department of public works and highways · 2020. 10. 9. · c.y. 2020 project detailed engineering...
TRANSCRIPT
C.Y. 2020 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR THE
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
PROJECT NET LENGTH: 445.00 ln.m.
RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES
POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
DATE :
EVA A. TRANI
SUBMITTED:
ACTING-CHIEF, PLANNING AND DESIGN SECTION
DATE :
CHRISTOPHER L. EBAL
RECOMMENDED:
ASSISTANT DISTRICT ENGINEER
DATE :
VERONICO O. MICARANDAYO
APPROVED:
DISTRICT ENGINEER
BRGY. POLO, DAPITAN CITY, ZAMBOANGA DEL NORTE
PROJECT LIMIT: K1825+251.70 - K1825+696.70
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
S01028MN
B00411MN
BRIDGE LIMITS: K1825+293.00 - K1825+655.40
BRIDGE LENGTH: 362.40 ln.m.
LP
LAYOUT PLAN
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
PROJECT LENGTH :
BEG. OF PROJECT ...................K1825+251.700
END OF PROJECT ....................K1825+696.700
PROJECT NET LENGTH ..............445.00 ln.m.
LAY-OUT PLAN
N. D. T. S.
1
RETROFITTING/STRENGTHENING SCHEME
C
L
7.32
B
AB
UT
. B
TO DAPITAN
END OF BRIDGE
K1825 + 655.40
AB
UT
. A
A
TO DIPOLOG
C
L
BEG. OF BRIDGE
K1825 + 293.00
BEG. OF PROJECT
K1825+251.70
END OF PROJECT
K1825+696.70
INDEX OF SHEETS
SET NO. SHEET NO.
