denver gold forum, colorado

47
novagold.com NYSE-MKT, TSX: NG | September 2014 Denver Gold Forum

Upload: novagold

Post on 16-Jul-2015

403 views

Category:

Investor Relations


1 download

TRANSCRIPT

Page 1: Denver Gold Forum, Colorado

novagold.com

NYSE-MKT, TSX: NG | September 2014

Denver Gold Forum

Page 2: Denver Gold Forum, Colorado

cautionary statements

REGARDING FORWARD-LOOKING STATEMENTS

This presentation includes certain “forward-looking statements” within the meaning of applicable securities laws, including the United States Private Securities Litigation Reform Act of 1995. All

statements, other than statements of historical fact, included herein including, without limitation, statements relating to Donlin Gold’s future operating or financial performance, are forward-

looking statements. Forward-looking statements are frequently, but not always, identified by words such as “plans”, “expects”, “anticipates”, “believes”, “intends”, “estimates”, “potential”,

“possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could”, or “should” occur or be achieved. These forward-looking statements are set forth in the

slides pertaining to the implementation of the Donlin Gold second updated Feasibility Study and pertaining to the implementation of the Galore Creek Pre-Feasibility Study, the factors that may

influence future gold price performance, and the potential future value of gold, and may include statements regarding perceived merit of properties; exploration results and budgets; mineral

reserves and resource estimates; work programs; capital expenditures; timelines; strategic plans; completion of transactions; market price of precious or base metals; or other statements that

are not statements of fact. Forward-looking statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and

future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations include the

uncertainties involving the need for additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation

of drilling results and geological tests and the estimation of reserves and resources; the need for continued cooperation between NOVAGOLD and Barrick Gold in the exploration and

development of the Donlin Gold property; the need for continued cooperation between NOVAGOLD and Teck Resources Ltd. in the exploration and development of the Galore Creek property;

the need for cooperation of government agencies and native groups in the development and operation of properties; the need to obtain permits and governmental approvals; risks of

construction and mining projects such as accidents, equipment breakdowns, bad weather, non-compliance with environmental and permit requirements, unanticipated variation in geological

structures, ore grades or recovery rates; unexpected cost increases; fluctuations in metal prices and currency exchange rates; and other risks and uncertainties disclosed in reports and

documents filed by NOVAGOLD with applicable securities regulatory authorities from time to time. The forward-looking statements made herein reflect our beliefs, opinions and projections on

the date the statements are made. Except as required by law, we assume no obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they

change.

REGARDING SCIENTIFIC AND TECHNICAL INFORMATION

Unless otherwise indicated, all reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of

Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (“CIM Definition

Standards”). Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (“SEC”), and reserve and resource

information in this presentation may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term “resource”

does not equate to the term “‘reserves”. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be

economically and legally produced or extracted at the time the reserve determination is made. At this time, both of Donlin Gold and Galore Creek projects are without known reserves, as

defined under SEC Industry Guide 7. The SEC’s disclosure standards normally do not permit the inclusion of information concerning “measured mineral resources”, “indicated mineral

resources” or “inferred mineral resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the

SEC. U.S. investors should also understand that “inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal

feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian rules, estimated “inferred mineral resources”

may not form the basis of feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or any part of an “inferred mineral resource” exists or is

economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report

mineralization that does not constitute “reserves” by SEC standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of

“reserves” are also not the same as those of the SEC, and reserves reported in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information

concerning mineral deposits set forth herein may not be comparable to information made public by companies that report in accordance with United States standards.

2 All dollar amounts quoted in this report are in U.S. currency unless otherwise noted.

Page 3: Denver Gold Forum, Colorado

EXCEPTIONAL IN SCALE, QUALITY, AND JURISDICTIONAL SAFETY

why NOVAGOLD?

Donlin Gold

Galore Creek

3

▶ poised to become one of the

largest producers in the

gold industry

▶ expected to be the largest

and lowest cost copper

mine in Canada

Page 4: Denver Gold Forum, Colorado

ATTRIBUTES POSITION IT AMONG THE WORLD’S MOST SIGNIFICANT GOLD

DEPOSITS

donlin gold a large high-grade gold project

EXCEPTIONAL reserve size

OUTSTANDING production profile

HIGH-QUALITY grade

SIGNIFICANT exploration upside

FAVORABLE jurisdiction

LOW COST operation

4

39Moz M&I resources2

2.2g/t M&I grade

Contained Gold1

Notes:

1) Shown on 100% project basis, of which NOVAGOLD holds a 50% interest

2) Measured and indicated resources inclusive of proven and probable reserves.

See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.

27year mine life

34Moz P&P reserves

2.1g/t P&P grade

6Moz Inferred resources

2.0g/t Inferred grade

Page 5: Denver Gold Forum, Colorado

the right project – donlin gold

ARGUABLY THE WORLD’S MOST SIGNIFICANT GOLD PROJECT

partnerships grade

growth jurisdiction

longevity

size

5

donlin gold

Page 6: Denver Gold Forum, Colorado

donlin gold emerging top-tier producer in safe jurisdiction

1.102

0.76

0.58

0.40 0.33

0.19 0.13

1.501

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

Donlin Gold Metates Livengood Merian Rainy River Aurora Haile

Location USA Mexico USA Suriname Canada Guyana USA

Owner(s) NOVAGOLD (50%)

Barrick (50%)

Chesapeake (100%) ITH Mines (100%) Newmont (100%) New Gold (100%) Guyana Goldfields

(100%)

Romarco (100%)

Pro

jecte

d A

nn

ual

Go

ld P

rod

ucti

on

(millio

ns o

f o

un

ces)

THE LARGEST PROJECTED GOLD PRODUCER AMONG DEVELOPMENT PROJECTS

6 Notes: Donlin Gold data as per Donlin Creek Gold Project Alaska, USA, NI 43-101 Technical Report on “Updated Feasibility Study”, effective November 18, 2011, as amended January 20, 2012 (the “second updated feasibility study”). Represents 100% of measured and indicated resources of which NOVAGOLD’s share represents 50%. Measured and indicated resources inclusive of proven and probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix. Peer group data as per latest company documents, public filings and websites. Comparison group based on large, open-pit, gold-focused development projects . 1) Projected annual gold production during first five full years of mine life; 2) Projected annual gold production during full life of mine.

