Rehabilitation of the Urban Water Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)
CURRENT SITUATION AND THE EXISTING PROBLEM The existing sewer system is a combined system, which collects the wastewater produced in households, industrial
wastewater, and small companies as well as storm water. At the moment, approximate between 50% and 55% of the water consumers in the city of Derventa are connected to the sewer system, while the rest 45% discharge their wastewater into septic tanks and open pits.
The pipe network consists of the pipes with the materials of PVC and concrete.
The existing sewer system has the following defects to be improved through the works to being tendered: · The existing sewer system is insufficient to collect the wastewater produced in the city of Derventa. The piping system is in
poor condition due to the poor maintenance and improper connections. · The discharge of the untreated wastewater without authorisation into the oxbow lake of the Ukrina river and other tributaries
of the Ukrina river as well as the Ukrine river has caused not only the serious pollution in the Ukrina river but also in the downstream of the Sava river.
· The hydraulic overload has caused the blockage of the collector in the Gakovac settlement, which has lead to a frequent overflow of the wastewater onto the ground surface.
· The dimension of the existing collector on the left bank of the Ukrine river is not sufficient as to allow any more connection of sewerage pipe. Thus, a new collector is required to be constructed to collect and discharge the wastewater collected in the
new settlement “Lug” on the left bank. · There are several “weak points”, which have insufficient hydraulic capacity due to the inadequate dimensions or gradients, in
the existing sewage system.
![Page 3: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/3.jpg)
Description of the Works: Lot B1 – In the northern part of the Derventa city, a new HDPE collector with diameters of DN 400-DN800 and length of ~2,000 m shall be
laid along the road from the “Banja Luka”, in order to transport the wastewater collected by the existing branches to the future WWTP. The dimension of this new collector shall be calculated under consideration of the future development along the road “Banja Luka”. Under the new bridge, because the existing pumping station (PS 2) is out of the operation, the new collector shall be connected to the
existing overflow structure (SWO 4). In this phase, the wastewater collected by the new collector will be discharged into the Ukraine River through the SWO4.
The sewerage pipe (DN 300 – DN 500, concrete) which is laid in the northern part and connected to the Pump Station “PS3” shall be disconnected from the PS3 and connected to the new collector.
Lot B2 - In order to collect the wastewater produced in the area along the road to “Banja Luka” and the refugee settlement “Lug” as well as the areas in the southern part of the Derventa City, the new sewerage networks which consists of ~ 2,400 m DN300-DN400 HDPE pipes shall be laid and the house connection shall be constructed.
The wastewater collected by this new network will be discharged into the new main collector which shall be constructed in Lot B-1 by a new pump stations PS 4 & PS5 (LOT B-3)
Lot B3: PS 1 and SWO 2 - Regarding to the Pumping Station PS 1, the investigation shall be carried out by the Contractor through pipe flushing and
camera inspection (250 m from the starting point) to make clear if there is sewerage in the pipes, which should be connected to the pumps, and where the sewerage is discharged. 2. PS 2 and SWO 4 - The Pumping Station PS 2 will not be in operation and therefore not be rehabilitated in this phase. The Pumping Station
PS 2 will not be connected with the new sewage pipe within this project. The new sewage pipe will pass the PS 2 and will divert the sewage directly into Ukrina River. Future Project foresees operation of PS2 and downstream collector up to the Treatment Plant.
3. PS 4 - In order to lift the wastewater collected by the new sewer network and the existing sewerage pipe (DN 300) to the new main collector, new pumping station PS 4 using submersible non-clog pumps shall be constructed. The two pumps will operate on an on-duty/stand-by basis. Each pump shall provide a capacity of 72 m³/h
4. PS 5 – In order to lift the wastewater collected by new PS4, connection of existing collectors at abandoned PS3, new pumping station PS5 using 4nr submersible non-clog pumps shall be constructed. 2nr pumps will provide a capacity of 2x540m3/h and 2nr small pumps - 2x180m3/h.
