december 12, 2007. substation business applications using cim / pi af by stephen diebold manager –...
TRANSCRIPT
December 12, 2007
Substation Business Applications using
CIM / PI AF by
Stephen DieboldManager – Real Time Systems
Kansas City Power & LightKansas City Power & Light
• Overview of KCP&L
• CIM / PI AF Project A Convergence of Opportunities Main Goal Situation Without Project Closing the Loop Asset-Related Applications Applications
• Interoperability Test
• Project Status
• Questions
Agenda
• Over 810,000 customers• Peak in excess of 5,660 MW• Service territory across 47 counties
in MO and KS covering 17,934 sq. miles
• Over 3,170 employees• 30 office/service center locations• 9 generation plant sites and 10
peaking facilities• 3,309 miles transmission lines• 24,466 miles of overhead
distribution lines• 3,400 miles of underground
distribution lines• 322 substations
CIM/PI AF ProjectA Convergence of Opportunities
• EMS comes with PI Historian– Stores history of EMS real-time point
data
– PI features for model-based access to tags
– Utilizes standards-based CIM model for EMS database configuration
CIM/PI AF ProjectMain Goal
Transmission Engineering Interest in moving from
Event-based maintenance
to
Condition-Based Maintenance
CIM/PI AF ProjectSituation Without Project
EMS
.. field devices
EMS gathering 50,000+ points of real-time data
CIM DE Environment
CIM database where equipment and associated real-time data points defined for EMS
..
PI Server Point data history stored in PI tags, but accessible only by point name
AF
PI product (AF) able to model equipment’s relationships to tags, but product not currently used
PI ServerAF
CIM/PI AF ProjectClosing the Loop
Network Manager EMS
.
CIM DE Environment
.
.. field devices
GDA (Utility Integration Bus)
• Create infrastructure for generalized retrieval of historic real-time information – on equipment basis (by reference to
equipment location in system)– on asset basis no matter where
asset has been moved in system
• Generalized retrieval is essential to the creation of applications
Export CIM model data to PI AF productCreate PI equipment / asset model for retrieving historic tag data
CIM/PI AF ProjectAsset-Related Applications
PI ServerPI ServerAF
Network Manager EMS
.
CIM DE Environment
.
.. field devices
Asset ManagementSystem
Condition-Based Maintenance Applications
Condition-Based Maintenance Applications for transformers and breakers
GDA (Utility Integration Bus)
• First step toward “dashboard” access
to real-time Operations data
• Desktop access• Paging/Email notification• Web access
Interoperability Test
• Demonstrate interoperability between ABB, SISCO and OSISoft’s products based on the CIM and/or GDA.
• Verify compliance with the CIM for those CIM classes/attributes involved in the information exchanges.
• Demonstrate the exchange of power system models using the CIM and an RDF schema and XML representation of the model data.
• Demonstrate exchange between ABB and SISCO products using the services defined in the GDA Client and Server interface standard.
Interoperability Test
Vendor Product Name Tests
ABB
• Network Manager, CIM DE Toolkit
• Full Import using CIM XML and GDA services
• Incremental Import using CIM XML and GDA services
OSISoft, LLC• PI AF
• PI System Explorer
• Storage of the ABB model data
• Review and browsing of the ABB model data
SISCO, Inc.
• Part number: UIB-PIWRAP-412-095 Version 2.0.0 Beta
• PI Adapter
• Full Import using CIM XML and GDA services
• Incremental Import using CIM XML and GDA services
• Provide UIB message bus for transport and communication
Project Status
• FAT completed June 4, 2010
• SAT is being scheduled
• Interoperability tests completedJune 9, 2010
Questions
PI ServerPI ServerAF
Network Manager EMS
.
CIM DE Environment
.
.. field devices
Asset ManagementSystem
Condition-Based Maintenance Applications
GDA (Utility Integration Bus)
December 15, 2007
Contact information:[email protected]