  • 8/12/2019 Dbs3900 Quick Installation Guide

    1/24

    HUAWEI TECHNOLOGIES CO., LTD.

    DBS3900 WiMAX V300R002C02

    Quick Installation Guide

    Issue: 03

    Part Number: 31504622

    Date: 2009-06-25

  • 8/12/2019 Dbs3900 Quick Installation Guide

    2/241

    Installation Tools

    Installation ModesRequirements for Dimensions and Installation Space

    Installing the BBU3900

    Installing the RRU3702

    Cable Connections

    Installing the BBU3900 Cables

    Installing the RRU3702 Cables

    Installing the Outdoor Cable Transfer Box

    Measuring the VSWR of the Antenna System

    Reference

    2

    34

    5

    7

    11

    18

    21

    21

    Contents

    15

    22

  • 8/12/2019 Dbs3900 Quick Installation Guide

    3/242

    Installation Tools

  • 8/12/2019 Dbs3900 Quick Installation Guide

    4/243

    Installation Modes

    b RRU3702 Installation Modes

    BBU3900 Installation Modes

    In the 19-inch indoor cabinet

    In the APM200

    On the pole On thechannel steel

    On theangle steel

    On the wallOn thetelegraph pole

    a

    A cabinet must be powered on within seven days after being unpacked, andcannot be kept in the power-off status over 48 hours during maintenance.

    A module must be powered on within 24 hours after being unpacked or afterbeing powered off for maintenance.

  • 8/12/2019 Dbs3900 Quick Installation Guide

    5/244

    Requirements for Dimensions and Installation Space

    Dimensions (unit: mm)

    Dimensions of the RRU shell:

    484 x 374 x 158

    Dimensions of the RRU:

    480 x 356 x 120

    Dimensions of the BBU:

    436 x 310 x 86

    356

    158

    484

    120

    374

    480

    310

    436482

    86

    Space Requirements (unit: mm)

    Space for installing the BBU in the19-inch cabinet

    25

    25

    70

    a b

    Space for install ing the RRU

    300

    100

    600

    400

    400 to 1200

    500 to 800

    200

  • 8/12/2019 Dbs3900 Quick Installation Guide

    6/245

    Installing the BBU3900

    Determine whether to reversely install the mounting ear according to the space

    available at the installation site and the installation mode of the equipment in the

    cabinet.

    Remove the screws and mounting ears on both sides of the BBU3900.

    Reinstall the mounting ears.

    Hold the BBU3900 with your hands

    and align the holes for mounting

    ears with the cabinet installation

    holes.

    Slide the BBU3900 into the cabinet

    slowly along the guide rails.Fix the BBU3900 in the cabinet by

    using four panel screws.

    a Installing the BBU3900 in the 19-Inch Cabinet

    Before installing the BBU, remove the two grounding screws on the right side of

    the BBU panel for easy installation.

  • 8/12/2019 Dbs3900 Quick Installation Guide

    7/246

    b Installing the BBU3900 in the APM200

    APM200

    BBU3900

    Panel screw

    DIP switch setting of

    the PMU

    Set the DIP switches on the PMU according to the figure.

    Put all cables through the cable-through hole of the APM200 before connecting the

    cables to the BBU.

    Loosen and remove the screws on the blank filler panel in the installation

    position of the BBU.

    Remove the blank filler panel and redundant slide rail in the installation position of

    the BBU.

    Remove the two grounding screws from the right side of the BBU panel.

    Slide the BBU3900 into its position slowly and screw its panel.

    Set the DIP switches

  • 8/12/2019 Dbs3900 Quick Installation Guide

    8/247

    Auxiliary fixture

    Main fixture

    Long bolt

    Main fixture

    Strap

    The Auxiliary Parts of the RRU

    Fasten the

    screws wheninstalling theRRU andloosen thesescrews whenremoving theRRU

    Installing the RRU3702

    Logo on the cover plate Transfer piecesFasten the screws whenremoving the RRU

    a

    The arrows onthe label of theauxiliary fixtureface upwards

    Installation position forthe auxiliary fixture

    The arrows on thelabel of the mainfixture face upwards

    Installing the RRU3702 On the Pole(Diameter: 60 mm to 114 mm)

  • 8/12/2019 Dbs3900 Quick Installation Guide

    9/248

    Installing Two RRU3702s On the Pole (Diameter: 60 mm to 114 mm)b

    The arrows on themain fixture faceupwards

    Main fixture

    40Nm

  • 8/12/2019 Dbs3900 Quick Installation Guide

    10/249

    The process for installing the RRU on the channel steel is the same as that forinstalling the RRU on a pole.

    You are advised to install only one RRU on the channel steel.

    Top views of the fourinstallation methods

    Top views of the installation methods

    The process for installing the RRU on the angle steel is thesame as that for installing the RRU on a pole.

    You are advised to install only one RRU on the angle steel.

    c Installing the RRU3702 on the Channel Steel

    d Installing the RRU3702 on the Angle Steel

    Angle steel

    63mmto80m

    m63mm

    to80mm

    50 mm to100 mm

    30 mm to50 mm

    Channel steel

  • 8/12/2019 Dbs3900 Quick Installation Guide

    11/2410

    You are advised to install

    only one RRU on the

    telegraph pole.

