![Page 1: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/1.jpg)
© 2009 Trail Ridge Consulting, LLC
Pete BehrensAgile Organization & Process [email protected] 303.819.1809
Death by Scrum Meeting
![Page 2: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/2.jpg)
© 2009 Trail Ridge Consulting, LLC 2
Pete Behrens
Agile Organization & Process Coach Certified Scrum Trainer Certified Scrum Coach Guide enterprise organizations in transitioning to an agile
organization implementing agile methods Services for agile assessment, alignment, training and coaching
Previous Experience Led development of the requirements management solution
RequisitePro – a core product in the IBM Rational product line – using the Rational Unified Process (RUP)
Consulted with EDS leading development of large data warehouse solutions using Rapid Application Development (RAD)
![Page 3: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/3.jpg)
© 2009 Trail Ridge Consulting, LLC
How long are your sprint planning meetings?
3
0
4
8
12
16
1 2 3 4
Spr
int
Plan
ning
(in
hou
rs)
Sprint Length (in weeks)
![Page 4: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/4.jpg)
© 2009 Trail Ridge Consulting, LLC
Adding all Scrum meetings...
4
0
4
8
12
16
1 2 3 4
Spri
nt M
eetin
gs (
in h
ours
)
Sprint Length (in weeks)
Sprint PlanningSprint ReviewSprint RetrospectiveDaily Scrum
![Page 5: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/5.jpg)
© 2009 Trail Ridge Consulting, LLC
Death by Meeting
5
Meetings are boring
Meetings are ineffective
![Page 6: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/6.jpg)
© 2009 Trail Ridge Consulting, LLC
Meetings are Boring - they lack Action, Drama & Conflict
6
![Page 7: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/7.jpg)
© 2009 Trail Ridge Consulting, LLC
Meetings are Ineffective - they lack context or focus
7
Meeting Type Time Required Purpose & Format Keys to Success
DailyCheck-in
5 minutes Share daily schedules and activities
Don’t sit down Keep it administrative Don’t cancel even when
some people can’t be there
WeeklyTactical
45 – 90 minutes Review weekly activities and metrics, and resolve tactical obstacles and issues
Don’t set agenda until after initial reporting
Postpone strategic discussions
Quarterly Strategic
1 - 2 days Discuss, analyze, brainstorm, and decide upon critical issues affecting long-term success
Limit to one or two topics Prepare and do research Engage in good conflict Get out of the office
Source: Death by Meeting, Patrick Lencioni
![Page 8: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/8.jpg)
© 2009 Trail Ridge Consulting, LLC
Death by Meeting - circa Scrum
8
Meeting Type Time Required Purpose & Format Keys to Success
DailyCheck-in
5 minutes Share daily schedules and activities
Don’t sit down Keep it administrative Don’t cancel even when
some people can’t be there
WeeklyTactical
45 – 90 minutes Review weekly activities and metrics, and resolve tactical obstacles and issues
Don’t set agenda until after initial reporting
Postpone strategic discussions
Quarterly Strategic
1 - 2 days Discuss, analyze, brainstorm, and decide upon critical issues affecting long-term success
Limit to one or two topics Prepare and do research Engage in good conflict Get out of the office
Daily ScrumSprint MeetingsRelease Planning
![Page 9: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/9.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum Meeting Keys
9
① Focus ② Timebox
③ Visualize ④ Engage the Team
Strategic Tactical
![Page 10: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/10.jpg)
© 2009 Trail Ridge Consulting, LLC
Focus
10
Strategic Tactical Daily
Release Sprint Scrum
Release Planning
Sprint Planning
Sprint Review
Sprint Retro
Daily Scrum
![Page 11: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/11.jpg)
© 2009 Trail Ridge Consulting, LLC
Do you play Planning Poker?