SET NO. 1
BR-1 1 LAYOUT PLAN
BR-2 2 LOCATION MAP AND VICINITY MAP
BR-3 3 NOTES & SPECIFICATION
BR-4 4 SUMMARY OF QUANTITIES
BR-5 5 TYPICAL SECTION
BR-6 6 GENERAL PLAN, BLOW-UP
BR-7 7 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR, EPOXY INJECTION
BR-8 8 WATERPROOFING PLAN
BR-9 9 ASPHALT OVERLAY PLAN
BR-10 10 THERMOPLASTIC PAVEMENT MARKINGS PLAN
SET NO. 2
BR-11 11-13 TYPICAL TRAFFIC SIGNAGE LAYOUT, SPL1 -ADVANCE WARNING SIGNS & BARRICADES, PAVEMENT MARKINGS
BR-12 14 PROJECT BILLBOARD
BR011
PACKAGE B
A. APPLICATION OF CRP SHEETS ON SLAB(UNDERNEATH) LONGITUDINAL AT SPAN 14 AND TRANSVERSE AT SPAN 4-14.
B. STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR UNDERNEATH DECK SLAB AT SPAN 5-13.
C. REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS ON BRIDGE AND APPROACHES 445 ln.m.
PACKAGE A
A. APPLICATION OF CRP SHEETS ON SLAB(UNDERNEATH) LONGITUDINAL AT SPAN 1-4 AND SPAN 15-16.
B. STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR ON TOP DECK SLAB AT SPAN 9-16.
C. WATERPROOFING APPLICATION ON DECK SLAB EXCLUDING SIDEWALK AT SPAN 9-16.
D. ASPHALT OVERLAY ON DECK SLAB AND APPROACHES 376.63 ln.m.
LM,VM
LOCATION MAP
VICINITY MAP
EW
S
N
VICINITY MAP
LOCATION MAP
DAPITAN
CITY
RIZAL SHRINE
TAGUILON
RIZAL
PIÑAN
LA LIBERTAD
MUTIA
SERGIO OSMEÑA
SIBUTAD
ALIGUAY ISLAND
SILINOG ISLAND
PIÑAHON ISLAND
SINIPAY ISLAND
OBAY ISLAND
ISIS
LARAYAN
TO DIPOLOG
TO OROQUIETABARCELONA
TO DON VICTORIANO
TO
D
IP
OL
OG
TO MOLAVE
MACLEODES
TO PUNTA
DANSULLAN
POLO
SAN PEDRO
SAN VICENTE
DAKAK
PULAUAN
PORT
CANLUCANI
TAG-ULO
GUIMPUTLAN
BANBANAN
CARANG
BAYLIMANGO
STO. NIÑO
SINONOC
TALISAY
ORO
NAPO
DARO
PANGANURAN
SAWANG
SILLA POINT
KANIM
KAUSWAGAN
LIBAY
MA. CRISTINA
CALUBE
MAGSAYSAY
NASIPANG
SEBACA
BALUBOHAN
MABUNAO
NANGKA
MINLASAG
DAMASING
SIPALOC
DELAPA
MARAPONG
SIBULOC
OYAN
CALILIC
BAGACAY
RIZALINA
SAN ROQUE
NILABO
BIRAYAN
LA ESPERANZA
NANGKAAN
MITIMOS
TOLON
NEW
DAPITAN
POTUNGAN
S. MAPANG
N. MAPANG
LA UNION
DAMPALAN
OPAO
HILLTOP
ILAYA
BURGOS
TAMION
OYAN
SULANGON
ANTIPOLO
OWAON
LIYANG
SICAYAB BUCANA
POB. WEST
POB EAST
NAPILAN
MABUHAY
MAUSWAGON
DIWAAN
MA. URAY
BA-AO
VILLA HERMOSA
SAN MIGUEL
STO. NIÑO
GUINLES
LABRADOR
LETAPAN
SILAWE
SIANIB
ANASTACIO
DAPDAP
BANDERA
PIAN
LAPAYANBAJA
SIKOT
DANGI
NEW SICAYAB
SAN ANTONIO
LINGASAD
BACUYONG
ADANTE
SAN NICOLAS
POB. NORTH
POB. SOUTH
SEGABE
MAGANGON
DEL PILAR
ASENIERO
MASIDLAKON
SINGARAN
NEW CARACAR
SIPAON
STA. CRUZ
STA. CATALINA
NEW BATAAN
LA VICTORIA
NEW ARGAO
SAN JOSE
SAN FRANCISCO
MERCEDES
EL PARAISO
NEW CASUL
TUBAC
NEW SIQUEJOR
G. BERGADO
TOTONGON
DIOLEN
UNIDOS
BUENASUERTE
TINGLAN
ALVENDA
PASORIO
NEW LAND
HEAD TIPAN
DILAND
STO. TUMAS
SAN MIGUEL
UPPER GUMAY
DIONUM
LOWER GUMAY
LAPULAPU
SIGAYAN
SILANO
TINAYTAYAN
VILLARICO
CALICAN
DESIN
BETHLEHEM
LIBANGON
SAN PEDRO
MILAD
STA. FE
UBAY DAAN TIPAN
BAGONG SILANG
