den so 080925 addition inj11-12 install
TRANSCRIPT
Revision Date:04/08/2023
ESTIMATION
Messrs. : Sankyu - Thai Co.,Ltd.Wellgrow Industrial Estate Ph III
90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong
Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287
Attn. : Mr. Surathep Lertsara
Manager
CC. : คุ�ณ วิ�ชาญ เดี�ยรดีาษ
Project : New Injection Machine Installation
Location : Wellgrow Industial Estate
Title of works : Addition Works For New Toshiba Injection Install
Job No. : SKT 080925
Revision : 0
บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดีEIR ENGINEERING CO.,LTD.
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
228/94 หมู่�� 5 ถ. ศรี�นครี�นทรี ต. บางเมู่�อง อ. เมู่�อง จ. สมู่�ทรีปรีาการี 10270
Revision Date:04/08/2023
Revision Date:04/08/2023
ESTIMATION
บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดี
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270
Revision Date:04/08/2023
Page 5 of 15 EIR Engineering Co.,Ltd.
บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดีEIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
QUOTATION
Quotation No. : SKT 080925
Messrs. : Sankyu - Thai Co.,Ltd.: Wellgrow Industrial Estate Ph III
: 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,
: .A.Bangpakong Chachoengsao 24180
Tel. : Tel 038-522280 - 7 Fax. 038-522288
Attn. : Mr. Surathep Lertsara
: Manager
1) Price ( Baht ) : 38,640.00
2) Project : New Injection Machine Installation
3) Title of work : Addition Works For New Toshiba Injection Install
4) Term of Payment : Within 30 days
Item Description
1 DIRECT COST
2 INDIRECT COST
3 EXPENSE & PROFIT
TOTAL
VAT 7%
FINAL AMOUNT
We hope that our confirmation will meet with your requirement and look forward to receiving your valuable order in due course
Page 6 of 15 EIR Engineering Co.,Ltd.
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
QUOTATION
Date : 24 September 2008
Validity of Quotation :
Preparing Period :
Delivery :
Revised : 0
P/O No. :
Excluded Vat 7%
Addition Works For New Toshiba Injection Install
Description Quantity Unit Amount
1 LOT 31,600.00
1 LOT 2,000.00
1 LOT 5,040.00
TOTAL 38,640.00 VAT 7% 2,704.80
FINAL AMOUNT 41,344.80 We hope that our confirmation will meet with your requirement and look forward to receiving your valuable order in due course
Your Faithfully,
Page 7 of 15 EIR Engineering Co.,Ltd.
Sukhon Thewaran
Manager
บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดีEIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
SUMMARY OF QUOTATION
Bidder : EIR ENGINEERING CO.,LTD.
Client : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation
Title of work : Addition Works For New Toshiba Injection Install
Item Description
1 Direct Cost
A Addition Works For New Toshiba Injection Install
Subtotal 1
2 Indirect Cost
2.1 Site Staff and Supervisor
2.2 Transportation
2.3 Tool and consumption
2.4 Site Expense
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2
3 Expense & Profit
GRAND TOTAL
228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
SUMMARY OF QUOTATION
Quotation No. : SKT 080925
Date : 24 September 2008Revision No. : 0
Q'ty Unit Unit Cost Total Amount
1 lot 31,600.00 31,600.00
31,600.00
1 lot
1 lot
1 lot 2,000.00
1 lot
2,000.00
5,040.00
GRAND TOTAL 38,640.00
document.xlsBOQ Page 10 of15 EIR Engineering Co.,Ltd.
Estimation SheetClient : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation
Location : Wellgrow Industial Estate
Title Of Work : Addition Works For New Toshiba Injection Install
No. Description
1 DIRECT COST
A Addition Works For New Toshiba Injection Install
A1 INJECTION 11 M/C TAKEOFF AND RE-INSTALL WORK
- PM11 MDB PANEL
- NEW INJECTION MACHINE 700 A.
- CHILLER MACHINE 100 A.
- MOLD TEMP MACHINE
- HOPPER DRYER MACHINE
- JET LOADER
- CRUSHER
- TAKEOFF AND RE-WIRING CABLE CV 1 C - 185x3 (x2) sq.
- TAKEOFF AND RE-INSTALL CABLE THW 1C - 50 sq. G
- TAKEOFF AND RE-WIRING CABLE CV 1 C - 95x3 sq.
