Page 1: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

General Presentation Footer

CCS Alum Crest / Clearbrook 6-12 School

Community Presentation12-02-2010

Page 2: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Core Team Members

• Columbus City SchoolsMary Ey, Executive Director of Education Services/ResourcesSusan Fossmeyer, Regional Executive DirectorDoug Swartz, Project ManagerTeresa McGurr, Principal of Alum Crest High SchoolNancy Vallette, Assistant Principal of Alum Crest High SchoolGilda Taylor, Principal of Clearbrook Middle SchoolDon Cantrell, Assistant Principal of Clearbrook Middle School

• Ohio School Facilities Commission (OSFC) – Financial Partner

Rhonda Hagemeyer

• Smoot Elford Resource (SER) – Construction Manager

Bob Hurley, SuperintendentCorey Holben, Project Engineer

Page 3: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Core Team Members

• Design TeamDesignGroup - Architect

Keith DeVoeJocelyn Krosky

Kinzelman Kline Gossman – Landscape ArchitectMichael Pistiolas

Shelley Metz Baumann Hawk – Structural Engineer

EMH&T – Civil Engineer

Dynamix Engineering Ltd. – Mechanical, Electrical, Plumbing, Fire Protection, Technology

Page 4: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Schedule

• DesignJuly 2010 through August 2011

• BiddingAugust 2011 through November 2011

• ConstructionJanuary 2012 through June 2013

• Start of SchoolAugust 2013

Page 5: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

What has Occurred So Far

• Geothermal Testing

• Archeological Study

• Environmental Studies – Phase I & II

• Geotechnical Servicesa. Soil borings start in December 2010.b. Geotechnical Company will be onsite for approximately a week with

their equipment.c. Soil samples help determine the bearing capacity of the soil for the

new building.d. All soil borings will be back-filled onsite by Geotech Company.

• Program of Requirementsa. Design team, CCS, and schools have reconciled the program for the

project.b. Basic massing studies of the building.c. Site Analysis.

Page 6: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Project Parameters

• New 6-12 School for 250 students.a. 100 Middle School Studentsb. 150 High School Students

• Room Types:a. Classrooms (Academic, Science, Computer, Wood Shop)b. Cafeteria and Kitchenc. Staged. Gymnasiume. Media Centerf. Vocal & Instrumental Roomsg. Art Roomsh. Administration Offices

• 72,549 gross square feet.

• $13.5 million construction budget.

Page 7: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Program Graphic

Page 8: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Project Site

Page 9: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Site Analysis

Page 10: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Building Massing Study 1

Page 11: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Building Massing Study 2

Page 12: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

CCS Website

Alum Crest/Clearbrook Homepage• Follow the Progress of the new school.• Download presentations to community.

Go to:

www.columbus.k12.oh.usa. In the bottom left-hand corner of the screen, click on ‘New Facilities’.b. Under the heading ‘Learning Continues During Construction and

Renovation’ click ‘more’.c. Then, click on the heading ‘Alum Crest/Clearbrook 6-12’.

Page 13: December 02, 2010 Columbus City Schools Schematic Design Progress Alum Crest / Clearbrook 6-12 School General Presentation Footer CCS Alum Crest / Clearbrook

December 02, 2010

Columbus City Schools Schematic Design Progress

Alum Crest / Clearbrook 6-12 School

Next Steps

• Schematic Design Approval with CCS and SER: November 2010 – January 2011

• Review Schematic Design with Community:January 2011 – Meeting Date TBD

• Design Development with CCS:January - February 2011

• Review Design Development with Community:

March 2011 – Meeting Date TBD