![Page 4: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/4.jpg)
CORRUGATED HDPE SN8 PIPES REHAU RAUVIA U-PVC SN8 PIPES REHAU
![Page 5: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/5.jpg)
PREFABRICATED MANHOLES BINIS PREFABRICATED MANHOLES BINIS
![Page 6: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/6.jpg)
MANHOLE COVERS – PAM REXESS DIRT CATCHERS
![Page 7: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/7.jpg)
GEOTEXTILE: M-PROINTEX GRUNDFOS PUMPS (S, SE & SEV SERIES)
![Page 8: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/8.jpg)
Lot B1 Collector Line
DN800 – L=598m; DN600 – L=761m; DN400 – L=523m; DN300 – L=220m In total – 2.102,00m collector installed; 38nr of prefabricated manholes
![Page 9: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/9.jpg)
EXCAVATION WORKS TRENCH BRACING
![Page 10: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/10.jpg)
USE OF PIPE LASER
![Page 11: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/11.jpg)
![Page 12: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/12.jpg)
MAGISTERIAL ROAD CROSSING 1 / UNDERGROUND DRILLING
MAGISTERIAL ROAD CROSSING 2 / UNDERGROUND DRILLING
![Page 13: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/13.jpg)
USE OF GEO-TEXTING ON HIGH UNDERGROUND WATER TRENCH SECTIONS
INSPECTION MANHOLES ON EACH COLLECTOR DIRECTION CHANGE POINTS. MANHOLES PRODUCED BASED ON DETAILED DESIGN WITH SPECIFIED DIAMETERS AND ANGLES
![Page 14: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/14.jpg)
SURVEY CONTROL
![Page 15: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/15.jpg)
EXTENSION OF LOT B1 – DN300 COLLECTOR INSPECTION MANHOLE
![Page 16: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/16.jpg)
INSPECTION MANHOLE “DIRT TRAP” MANHOLE COVER
![Page 17: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/17.jpg)
TIGHTNESS TESTING AS PER EN1610
![Page 18: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/18.jpg)
CCTV INSPECTION AS PER ATV M 14, PART 2
![Page 19: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/19.jpg)
CCTV INSPECTION AS PER ATV M 14, PART 2
![Page 20: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/20.jpg)
PLATE LOAD TEST ON ROAD CROSSINGS REINSTATEMENT OF SURFACES - ASPHALTING
![Page 21: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/21.jpg)
Lot B2 Sewage Network
DN400 – L=274m DN300 – L=1,844m In total: 2,118m of collector installed; House connections – 126nr; Prefabricated manholes – 61nr
![Page 22: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/22.jpg)
COLLECTOR DN400 TRENCH EXCAVATION INSPECTION MANHOLE INSTALLATION
![Page 23: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/23.jpg)
INSPECTION MANHOLE INSTALLATION PIPE LASER GUIDED INSTALLATION
![Page 24: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/24.jpg)
PIPE LASER GUIDED INSTALLATION COLLECTOR DN300 TRENCH BRACING
![Page 25: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/25.jpg)
INSPECTION MANHOLE INSTALLATION INSPECTION MANHOLE INSTALLATION
![Page 26: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/26.jpg)
COLLECTION MANHOLES INSTALLATION
![Page 27: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/27.jpg)
COLLECTION MANHOLES DRILLING FOR U-PVC HOUSE CONNECTION PIPE
![Page 28: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/28.jpg)
U-PVC PIPE HOUSE CONNECTION TO THE COLLECTION MANHOLE
![Page 29: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/29.jpg)
COLLECTION MANHOLE – U-PVC HOUSE CONNECTIONS COLLECTION MANHOLE INSTALLATION
![Page 30: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/30.jpg)