Page 7: Denver Gold Forum, Colorado

the right project – donlin gold

HIGH GRADE OPEN PIT MINE

partnerships grade

growth jurisdiction

longevity

size

7

donlin gold

Page 8: Denver Gold Forum, Colorado

DONLIN GOLD’S GRADE IS AMONG THE HIGHEST COMPARED TO WORLD’S

BIGGEST PRODUCERS

donlin gold expected to emerge as one of the highest-grade gold producers

8 Notes: Donlin Gold data as per the second updated feasibility study effective November 18, 2011, as amended January 20, 2012. Represents 100% of measured and indicated resources of which NOVAGOLD’s share represents 50%. Measured and indicated resources are inclusive of proven and probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix. Peer group data - 2013 annual average grade per tonne (combined proven & probable reserves and measured & indicated resources) for open-pit and underground material as per public filings.

2.66

2.24 2.14

1.88 1.81

1.44

1.32

1.04 0.98

0.81 0.78

0.00

0.50

1.00

1.50

2.00

2.50

3.00

AgnicoEagle

Donlin Gold Polyus Gold Fields AngloGoldAshanti

Barrick Harmony Eldorado Goldcorp Yamana NewmontDonlin

Gold

M&I Au Grade (g/t)

Page 9: Denver Gold Forum, Colorado

the right project – donlin gold

SUBSTANTIAL EXPLORATION POTENTIAL

partnerships grade

growth jurisdiction

longevity

size

9

donlin gold

Page 10: Denver Gold Forum, Colorado

MULTIPLE DRILL PROSPECTS AND TARGETS EXIST ALONG 8KM TREND

donlin gold substantial exploration potential

10

▶ Potential to expand current open-pit

resources along strike and at depth

▶ Good potential to discover meaningful

deposits outside current mine footprint

• Reserves and resources are contained

within just 3 km of an 8 km long district

▶ Between 2002 and 2010, drilling programs

more than doubled the mineral endowment

▶ Inferred mineral resource: 6 million ounces

of gold mainly within the resource pit shell

• Upside potential to project economics

Page 11: Denver Gold Forum, Colorado

0

2

4

6

8

10

12

14

16

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1997 1999 2001 2003 2005 2007 2009 2011 2013

why gold? no new and substantial discoveries

11 Notes:

Data as per SNL MEG’s MineSearch database, Company reports, SNL MEG estimates. Thomson Reuters. A gold discovery of 5 million ounces or

more is considered significant. Number of discoveries data not yet available for 2013 and 2014.

Nu

mb

er

of

Go

ld D

isco

veri

es

Gold Discovered

Exploration Budget (US$M)

2012 highest year on

record for

exploration

spending and first

year in over two

decades with no

discoveries

DESPITE RECORD HIGH EXPLORATION SPENDING LEVELS THE GOLD INDUSTRY

HAS EXPERIENCED A RECENT DROP IN DISCOVERIES

Page 12: Denver Gold Forum, Colorado

the right project – donlin gold

27 YEAR MINE LIFE

partnerships grade

growth jurisdiction

longevity

size

12

donlin gold

Page 13: Denver Gold Forum, Colorado

z

donlin gold strong cash flow at today’s gold prices

13 Notes:

Donlin Gold estimates as per the second updated feasibility study effective November 18, 2011, as amended January 20, 2012

1) Based on Donlin Gold’s projected first five full years of production.

2) Pre-tax cash flow estimate.

$768/oz1

$1.0B+

annual cash flow1,2

MARGIN ALL-IN

SUSTAINING COST

GOLD PRICE

$1,300/oz

1.5M/oz annual production1

$532/oz1

Page 14: Denver Gold Forum, Colorado

$6.2B

$9.2B

$11.6B

$14.6B

$19.2B

$27.0B

0

5,000

10,000

15,000

20,000

25,000

30,000

$1,200 $1,350 $1,500 $1,700 $2,000 $2,500

NP

V (

US

$ i

n m

illi

on

s)

Gold Price (US$)

NPV at 0% NPV at 5%

NPV INCREASES ~20X WITH ~2X INCREASE IN GOLD PRICE

donlin gold has exceptional leverage to gold

▶ Project has a positive return

that increases substantially

with higher gold prices

▶ Good payback at a

broad range of gold prices

▶ Significant exploration upside

on the mineralized trend

14 Notes:

Donlin Gold estimates as per the second updated feasibility studyeffective November 18, 2011, as amended January 20, 2012 . All dollar figures are in USD and reflect after-tax net present value (at a 0% and 5% discount

rates) of the Donlin Gold project as of 1/1/2014. At a 5% discount rate, the net present value is: $547 m @ $1,200 gold; $1,922m @ $1,350 gold; $3,147m @ $1,500 gold; $4,581 m @ $1,700 gold; $6,722 m @ $2,000 gold;

and $10,243 m @ $2,500 gold. Project development costs prior to 1/1/2014 are treated as sunk costs.

27year mine life

Page 15: Denver Gold Forum, Colorado

the right project – donlin gold

LOCATED IN ALASKA, ONE OF THE FEW SAFE MINING JURISDICTIONS

partnerships grade

growth jurisdiction

longevity

size

15

donlin gold

Page 16: Denver Gold Forum, Colorado

donlin gold located in a favorable jurisdiction

M&I Gold Resource

>30 million oz.

>10 million oz.

>4 million oz.

Donlin Gold: 39.0 M oz.

Livengood: 15.7 M oz.