MALIGAYA
LINABO
DILAWA
SINAAD
STA. TERESITA
SAN FRANCISCO
MACALIBRE
MAHYAHAY
MABUHAY
MARAPONG
PRINCESA
PRESIA
NUEVA
VISTA
NEW RIZAL
NAZARETH
BAGONG BAYAN
SAN ANTONIO
NEBO
TINAGO
KAUSWAGAN
SAN ISIDERO
PEDAGAN
NEW TANGUB
DAMPALAN
LABIRAY
PRINCESA
LAMAYA
SAN JOSE
DANAO
SAN JUAN
VENUS
LIWANAG
BAJO
ALTO
BIAYON
WILBEN
DE VENTA PERLA
ANTONINO
SIKITAN
LUZVILLA
PENACIO
SITUBO
TUBURAN
BUENAVISTA
SINAI
DON ELINO
TININDUGAN
BAGONG BAGUIO
POLANCO
D
I
P
O
L
O
G
R
I
V
E
R
D
I
S
O
Y
R
I
L
A
Y
A
W
A
N
R
I
V
E
R
D
I
W
A
N
R
I
V
E
R
D
A
P
I
T
A
N
I
V
E
R
S A L U GR I V E R
UBAY
VE
R
R
S
A L
U
G
R
I
V
E
R
THIS SITE
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
DAPITAN
CITY
RIZAL SHRINE
TAGUILON
SIBUTAD
PIÑAHON ISLAND
SINIPAY ISLAND
OBAY ISLAND
POLO
SAN PEDRO
SAN VICENTE
DAKAK
CANLUCANI
TAG-ULO
GUIMPUTLAN
BANBANAN
CARANG
BAYLIMANGO
STO. NIÑO
SINONOC
TALISAY
ORO
NAPO
DARO
PANGANURAN
SAWANG
SILLA POINT
KANIMKAUSWAGAN
LIBAY
MA. CRISTINA
CALUBE
MAGSAYSAY
NASIPANG
MINLASAG
SIPALOC
DELAPA
MARAPONG
SIBULOC
OYAN
CALILIC
BAGACAY
HILLTOP
BURGOS
TAMION
OYAN
SULANGON
ANTIPOLO
OWAON
DIWAAN
MA. URAY
D
A
P
I
T
A
END OF PROJECT
K1825 + 696.70
BEG. OF PROJECT
K1825 + 251.70
1
BR02 2
NS
NOTES AND SPECIFICATION
NOTES AND SPECIFICATIONS:
ALL CARBON REINFORCED POLYMER PLATES SHALL HAVE THE TECHNICAL PROPERTIES:
SIZE OF PLATES WIDTHTHICKNESS CROSS SECTIONAL AREA (mm2)
2 inches
4 inches
50 mm
100 mm
1.2 mm
1.2 mm
60 mm
120 mm
TENSILE E-MODULUS - 165,000 N/mm2
TENSILE STRENGTH - 2,800 N/mm2
Mean Value of tensile strength at break - 3,050 N/mm2
Elongation at break - 1.7%
PLATE ADHESIVE SHALL BE PART OF THE SYSTEM OF THE STRUCTURAL STRENGTHENING PROCESS AND
SHALL CONFORMED WITH THE FOLLOWING TECHNICAL PROPERTIES:
THIXOTROPIC, STRUCTURAL TWO PART ADHESIVE, BASED ON A COMBINATION OF EPOXY RESINS AND SPECIAL FILLER,
DESIGNED FOR USE AT NORMAL TEMPERATURE BET. +8 DEG.CELCIUS AND +35 DEG. CELCIUS
DENSITY = 1.65 KG/L + 0.1 KG/L (PARTS A&B) (AT +23 DEG. CELCIUS)
SAG FLOW = ON VERTICAL SURFACES IT IS NON-SAG UP TO 3-5mm THK AT 35 DEG. CELCIUS
THERMAL EXPANSION COEFFICIENT = 2.5 X 10-5 PER DEG. CELCIUS (TEMP. RANGE -20 TO 40 DEG. CELCIUS
THERMAL STABILITY
CURING TIME CURING TEMPERATURETG
7 DAYS +45 DEG. CELCIUS +62 DEG. CELCIUS
SERVICE TEMPERATURE = -40 TO +45 DEG. CELCIUS
STRENGTH 1 DAY 3 DAYS 7 DAYS
COMPRESSIVE STRENGTH
SHEAR STRENGTH
85-95 N/mm2
TENSILE STRENGTH
15-18 N/mm2
23-28 N/mm2
85-95 N/mm2
16-19 N/mm2
25-30 N/mm2
85-95 N/mm2
16-19 N/mm2
26-31 N/mm2
(AT 35 DEG. CELCIUS)
BOND STRENGTH = ON STEEL > 21 N/mm2 (ACCORDING TO DIN EN 24624)
ON CONCRETE > 4 N/mm2 (CONCRETE FAILURE) (ACCORDING TO FIP)
E-MODULUS = COMPRESSIVE : 9,600 N/mm2 (AT +23 DEG. CELCIUS) ACCORDING TO ASTM D695
TENSILE : 11,200 N/mm2 (AT +23 DEG. CELCIUS) ACCORDING TO ISO 527
