contents:• Preliminary WBS (in SLAC format)
slice by Area Sys. or Tech/Global Sys.
• WBS Guidelines: elements, dictionary, BoE
e.g. TESLA Budget Book & WBS Dictionary,
CFS Draft WBS matrix, CFS Config-USLCTOS
• Draft Questions for Area System groups
• Draft outline of RDR document
• Current CFS layout sketches
• Interactions DCB Area, Tech, Global Sys
• DCB’s working schedule => converge!
WBS from Wilhelm – 16jan06nearly same as TESLA Budget Book + RTML
Open e- Injection System (didn’t show labor)
Open e+ Linac
EXCEL example – use pointer to sort by Area Systems
use pointer to sort by Technical & Global Systems
Run through some preliminary documents and guidelines – 1
(X to close .pdf)
Draft WBS Guidelineshttp://lcdev.kek.jp/GDE/ASL2006KEK/1_Draft_WBS_Guidelines_PHG_060116.pdf
TESLA Budget Book & WBS dictionaryhttp://home.fnal.gov/~peterg/ILCDCB/2_TESLA_Budget_Book_and_WBS_dictionary.pdf
Draft CF&S WBS Matrix vs. Area Sys.http://home.fnal.gov/~peterg/ILCDCB/3_CFSDRAFT_WBS-20060119.pdf
Run through some preliminary documents and guidelines – 2
(X to close .pdf)
CF&S Criteria form from USLCTOShttp://home.fnal.gov/~peterg/ILCDCB/4_CFS_CRITERIA_CONFIGURATION_LIST.pdf
Draft questions for Area System Groupshttp://home.fnal.gov/~peterg/ILCDCB/5_Input_Area_Systems.pdf
Draft format and contents for RDR bookhttp://home.fnal.gov/~peterg/ILCDCB/6_Draft_RDR_outline_PHG_060116.pdf
immediate DCB needs• Expand the levels of WBS
are they logically consistent, optimal?• Define level of detail for each system
don’t go too deep, but will need
appropriate depth to produce cost estimate
Tor’s 1% for each element (~ $ 50 M)
seems about right scale
TESLA TDR had ~600 active L5 elements• Define production model for high tech items
- how many vendors/regions & distribution?
Gerry Aarons (CFS for Fred Asiri) 18jan06drawing includes 1 TeV configuration from
from Gerry Aarons (CFS) - 18jan06
DCB working schedule => converge!
• get feedback from you today, tomorrow…
• another pass through DCB @ tonight’s call
• by Monday night,
forward these preliminary documents to Area, Global, and Technical System leaders
• Cost Engineers:
will concentrate on formulation of WBS
working with Systems Groups
System Groups Primary DCB Contact Secondary DCB Contact Primary Sys Group Contact
need contact personArea System Groupse- Source Axel Brachmann
e+ Source Masao Kuriki
Damping Rings Jean-Pierre Delahaye Andy Wolski
Ring-to-Main Linac Nan Phinney (3rd choice) Peter Tenenbaum
Main Linac Bob Kephart Tetsuo Shidara Chris Adolphsen
Beam Delivery System Nan Phinney (2) Andre Seryi
Global System GroupsCommissioning, Ewan Paterson Nobuhiro Terunuma * Tom Himel Operations, & ReliabilityControl System
Cryogenics Peter Garbincius
Conventional Facility Atsushi Enomoto * Vic Kuchler and SitingInstallation Ewan Paterson Tetsuo * or Wilhelm *
Technical System GroupsVacuum Systems
Magnet Systems Peter Garbincius
Cryomodules Bob Kephart
Cavity Package
RF Power Tetsuo Shidara
Instrumentation likely Marc Ross
Dumps and Collimators
Accelerator Physics Nan Phinney (1) Jean-Pierre Delahaye Tor, Kaoru, and Nick orKiyoshi Kubo & Daniel Schulte