Metates: 19.0 M oz.

Haile: 4.0 M oz.

Aurora: 6.5 M oz.

Rainy River: 6.2 M oz.

Notes:

Donlin Gold data as per the second updated feasibility study effective November 18, 2011, as amended January 20, 2012 . Peer group resource data from RBC Capital Markets Research, focusing on large, open pit, gold focused

development projects. Measured and indicated resources are inclusive of proven and probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the

appendix.

1) Source: Canaccord Genuity Research, “Don’t Fear the Reaper,” January 8, 2013. This report ranks each of the top twenty gold-producing countries in terms of jurisdictional safety.

2) Newmont reports "Mineralized Material" as defined by SEC Industry Guide 7 for its Merian gold project as oppose to an "M&I Gold Resource" as defined by NI 43-101.

Jurisdictional Considerations1

Safest Somewhat Safe Unranked Less Safe Riskiest

16

Hycroft Mine Expansion:

24.3 M oz.

Rosia Montana: 17.1 M oz.

A REMARKABLE RESOURCE AMONG EMERGING OPEN-PIT DEPOSITS

Merian: 4.2 M oz.2

Page 17: Denver Gold Forum, Colorado

Donlin Gold located in Alaska, one of

the safest jurisdictions in the world with

history of successful mining

development

ALASKA HAS A GROWING NATURAL RESOURCES SECTOR

alaska a resource-rich state with an established rule of law

▶ Alaska is the second largest U.S. gold-

producing State

▶ Well-defined permitting process

▶ Four large precious metals mines, one

coal mine & one base metal mine

▶ Numerous small-scale mines

▶ Natural resource projects integral to the

State’s economy

▶ Strong and time-tested community support

17

Page 18: Denver Gold Forum, Colorado

the right project – donlin gold

STRONG PARTNERSHIPS WITH NATIVE CORPORATIONS

partnerships grade

growth jurisdiction

longevity

size

18

donlin gold

Page 19: Denver Gold Forum, Colorado

“Calista would like to take this opportunity to assert

and inform the U.S. Army Corps of Engineers and

the public of its legislated mandate under ANCSA.

Calista and TKC are not only stakeholders, but are

the legislatively mandated landowners charged with

the responsibility of seeing the project to fruition in

an environmentally responsible manner.”

– June MacAtee, Vice President of

Calista Corporation (mineral owner)

STRONG AND TIME-HONORED RELATIONSHIPS WITH STAKEHOLDERS

"Since 1995, Donlin Gold has worked constructively

in our region and I know our partnership will benefit

our shareholders for many generations. Today's

agreement sets the basis for a long and productive

relationship that with construction of the mine will

provide jobs and financial value to the shareholders

in our 10 villages.”

– Maver Carey, President & CEO of

The Kuskokwim Corporation (surface owner) 19

donlin gold durable, long-term agreements with native corporations

Page 20: Denver Gold Forum, Colorado

PROTECT, RESTORE AND CONSERVE ALASKA FISH AND WILDLIFE

NFWF partnership

“We, the Board members of NOVAGOLD, are truly

proud of the fact that our company and NFWF

have come together to create an extraordinary

partnership that can serve as a model for the

sustainable development of natural resources.”

Thomas Kaplan, Chairman

“The lands and waters of Alaska provide a home for

an incredible number of fish and wildlife species.

We applaud this commitment from NOVAGOLD and

Donlin Gold as a significant contribution toward

conserving the wetlands, streams and wild places of

Alaska for future generations.”

Jeff Trandahl, Executive Director & CEO

The partnership supports regional

solutions driven by locals to:

▶ Promote healthy water systems

▶ Improve working landscapes for wildlife

▶ Advance sustainable fisheries

20

Page 21: Denver Gold Forum, Colorado

NATIVE CORPORATIONS WANT TO LEAD THE ECONOMIC DEVELOPMENT OF THEIR REGIONS

donlin gold mining an integral part of communities

▶ ANCSA established 40 years ago; resolved

legal issues related to Native title claims

▶ Lands valuable for resource potential

selected by Regional Corporations under

ANCSA

▶ Native corporations have an owner’s interest

in the development of the selected lands to

support the economic prosperity of their

shareholders

▶ Mining is compatible and consistent with

subsistence lifestyles

▶ Donlin Gold is located on private land

selected for its resource development

potential

Donlin Gold has the support of the land

owners through a 20+ year relationship

21

Page 22: Denver Gold Forum, Colorado

donlin gold project permitting is on track

22

1.5Moz/year first five full years1

1.1Moz/year life of mine1

16 years 4 27+ years

EX

PL

OR

AT

ION

&

EN

VIR

ON

ME

NTA

L

ST

UD

IES

PE

RM

ITT

ING

EN

GIN

EE

RIN

G &

CO

NS

TR

UC

TIO

N

OP

ER

AT

ION

WE ARE HERE

HALF WAY THROUGH PERMITTING

1.5Moz/year first five full years1

1.1Moz/year life of mine1

4

Notes: 1) Donlin Gold data as per the second updated feasibility study. Projected average annual production represents 100% of which NOVAGOLD’s share represents 50%.

DEVELOPMENT TIMELINE - ADVANCING TOWARD A CONSTRUCTION DECISION

Federal and State agencies are working cooperatively,

with day-to-day support from Donlin Gold,

to efficiently move the project through the EIS and permitting processes.

