Lean Manufacturing
Delta 1&2Cycle Time Reduction
-
Project Title : Delta 1/2 Cycle Time Improvement
Section : Production Engineering
Site : Elite Business Machine Mfg Co. Ltd
Team Leader : XJ Shi
Champion : CH Chan
-
Lean Manufacturing Road Map
1. 7 Wastes reduction2. Cycle Time Reduction3. UPH Improvement4. Financial Saving
-
Waste of Motion Eliminate Idle Time
Example: FCT Station
Place finished machine on line 10Place finished machine on line 10
Install 3pcs test jig 7Install 3pcs test jig 7Scan P/N + S/N. Connect to LAN 8Scan P/N + S/N. Connect to LAN 8Connect MMI assy 13Connect MMI assy 13
Install envelop inject platform 8
Power on machine 4Power on machine 4Machine initialization 95Worker: 1. record data in QC report 32. Install envelop inject platform 83. Record the results in check list 23
Machine initialization 95Worker : Record data in QC report 3
Test 197Test 197Record the results in check list 23
After improve Time: 339Before improve time: 370
Take machine from line 5Take machine from line 5
AfterBefore
-
Improvement
1.
1. 5 2. - 100% 3. ""
2. Balance HS label/Energy star label/Produce Label,WP24MMI2
3CasingBalance.
1. 1 2. Balance
3. 2 PD3
-
Waste of Waiting Line Balancing
92%May
82%Mar
95%92%82%Delta 1/2JunAprFebModel
82% 82%
92% 92%
95%
75%
80%
85%
90%
95%L
i
n
e
b
a
l
a
n
c
e
L
i
n
e
b
a
l
a
n
c
e
L
i
n
e
b
a
l
a
n
c
e
L
i
n
e
b
a
l
a
n
c
e
Feb Mar Apr May Jun
MonthMonthMonthMonth
Delta 1/2Delta 1/2Delta 1/2Delta 1/2
-
Cycle time Reduction
2700May
2220Jun
3162Mar
2700Apr
3162CasingFebCycle time
Cycle Time ReductionCycle Time ReductionCycle Time ReductionCycle Time Reduction
2220
27002700
31623162
2000
3000
4000
Feb Mar Apr May Jun
MonthMonthMonthMonth
C
y
c
l
e
T
i
m
e
C
y
c
l
e
T
i
m
e
C
y
c
l
e
T
i
m
e
C
y
c
l
e
T
i
m
e
(
s
e
c
)
(
s
e
c
)
(
s
e
c
)
(
s
e
c
)
-
UPH Improvement
30Mar
30Feb JunMayAprMonths
413535UPH
30 30
35 35
41
0
10
20
30
40
50
U
P
H
U
P
H
U
P
H
U
P
H
Feb Mar Apr May Jun
MonthMonthMonthMonth
Unit Per Hour (UPH)Unit Per Hour (UPH)Unit Per Hour (UPH)Unit Per Hour (UPH)
-
Financial Saving
Projected Saving till Nov = RMB 60,442.68
60,442.68 10,648.54 10,648.54 10,648.54 10,648.54 10,648.54 4,680.00 2,520.00 0.00 0.00 Total Cost Saving (RMB)
304.24 304.24 304.24 304.24 304.24 133.71 7200Total Man Hours Saved
303030303030303030Manpower Used
10.14 10.14 10.14 10.14 10.14 4.46 2.40 0.00 0.00 Man Hours Saved
27.66 27.66 27.66 27.66 27.66 26.74 14.40 0.00 22.63 Working Hour After Improvement
414141414135353030UPH After Improvement
37.80 37.80 37.80 37.80 37.80 31.20 16.80 0.00 22.63 Working Hour Before Improvement
303030303030303030UPH Before Improvement
113411341134113411349365040679Production Qty
OctSepAugJulyJuneMayAprMarFebMonthTotal
Forecast
-
Thank You