deconstructable new construction: a smart alternative

41
Mahaffey Fabric Structures Boomerang Buildings 4161 Delp Street, Memphis, TN 38118 www.BoomerangBuildings.com

Upload: beth-wilson

Post on 25-Jun-2015

509 views

Category:

Real Estate


0 download

DESCRIPTION

This presentation was recently approved by the U.S. Green Building Council & GBCI for one CEU credit. For those companies who need space fast, the Boomerang Building can be installed in as little as 21 days. Can't commit to a large capital investment or new construction not in the budget? Boomerang's short-term lease frees up cash flow and provides tax benefits. It is also a smart alternative to the waste of resources constructing permanent buildings for needs of only 2-5 years. Designed for deconstruction, the Boomerang has a high content of recycled materials, is 100% repurposed after each project and can contribute to LEED points.

TRANSCRIPT

Page 1: Deconstructable New Construction: A Smart Alternative

Mahaffey Fabric Structures Boomerang Buildings4161 Delp Street, Memphis, TN 38118 www.BoomerangBuildings.com

Page 2: Deconstructable New Construction: A Smart Alternative

Tents were sustainable long before there was a green movement.

Since 1924, Mahaffey has taken numerous steps to adapt to these needs and decrease our ecological footprint.

Page 3: Deconstructable New Construction: A Smart Alternative

All elements of these temporary structures are carefully deconstructed after each use, cleaned in our water-conserving washing machine and then refurbished or repurposed for another project.

The LEED credit Building Reuse may be a target, as it can be shown that the structure has been erected before. It represents 1 LEED point potential in MRc3.

Page 4: Deconstructable New Construction: A Smart Alternative

Once the structure has reached the end of its lifespan, it is recycled after selective deconstruction by contacting the local recycling centers and shipping directly to the nearest mill or smelter. The frame is then melted down and reused.

This can contribute to the LEED credit Construction Waste Management. It represents a 1-2 LEED point potential in MRc2.

Page 5: Deconstructable New Construction: A Smart Alternative

The Boomerang Building was designed with thesegoals in mind.

Page 6: Deconstructable New Construction: A Smart Alternative

Industrial professionals lease a Boomerang Building when:

• There’s need for immediate, fully functional space.• New construction is not in the budget, but the demand

needs to be satisfied tomorrow.• Frustrated that materials are being lost to theft and

weather damage.• Project needs change and building(s) must be

relocated quickly.• A conventional “tent” structure is not an option due to

high winds or other environmental conditions, such as the need for thermal insulation.

• Seeking a competitive advantage by supporting sustainable green initiatives.

Page 7: Deconstructable New Construction: A Smart Alternative

Should the need arise for a temporary building and there is a limited installation time frame,

Boomerang provides the ideal solution in just 21 days.

Page 8: Deconstructable New Construction: A Smart Alternative

Can’t commit to a large capital investment or new construction not in the budget?

Boomerang’s short-term lease frees up cash flow.

Page 9: Deconstructable New Construction: A Smart Alternative

Benefits:

• Low startup costs & quickly operational

• Portable, temporary structure = property tax savings

• Lease expense is fully tax deductible vs. depreciation of permanent real estate. Considered a business expense vs. capital expenditure – a strategic financial choice for many organizations

• 1 LEED point potential in IDc1.1 by showing the cost and CO2 savings.

Page 10: Deconstructable New Construction: A Smart Alternative

Money is always tight. If owners were presented with an option to bridge temporary needs with sturdy, temporary buildings in lieu of tents, they may choose this alternative.

Page 11: Deconstructable New Construction: A Smart Alternative

Finally, the Boomerang is a smart alternative to the waste of resources used constructing permanent buildings for needs of only 2-5 years.

It has a high content of recycled materials, is reused each time it is deployed and is itself recyclable at the end of its useful life.

This can also contribute to the LEED credit Construction Waste Management. It may represent a 1-2 LEED point potential in MRc2.

Page 12: Deconstructable New Construction: A Smart Alternative

:: Boomerang Building Mission ::

To transform design teams’ thought process of new construction by incorporating a lease option for temporary, sustainable buildings that can be rapidly adapted to society’s changing needs, while causing the least amount of negative impact on our environment.

Page 13: Deconstructable New Construction: A Smart Alternative

Boomerang Buildings are fast and cost-effective.

Want one more reason? They’re green.

Page 14: Deconstructable New Construction: A Smart Alternative

Green buildings:

• Reduce construction costs• Reduce CO2 emissions• Reduce environmental impacts of new

construction• Reduce liability, and by this, lower insurance costs• Achieve more predictable results in the design,

construction and operation of built environments• Save money through tax benefits (lease cost vs.

depreciation deduction)• Once the need no longer exists, the temporary

building’s site can easily be restored to its landscaped origin

Page 15: Deconstructable New Construction: A Smart Alternative

The cumulative impact of the design, construction and operation of built environments has profound

implications on the environment and the economy.