Page 23: Denver Gold Forum, Colorado

Notice of Intent to Prepare EIS

Draft EIS

Final EIS Record of Decision

23

Initial permit applications Submitted: 08/12

Notice of intent Published: 12/14/12

Public scoping period Ended: 03/29/13

Scoping summary document Completed: 08/13

Development of alternatives

Completed: Q2/14

Prepare preliminary draft EIS

Agency review

Prepare draft EIS

Public comment period

Prepare draft final EIS

Agency review

Publish final EIS

Record of decision

HALFWAY THROUGH PERMITTING TIMELINE

donlin gold permitting milestones

2012-2013 2013-2015 2015-2016

Page 24: Denver Gold Forum, Colorado

THE KIND OF ASSET YOU CAN BUILD A COMPANY AROUND

galore creek a significant copper-gold-silver asset in canada

STRONG copper grade

SIGNIFICANT gold & silver content

GROWING resources

CONSIDERABLE exploration upside

SAFE jurisdiction

24

9Blbs copper

8Moz gold

136Moz silver

0.5% copper

0.3g/t gold

5.2g/t silver

M&I Resources1

Notes:

1) Represents 100% of measured and indicated resources of which

NOVAGOLD’s share represents 50%. Measured and indicated resources

inclusive of proven and probable reserves. See “Cautionary Note

Concerning Reserve & Resource Estimates” and “Reserve & Resource

Base” with footnotes in the appendix.

18year mine life

Page 25: Denver Gold Forum, Colorado

AMONG HIGHEST COPPER GRADE COMPARED TO NORTH AMERICAN ASSETS

galore creek grade peer comparison

25

P&P + M&I grade (Cu%)

Notes:

Data as per SNL MEG’s MineSearch database, Company reports, SNL MEG estimates.

0.50

0.45

0.42 0.40

0.32 0.30

0.27

0.24

0.21

0.18 0.18

0.00

0.10

0.20

0.30

0.40

0.50

0.60

GaloreCreek

Pebble Rosemont Catface Red Chris Berg SchaftCreek

NewProsperity

KSM MountMilligan

Casino

Page 26: Denver Gold Forum, Colorado

ENHANCING VALUE WHILE EVALUATING OPPORTUNITIES TO MONETIZE ASSET

galore creek

CURRENT ACTIVITIES

▶ Execute capital efficient work plan incorporating 2012 and 2013

drill results to advance the project toward next-level mine

planning and design

▶ Evaluate mining, waste rock and water management options to

enhance the economics of the project

▶ Ongoing environmental monitoring

26

IN THE COMMUNITY

▶ Bursary award program for Tahltan members pursuing

post-secondary education

▶ Sponsor of the 37th Annual Kilrich/Northern Yukon Native

Hockey Tournament

▶ Sponsor of the Dease Lake Community sporting event

Page 27: Denver Gold Forum, Colorado

CLEAR FOCUS BEGINS WITH STRONG FUNDING TO EXECUTE ON ALL FRONTS

financial obligations have decreased substantially

27 Notes:

(1) 2014 anticipated budget expenditure disclosed on February 11, 2014. (2) Includes US$105 million in term deposits as of May 31, 2014.

2013 2012 2014

$176M cash and term deposits2

To

tal A

nn

ua

l E

xp

en

dit

ure

($

US

D)

~77% reduction in

expenditures

$129M actual

$38M actual $30M

budget1

Page 28: Denver Gold Forum, Colorado

26.7%

11.3%

6.9%

2.7% 1.4%

51%

BLUE CHIP INSTITUTIONAL QUALITY INVESTMENT

why NOVAGOLD? excellent and committed shareholder base

28

Institutional

Ownership

80%

held by top

5 shareholders(1)

49%

Notes:

(1) Shareholder positions are based on the latest 13-F filings.

committed to Shareholder Value

Electrum Strategic

Resources LP

Paulson & Co.

Inc

The Baupost

Group, L.L.C.

Tocqueville Asset

Management Sun Valley

Gold, LLC

Other

Page 29: Denver Gold Forum, Colorado

why NOVAGOLD? why now?

NOVAGOLD offers:

▶ TOP TIER, high-grade assets with excellent exploration upside

▶ SAFEST leverage to a massive gold endowment

▶ PROLIFIC gold production for decades to come

▶ SUPPORTIVE, loyal, and engaged stakeholders

▶ ACCOMPLISHED team in permitting, building & operating large-scale mining assets

▶ STRONG balance sheet

29

In an environment where:

▶ Gold is in a secular bull market

▶ Macroeconomic environment supportive of continued trend toward higher price

▶ Grades are declining

▶ New discoveries are few

▶ Global exploration & development shrinking

▶ Geopolitical risks increasing

Page 30: Denver Gold Forum, Colorado

novagold.com

appendix

Page 31: Denver Gold Forum, Colorado

▶ Donlin Gold LLC is the operating company

▶ 50/50 ownership by NOVAGOLD and Barrick Gold

▶ Board of Directors has two representatives from each company

• Chairman rotates every year

• Each company has the right to appoint the Donlin Gold General Manager every

two years

▶ Operates under agreements with Alaska Native Claims Settlement Act (ANCSA)

landowners

• Calista Corporation (Subsurface minerals and surface lease)

• The Kuskokwim Corporation (Surface use agreement)

▶ Project office in Anchorage

• 36 full-time employees and 2 contractors

▶ Strong track record for local hiring

ADVANCING DONLIN GOLD UP THE VALUE CHAIN

donlin gold project overview

31

Page 32: Denver Gold Forum, Colorado

DONLIN GOLD SLATED TO BE A STATE-OF-THE-ART SIGNIFICANT MINE

donlin gold project highlights

32

Reserves: 33.9 Moz Au (505M tonnes ore)1

Resources: 5.1 Moz M&I (excluding P&P) and 6.0 Moz Inferred1

Mine Life: ~27 years

Production: Year 1-5,1.5 Moz/year; LOM,1.1 Moz/year

Operation: Open-pit, conventional truck & shovel

Milling: 53.5k tonnes/day, sulfide flotation, pressure

oxidation (POX), carbon-in-leach recovery (CIL)

Strip ratio: 5.5 = 2.8B tonnes waste rock

Tailings: Fully lined storage facility

Power: 153MW average site-generated load, fueled by natural gas

transported via a 315-mile pipeline

Logistics: All consumables supplied by Kuskokwim River transportation

system with port near Jungjuk Creek See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve and Resource Base” table with footnotes.

