Since 1990 EXPERIENCE where it counts INNOVATION where it matters DEEPWATER DEPLOYMENT SYSTEM LOWERING DEEPWATER MODULES WITH GMC ICP TM LOWERING SYSTEM GMC ICP TM Lowering System, has been designed for installation of subsea modules, the system uses GMC’s patented ICP TM Connection system for deploying the hard- ware to the seabed. The system can be used for safely lowering modules such as PLET’s PLEM’s Manifolds, and general subsea hardware from any crane barge or vessel of opportunity in deep water hostile environments. The GMC ICPLS system offers fast deployment, using high fatigue, quick connect snaplay connector’s on light weight high strength tubular. Once in position the subsea module is released and the deployment system is recovered to surface and ready for the next deployment. Reducing installation time and cost, and enabling large heavy modules to be lowered safely in a controlled manner in deep water applications. See overleaf for installation sequence. • Tension = 2000 MT up to 3000M Water Depth • Weight in Air = 5.6mt/50m • Weight in Water = 3.7mt/50mt • Connection Type = GMC Connector high-fatigue, non-rotational, quick connect.

Upload: others

Post on 02-Aug-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Deepwater Deployment SyStemgmcdeepwater.com/wp-content/uploads/2015/03/GMC... · PLET’s PLEM’s Manifolds, and general subsea hardware from any crane barge or ... Once in position

Since 1990

EXPERIENCEwhere it counts

INNOVATIONwhere it matters

Deepwater Deployment SyStem

lowering Deepwater moDuleS with

GMC ICPTM lowering SyStem

GMC ICPTM Lowering System, has been designed for installation of subsea modules, the system uses GMC’s patented ICPTM Connection system for deploying the hard-ware to the seabed. The system can be used for safely lowering modules such as PLET’s PLEM’s Manifolds, and general subsea hardware from any crane barge or vessel of opportunity in deep water hostile environments.

The GMC ICPLS system offers fast deployment, using high fatigue, quick connect snaplay connector’s on light weight high strength tubular. Once in position the subsea module is released and the deployment system is recovered to surface and ready for the next deployment. Reducing installation time and cost, and enabling large heavy modules to be lowered safely in a controlled manner in deep water applications. See overleaf for installation sequence.

• Tension = 2000 MT up to 3000M Water Depth

• Weight in Air = 5.6mt/50m• Weight in Water = 3.7mt/50mt• Connection Type = GMC Connector

— high-fatigue, — non-rotational, — quick connect.

Page 2: Deepwater Deployment SyStemgmcdeepwater.com/wp-content/uploads/2015/03/GMC... · PLET’s PLEM’s Manifolds, and general subsea hardware from any crane barge or ... Once in position

GMC Deepwater DeployMent SySteM

About GMC

GMC is an industry leader in innovative engineering, project management, and installation solutions and products, from the seabed to the surface, for offshore oil and gas SURF, drilling, and production projects. Established in 1990, GMC has offices in the UK and USA.

GMC Limited © 2015 | All Rights Reserved V3:02/15

GMC Limited100 Longwater AveReading, RG2 6GP United Kingdom

+44 (0)118 945 0320

* * *

GMC Inc738 Hwy 6 South

Suite 900Houston, TX 77079

United States

+1 832.300.1480

* * *

[email protected]

• Payloadmovedintoposition.• Rigging&“LaunchJoint”connectedtocrane’smainblock.

• Connect“LowerRiggingJoint”topayload.• Lift&lowerpayloaduntilpipecollarisrestingonmake/breaktool.

• Lift50Msection&bringintopositionovermake/breaktool.

• Landoutpipe.• Makeupconnection

• Whenpayloadisapproximately50Moffbottom,lift,landandmakeupfinalloweringjoint.

• Usecranetolandoutpayloadonseabed.

CraneHook

PayloadManifoldSubseaFoundation

PayloadManifoldw/GMCConnector

LowerRiggingJointheldinmake/breaktool

Make/BreakTool

8”x50MPipeJointw/GMCPin/BoxConnectors

Make/BreakTool

8”x50MPipeJointw/GMCPin/BoxConnectors

8”x50MPipeJointw/GMCPin/BoxConnectors

Make/BreakTool

PayloadManifold

PayloadManifold

LowerRiggingJointHeldinMake/BreakTool

8”x50MPipeJointw/GMCPin/BoxConnectors

LowerRiggingJointHeldinMake/BreakTool

• Mainblocktoloweruntilpipecollarisrestingonmake/breaktool.

• Liftanother50Msection&bringintopositionovermake/breaktool.

• Landoutpipe.• Makeupconnection

• Continueaddingpipesectionsw/GMCPin/BoxConnectors.