11
![Page 12: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/12.jpg)
© 2009 Trail Ridge Consulting, LLC
Planning Poker is a Release Tool
12
Strategic Tactical Daily
Release Sprint Scrum
Release Planning
Sprint Planning
Sprint Review
Sprint Retro
Daily Scrum
![Page 13: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/13.jpg)
© 2009 Trail Ridge Consulting, LLC
Story Points are for looking ahead
Backlog Item Points 1. Login portal 52. Display minutes 33. Support ticket call 84. Remote login help 135. Update profile 26. Buy more time 87. Single sign-on 208. Log rotation 59. Timer display 310. Automatic logout 111. Usage warning 212. Exchange 12 integration 1313. HP Openview API 2014. XML API 815. 300 logins/min 1316. Location tracking 517. Intrusion detection 1318. Update MySQL DB 2019. Update Web Stack 1320. Update Linux Kernel 821. Support Novel Auth 1322. Support RADIUS Auth 823. Scan & Block Int. 4024. AP Manager Int. 20
ReleasePlan
13
![Page 14: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/14.jpg)
© 2009 Trail Ridge Consulting, LLC
Using Velocity Projections
0
40
80
120
160
Jan Feb Mar Apr May Jun Jul Aug Sep
Points
Remaining
0
40
80
120
160
Jan Feb Mar Apr May Jun Jul Aug Sep
Points
RemainingCompleted
0
37.5
75.0
112.5
150.0
Jan Feb Mar Apr May Jun Jul Aug Sep
Points
RemainingCompleted
0
37.5
75.0
112.5
150.0
Jan Feb Mar Apr May Jun Jul Aug Sep
Points
RemainingCompleted
14
![Page 15: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/15.jpg)
© 2009 Trail Ridge Consulting, LLC
Product & Process Focus
15
Strategic Tactical Daily
Release Sprint Scrum
Release Planning
Sprint Planning
Sprint Review
Sprint Retro
Daily Scrum
P
roce
ss
Prod
uct
![Page 16: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/16.jpg)
© 2009 Trail Ridge Consulting, LLC
Product & Process Focus Issues
16
Sprint Reviews eroding into process questions about why we didn’t get things done and what to do about it
Sprint Planning sessions spending more time about how to plan or not plan vs. actually planning the product increment
Daily Scrums used to solve problems
![Page 17: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/17.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum Meeting Keys
17
① Focus ② Timebox
③ Visualize ④ Engage the Team
Strategic Tactical
![Page 18: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/18.jpg)
© 2009 Trail Ridge Consulting, LLC
Sprint Timebox
18
2 - 4 weeks!
![Page 19: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/19.jpg)
© 2009 Trail Ridge Consulting, LLC 19
Timeboxes drive focus, intensity, decisions, productivity...
Time
Intensity
Waterfall
Scrum
![Page 20: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/20.jpg)
© 2009 Trail Ridge Consulting, LLC
Timeboxes drive predictability
20
Predictable Uncertain Unpredictable
Project Timeline
Sprint Sprint Sprint Sprint Sprint Sprint Sprint Sprint
![Page 21: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/21.jpg)
© 2009 Trail Ridge Consulting, LLC
Daily Scrum Timebox
21
15 Minutes!
![Page 22: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/22.jpg)
© 2009 Trail Ridge Consulting, LLC
Timebox All Meetings?
22
Release Planning
Sprint Planning
Sprint Review
Sprint Retro
Daily Scrum
120 - 24060 - 12030 - 6015 - 305 - 15Minutes
Timeframe Daily Bi-weekly Quarterly
1/2 Day
![Page 23: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/23.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum Meeting Keys
23
① Focus ② Timebox
③ Visualize ④ Engage the Team
Strategic Tactical
![Page 24: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/24.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize
24
① Color ② Size
③ Time ④ Change
![Page 25: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/25.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Themes by Color
25
![Page 26: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/26.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Types by Color
26
![Page 27: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/27.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Role by Color
27
![Page 28: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/28.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Size
28
![Page 29: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/29.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Size
29
![Page 30: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/30.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Time
30
![Page 31: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/31.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Time
31
![Page 32: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/32.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Change
32
![Page 33: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/33.jpg)
© 2009 Trail Ridge Consulting, LLC
Visualize Change
33
![Page 34: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/34.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum Meeting Keys
34
① Focus ② Timebox
③ Visualize ④ Engage the Team
Strategic Tactical
![Page 35: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/35.jpg)
© 2009 Trail Ridge Consulting, LLC
Engage the Team?
35
![Page 36: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/36.jpg)
© 2009 Trail Ridge Consulting, LLC
Engage the Team?
36
![Page 37: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/37.jpg)
© 2009 Trail Ridge Consulting, LLC
Engage the Team?