SUBSTRATE SHALL HAVE A TEMPERATURE = +8 DEG. CELCIUS / +35 DEG. CELCIUS MAX
AMBIENT SHALL HAVE A TEMPERATURE = +8 DEG. CELCIUS / +35 DEG. CELCIUS MAX
ADHESIVE MUST BE APPLIED AT TEMPERATURE = +8 DEG. CELCIUS / +35 DEG. CELCIUS MAX
SUBSTRATE MOISTURE CONTENT SHALL HAVE A MAX. OF 4% pbw
CARBON FIBER PLATES AND ADHESIVE SHALL BE WITH THE SAME MANUFACTURER TO INSURE
COMPATIBILITY AND PRODUCT GUARANTEE
INSTALLATION OF CARBON FIBER SHALL BE DONE BY THE MANUFACTURER'S TRAINED APPLICATORS
AND SHALL HAVE A APPLICATOR'S TRAINING CERTIFICATE TO INSURE THE QUALITY OF THE WORKMANSHIP
CARBON FIBER REINFORCED PLATES AND ITS ADHESIVE SYSTEM SHALL HAVE AN INTERNATIONAL TEST APPROVALS SUCH AS:
SOCOTECH (FRANCE)
EMPA, REPORT NO. 154 490/1, 1994: STATIC LOADING TEST ON CONC. BEAMS APPROVALS
EMPA, REPORT NO. 154 490/1, 1994: STATIC LOADING TEST ON CONC. BEAMS APPROVALS
DEUTSCHES INSTITUTE FUR BAUTECHNIK Z-36.12-29, 2006 (GENERAL CONSTRUCTION AUTHORIZED)
NOTES AND SPECIFICATIONS:
ALL CARBON REINFORCED POLYMER SHEETS SHALL HAVE THE TECHNICAL PROPERTIES:
FABRIC TYPE STRENGTH STIFFNESS MAX. STRAIN
CARBON FIBER 230g/m2 4,100 MPa 230 GPa 1.7%
SHEET ADHESIVE SHALL BE PART OF THE SYSTEM OF THE STRUCTURAL STRENGTHENING PROCESS AND
SHALL CONFORMED WITH THE FOLLOWING TECHNICAL PROPERTIES:
TWO PART EPOXY BASED IMPREGNATING RESIN (FOR WET LAY-UP APPICATION)
DENSITY = MIXED 1.16 KG/L (AT +23 DEG. CELCIUS)
ELONGATION AT BREAK = 1.5% (7 DAYS AT +23 DEG. CELCIUS)
THERMAL EXPANSION COEFFICIENT = 6.0 X 10-5 PER DEG. CELCIUS (TEMP. RANGE -20 TO 40 DEG. CELCIUS
THERMAL STABILITY
CURING TIME CURING TEMPERATURE HDT (HEAT DISTORTION TEMP)
7 DAYS +15 DEG. CELCIUS +43 DEG. CELCIUS
SERVICE TEMPERATURE = -40 TO +45 DEG. CELCIUS
STRENGTH 7 DAYS
BOND STRENGTH
TENSILE STRENGTH
45 N/mm2
45 N/mm2
(AT 23 DEG. CELCIUS)
E-MODULUS = FLEXURAL: 2,800 N/mm2 (AT +23 DEG. CELCIUS) ACCORDING TO DIN 53452
TENSILE : 3,500 N/mm2 (AT +23 DEG. CELCIUS) ACCORDING TO DIN 53455
SUBSTRATE SHALL HAVE A TEMPERATURE = +15 DEG. CELCIUS / +40 DEG. CELCIUS MAX
AMBIENT SHALL HAVE A TEMPERATURE = +15 DEG. CELCIUS / +40 DEG. CELCIUS MAX
ADHESIVE MUST BE APPLIED AT TEMPERATURE = +8 DEG. CELCIUS / +35 DEG. CELCIUS MAX
SUBSTRATE MOISTURE CONTENT SHALL HAVE A MAX. OF 4% pbw
CARBON FIBER SHEETS AND ADHESIVE SHALL BE WITH THE SAME MANUFACTURER TO INSURE
COMPATIBILITY AND PRODUCT GUARANTEE
INSTALLATION OF CARBON FIBER SHALL BE DONE BY THE MANUFACTURER'S TRAINED APPLICATORS
AND SHALL HAVE A APPLICATOR'S TRAINING CERTIFICATE TO INSURE THE QUALITY OF THE WORKMANSHIP
SOCOTECH (FRANCE)
ROAD AND BRIDGES RESEARCH INSTITUTE (POLAND): IBDiM No. AT/2003-04-336. TESTING ACCORDING TO EN 1504-4
THICKNESS AREAL WEIGHT
0.12 230 g/m2
MATERIAL TESTING SHALL CONFORMED AS DESCRIBED IN THE TWO STANDARDS ISO 527-5 AND ASTM D3039/D3039 M
AND CONFROMS TO THE REQUIREMENTS OF:
