Deep Water Seabed InterventionJan Vlak – Operations Manager
Van Oord Offshore Offshore and EPC Contractors
2
Subsea Rock Installation
Rock installation in deep and shallow water o Pre lay support for subsea pipelines, cables and
structureso Post lay support for the stabilization of subsea
pipelines and cableso Scour protection around structureso Ballasting
Equipment o Flexible Fall Pipe Vessels (FFPV)
For deep water installation up to 1500 meters o Side Stone Dumping Vessels (SSDV)
For shallow water installation to 30 meters
Offshore and EPC Contractors
3
Offshore and EPC Contractors
4
Deep water seabed intervention using excavation techniquesHow deep?Two projects: 1. Nothern Scarp Australia – 625m / 657m2. Polarled, Norway – 115m / 375m
Offshore and EPC Contractors
5
Northern Scarp Australia Scope of WorkPreparation of the Jansz Field pipeline route
ClientChevron Australia Pty Ltd
LocationAustralia, Gorgon/Jansz Field
Offshore and EPC Contractors
6
Northern Scarp Australia
Offshore and EPC Contractors
7
Northern Scarp Australia
Profile of the northern scarp crossing project
Offshore and EPC Contractors
8 m to be removed
-/- 657 m !!
8
Northern Scarp AustraliaSoil conditionso CPT = 2.5 – 3.5 MPa.o Hard Silt o Su = 80 – 200 kPa
Offshore and EPC Contractors
9
Northern Scarp Australia
Primary approach: o Flexible Fall Pipe Vessel Tertneso Equipped with FPROVo And High Pressure Jetting Device (Clay Cutter)
Offshore and EPC Contractors
10
Northern scarp Australia
Key elements of the Primary Approacho Pumps at deck levelo Composite coiled tubing in combination with Fall Pipe ROVo Higher accuracy of controlling excavation tools (Fall Pipe ROV)o Back up / alternative tool – Clamshell Grabo Option to install rock
Offshore and EPC Contractors
11
Northern Scarp Australia
Primary approach: o Unfortunately, the “hose” failed.
Offshore and EPC Contractors
And then????
12
Offshore and EPC Contractors
13
Northern Scarp Australia
Primary approach:
o Flexible Fall Pipe Vessel Tertneso Equipped with FPROVo And High Pressure Jetting Device (Clay Cutter)
Alternative approach: o Clamshell Grab or
Deepwater Excavation System (DES)
Offshore and EPC Contractors
14
Northern Scarp project
Plan B – Deep Excavation System
Offshore and EPC Contractors
15
Northern Scarp project
Plan B – Deep Excavation System (movie)
Offshore and EPC Contractors
16
Northern scarp Australia
Offshore and EPC Contractors
17
Northern scarp Australia
Project progress
Offshore and EPC Contractors
18
Northern scarp Australia
As built main trench
Offshore and EPC Contractors
19
Northern scarp Australia
Client satisfaction
“I would like to express my gratitude and admiration for the crew of the Tertnes that has done all the hard work.
It has been a bit of a difficult start, but with the grab as an add-on to the FPROV all of you have once again demonstrated the outstanding ability and agility of Van Oord and Tertnes to achieve the extraordinary.”
Offshore and EPC Contractors
20
Polarled Norway
Scope of WorkRemoval of high peaks on the Polarled Route by FFVP Tertnes in deep excavation mode at 115 – 375 m waterdepth
ClientStatoil
Location50 locations along the Polarled pipeline route Norway
Offshore and EPC Contractors
21
Polarled Norway
Offshore and EPC Contractors
To be removed
22
Polarled Norway
10,000 m3 of excavation saves 350,000 m3 of rock
Offshore and EPC Contractors
23
Polarled Norway
Soil conditionso Soft Clayo Su = 10 – 50 kPao Risk of some Hard Clay
and Cobbles/Boulders
Offshore and EPC Contractors
24
Polarled NorwayCorals
Offshore and EPC Contractors
25
Polarled Norway
Dedicated disposal area’s
Offshore and EPC Contractors
26
Polarled Norway
Offshore and EPC Contractors
27
Polarled Norway
Offshore and EPC Contractors
28
Polarled Norway
Offshore and EPC Contractors
29
Polarled Norway
Location
Offshore and EPC Contractors
30
DEEP EXCAVATION SYSTEM (DES)
Conclusions o Two projects have been very successfully executedo Two very happy clientso Combination of Grab with FPROV gives good positioning controlo Good control of deposited materialo Grab Excavation System gives very limited turbidity (Coral)o Van Oord has a patent on Deep Excavation System.