Page 33: Denver Gold Forum, Colorado

RESOURCES MORE THAN DOUBLED FROM 2006 TO 2008

donlin gold reserve & resource growth

33

16.6

29.4

35.3

37.9 39.0

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

2006 2007 2008 2009 2011

Notes: Donlin Gold data as per NOVAGOLD public documents. Represents 100% of measured and indicated resources of which NOVAGOLD’s share represents 50%. Measured and indicated resources are inclusive of proven and probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.

M&

I A

u R

eso

urc

es (

Mo

z)

39Moz M&I RESOURCES

34Moz P&P RESERVES @ $975/oz

inclusive of

grade of

2.24g/t

And there is opportunity for

continued growth once in

production…

PE

A

Fe

as

ibil

ity S

tud

y

Up

da

ted

Fe

as

ibil

ity S

tud

y

Focused on feasibility-level planning

and more recently permitting

Page 34: Denver Gold Forum, Colorado

donlin gold expected to provide more than three decades of low cost production LOW OPERATING CASH COSTS AND ALL-IN SUSTAINING COSTS

34

Open-pit mining2 270

Processing 257

G&A, royalties, land & other3 108

Total $635

Open-pit mining2 133

Processing 208

G&A, royalties, land & other3 70

Total $411

Cash Costs1 Per Ounce

First Five Years

Notes:

Donlin Gold estimates as per the second updated feasibility study effective November 18, 2011, as amended

January 20, 2012 .

1) US GAAP cost of sales, excluding depreciation and reclamation

2) Net of deferred costs

3) Based on US$1,200/oz gold price

All-in Sustaining Costs Per Ounce

Cash costs1 635

Sustaining capex 50

Corporate administration 28

Reclamation 22

Total $735

Cash costs1 411

Sustaining capex 83

Corporate administration 21

Reclamation 17

Total $532

Life of Mine

Cash Costs1 Per Ounce

All-in Sustaining Costs Per Ounce

Page 35: Denver Gold Forum, Colorado

donlin gold

WELL POSITIONED TO SHARE UPFRONT COSTS WITH THIRD PARTIES

Areas US$M1 Opportunities1

Mining 345 Leasing equipment ~$170M

Site preparation/roads 236

Process facilities 1,326 Oxygen plant could be built by third party ~$130M

Tailings 120

Utilities 1,302

Ancillary buildings 304

Off-site facilities 243

Total Direct Costs 3,876

Owners’ cost 414

Indirect Costs 1,405

Contingency 984 Healthy Contingency

Total Owner’s & Indirect Costs, and Contingency

2,803

Total Project Cost 6,679 >$1B potential capital reductions

Gas pipeline could be built by third party $834M

1) Represents 100% of project’s capital expenditures 35

Page 36: Denver Gold Forum, Colorado

ROBUST ECONOMICS HIGHLY LEVERAGED TO GOLD PRICES

donlin gold key performance indicators

36

Gold Price

Unit $1,000/oz $1,200/oz

Base Case

$1,700/oz $2,000/oz $2,500/oz

Average annual

after-tax cash flow

(first full five years)

$M 670 950 1,500 1,785 2,185

Average annual

after-tax cash flow (LOM)

$M 350 500 815 990 1,275

NPV (5%) after-tax1 $M (1,340) 550 4,580 6,720 10,240

NPV (0%) after-tax1 $M 2,100 6,200 14,620 19,250 26,975

IRR after-tax1 % 2.3 6.0 12.3 15.1 19.1

Payback period Years 19.1 9.2 5.3 4.4 3.5

Notes:

Donlin Gold estimates as per the second updated feasibility study effective November 18, 2011, as amended January 20, 2012. All dollar figures are in USD and reflect after-tax net present value (at a 0% and 5% discount

rates) of the Donlin Gold Project as of 1/1/2014. At a 5% discount rate, the net present value is: $547 m @ $1,200 gold; $4,581 m @ $1,700 gold; $6,722 m @ $2,000 gold; and $10,243 m @ $2,500 gold. Project development

costs prior to that date are treated as sunk costs.

All amounts in US dollars

1) NPVs and IRRs as at January 1, 2014. Project development costs prior to that date are treated as sunk costs.

Page 37: Denver Gold Forum, Colorado

PROCEEDING ON SCHEDULE AS PER EIS TIMELINE

donlin gold current work

▶ Maintaining strong working relationships with the agencies and providing input

throughout the permitting and EIS processes

▶ EIS process and current activities

• Alternatives development addressing mine, pipeline and transportation

components was completed in Q1 2014

• PDEIS well underway including defining the baseline conditions and

analyzing consequences expected to be completed around year-end 2014

• Draft EIS anticipated mid-year 2015

▶ Major permit application submittals and agency reviews – well underway

• Air quality

• Water discharge and usage

• Pipeline plan of development

• Wetlands

• Dam safety

37

Page 38: Denver Gold Forum, Colorado

LARGE PROJECTS HAVE BEEN SUCCESSFULLY PERMITTED

permitting in the U.S.