7 DAYS +23 DEG. CELCIUS +49 DEG. CELCIUS
3 DAYS +40 DEG. CELCIUS +66 DEG. CELCIUS
VISCOSITY Shear rate : 50/s
+15 deg. celcius - 2'000 mPas
temperature viscocity
+23 deg. celcius
+40 deg. celcius
- 700 mPas
- 200 mPas
ALL ON SITE APPLICATION SHALL CONFORMS TO THE CORPORATE METHODOLOGY GIVEN BY THE MANUFACTURERS
ALL ON SITE APPLICATION SHALL CONFORMS TO THE CORPORATE METHODOLOGY GIVEN BY THE MANUFACTURERS
OR TWO PART EPOXY BASED IMPREGNATING RESIN (FOR DRY LAY-UP APPICATION)
DENSITY = 1.30 KG/L + 0.1 KG/L (PART A & b) (AT +23 DEG. CELCIUS)
ELONGATION AT BREAK = 0.9% (7 DAYS AT +23 DEG. CELCIUS)
THERMAL EXPANSION COEFFICIENT = 4.5 X 10-5 PER DEG. CELCIUS (TEMP. RANGE -10 TO 40 DEG. CELCIUS
THERMAL STABILITY
CURING TIME TEMPERATURE HDT (HEAT DISTORTION TEMP)
7 DAYS +10 DEG. CELCIUS +36 DEG. CELCIUS
SERVICE TEMPERATURE = -40 TO +45 DEG. CELCIUS
STRENGTH 7 DAYS
BOND STRENGTH
TENSILE STRENGTH
CONCRETE FAILURE (>4 N/mm2) EN 24624
30 N/mm2
(AT 23 DEG. CELCIUS)
E-MODULUS = FLEXURAL: 3,800 N/mm2 (AT +23 DEG. CELCIUS) ACCORDING TO DIN 53452
TENSILE : 4,500 N/mm2 (AT +23 DEG. CELCIUS) ACCORDING TO DIN 53455
SUBSTRATE SHALL HAVE A TEMPERATURE = +10 DEG. CELCIUS / +35 DEG. CELCIUS MAX
AMBIENT SHALL HAVE A TEMPERATURE = +10 DEG. CELCIUS / +35 DEG. CELCIUS MAX
ADHESIVE MUST BE APPLIED AT TEMPERATURE = +8 DEG. CELCIUS / +35 DEG. CELCIUS MAX
SUBSTRATE MOISTURE CONTENT SHALL HAVE A MAX. OF 4% pbw
7 DAYS +23 DEG. CELCIUS +47 DEG. CELCIUS
7 DAYS +35 DEG. CELCIUS +53 DEG. CELCIUS
VISCOSITY Shear rate : 50/s
+15 deg. celcius - 10'000 mPas
temperature viscocity
+23 deg. celcius
+40 deg. celcius
- 6'000 mPas
- 5'000 mPas
N O T E S A N D S P E C I F I C A T I O N S
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
CARBON FIBER REINFORCED SHEET AND ITS ADHESIVE SYSTEM SHALL
HAVE AN INTERNATIONAL TEST APPROVALS SUCH AS:
1
BR033
PART A:
A.1.1(8) PROVISION OF FIELD OFFICE FOR THE ENGINEER (RENTAL BASIS)
3.20 month
A Temporary Field Office (40 Footer Container Van with ACU, Furnished and Maintained) Shall be Provided for the
Engineer
SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION QUANTITY UNITREMARKS
PART B:
B.5 PROJECT BILLBOARD / SIGNBOARD 2.00 each
As per Department Order No. 21, Series of 2017 - Revised Guidelines on the Installation of Project Billboards.
B.7(2)
OCCUPATIONAL SAFETY & HEALTH PROGRAM 1.00Lump Sum
Utilized Construction Foreman as Trained First Aide Personnel.
B.8(1)
TRAFFIC MANAGEMENT 3.20 Month
As per D.O. 13 series of 2018, Revised Guidelines for the Preparation of Cost Estimates for Traffic Management and
Safety Health Requirements
B.9 MOBILIZATION / DEMOBILIZATION 1.00
Lump Sum
Intended for the Transporting of Slow Moving Heavy Equipments & Other Necessary Equipments
for the Project Proper Implementation.
