AGENDA
What does D&D include?
How do the phases of D&D relate to the FIMS Status data element?
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 2
PHASES OF D&D
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 3
D & D & D & D & D & D & D Stabilization (Transition) “Diminishing and
Detaining” neutralizing unstable processes & shoring up degraded
infrastructure
Decontamination removal of radiological, chemical, or hazardous contaminants
Deactivation Risk reduction activities leading to a cold and dark condition (e.g.,
shutting down process equipment)
Decommissioning removal of items necessary for original mission
Demolition or Dismantlement clearing of structures with debris recycled or disposed
Disposition reaching the final state for the facilities and may include reuse,
conveyance, or sale
Don’t Forget . .
. Net Proceeds includes
disposition costs
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 4
Transition / Stabilization
Deactivation Decommissioning
Disposition
Surveillance and Maintenance
Decontamination
RELATIONSHIPS BETWEEN THE D’S
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 5
Operations Transition Deactivation Decommissioning Remediation
Surveillance and Maintenance
• Operating• Operation
al Standby
• Operating under an Outgrant
• Shutdown Pending Transfer
• Shutdown Pending D&D
• Operating Pending D&D
• D&D in Progress
• Deactivation
• D&D in Progress
• Shutdown Pending Disposal
• In Situ Closed
• In Situ Closed LTM
ALIGNING D&D PHASES AND FIMS STATUS
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 6
FIMS STATUS CODES
Current What about? Operating (1) Operating under an Outgrant
(7) Operational Standby (2) Shutdown Pending Transfer (3) Shutdown Pending D&D (4) Operating Pending D&D (6) D&D in Progress (5) Deactivation (11) Shutdown Pending Disposal
(12) In Situ Closed (IC) In Situ Closed LTM (IM)
Decommission D&D Complete Surveillance and
Maintenance
Shutdown Historic
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 7
OR . . . STATUS CODES & LIFECYCLE DATES
Simplify the D&D Status Codes . . . Add Lifecycle Dates . . .
Operating Pending D&D
Shutdown Pending D&D
D&D in Progress
Deactivation
Shutdown Pending Disposal
Year Built (for Beneficial Occupancy
Date) Transfer Year [Planned / Actual]
D&D Start Year [Planned / Actual]
D&D Completion Year [Planned / Actual]
Historic Designation Year Disposal Start Year [Planned / Actual]
Estimated Disposition Year Archive Date
Note: White font indicates existing FIMS fields
MARCH 25, 2014FIMS ANNUAL COMPREHENSIVE TRAINING 8
DESIRING DOUBT DISSIPATION?
Ivan GraffDial: (202) 586-
.gov
Sources Consulted• Facility Deactivation
& Decommissioning 2011 Edition Appendix D – D&D Project Basics
• DOE G 430.1-2• DOE G 430.1-3• DOE G 430.1-4• DOE G 430.1-5