37
![Page 38: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/38.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum teams work together - Engage the Team
Analysis
Design
Development
Test
Deployment
Analysis
Design
Development
Test
Deployment
Traditional Phased-based Approach
Scrum time-boxes the life-cycle
Handoffs
Delays
TaskSwitching
Lackof Ownership
Lackof Commitment
CompromisedQuality
Shared CommitmentShared OwnershipShared FocusMore ProductiveQuality Built In
38
![Page 39: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/39.jpg)
© 2009 Trail Ridge Consulting, LLC 39
Scrum Teams communicate
Cold Hot
Com
mun
icat
ion
Effe
ctiv
enes
s
DocumentationOptions
ModelingOptionsVideotape
EmailConversation
Audiotape
Paper
PhoneConversation
VideoConversation
Face-to-faceConversation
Face-to-faceAt whiteboard
![Page 40: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/40.jpg)
© 2009 Trail Ridge Consulting, LLC
Engage the Team
40
![Page 41: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/41.jpg)
© 2009 Trail Ridge Consulting, LLC
Engage the Team
41
![Page 42: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/42.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum teams work together
42
![Page 43: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/43.jpg)
© 2009 Trail Ridge Consulting, LLC
Engage the Team
43
![Page 44: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/44.jpg)
© 2009 Trail Ridge Consulting, LLC
Scrum team share space
44
![Page 45: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/45.jpg)
© 2009 Trail Ridge Consulting, LLC 45
Release Planning
0
40
80
120
160
Jan Feb Mar Apr May Jun Jul Aug Sep
Points
② Relative Estimation
③ Prioritization ④ Velocity Projection
① Project Definition
![Page 46: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/46.jpg)
© 2009 Trail Ridge Consulting, LLC 46
Story Identification
②Brainstorm user stories for each theme
①List the primary objectives or themes for the release
Theme 1 Theme 2 Theme 4 Theme 5Theme 3
Story 22
Story 14
Story 18
Story 5
Story 12
Story 9
Story 13
Story 21 Story 16
Story 10
Story 3
Story 7
Story 2
Story 18
![Page 47: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/47.jpg)
© 2009 Trail Ridge Consulting, LLC
Release by Theme
47
![Page 48: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/48.jpg)
© 2009 Trail Ridge Consulting, LLC
Release Plan as a Team
48
![Page 49: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/49.jpg)
© 2009 Trail Ridge Consulting, LLC 49
Relative Estimation
①Layout the
stories relatively
1 2 3 5 8 13
②Group into
point values
Story 225 pt
Story 145 pt
Story 181 pt
Story 58 pt
Story 128 pt
Story 93 pt
Story 131 pt
Story 212 pt
Story 1613 pt
Story 103 pt
Story 35 pt
Story 78 pt
Story 25 pt
Story 181 pt
![Page 50: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/50.jpg)
© 2009 Trail Ridge Consulting, LLC
Relative Estimation
50
![Page 51: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/51.jpg)
© 2009 Trail Ridge Consulting, LLC
Relative Estimation by Team
51
![Page 52: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/52.jpg)
© 2009 Trail Ridge Consulting, LLC
Velocity Projection
52
Jan 1 Jan 2 Feb 1 Feb 2
Story 225 pt
Story 145 pt
Story 181 pt
Story 58 pt
Story 128 pt
Story 93 pt
Story 131 pt
Story 212 pt
Story 1613 pt
Story 103 pt
Story 35 pt
Story 78 pt
Story 25 pt
Story 181 pt
Mar 1 Mar 2
Use only to estimate velocity - not to create a locked plan. Just keep the priorities sorted in the backlog
![Page 53: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/53.jpg)
© 2009 Trail Ridge Consulting, LLC
Release Plan
53
![Page 54: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/54.jpg)
© 2009 Trail Ridge Consulting, LLC
Release Plan
54
![Page 55: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/55.jpg)
© 2009 Trail Ridge Consulting, LLC
Velocity Estimation as a Team
55
![Page 56: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/56.jpg)
© 2009 Trail Ridge Consulting, LLC
Sprint Planning
56
Story 22 Story 5 Story 9 Story 13 Story 10
① Identify the next priority stories and post them on the wall or task board
• AC 1• AC 2
• AC 1• AC 2
• AC 1• AC 2
② Review the acceptance criteria of each story, or identify them if not done
CodeCode
TestTest
Doc
UXMeet
CodeCode
TestTest
Doc
UXMeet
CodeCode
TestTest
Doc
UXMeet
③Allow the team to brainstorm all tasks and hours for all stories at once - not one at a time
④Review all results looking for missing tasks, wrong sizes, and gaining commitment
![Page 57: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/57.jpg)
© 2009 Trail Ridge Consulting, LLC
Sprint Planning
57
![Page 58: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/58.jpg)
© 2009 Trail Ridge Consulting, LLC
Sprint Planning
58
![Page 59: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/59.jpg)
© 2009 Trail Ridge Consulting, LLC
5 Min Review
59
① Focus ② Timebox
③ Visualize ④ Engage the Team
Strategic Tactical
![Page 60: Death by Scrum Meeting - Laugh | Grow | Scrum · 3/16/2009 · Death by Meeting - circa Scrum 8 Meeting Type Time Required Purpose & Format Keys to Success Daily Check-in 5 minutes](https://reader030.vdocuments.mx/reader030/viewer/2022040917/5e91c7e972e24021a461e0c5/html5/thumbnails/60.jpg)
© 2009 Trail Ridge Consulting, LLC
5 Min Session Retrospective
What worked well?
60
What would you change?