desain fasilitas penerima lng berdasarkan nfpa 59a studi
TRANSCRIPT
![Page 1: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/1.jpg)
Desain Fasilitas Penerima LNG
berdasarkan NFPA 59A Studi Kasus
PLTG Gilimanuk, PLTG Pemaron, dan
PLTG Pesanggaran
![Page 2: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/2.jpg)
DAFTAR ISI
Pendahuluan
Metodologi
Analisa dan Pembahasan
![Page 3: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/3.jpg)
LatarBelakang
RumusanMasalah
BatasanMasalah
Tujuan
PENDAHULUAN
![Page 4: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/4.jpg)
Latar Belakang
Sebuah terminal LNG skala kecil (mini LNG terminal) di Celukan Bawang,
Buleleng Bali akan dioperasikan untuk menerima dan menyalurkan gas alam
menuju 3 pembangkit listrik di Bali. PLTG Gilimanuk di ujung barat pulau Bali
dengan kapasitas 200 MW, PLTG Pesanggaran di Denpasar dengan kapasitas
133.8 MW serta PLTG pemaron di Singaraja dengan kapasitas 97.6 MW.
Moda transportasi darat dengan truk dipilih sebagai alternatif transportasi LNG
untuk mendistribusikan LNG menuju PLTG Gilamanuk dan PLTG Pemaron.
Sedangkan moda transportasi laut dengan mini LNG Carrier atau barge dipilih
sebagai alternatif transportasi LNG menuju PLTG Pesanggaran.
![Page 5: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/5.jpg)
Latar Belakang
LNG Barge
PLTG Gilimanuk (133.8 MW)PLTG Pemaron (97.6 MW)
PLTG Pesanggaran (200.3 MW)
CelukanBawang
Menuju Gilimanukdan Pemaron
Menuju Pesanggaran
Desain Fasilitas Penerima?
Model Transportasi?
![Page 6: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/6.jpg)
Tujuan
Mendesain fasilitas penerima pada PLTG Gilimanuk,
PLTG Pemaron, dan PLTG Pesanggaran yang sesuai
dengan standar, kondisi, dan kebutuhan pembakit.
Mendesain fasilitas penerima pada PLTG Gilimanuk,
PLTG Pemaron, dan PLTG Pesanggaran dalam lay
out 3 dimensi beserta process flow diagram.
Mendesain model transportasi LNG dari Receiving
Terminal Celukan Bawang menuju PLTG Gilimanuk,
PLTG Pemaron, dan PLTG Pesanggaran.yang
memiliki biaya investasi paling minimum.
![Page 7: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/7.jpg)
Batasan
Model distribusi LNG dari Receiving Terminal Celukan Bawang menuju
PLTG Gilimanuk dan PLTG Pemaron hanya menggunakan moda
transportasi truk.
Model distribusi LNG dari Receiving Terminal Celukan Bawang menuju
PLTG Pemaron hanya menggunakan moda transportasi kapal atau
barge.
Desain merupakan spesifikasi-spesifikasi utama dari fasilitas penerima
LNG beserta process flow diagram (PFD)
Kebutuhan gas diasumsikan dapat dipenuhi secara keseluruhan.
![Page 8: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/8.jpg)
METODOLOGI PENGERJAAN
SpesifikasiFasilitas
PFD Lay OutModel
Transportasi
Here comes your footer Page 8
![Page 9: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/9.jpg)
METODOLOGI PENGERJAAN
Here comes your footer Page 9
![Page 10: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/10.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Spesifikasi teknis PLTG Gilimanuk
Uraian Data Data Teknis
Tipe turbin 13E2
Merek ABB
Tahun operasi 1997
Putaran (RPM) 3000
Daya terpasang base (kW) 133800
Tipe generator WY2/Z-092LLT
Daya terpasang (kVA) 182750
Tegangan (kV) 16
Arus (Amp) 7698
![Page 11: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/11.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Lay Out PLTG Gilimanuk
![Page 12: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/12.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Hasil Survey Kawasan PLTG Gilimanuk
![Page 13: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/13.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Process Flow Diagram
![Page 14: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/14.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Persyaratan Plant and Sitting Lay Out NFPA 59A
![Page 15: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/15.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Lay Out
5.2.4.2
5.2.5.2
5.2.5.1
5.2.5.2
5.2.5.6
5.2.4.1
5.2.7.3
![Page 16: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/16.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Lay Out Tiga Dimensi
Here comes your footer Page 16
![Page 17: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/17.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Lay Out Tiga Dimensi
![Page 18: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/18.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
![Page 19: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/19.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG PEMARON
Data Lingkungan dan Informasi Kawasan PLTG Pemaron
![Page 20: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/20.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG PEMARON
Process Flow Diagram
![Page 21: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/21.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG PEMARON
Lay Out
Here comes your footer Page 21
![Page 22: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/22.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG PESANGGARAN
Data Lingkungan dan Informasi Kawasan Pelabuhan Benoa
![Page 23: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/23.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG PESANGGARAN
Process Flow Diagram
![Page 24: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/24.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG PESANGGARAN
Lay Out
Here comes your footer Page 24
![Page 25: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/25.jpg)
ANALISA DAN PEMBAHASANMODEL TRANSPORTASI
Menuju Gilimanuk1163.48 m³/day9 Trailer 40” (41 m³)3 roundtrip/day/trailer
Menuju Pemaron848.7 m³/day7 Trailer 40” (41 m³)3 roundtrip/day/trailer
Menuju Pesanggaran638176.95 m³/year
2 barge 300 feet (2160 m³)208 roundtrip/day/year
![Page 26: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/26.jpg)
Kesimpulan dan Saran
Studi Kasus PLTG Gilimanuk
Uraian Jumlah Satuan
Kebutuhan LNG 1163.48 m³/hari
Tangki Penyimpanan 12 x 300 m³
Safety stock 2 Hari
BOG compressor 160 Nm³/jam
Vaporizer 2 x 152 Nm³/jam
Primary pump 2 x 900 l/min
Secondary pump 2 x 900 l/min
![Page 27: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/27.jpg)
Kesimpulan dan Saran
Studi Kasus PLTG Pemaron
Uraian Jumlah Satuan
Kebutuhan LNG 848.7 m³/hari
Tangki Penyimpanan 8 x 300 m³
Safety stock 2 Hari
BOG compressor 160 Nm³/jam
Vaporizer 2 x 101 Nm³/jam
Primary pump 2 x 600 l/min
Secondary pump 2 x 600 l/min
![Page 28: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/28.jpg)
Kesimpulan dan Saran
Studi Kasus PLTG Gilimanuk
Uraian Jumlah Satuan
Kebutuhan LNG 1748.43 m³/hari
Tangki Penyimpanan 128x 300 m³
Safety stock 2 Hari
BOG compressor 160 Nm³/jam
Vaporizer 2 x 203 Nm³/jam
Primary pump 4 x 650 l/min
Secondary pump 4 x 650 l/min
![Page 29: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/29.jpg)
Perlu dilakukannya analisa risiko dari desain fasilitas penerima yang telah
didesain sebab penimbunan LNG dalam jumlah relatif besar secara
vertikal masih belum banyak dijumpai di beberapa fasilitas penerima
LNG.
