Reading "Datacenter as a Computer" Chapter 4 (written in Japanese)

TRANSCRIPT

  • 1. Datacenter as a Computer (Chapter 4) 2009/12/13 id:shiumachi

2. Agenda

  • 3. 4.1 4. 4.2
    • 4.2.1 UPS 5. 4.2.2 PDU
  • 4.3
    • 4.3.1 CRAC 6. 4.3.2 7. 4.3.3 8. 4.3.4 9. 4.3.5

10. 11.

  • 12.

$10-20/W 13. 4.1 14. Tier I Tier II N+1 99.7% Tier III 1N+2 99.98% Tier IV 2SPOF(SPOF:Single Point Of Failure) 99.995% 15. Tier I 16. Tier II N+1 17. Tier III ( ) 18. Tier IV 19.

  • III IV

20.

  • 2/3 450 m 1MW 21. (colos)10-20MW 22. 30MW

23. 4.2 24. p.40 25. 60 - 400kV 10 - 20kV 110-600 V UPS 26. 4.2.1 UPS

  • Uninterruptible Power Supply 27. UPS3
    • ( 10 15 ) 28. AC-DC-AC 29.

30. 4.2.1 UPS

  • UPS UPS 31. UPS kW 2 MW

32. 4.2.2 PDU

  • Power Distribution Unit
    • 200 480 V 110 V 220 V 33. PDU 75 225 kW 6kW 34. PDU

35.

  • RAIDUPSPDU
    • N+1 36. N+2 37. 2N 38.

39. 4.3 40. 4.3.1 CRAC

  • Computer Room Air Conditioning
    • 41.
      • :12-1418-2216-20 42. 12-14

43. 4.3.2

  • 44.
    • 45. ()

46. 4.3.3

  • -> recirculation
  • 150 200W / sq ft

47. 4.3.4

  • 48. 49.

50. 4.3.5

  • ()
    • CRACPDU 51. UPS
  • 52. Google 2005 53. Microsoft

54. Thank you !