38

Project Name Location Metal Time Description

Red Dog Alaska Lead/zinc ~2 years

• Expansion

• EIS completed in 2009

• Development started on schedule in 2010

Fort Knox Alaska Gold ~3 years • Expansion – new heap leach facility

• Permitting completed in 2007

Pogo Alaska Gold ~3 years

• New mine

• Permitting completed in 2004

• Operations began in 2006

Arturo Nevada Gold ~4 years

• Major pit expansion

• New waste rock and heap leach facilities

• EIS/ROD completed in May 2014

Rochester Nevada Silver ~1 year • Expansion – new heap leach & mine reopening

• EA/permitting completed in 2011

Cortez Nevada Gold ~3 years • Major pit expansion

• EIS/permitting completed in 2008/2009

Goldstrike Nevada Gold ~2 years

• Major pit expansion

• Waste rock and tailings facilities

• ROD approving the project was in 2009

Hycroft Nevada Gold ~2 years • Reactivation

• EIS/permitting completed in 2012

Long Canyon Nevada Gold ~3 years

(anticipated)

• New pit, heap leach, mill and tailings facility

• Draft EIS issued in March 2014

Pan Nevada Gold ~2 years • New open pit and heap leach

• EIS/permitting completed in 2013

Haile South Carolina Gold ~4 years

(anticipated)

• New mine on historic property

• Open pits, processing and tailings facilities

• Final EIS issued July 2014, ROD anticipated November 2014

Page 39: Denver Gold Forum, Colorado

GALORE CREEK, AN EXCEPTIONAL ASSET

galore creek project overview

39

▶ Galore Creek Mining Corporation (GCMC) is the operating company

▸ 50/50 ownership by NOVAGOLD and Teck Resources Inc.

▸ Management Committee has two representatives from each company

• Chairman rotates every year

▸ Project is located within the Tahltan Nation Territory and operates under a

Participation Agreement

▸ All mineral claims are on Crown land

▸ Project office in Vancouver

• Abundance of technical strength to draw from within Teck

▸ Strong track record for Tahltan hiring at project site as well as contracting and

procurement with Tahltan businesses and joint ventures

Page 40: Denver Gold Forum, Colorado

GALORE CREEK TO BE ONE OF CANADA’S LARGEST COPPER MINES

galore creek project highlights

40

Reserves: 6.8 Blb Cu; 5.5 Moz Au; 102 Moz Ag 1

Resources: 8.9 Blb Cu; 8.0 Moz Au; 136 Moz Ag (inclusive of reserves) 1

Mine Life: ~18 years

Production: Year 1-5, 400 Mlb/year Cu; LOM, 340 Mlb/year Cu

Operation: Open-pit, conventional truck & shovel

Milling: +80k tonnes/day, conventional crush, grind, and Cu/Au/Ag flotation

concentration, plant located in West More Valley

Strip ratio: 2.2 = 1.1B tonnes waste rock

Tailings: storage facility located in West More Valley next to plant

Power: BC Hydro currently constructing the Northwest Transmission

Line from near Terrace, BC to Bob Quinn to promote remote

industrial development, Galore Creek to tie into the NTL

Logistics: Port facilities to be built near Stewart, BC Notes:

See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve and Resource Base” table with footnotes.

Page 41: Denver Gold Forum, Colorado

ROBUST ECONOMICS HIGHLY LEVERAGED TO METAL PRICES

galore creek key performance indicators

41

Unit

Metal Prices

Copper

Gold

Silver

US$/lb

US$/oz

US$/oz

2.00

900

15.00

2.65

1,100

18.50

3.00

1,100

20.00

3.50

1,200

25.00

4.00

1,300

30.00

LOM after-tax cash flow $M 1,514 5,118 6,641 9,223 11,812

NPV (5%) after-tax1 $M (969) 988 1,794 3,134 4,458

NPV (7%) after-tax1 $M (1,431) 137 778 1,837 2,877

IRR after-tax1 % 2.4 7.4 9.2 11.9 14.3

Payback period Years 13.2 7.8 6.1 4.1 3.3

Notes:

Galore Creek estimates as per the 2011 Pre-Feasibility Study. All dollar figures are in CAD. See “Cautionary Note Concerning Reserve & Resource Estimates” and

“Reserve & Resource Base” with footnotes in the appendix.

1) NPVs and IRRs as of two years prior to significant project spend. Project development costs prior to that point are treated as sunk costs.

All amounts in CAD dollars

Page 42: Denver Gold Forum, Colorado

INDUSTRY LEADERS TO BRING DONLIN GOLD THROUGH PERMITTING & BEYOND

the NOVAGOLD team

42

Gregory Lang

President & CEO

▸ Former President of Barrick Gold North America ▸ 35 years experience building & operating major mines ▸ Intimate knowledge of Donlin Gold

David Deisley

Executive Vice President and

General Counsel

▸ Former EVP and General Counsel of Goldcorp ▸ Regional General Counsel for Barrick Gold North America ▸ Extensive track record in project permitting, corporate social responsibility,

mergers and acquisitions and corporate development ▸ 25 years of mining industry experience

David Ottewell

Vice President and Chief

Financial Officer

▸ Former VP and Corporate Controller of Newmont Mining Corporation ▸ 25 years of mining industry experience ▸ Diverse experience in all facets of financial management, from mine operations

to executive corporate financial management of premier gold producers

Mélanie Hennessey

Vice President, Corporate

Communications

▸ Held variety of executive and senior IR & corporate communications positions with Goldcorp, New Gold, and Hecla Mining Company

▸ Leading NOVAGOLD’s internal and external communications functions

Ron Rimelman

Vice President, Environment,

Health, Safety & Sustainability

▸ 25+ years of environmental experience, managing environmental impact assessments and permitting activities world-wide

▸ Leadership role on mine permitting and NEPA evaluations for mine projects in Alaska since 1993

Richard Williams

Vice President, Engineering

and Development

▸ Former Project Director for the Pueblo Viejo project in the Dominican Republic ▸ 30 years of experience developing and operating major mines world-wide ▸ Particular expertise in autoclave technology

MANAGEMENT

Page 43: Denver Gold Forum, Colorado

NOVAGOLD board of directors

43

Dr. Thomas Kaplan

Chairman

Chairman and CIO of The Electrum Group LLC, a privately held natural resources

investor that controls a diversified portfolio of precious and base metals assets

Sharon Dowdall Former Chief Legal Officer and Corporate Secretary with Franco-Nevada, transforming an

industry pioneer into one of the most successful precious metals enterprises in the world

Dr. Marc Faber Publishes a monthly investment newsletter entitled The Gloom, Boom & Doom

Report and is the author of several books

Greg Lang

President & CEO

Former President of Barrick Gold North America, 35 years experience building & operating major mines with intimate knowledge of Donlin Gold

Gil Leathley COO and Director of Sunward Resources, former Senior Vice President and Chief

Operating Officer of the Company

Igor Levental President of The Electrum Group LLC, former VP of Homestake Mining and International

Corona Corp.