SQ
SUMMARY OF QUANTITIES
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
1
BR04 4
PART F:
612(1) REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS (WHITE)89.00
612(2)
133.50
sq.m
REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS (YELLOW)
sq.m
PACKAGE A PACKAGE B
3.80
2.00
1.00
3.80
1.00
PART E:
302(2)
EMULSIFIED ASPHALT2,748.09 sq.m Intended for Bridge and Approaches
310(1)b BITUMINOUS CONCRETE SURFACE WEARING COURSE, HOT LAID (40mm thk.) 2,748.09 sq.m Intended for Bridge and Approaches
-
-
PART F:
414(1)
FORMS AND FALSEWORK 1.00
Lump Sum
416(1)a CARBON FIBER SHEETS (1-LAYER)
354.60
sq.m Intended for CRFP Sheeting Under Deck Longitudinal Sheeting and Transverse Sheeting
628(1)b
WATERPROOFING ON DECK SLAB1,756.80 sq.m
628(11)
STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR 1.00
Lump Sum
Intended for carriageway
-
-
1.00
496.50
-
1.00
For Continuous White Edge line (100mm wide)
For Continuous Double Yellow Centerline (150mm wide)
Intended for Top and Underneath Deck Slab
1-layer LONGITUDINAL CRP
SHEETS (230G/SQ.M)
@ 1.20m Spacing O.C
9.54
7.321.11 1.11
1.00
1.67
SCALE
C
L
2%Slope2%Slope
1:100 MTRS
TS
TYPICAL SECTION
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
T Y P I C A L S E C T I O N
1
BR055
1.20m1.20m
1.20m
SIDEWALK
GIRDER
DECK SLAB
RAILING
COPING
COLUMN
TRANSVERSE
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C.
WATERPROOFING ON DECK SLAB
EMULSIFIED ASPHALT (ITEM 302)
BITUMINOUS CONCRETE SURFACE WEARING
COURSE, HOT LAID (40mm thk.) (ITEM 310)
ASPHALT OVERLAY
GP/BUGENERAL PLAN
BLOW UP
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
AB
UT
. A
A
TO DIPOLOG
C
L
7.32
TO DAPITAN
G E N E R A L PLAN (SPAN 1-10)
SCALE : 1:600 MTRS.
G E N E R A L PLAN (SPAN 11-16)
SCALE : 1:600 MTRS.
C
L
CL O
F P
IE
R
1 2 3 4 5 6 7 8 9 10
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
10
CL O
F P
IE
R
11
CL O
F P
IE
R
12
CL O
F P
IE
R
13
CL O
F P
IE
R
14
CL O
F P
IE
R
15
CL O
F P
IE
R
B
AB
UT
. B
LONGITUDINAL (PACKAGE A)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.20m O.C. (SPAN 1-4)
15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 30.00 30.00
30.00 30.00 30.00 30.00 30.00 30.69
EXISTING CRP SHEETSEXISTING CRP PLATES
LONGITUDINAL (PACKAGE A)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.20m O.C. (SPAN 15-16)
LONGITUDINAL (PACKAGE A)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.20m O.C. (SPAN 15-16)
BEG. OF BRIDGE
K1825 + 293.00
END OF BRIDGE
K1825 + 655.40
B L O W U P
N . D . T . S
EXTG. RAILING
EXTG. SIDE WALK
LONGITUDINAL CRP SHEETS (230G/sq.m.)
space @ 1.20m O.C.
EXTG. GIRDER
EXTG. DIAPHRAGM
1.20
1.20
1.20
TOTAL LENGTH OF THE BRIDGE 362.40 m (BACK OF BACKWALL )
TOTAL LENGTH OF THE BRIDGE 362.40 m (BACK OF BACKWALL )
1
BR066
SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6 SPAN 7 SPAN 8 SPAN 9 SPAN 10
SPAN 11 SPAN 12 SPAN 13 SPAN 14 SPAN 15 SPAN 16
EXISTING CRP SHEETS
EXTG. CRP SHEETS
EXISTING CRP PLATES
LONGITUDINAL (PACKAGE A)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.20m O.C. (SPAN 1-4)
LONGITUDINAL (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.20m O.C. (SPAN 14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
NOTE:
PACKAGE A
- LONGITUDINAL CRP SHEETS 1-LAYER AT SPAN 1-4 AND SPAN 15-16
PACKAGE B
- LONGITUDINAL CRP SHEETS 1-LAYER AT SPAN 14
- TRANSVERSE CRP SHEETS 1-LAYER AT SPAN 4-14
TRANSVERSE (PACKAGE B)
CRP SHEETS 1-LAYER (230G/sq.m.)