Perlu dilakukannya simulasi transportasi LNG dari ORF Celukan Bawang
menuju setiap pembangkit listrik di Bali. Simulasi perlu dilakukan untuk
dapat memastikan perencanaan transportasi dapat memenuhi kebutuhan
LNG di setiap pembangkit secara kontinyu.
Kesimpulan dan Saran
![Page 30: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/30.jpg)
Terima kasih
![Page 31: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/31.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Perhitungan kebutuhan LNG dan kapasitas penyimpanan
Uraian Jumlah Satuan
Kapasitas PLTG 133.8 MW
Safety stock 2 Hari
Total kebutuhan gas 26.76 MMSCFD
Total kebutuhan LNG 195348 TPY
Total kebutuhan LNG 535.2 TPD
Total kebutuhan LNG 424669.57 m³/tahun
Total kebutuhan LNG 1163.48 m³/hari
Total kebutuhan LNG 48.48 m³/jam
Estimasi kapasitas total tangki 1605.6 Ton
Estimasi kapasitas total tangki 3490.43 m³ LNG
![Page 32: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/32.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Spesifikasi dan jumlah tangki
Kebutuhan kapasitas penyimpanan 3490.43 m³
Kapasitas per tangki 300 m³
Design pressure 8 bar
Design BOG rate 0.08 %
Tinggi tangki 28 M
Diameter tangki 4.30 M
Jumlah tangki 12
Kapasitas total 3600 m³
Back to PFD
![Page 33: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/33.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Perhitungan dan spesifikasi kompresor BOG
Uraian Jumlah Satuan
BOG rate 0.08 %
BOG rate (LNG) 2.79 m³/hari
BOG rate (gas) 1675.4 m³/hari
BOG normal rate 69.8 Nm³/jam
Model kompresor TS2/130-E2
Kapasitas 160 Nm³/jam
Inlet pressure 1.08 Bar
Outlet pressure 7 Bar
Jumlah langkah 2
Putaran 490 RPM
Installed power 11 kW
Back to PFD
![Page 34: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/34.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Perhitungan dan spesifikasi unit regasifikasiUraian Jumlah Satuan
Kebutuhan suplai gas 48.48 m³/jam
Waktu operasi 24 Jam/hari
Kapasitas nominal 106.65 Nm³/jam
Syarat tekanan 15 bar
AAV Model SG 70 HF
Kapasitas nominal 152 Nm³/jam
Connecton size DN 25
Luas permukaan 54 m²
Berat 184 Kg
Panjang 1210 Mm
Lebar 900 Mm
Tinggi 3860 Mm
Jumlah vaporizer 2
Tekanan 15 Bar
Back to PFD
![Page 35: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/35.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Perhitungan dan spesifikasi pompaKebutuhan kapasitas 48.48 m³/jam
Tekanan menuju recondenser 7 bar
Tekanan menuju vaporizer 15 bar
LP pump model DSM 230
Tipe Centrifugal
Kapasitas LP pump 900 l/min
Kapasitas LP pump 54 m³/jam
Tekanan LP pump 7 Bar
HP pump model SGM 185
Tipe Centrifugal
Kapasitas LP pump 900 l/min
Kapasitas LP pump 54 m³.jam
Tekanan LP pump 15 bar
Back to PFD
![Page 36: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/36.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Pemodelan Transportasi LNG Menuju PLTG Gilimanuk
![Page 37: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/37.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Pemodelan Transportasi LNG Menuju PLTG Gilimanuk
Back to Map
![Page 38: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/38.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Pemodelan Transportasi LNG Menuju PLTG Pemaron
![Page 39: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/39.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Pemodelan Transportasi LNG Menuju PLTG Pemaron
Back to Map
![Page 40: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/40.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Pemodelan Transportasi LNG Menuju PLTG Pesanggaran
![Page 41: Desain Fasilitas Penerima LNG berdasarkan NFPA 59A Studi](https://reader031.vdocuments.mx/reader031/viewer/2022012505/6180b2489ddb39449f19cea9/html5/thumbnails/41.jpg)
ANALISA DAN PEMBAHASANSTUDI KASUS: PLTG GILIMANUK
Pemodelan Transportasi LNG Menuju PLTG Pesanggaran
Back to Map