- TAKEOFF AND RE-WIRING CABLE THW 1C - 16 sq. G
- TAKEOFF AND RE-WIRING CABLE CV 4 C - 2.5 sq.
- TAKEOFF AND RE-WIRING CABLE CV 4 C - 2.5 sq.
- TAKEOFF CABLE RACK W:300 L:3000
- TAKEOFF CABLE RACK W:200 L:3000
- TAKEOFF CABLE RACK ACCESSORIES
- TAKEOFF WIREWAY W:300 FOR P-M11 AND P-M12
- TAKEOFF STEEL SUPPORT C:75 800X660X400
- STEEL SUPPORT C:75 1500X300X1500
- INSTALL CABLE RACK W:300 L3000 WITH COVER
- INSTALL CABLE RACK W:200 L3000 WITH COVER
- HORIZONTAL RACK W:200
- SPECIAL TEE RACK W:200/300
- COVER HORIZONTAL RACK W:200
document.xlsBOQ Page 11 of15 EIR Engineering Co.,Ltd.
Estimation SheetClient : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation
Location : Wellgrow Industial Estate
Title Of Work : Addition Works For New Toshiba Injection Install
No. Description
- COVER SPECIAL TEE RACK W:200/300
- STEEL SUPPORT C:100 L:400
- WIRING CONNECT ACCESSORIES
- MISCELENEOUS
- PAINTING WORK
- LABOR CHARGE
TOTAL A1
A2 SUB-PANEL INJECTION 11,12 MODIFIED
- SUB-PANEL 11 W550X H1000 XL200
- SUB-PANEL 12 W550X H1000 XL201
- WIRE AND CABLE CV 1C-95 x3 ( R,S,T)
- WIRE AND CABLE THW 1C-16 ( G )
- MAIN BUSBAR (R,S,T)
- GROUND BUSBAR (G)
- FLANGE SOCKET SLOPING 32A 3P+E IP67
- POWER PLUGS 32A 3P+E IP67
- ABB BREAKER T1N 32AT 3P MCCB (TAKEOFF)
- ABB BREAKER T1N 32AT 3P MCCB
- ABB BREAKER T1N 160AT 3P MCCB (NEW INSTALL)
- LABOR CHARGE
TOTAL A2
TOTAL A
document.xlsBOQ Page 12 of15 EIR Engineering Co.,Ltd.
Estimation SheetClient : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation
Location : Wellgrow Industial Estate
Title Of Work : Addition Works For New Toshiba Injection Install
No. Description
document.xlsBOQ Page 13 of15 EIR Engineering Co.,Ltd.
Date : 24 September 2008Job Number : SKT 080925Revision : 0
Labour Cost
Q'ty Unit Unit Price Total Cost Remark
1 SET Existing
1 SET Existing
1 SET Existing
1 SET Existing
1 SET Existing
1 SET Existing
1 SET Existing
1 LOT Existing Inj. M/C No.11
1 LOT Existing Inj. M/C No.11
1 LOT Existing Sub-Panel11
1 LOT Existing Sub-Panel11
1 LOT Existing Crusher
1 LOT Existing Lighting
1 LOT Existing
1 LOT Existing
1 LOT Existing
1 LOT Existing
1 LOT Existing
1 LOT Existing
1 LOT Existing
1 LOT Existing
1 SET 1,200.00 1,200.00
1 SET 1,650.00 1,650.00
1 SET 700.00 700.00
document.xlsBOQ Page 14 of15 EIR Engineering Co.,Ltd.
Date : 24 September 2008Job Number : SKT 080925Revision : 0
Labour Cost
Q'ty Unit Unit Price Total Cost Remark
1 SET 1,250.00 1,250.00
8 SET 250.00 2,000.00
1 LOT 2,000.00 2,000.00
1 LOT 1,000.00 1,000.00
1 LOT 800.00 800.00
1 LOT 15,000.00 15,000.00
25,600.00
1 SET Existing
1 SET Existing
1 SET Existing
1 SET Existing
2 SET Existing
2 SET Existing
2 SET Existing
2 SET Existing
2 SET Existing CRUSHER
2 SET Existing FOR MOLDCHANGE C/P
2 SET 2,600.00 5,200.00 FOR HOT RUN C/P
1 LOT 800.00 800.00
6,000.00
31,600.00
document.xlsBOQ Page 15 of15 EIR Engineering Co.,Ltd.
Date : 24 September 2008Job Number : SKT 080925Revision : 0
Labour Cost
Q'ty Unit Unit Price Total Cost Remark