space @ 1.50m O.C. (SPAN 4-14)
SCI/CRP
STRUCTURAL CONCRETE INJECTION AND
CRACK REPAIR PLAN
ENGINEER I / J.O
JOFE C. CAINCAY
ENGINEER II
LUZMINDA C. SAGUIN
DATE :
LUNA C. CASTAÑARES
DATE :
EVA A. TRANI
DATE :
CHRISTOPHER L. EBAL
DATE :
DISTRICT ENGINEER
VERONICO O. MICARANDAYO
SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
REGION IX
3RD ENGINEERING DISTRICT
SEGABE, PIÑAN, ZAMBOANGA DEL NORTE
D
E
P
A
R
T
M
E
NT
O
F
P
U
B
L
IC
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
RETROFITTING / STRENGTHENING OF PERMANENT
BRIDGES POLO BR. (B00411MN)
ALONG JCT. POLO-DAPITAN PARK NATL RD
PROJECT AND LOCATION:
SHEET CONTENTS:
DRAFTED:
PREPARED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:
ACTING ASST. CHIEF, PLANNING
AND DESIGN SECTION
ACTING-CHIEF, PLANNING
AND DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
ENGINEER II ENGINEER II
14
AB
UT
. A
A
TO DIPOLOG
C
L
7.32
TO DAPITAN
SCALE : 1:600 MTRS.
SCALE : 1:600 MTRS.
C
L
CL O
F P
IE
R
1 2 3 4 5 6 7 8 9 10
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
CL O
F P
IE
R
10
CL O
F P
IE
R
11
CL O
F P
IE
R
12
CL O
F P
IE
R
13
CL O
F P
IE
R
14
CL O
F P
IE
R
15
CL O
F P
IE
R
B
AB
UT
. B
15.00 15.00 15.00 15.00 15.00 15.00 30.00
30.00 30.00 30.00 30.00 30.00 30.69
BEG. OF STRUCTURAL CONCRETE
INJECTION AND CRACK REPAIR AT SPAN 5
UNDERNEATH DECK SLAB (PACKAGE B)
STRUCTURAL CONCETE INJECTION
AND CRACK REPAIR PLAN (SPAN 1-10)
STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR
15.00 15.00 30.00
BEG. OF BRIDGE
K1825 + 293.00
END OF BRIDGE
K1825 + 655.40
PLAN NOTES:
1. TO REPAIR CONCRETE SPALLING, SCALING AND
IMPACT AS DEFINED IN BRIDGE REPAIR MANUAL
(2ND ED.), APPLY PATCHING REPAIR METHOD.
2. USE GRINDER TO ELIMINATE CRACKS FOR EPOXY
INJECTION.
EPOXY INJECTION
CRACK
INJECTION PIPE
SEALANT
APPLY EPOXY INJECTION,
WITH 50 MPA (7000 PSI)
MINIMUM COMPRESSIVE
STRENGTH, TO CONCRETE
CRACKS BETWEEN 0.30 MM TO
3.0 MM WIDTH.
TOTAL LENGTH OF THE BRIDGE 362.40 m (BACK OF BACKWALL )
TOTAL LENGTH OF THE BRIDGE 362.40 m (BACK OF BACKWALL )
STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR
STRUCTURAL CONCETE INJECTION
AND CRACK REPAIR PLAN (SPAN 1-10)
1
BR077
SPAN 11 SPAN 12 SPAN 13 SPAN 14 SPAN 15 SPAN 16
SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6 SPAN 7 SPAN 8 SPAN 9 SPAN 10
BEG. OF STRUCTURAL CONCRETE
INJECTION AND CRACK REPAIR AT SPAN 9
TOP DECK SLAB (PACKAGE A)
END OF STRUCTURAL CONCRETE
INJECTION AND CRACK REPAIR AT SPAN 13
UNDERNEATH DECK SLAB (PACKAGE B)
END OF STRUCTURAL CONCRETE
INJECTION AND CRACK REPAIR AT SPAN 16
TOP DECK SLAB (PACKAGE A)
PACKAGE A = TOP DECK SLAB AT SPAN 9-16
PACKAGE B = UNDERNEATH DECK SLAB AT SPAN 5-13
PACKAGE A = TOP DECK SLAB AT SPAN 9-16
PACKAGE B = UNDERNEATH DECK SLAB AT SPAN 5-13