decon team requirements/ site considerations
DESCRIPTION
DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS. Objectives. Who should be on the Decon team? Discuss OSHA First Receivers standard. Roles of various team members. Discuss decontamination site selection. Hospital Decontamination Teams. Core Trained Group Originally only ER staff - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/1.jpg)
1Decon v2.0
DECON TEAM REQUIREMENTS/
SITE CONSIDERATIONS
![Page 2: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/2.jpg)
Decontamination Team 2Decon v2.0
Objectives
• Who should be on the Decon team?• Discuss OSHA First Receivers standard.• Roles of various team members. • Discuss decontamination site selection.
![Page 3: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/3.jpg)
Decontamination Team 3Decon v2.0
Hospital Decontamination Teams
• Core Trained Group– Originally only ER staff– Now core includes many more than ER staff
• Members available 24/7– Pager– Stipend for responding and training
• Accountability for equipment and access
![Page 4: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/4.jpg)
Decontamination Team 4Decon v2.0
Who will do Decon?Who should not do DECON?
• Administrators• ED Clinicians• Firefighters/EMS • Housekeeping• Facilities• Military• Techs and non-medical support• Security
![Page 5: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/5.jpg)
Decontamination Team 5Decon v2.0
OSHA First Receivers Guidelines
• Created in January 2005• It is an extension of the standards for
personnel involved in responding to hazardous chemical spills
• Specifically addresses hospital providers
• Available at www.osha.org
![Page 6: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/6.jpg)
Decontamination Team 6Decon v2.0
Security Team
• Control all access to hospital entrance/exits.
• May have to recruit non-security staff.• PPE requirements risk/benefit analysis.• Might be the first person to “greet” a
contaminated patient.
![Page 7: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/7.jpg)
Decontamination Team 7Decon v2.0
• Patient transport – entry and exit (does not enter tent)– To the tent (guide/non-ambulatory)– Cut clothes if non-ambulatory
• Triage - pre and/or post decontamination (does not normally enter tent)
• Decontamination personnel – Ambulatory (1 per side – post DECON)– Non-ambulatory (minimum of 4 (?) per patient)– Agent specific monitoring for success (another
person?)
Decontamination Team
![Page 8: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/8.jpg)
Decontamination Team 8Decon v2.0
Decontamination Clinical Team
Decides if immediate treatment is needed prior to decontamination – MARK 1 kits– Amyl nitrate
• Decide what type of decontamination is needed
• Deceased/expectant patients assessment
![Page 9: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/9.jpg)
Decontamination Team 9Decon v2.0
Perfect World• Decon zone personnel = 9 people
– Safety Monitor - 1– Security - 1– Clinical/Triage - 1– Litter bearers/escorts – 2– Decontaminators – 4
• Decon zone personnel = 30 people– Safety Monitor - 1– Security – 1 to 4– Clinicians – 2 to 5 – Litter bearers/escorts – 14– Decontaminators – 8
![Page 10: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/10.jpg)
Decontamination Team 10Decon v2.0
Decontamination Site• Large outdoor area • Fixed lines vs. deployable shelters• Control run off (EPA)• Non-permeable surface if possible• Utilities & Water
– Hot & cold – No tears soap
• Down wind of the facility• Controlled access to the DECON site and the
healthcare facility!!!!!!!!!
![Page 11: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/11.jpg)
Decontamination Team 11Decon v2.0
DecontaminationEquipment
• Ownership
• Accessible• Mobile as site may
change• Maintained and
Inspected regularly
![Page 12: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/12.jpg)
Decontamination Team 12Decon v2.0
Hospital
Secure EntryControl Point
Secondary Facility ?
Wet Decon Dry Decon
LitterDecon
TriageStation
ImmediateTreatment ?
DecontaminationSite
![Page 13: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/13.jpg)
Decontamination Team 13Decon v2.0
WetDecon
LitterDecon
DryDecon
![Page 14: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/14.jpg)
Decontamination Team 14Decon v2.0
Summary• Personnel need to …
– Understand the decontamination plan– Understand the difference in requirements
between the RELEASE SITE (HAZMAT) and HOSPITAL ENTRY DECON zones
– Be trained and medically cleared for their specific roles
– Equipped with Level C PPE if working in the decon zone
– Scale response to the size of the event– Establish a decontamination site
![Page 15: DECON TEAM REQUIREMENTS/ SITE CONSIDERATIONS](https://reader038.vdocuments.mx/reader038/viewer/2022102818/56812a9b550346895d8e5505/html5/thumbnails/15.jpg)
15Decon v2.0
Thank you!
Questions?