decommissioning and p&a in the future
TRANSCRIPT
Decommissioning and P&A in the Future
UK Decomm Trade Mission June 2017
ConocoPhillips’ P&A Story
2
CoP Norway Future Decomm Scope
P&A +/- 100 wells
Remove 4-5 major facilities
Next +/-10 years
P&A > 300 wells
Remove 19 major facilities
TotalRemaining
Scope
ConocoPhillips Norway Interests in the North Sea
2014 – 2016 P&A Programs (Total 38 wells)
3
Ekofisk Alpha:• 23 Wells – Completed
• Rowan Gorilla VI
Eldfisk Bravo:• 6 Wells
• Platform Rig
Ekofisk Kilo: • 3 Wells
• Platform Rig
Eldfisk Alpha:• 2 Wells
• Maersk Gallant
Ekofisk Bravo:• 4 Wells
• Rowan Norway
Eldfisk 2/7 B – P&A 6 wells
Platform Rig - 2016
Greater Ekofisk Well Plug & Abandonment Scope
Tor – P&A 12 wellsEkofisk 2/4 B – P&A 22 wells
2 wells 2016 (completed)
Future 20 wells
Ekofisk 2/4 A – P&A 23 Wells
23 wells – Completed 2016
Ekofisk 2/4 C – P&A 23 wells
Eldfisk 2/7 A – P&A 27 wells
Eldfisk 2/7 B – P&A 19 wells
Platform Rig - 3 wells 2016 (completed)
Future 16 wells
4
Medium Term P&A +/- 100 wells
Structural Integrity Driven
Short Term P&A
Well Integrity Driven
Long Term P&A > 220 wells
Economic Life Driven
Multiple Potential Solutions and Providers
Revolutionary
P&A
Technology
Regain Wellbore
Access
Remove Steel
Clean Out
Establish Barrier
Verify Barrier
Monitoring
Spex
Foro
Interwell
GA Drilling
BiSN
Nammo
Sintef
DNV GL
ANT
DrillWell
Heat melting
Erosion
Corrosion
Explosion pressure
Advanced Pugging Materials
Formation Barriers
Multi-string bond logging
Remote monitoring
Key to Success – Collaboration!
• Pan North Sea
• Regional Organizations
• UK Oil and Gas
• Norwegian Oil and Gas Association
• Industry JIP’s
• Bi-Lateral / Tri-Lateral
Operator Collaboration
…. etc.
Through Tubing Solutions
…. etc.
5
Tor
Greater Ekofisk Area Facility Removal History / Plans
Albuskjell
West Ekofisk
Edda
Embla
Eldfisk Complex
H 7
36/22 A
37/4 A
B 11
Tor
Ekofisk Complex
Eldfisk 2/7 B
Removed 2006-2014
Planned removal 2017-2020
Future removal, 3rd party
Removed, 3rd party
2/4 A
Cod
2/4 B - K
Cat 1 - Removal of Bridges, Flares and Tripods
7
Awarded 2005 to Heerema (main contractor)
AF Decom (subcontractor onshore disposal)
Method: Reverse installation
Total weight: approximately 11,000 ton
Scope:▪ 9 bridges
▪ 5 flares
▪ 8 tripods
▪ 2 modules
Completed 2010
Norpipe 37/4A2010
Norpipe 36/22A2010
EKOFISK 2/4R2010
EKOFISK 2/4P2010
EKOFISK 2/4Q (Modules)2014
WEST EKOFISK 2/4D2012
ALBUSKJELL 1/6A2013
Cat 2 - Removal of Topsides and Jackets
Awarded 2008 to Heerema (main contractor)
AF Decom (subcontractor make safe / preparation / onshore disposal)
Method: Reverse installation
In addition 2/4W was removed in 2011 (topside&jacket)
Total weight: 120 000 tons
ALBUSKJELL 2/4F2011
EDDA 2/7C2012
COD 7/11A2013
Scope ▪ 9 Topsides
▪ 9 Jackets
▪ 2 Quarters Modules
Completed 2014
This includes
• Engineering
• Offshore preparation
• Cleaning of equipment as required
• Relocate drill-cuttings
• Removal of topsides and jackets
• Design/install temporary nav. aids
• Cut Piles below natural seabed
• Handling of inhibited water in pipeline
• Cut risers / pipeline connection
• Remove/gravel dump exposed parts of pipeline
• Seabed clean up
• Onshore disposal
• Investment recovery
The platform facilities are to be removed, transported to a disposal site and all items disposed of.
Cat 3 - Next Phase of Facility Removal
2/4 HLast Sleep
Summer 2014
2/4 FTPCold Mode June 2014
2/4 Q LQ Removal
July 2014
2/4 ACoP September 2013
P&A 2014–2016+
Tor 2/4 EOption
P&A 2016+Removal 2020+