Kalidas Madhavpeddi Former Executive with Phelps Dodge

Gerald McConnell Former Chairman and CEO of NOVAGOLD, CEO of Namibia Rare Earths Inc.

Clynton Nauman CEO of Alexco Resources, formerly with Viceroy Gold and Kennecott Minerals

Rick Van Nieuwenhuyse CEO of NovaCopper, founder and former CEO of NOVAGOLD

Anthony Walsh Former President and Chief Executive Officer of Miramar Mining Corporation, which in

2007 was sold to Newmont Mining Corporation.

Page 44: Denver Gold Forum, Colorado

COPPER

Tonnage

Mt

Grade*

%Cu

Metal content

Mlbs

NOVAGOLD share**

Mlbs

Reserves (100%)2

Proven 69.0 0.61 900.0 450.0

Probable 459.1 0.58 5,900.0 2,950.0

P&P 528.0 0.59 6,800.0 3,400.0

Resources (100%)4 inclusive of reserves

Measured 108.4 0.48 1,147.0 573.5

Indicated 706.3 0.50 7,786.0 3,893.0

M&I 814.7 0.50 8,933.0 4,466.5

Inferred 346.6 0.42 3,230.0 1,615.0

GOLD Mt

g/t

Moz

Moz

Reserves (100%)2

Proven 69.0 0.52 1.15 0.58

Probable 459.1 0.29 4.30 2.15

P&P 528.0 0.32 5.45 2.73

Resources (100%)4 inclusive of reserves

Measured 108.4 0.48 1.70 0.85

Indicated 706.3 0.28 6.40 3.20

M&I 814.7 0.31 8.00 4.00

Inferred 346.6 0.24 2.70 1.35

SILVER

Mt

g/t

Moz

Moz

Reserves (100%)2

Proven 69.0 4.94 11.0 5.5

Probable 459.1 6.18 91.2 45.6

P&P 528.0 6.02 102.2 51.1

Resources (100%)4 inclusive of reserves

Measured 108.4 4.10 14.30 7.15

Indicated 706.3 5.38 122.10 61.05

M&I 814.7 5.21 136.40 68.20

Inferred 346.6 4.28 47.73 23.87

At April 30, 2012

Donlin Gold (NOVAGOLD 50%)

Galore Creek (NOVAGOLD 50%)

GOLD

Tonnage

Mt

Grade*

g/t

Metal content

Moz

NOVAGOLD share**

Moz

Reserves (100%)1

Proven 7.7 2.32 0.57 0.29

Probable 497.1 2.08 33.28 16.64

P&P 504.8 2.09 33.85 16.93

Resources (100%)3 inclusive of reserves

Measured 7.7 2.52 0.63 0.31

Indicated 533.6 2.24 38.38 19.19

M&I 541.3 2.24 39.01 19.50

Inferred 92.2 2.02 5.99 3.00

NOVAGOLD reserve/resource table

44

Page 45: Denver Gold Forum, Colorado

reserve/resource table (con’t)

Resources (100%)5,6

Tonnage

Grade*

Metal content

NOVAGOLD share**

COPPER Mt %Cu Mlbs Mlbs

Inferred 53.7 0.50 592.0 414.4

GOLD Mt g/t Moz Moz

Inferred 53.7 0.73 1.26 0.88

SILVER Mt g/t Moz Moz

Inferred 53.7 10.60 18.36 12.85

Copper Canyon (NOVAGOLD 70%)

t = metric tonne

M = million

g/t = grams/tonne

* Reserve grade is diluted; resource

grade is in situ.

** NOVAGOLD share net after earn-ins

Approximate cut-off grades (see Resource Footnotes below):

Donlin Gold Reserves1: 0.57 g/t gold

Resources3: 0.46 g/t gold

Galore Creek Reserves2: C$10.08 NSR

Resources4: C$10.08 NSR

Copper Canyon Resources5,6: 0.6% copper equivalent

45

Page 46: Denver Gold Forum, Colorado

Notes:

a. These resource estimates have been prepared in accordance with NI43-101 and the CIM Definition Standard, unless otherwise noted.

b. See numbered footnotes below on resource information.

c. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content

d. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as imperial pounds

Resource Footnotes:

Mineral Reserves are contained within Measured and Indicated pit designs, and supported by a mine plan, featuring variable throughput rates, stockpiling and cut-off optimization. The pit designs and mine plan were optimized on diluted grades using the following economic and technical parameters: Metal price for

gold of US$975/oz; reference mining cost of US$1.67/t incremented US$0.0031/t/m with depth from the 220 m elevation (equates to an average mining cost of US$2.14/t), variable processing cost based on the formula 2.1874 x (S%) + 10.65 for each US$/t processed; general and administrative cost of US$2.27/t

processed; stockpile rehandle costs of US$0.19/t processed assuming that 45% of mill feed is rehandled; variable recoveries by rock type, ranging from 86.66% in shale to 94.17% in intrusive rocks in the Akivik domain; refining and freight charges of US$1.78/oz gold; royalty considerations of 4.5%; and variable pit

slope angles, ranging from 23º to 43º. Mineral Reserves are reported using an optimized net sales return value based on the following equation: Net Sales Return = Au grade * Recovery * (US$975/oz – (1.78 + (US$975/oz – 1.78) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.27 + 0.19) and reported in US$/tonne. Assuming

an average recovery of 89.54% and an average S% grade of 1.07%, the marginal gold cutoff grade would be approximately 0.57 g/t, or the gold grade that would equate to a 0.001 NSR cutoff at these same values. The life of mine strip ratio is 5.48. The assumed life-of-mine throughput rate is 53.5 kt/d.