Lot B3 Pumping Stations
PS1 – Cleaning, rehabilitation of Pumps and inclusion into the SCADA System; PS2 – Connection of new B1 Collector to existing PS2, discharging into Ukrina River over SWO4 structure. Future development foresees engagement of PS2 to pump the waste water downstream further from the City until the new Treatment Plant PS3 – Existing PS3 is to be abandoned, belonging Collectors to be connected to new B1 collector, existing pumps to be rehabilitated and transferred to new PS4; PS4 – new PS to be built for lifting the collector B2 elevation, 2nr pumps to be installed (2x20l/s, Hmax=12.4m); water level sensors, control and power cabinet to be installed, inclusion into SCADA System PS5 – new PS was to be built lifting the elevation of B1 collector, 2+2 pumps (2x150l/s + 2x50l/s) with lifting heights of 7.72m & 7.15m to be installed, water level sensors, control and power cabinet to be installed, inclusion into SCADA System
![Page 31: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/31.jpg)
EXISTING PUMPING STATION PS-1
![Page 32: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/32.jpg)
EXISTING PUMPING STATION PS-1
![Page 33: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/33.jpg)
EXISTING PUMPING STATION PS2 (CURRENTLY OUT OF FUNCTION)
FUTURE PROJECT FORESEES OPERATION OF PS-2 AND TRANSPORT OF SEWAGE TO THE PLANNED DOWNSTREAM TREATMENT PLANT
![Page 34: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/34.jpg)
EXISTING PUMPING STATION PS-2 TABLE VALVE ON SWO STRUCTURE
EXISTING PS-2 / SWO4 OUTLET TO RIVER “UKRINA”
![Page 35: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/35.jpg)
EXISTING PUMPING STATION PS-3, PLACED OUT OF OPERATION UNDER THE PROJECT
ABANDONED PS3, PUMP REHABILITATED AND TRANSFERRED TO NEW PS4
![Page 36: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/36.jpg)
![Page 37: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/37.jpg)
NEW PUMPING STATION PS-4
![Page 38: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/38.jpg)
PS-4 PENETRATING 1ST WALL ELEMENT
![Page 39: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/39.jpg)
1ST WALL ELEMENT LOWERING OF 1ST ELEMENT
![Page 40: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/40.jpg)
![Page 41: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/41.jpg)
![Page 42: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/42.jpg)
STORM WATER OVERFLOW STEEL DN400 PIPE
![Page 43: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/43.jpg)
INLET HDPE DN400 PIPE – FROM LOT B2 NETWORK OVERFLOW STEEL DN300 PIPE
![Page 44: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/44.jpg)
ROOF SLAB
![Page 45: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/45.jpg)
PRESSURE PIPES 2NR SWING CHECK VALVES DN150 TRANSITION DN300/150 WITH SWING CHECK VALVES
![Page 46: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/46.jpg)
INSTALLED 2NR SUBMERSIBLE NON-CLOG GRUNDFOS “SEV” PUMPS (2X23.30L/S, H=12.4M, 50HZ)
PS-4 OUTLET CHAMBER
![Page 47: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/47.jpg)
PS-4 TIGHTNESS TESTING (AS PER EN1610), PLUGGING BALONS
![Page 48: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/48.jpg)
![Page 49: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/49.jpg)
LOCATION OF NEW PUMPING STATION PS-5
![Page 50: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/50.jpg)
SEGMENTAL LOWERING – 1ST WALL’S SEGMENT
![Page 51: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/51.jpg)
SEGMENTAL LOWERING – 1ST WALL’S SEGMENT
![Page 52: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/52.jpg)
