37/share $2.29/share

    7 - - 25,480 38,003 63,322

    $1.07/share $1.60/share $2.67/share

    - - , , ,

    $1.23/share $1.83/share $3.05/share

    9 - - 32,760 48,861 81,414

    . . .

    10 - - 36,400 54,290 90,460

    $1.54/share $2.29/share $3.82/share

    6

  • 7/31/2019 Design 2011 Ecocomics and Control

    7/22

    Investment/Purchase on NTAs Investment/Purchase on Earnings Multiples

    Pa back Period time for investment aid

    back -

    NPV net present value (purchase value) IRR internal rate of return on investment

    7

  • 7/31/2019 Design 2011 Ecocomics and Control

    8/22

    Perry

    Direct Quotation (requires someone's time, rarelydonated for a non- a in ro ect challen e for

    student projects) 2nd Hand Equipment Sales

    Personal Experience

    Consultation with the experienced Estimation methods rules of thumb

    six tenths rule scaling: C2 = C1*(Q2/Q1)**0.6

    8

  • 7/31/2019 Design 2011 Ecocomics and Control

    9/22

    Industrial Land Purchase - $100-$300 /m2

    20 year lease - $8-$20/m2/annum

    Statutor A rovals and Licences $60-150K for variation/6-12 months

    $400-$1M for new/12-36 months

    Basic Site Establishment

    $30 /m2 for raw/Brownfield site $5 /m2 for previously occupied site

    Buildin s - $800-$1200 /m2

    Services Power - $150K per 1000 Amps

    Gas $100K er 40 GJ/hr Water $50K

    Other $20K

    9

  • 7/31/2019 Design 2011 Ecocomics and Control

    10/22

    Materials Mild Steel - $2000 per tonne

    Stainless Steel - $10,000 per tonne

    Fiberglass ??

    Information

    xo cs - , per onne

    Fabrication Consumables Mild steel minimal $20 per day

    1 kg wire per hour 3 m weld per hour

    $45 per kg wire

    Basic: 40-50 hours per tonne

    Intricate: 80-90 hours per tonne

    Highly complex/specialist: 100-120 hours per tonne Labour Rates: $60 - $80 per hour

    10

  • 7/31/2019 Design 2011 Ecocomics and Control

    11/22

    Pumps Motors and Drives - $10K per unit ar ware: nstrumentat on an ensors - per

    unit

    ec r ca ns a a on = os o ar ware Control Systems = 50% Cost of Hardware

    Installation

    Commissioning ..etc..

    11

  • 7/31/2019 Design 2011 Ecocomics and Control

    12/22

    Sort key

    (hide

    column) MODIFICATIONS / CHANGES / ADDITIONS Supplier

    CURRENT COST

    ESTIMATE

    Task 1 Replacement of Twin Screw Auger with Single Shaft Pugmill $132,000Sub Task 1.1 Pug mill - single shaft, paddle mixer arms ASTEC _ USA $105,000

    Sub Task 1.2 Electrical design/control mods CI $1,000Sub Task 1.3 Electrical installation BBE $1,000Sub Task 1.4 Water cooled refractory lined transition screw for converter dust transfer MCM $25,000

    Task 2 Replacement of tipper valve with Double Dump Valve $10,500

    Sub Task 2.1 Double dump valve Filtaire - Melbourne $7,500

    u as . ec r ca es gn con ro mo s ,

    Sub Task 2.3 Electrical installation BBE $2,000Task 3 Replacement of feed screw with Slinger Belt Feeder $32,000

    Sub Task 3.1 Slinger Belt ASTEC _ USA $20,000Sub Task 3.2 Electrical design/control mods CI $1,000

    Sub Task 3.3 Electrical installation BBE 1 000Sub Task 3.4 Dogbox modifications (steel work) MCM $10,000Sub Task 3.5 Dogbox modifications (refractory) TBA $5,000

    Task 4 Drier skid / Lifter modifications for Items 1-3 (HEIGHT INCREASE 1.8m) $57,000

    Sub Task 4.1 Electrical works allowing removal of skid BBE $3,000

    Sub Task 4.2 Electrical modifications (new junction box/cable extensions) BBE $5,000Sub Task 4.3 Modification of skid MCM $10,000

    Sub Task 4.4 Transportation and cranage TBA $4,000Sub Task 4.5 Extension of electrical cables BBE $3,000

    12

  • 7/31/2019 Design 2011 Ecocomics and Control

    13/22

    -

    -

    Cranes - $320 per hour nsurances - - pa

    Land Rates

    Workers Comp 9% Legal Fees - $10K per transaction

    Company Overheads 20-30 %

    Maintenance - $3 er tonne roduced/ rocessed Labour Rates Professionals - APESMA

    13

  • 7/31/2019 Design 2011 Ecocomics and Control

    14/22

    Acid Scrubber

    $500K

    Bag House

    $480K

    J Lucas 2008 14$250K Install$130K Install

  • 7/31/2019 Design 2011 Ecocomics and Control

    15/22

    -

    .

    Hand Sketch parameters you think should be measured.

    Develop a hierarchy, eg Critical redundancy

    Interlocks

    Alarms

    Monitor Visual

    Think about benefit of Cascade Control

    Feed Forward or other advanced (Add limit switches, motion detectors advanced)

    15

  • 7/31/2019 Design 2011 Ecocomics and Control

    16/22

    -

    , , , ,

    Set alarms

    Set Interlocks pec y a sa es

    E-Stops

    Work out Operating Procedures

    Start-up

    Standard Operation

    Shutdown

    Emergency Shutdown

    All the above are related to the Control Strategy

    Commissioning Plan is quite Separate

    Change Management Plan - advanced

    16

  • 7/31/2019 Design 2011 Ecocomics and Control

    17/22

    Control needs to be communicated at several levels:

    Overview strategy and principles - PPT

    -

    Detail P&ID report/appendix

    Start with a ood readable le end courtes Bo le et al

    17

    - Annotate PFD

    - Develop Control Loopsetc

  • 7/31/2019 Design 2011 Ecocomics and Control

    18/22

    ow ery mp e xamp es

    Breakdown into sections

    18

  • 7/31/2019 Design 2011 Ecocomics and Control

    19/22

    Show Very Simple Examples

    Breakdown into sections

    19

  • 7/31/2019 Design 2011 Ecocomics and Control

    20/22

    e eta s are n t s eport rea own nto ect ons

    20

  • 7/31/2019 Design 2011 Ecocomics and Control

    21/22

    ,

    80 Measurement

    300 Alarms

    Extract Slide - example

  • 7/31/2019 Design 2011 Ecocomics and Control

    22/22

    Extract Slide - example