Page 16: Deconstructable New Construction: A Smart Alternative

Consider the lifecycle of these buildings:

• Where did the building materials come from? Recycled content

• Where will they go after use? Repurposed

Page 17: Deconstructable New Construction: A Smart Alternative

LEED-related Components

Page 18: Deconstructable New Construction: A Smart Alternative

Steel frame→ Nucor Yamato Steel in Blytheville, AR & Keeler Iron Works in Memphis, TN

• Total Post Consumer Recycled Content (Steel): 82.3%

• Total Pre-Consumer/Post-Industrial Recycled Content: 16.9%

• 70 miles from Mahaffey headquarters:5929 Arkansas 18Blytheville, AR 72315

Page 19: Deconstructable New Construction: A Smart Alternative

Boomerang Building Installation

Page 20: Deconstructable New Construction: A Smart Alternative

Guardian Steel™ Walls & Roll-Up Door → Haas Door

• Metal siding is made from steel that contains up to 80% recycled material.

• CFC-free polyurethane insulation, resulting in energy efficiency, reducing the need for heating or cooling.

• Insulated structures help reduce CO2 emissions by the lower energy need of building climate control systems.

• High quality, long lasting, factory-applied finishes extend the lifespan of the siding, roof and roll-up door elements and make them reusable over and over again.

Page 21: Deconstructable New Construction: A Smart Alternative

Storage Building for Auto Manufacturer – Smyrna, TN

Page 22: Deconstructable New Construction: A Smart Alternative

Temporary Manufacturing Facility

Page 23: Deconstructable New Construction: A Smart Alternative

Metal Roof → MBCI in Hernando, MS

• Composed of 35% recycled content.• 100% reusable after each application.• Insulation value can be adjusted to owner’s need.• Strength of structure can be adjusted simply by the

placement of the footplates.• 25 miles from Mahaffey headquarters:

300 Old Highway 51 SHernando, MS 38632

Page 24: Deconstructable New Construction: A Smart Alternative

Fabric → Sometimes used for Roof and/or Walls

• 7-year Warranty; 100% reusable after each application

• U.V. resistant/opaque fabric or translucent fabric for natural day lighting

• 100% recyclable textile through Texyloop process

Page 25: Deconstructable New Construction: A Smart Alternative

Lighting System: Energy-Efficient Fluorescent or LED Lighting

• Technology + Effective Design = Performance & Energy Savings

• This system is designed using T5 (5/8" in diameter) lamps, or LED lighting for improved energy efficiency. LED luminaries are durable and reusable with a life span of min. 5 years. It offers improved efficiency, higher intensity and potentially longer life due to reduced degradation in light output over time.

• ENERGY STAR certified products

Page 26: Deconstructable New Construction: A Smart Alternative

Industrial Warehouse Building – Smyrna, TN

Page 27: Deconstructable New Construction: A Smart Alternative

Elementary School Gymnasium – Joplin, MO

Page 28: Deconstructable New Construction: A Smart Alternative

Gymnasium > Two Years Later

Page 29: Deconstructable New Construction: A Smart Alternative

Materials & Resources

• We pay special attention to the selection of sustainable materials and their procurement (lifecycle impacts)o Practice sustainable purchasingo Select highly recycled content materialso Salvage all elements of the temporary buildingo Reuse all elements with minor refurbishment

• Waste managemento Manage construction waste both during installation

and at the end of the components’ useful life.o Salvage and reuse all materials used in the

construction process.

Page 30: Deconstructable New Construction: A Smart Alternative

Temporary Air Ambulance Hangar – Valentine, NE

Page 31: Deconstructable New Construction: A Smart Alternative
Page 32: Deconstructable New Construction: A Smart Alternative

Site and Indoor Environmental Quality

• Integrated pest management: We have created a plan to prevent pests from entering and damaging the building and its contents.

• Select appropriate materials: Use low VOC emitting materials (steel panels vs. fabric, no VOC emitting insulation) to limit off-gassing.

• Use lighting controls: Lighting system to include timer to turn off interior lighting and motion sensor as possible for energy saving of exterior lighting.

• Control thermal comfort: HVAC systems controlled by a Building Automation System to control indoor temperature as a function of the exterior temperature and humidity.

• Provide day lighting and views: Utilize natural light with window walls or skylight systems if requested.

Page 33: Deconstructable New Construction: A Smart Alternative

Auto Parts Storage – Smyrna, TN

Page 34: Deconstructable New Construction: A Smart Alternative

Temporary Fireboat Cover – Port of Los Angeles

Page 35: Deconstructable New Construction: A Smart Alternative
Page 36: Deconstructable New Construction: A Smart Alternative
Page 37: Deconstructable New Construction: A Smart Alternative
Page 38: Deconstructable New Construction: A Smart Alternative

As your needs change, so can your building, thanks to its modular design and inherent flexibility.

Boomerang Buildings can be reconfigured, expanded and relocated with ease.

Page 39: Deconstructable New Construction: A Smart Alternative

This concept takes green building to the next level.

It encourages project teams to create environments that may be completely restored or regenerated once the need for the temporary

building no longer exists.

Through this effort, we are ultimately able to provide positive environmental, social and

economic impacts.

Page 40: Deconstructable New Construction: A Smart Alternative

We’re not just creating a better building, but a smarter one.

Page 41: Deconstructable New Construction: A Smart Alternative

By using these structures doing the right thing becomes the logical, economical and environmentally correct choice.

Make a difference by leasing a temporary, sustainable Boomerang Building.

www.boomerangbuildings.com800.918.5795