Mineral Reserves are contained within Measured and Indicated pit designs using metal prices for copper, gold and silver of US$2.50/lb, US$1,050/oz, and US$16.85/oz, respectively. Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles varing from 42º to 55º were used to

generate the pit phase designs. Mineral Reserves have been calculated using a 'cashflow grade' ($NSR/SAG mill hr) cut-off which was varied from year to year to optimize NPV. The net smelter return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Net

Smelter Return; TCRC = Transportation and Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using metal prices of US$2.50/lb, US$1,050/oz, and US$16.85/oz for copper, gold, and silver, respectively, at an exchange rate of

CDN$1.1 to US$1.0; Cu Recovery = Recovery for copper based on mineral zone and total copper grade; for Mineral Reserves this NSR calculation includes mining dilution. SAG throughputs were modeled by correlation with alteration types. Cash flow grades were calculated as the product of NSR value in $/t and

throughput in t/hr. The life of mine strip ratio is 2.16.

Mineral Resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the following assumptions: gold price of US$1,200/oz; variable process cost based on 2.1874 * (sulphur grade) + 10.6485; administration cost of US$2.29/t; refining, freight & marketing (selling costs) of

US$1.85/oz recovered; stockpile rehandle costs of US$0.20/t processed assuming that 45% of mill feed is rehandled; variable royalty rate, based on royalty of 4.5% * (Au price – selling cost). Mineral Resources have been estimated using a constant Net Sales Return cut-off of US$0.001/t milled. The Net Sales Return

was calculated using the formula: Net Sales Return = Au grade * Recovery * (US$1200/oz – (1.85 + ((US$1200/oz – 1.85) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.29 + 0.20)) and reported in US$/tonne. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have

demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever

be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".

Mineral resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the same economic and technical parameters as used for Mineral Reserves. Tonnages are assigned based on proportion of the block below topography. The overburden/bedrock boundary has been

assigned on a whole block basis. Mineral resources have been estimated using a constant NSR cut-off of C$10.08/t milled. The Net Smelter Return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Diluted Net Smelter Return; TCRC = Transportation and

Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using silver using the economic and technical parameters mentioned above. The mineral resource includes material within the conceptual M,I&I pit that is not scheduled for processing

in the mine plan but is above cutoff. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty

as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".

The copper-equivalent grade was calculated as follows: CuEq = Recoverable Revenue ÷ 2204.62 * 100 ÷ 1.55. Where: CuEq = Copper equivalent grade; Recoverable Revenue = Revenue in US dollars for recoverable copper, recoverable gold and recoverable silver using metal prices of US$1.55/lb, US$650/oz, and

US$11/oz for copper, gold, and silver, respectively; for the purposes of the equivalency formula, Cu Recovery is assumed to be 100%. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred

Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".

NOVAGOLD Canada Inc. has agreed to transfer its 60% joint venture interest in the Copper Canyon property to the Galore Creek Partnership, which is equally owned by NOVAGOLD Canada Inc. and a subsidiary of Teck Resources Limited. The remaining 40% joint venture interest in the Copper Canyon property is

owned by another wholly owned subsidiary of NOVAGOLD.

Cautionary Note Concerning Reserve & Resource Estimates

This summary table uses the term “resources”, “measured resources”, “indicated resources” and “inferred resources”. United States investors are advised that, while such terms are recognized and required by Canadian securities laws, the United States Securities and Exchange Commission (the “SEC”) does not

recognize them. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Mineral resources that are not mineral reserves

do not have demonstrated economic viability. United States investors are cautioned not to assume that all or any part of measured or indicated resources will ever be converted into reserves. Further, inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined

legally or economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher category. Therefore, United States investors are also cautioned not to assume that all or any part of the inferred resources exist, or that they can be mined legally or economically. Disclosure of

“contained ounces” is permitted disclosure under Canadian regulations, however, the SEC normally only permits issuers to report “resources” as in place tonnage and grade without reference to unit measures. Accordingly, information concerning descriptions of mineralization and resources contained in this release

may not be comparable to information made public by United States companies subject to the reporting and disclosure requirements of the SEC.

NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all resource estimates contained in this circular have been prepared in

accordance with NI 43-101 and the CIM Definition Standards.

Technical Reports and Qualified Persons

The documents referenced below provide supporting technical information for each of NOVAGOLD's projects.

Project Qualified Person(s) Most Recent Disclosure & Filing Date

Donlin Gold Tony Lipiec, P. Eng., AMEC Donlin Creek Gold Project

Gordon Seibel R.M. SME, AMEC Alaska, USA

Kirk Hanson P.E., AMEC NI 43-101 Technical Report on Second Updated Feasibility Study amended filing on January 23, 2012

Galore Creek Robert Gill, P.Eng., AMEC Galore Creek Copper–Gold Project,

Jay Melnyk, P.Eng., AMEC British Columbia, NI 43-101 Technical Report on Pre-Feasibility Study,

Greg Kulla, P.Geo., AMEC filed on September 12, 2011

Greg Wortman, P.Eng., AMEC

Dana Rogers, P.Eng., Lemley International

Heather White, B.Sc., P.Eng., who is a consultant to NOVAGOLD and a “qualified person” under NI 43-101, has approved the scientific and technical information included in this section related to: (i) Donlin Gold since the issuance of the technical report filed on January 23, 2012, and (ii) Galore Creek since the

issuance of the technical report filed on September 12, 2011.

reserve/resource table (con’t)

46

Page 47: Denver Gold Forum, Colorado

47

NOVAGOLD RESOURCES INC.

Suite 720 – 789 West Pender Street

Vancouver, BC

Canada V6C 1H2

T 604 669 6227 TF 1 866 669 6227 F 604 669 6272

www.novagold.com

[email protected]

Mélanie Hennessey

VP, Corporate Communications

[email protected]

Erin O’Toole

Analyst, Investor Relations

[email protected]

contact us