SEGMENTAL LOWERING – 1ST WALL’S SEGMENT LOWERING BY EXCAVATION
![Page 53: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/53.jpg)
SEGMENTAL LOWERING – 1ST WALL’S SEGMENT SEGMENTAL LOWERING – 2ND WALL’S SEGMENT
![Page 54: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/54.jpg)
SEGMENTAL LOWERING – 2ND WALL’S SEGMENT (INLET HDPE DN600 PIPE VISIBLE)
UNDERGROUND LOWERING OF THE 2ND WALL’S SEGMENT
![Page 55: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/55.jpg)
PREPARATION FOR UNDERWATER BASE PLUG CONCRETE INSTALLATION
PREPARATION FOR BASE PLUG CONCRETE INSTALLATION
![Page 56: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/56.jpg)
BASE PLUG CONCRETE INSTALLATION BASE SLAB REINFORCEMENT WORKS – OVER THE BASE PLUG CONCRETE SLAB
![Page 57: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/57.jpg)
MIDDLE SLAB CONSTRUCTION (OUTLET DN800 PIPE VISIBLE)
![Page 58: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/58.jpg)
TOP WALLS CONSTRUCTION INNER WALL – PRESSURE PIPES NOZZLE’S PENETRATIONS
![Page 59: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/59.jpg)
OUTLET CHAMBER (PRESSURE PIPES AND HDPE DN800 OUTLET PIPE)
TOP WALLS VIEW, DN500 OVERFLOW PIPE VISIBLE
![Page 60: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/60.jpg)
INNER WALL, PRESSURE PIPE NOZZLES OUTLET DN800 PIPE
![Page 61: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/61.jpg)
PS-5 ROOF SLAB REINFORCEMENT ROOF SLAB CONCRETE POURING
![Page 62: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/62.jpg)
![Page 63: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/63.jpg)
TIGHTNESS TESTING AS PER EN1610 OVERFLOW DN500 PIPE
![Page 64: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/64.jpg)
TIGHTNESS TESTING AS PER EN1610, PLUGGING BALLOONS
![Page 65: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/65.jpg)
TIGHTNESS TESTING AS PER EN1610, PLUGGING BALLOONS TIGHTNESS TESTING AS PER EN1610, CALCULATED ADDING WATER (ABSORPTION OF CONCRETE SURFACES)
![Page 66: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/66.jpg)
PRESSURE PIPES, SWING CHECK VALVES INSTALLATION PRESSURE PIPE PLINTH
![Page 67: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/67.jpg)
![Page 68: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/68.jpg)
CONTROL CABINET, SCADA SYSTEM VENTILATION PIPES AND ACCESS HATCHES
![Page 69: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/69.jpg)
2NR SUBMERSIBLE NON-CLOG GRUNDFOS “S2” PUMPS (2X150L/S, H=7.72M, 50HZ)
![Page 70: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/70.jpg)
WATER LEVEL SIGNALING PROBES; 2NR SUBMERSIBLE NON-CLOG GRUNDFOS “SE” PUMPS (2X50L/S, H=7.15M, 50HZ)
![Page 71: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/71.jpg)
OUTLET CHAMBER: PRESSURE PIPES, OUTLET DN800 HDPE PIPE
![Page 72: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/72.jpg)
CONTROL CABINET PUMP / SYSTEM TEST
![Page 73: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/73.jpg)
PUMP / SYSTEM TEST PUMP / SYSTEM TEST
![Page 74: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/74.jpg)
PUMP / SYSTEM TEST PUMP / SYSTEM TEST
![Page 75: Derventa City WW Project](https://reader033.vdocuments.mx/reader033/viewer/2022051213/55c4ce43bb61ebc3218b45ab/html5/thumbnails/75.jpg)
Lot A10 “Delivery of equipment for maintenance and proper operation”:
Lot A10 “Delivery of equipment for maintenance and proper operation”: Pick-up vehicle 4WD: NISSAN NAVARA DC 2.5 DCI LE Backhoe Loader: KOMATSU WB97S-5 Pipe Cutting Saw: STIHL TS420 Flat Bed Vehicle: RENAULT MASTER 2.5 DCI 150 Vibratory Rammer: WACKER BS 60-2i Asphalt Cutter: WACKER NEUSON BFS 1350 AL