    Bolt M10x65

    Spring washer M10

    Flat washer M10

    Expansion tube

    f Installing the RRU3702 On the Wall

    e Installing the RRU3702 On the Telegraph Pole (Diameter: 300mm to 390 mm)

    The arrows

    on the label

    of the main

    fixture face

    upwards

    Ensure that thearrow on theauxiliary fixtureis upward

    Ensure that the

    arrow on the mainfixture is upward

    Plastic tube

    After the expansion bolt is removed,dispose of the plastic tube

    The wall can bear the weight that is 4 times the weight of the RRU (20 kg/pcs).

    When the RRU is mounted against the wall, the torque for tightening expansion bolts mustbe 40 Nm, so that the expansion bolts can be fixed on the wall and the wall is not damaged.

  • 8/12/2019 Dbs3900 Quick Installation Guide

    12/2411

    Cable Connections

    BBU power cable

    PGND cable

    of the BBU

    RRU powercable

    PGND cable ofthe RRU

    CPRI optical cableGPS clocksignal cable

    Optical cable

    Ethernet cable

    To the Boolean

    sensor

    To the EMUA

    or PMU

    RFjumper

    RF

    feeder

    Connected through the optical

    cable or Ethernet cable

    BBU3900

    ASN-GW

    To provide -48 V DC power supply for the site, you need to install the DCDU-03C. TheDCDU-03C converts one -48 V DC power input to multiple 48 V DC power outputs for thebase station. The APM200 needs to be installed only when there is only 220 V AC powersupply at the site. The APM200 converts 220 V AC power input to multiple -48 V DC poweroutputs for the base station. Ensure that the power distribution equipment such as the APM200 and DCDU-03C has an

    independent power switch to control the power-on and power-off of each BBU and RRU. When the 2T2R is used, the remaining N-type connectors are protected by waterproof caps.

    RRU3702RRU3702RRU3702

    GPS

    antenna

    GLONASS

    antenna

    RFjumper

    ProtectSurge

    Lightning arrester

    a Cable Connections

  • 8/12/2019 Dbs3900 Quick Installation Guide

    13/2412

    Cable Connections

    1. 2T2R O1: One RRU for O1

    2. 2T2R S1/1/1: Two RRUs for S1/1/1

    b Connections of Typical Cables

    CPRI_0CPRI_0

    ANTANT ANT

    External powersupply system

    External powersupply system

    CPRI_0

    ANT

    External powersupply system

    PGND cable

    Power cableCPRI optical cable

    Jumper

    Feeder

    PGND cable

    Power cable

    CPRI optical cable

    Jumper

    Feeder

  • 8/12/2019 Dbs3900 Quick Installation Guide

    14/2413

    CPRI_0

    ANT

    External powersupply system

    ANT ANT ANT

    External powersupply system

    External powersupply system

    3. 2T2R S2/2/2: Two RRUs for S2/2/2

    4. 4T4R O1: One RRU for O1

    b Connections of Typical Cables

    PGND cable

    Power cable

    CPRI optical cable

    Jumper

    Feeder

    PGND cable

    Power cable

    CPRI optical cable

    Jumper

    Feeder

  • 8/12/2019 Dbs3900 Quick Installation Guide

    15/2414

    PGND cable

    Power cable

    CPRI optical cable

    Jumper

    Feeder

    CPRI_0 CPRI_0CPRI_0

    ANT

    External powersupply system

    ANT ANT

    External powersupply system

    External powersupply system

    PGND cable

    Power cable

    CPRI optical cableJumper

    Feeder

    5. 4T4R S1/1/1: Three RRUs for S1/1/1

    6. 4T4R S2/2/2: Three RRUs for S2/2/2

    b Connections of Typical Cables

    ANT ANT ANT

    External powersupply system

    External powersupply system

    External powersupply system

  • 8/12/2019 Dbs3900 Quick Installation Guide

    16/2415

    The PGND cable of the BBU isyellow-green or green. The sectional

    area of the PGND cable is 6 mm2

    (10AWG).The PGND cable is

    connected to the BBU through a OT

    terminal or a two-hole OT terminal

    (M4) and to the grounding bar

    through an OT terminal. The PGND

    cable of the BBU should be created

    at the site.

    Installing the BBU3900 Cables

    a Installing the PGND Cable of the BBU3900

    b Installing the 48 V DC Power Cable of the BBU3900

    When the BBUs are powered by the DCDU-03C, connect the BBUs to ports LOAD6 and

    LOAD5 on the DCDU-03C in the sequence of LOAD6 to LOAD5.

    When the BBU is powered by the APM200, connect the BBU to No.1 wire post of LOAD1.

    DCDU-03C

    PGND cable

    of the BBU

    BBU power cable

    Connect the BBU to the DCDU-03C. Connect the BBU to the APM200.

    APM200

    Two-hole OT terminalOT terminal

  • 8/12/2019 Dbs3900 Quick Installation Guide

    17/2416

    d Installing the CPRI Optical Cables Between the BBU and the RRU

    Before installing the optical cable, you need to install removable optical modules.

    Connect the longer exposed end of the optical cable to the BBU and wrap the end with atube, and connect the shorter exposed end to the RRU.

    c Installing the FE/GE Ethernet Cable or Optical Cable

    ASN-GW

    Optical cable

    Ethernet cable

    BBU3900

    Optical cable Ethernet cable

    CPRI Optical Cable

    BBU3900

    RRU3702

    Use either the Ethernet cable or optical cableto connect the transmission equipment orgateway equipment.

    Before installing the optical cable, you needto install removable optical modules.

  • 8/12/2019 Dbs3900 Quick Installation Guide

    18/2417

    e Installing the GPS Clock Signal Cable

    When the BBU3900 is configured with a USCU, the GPS clock signal cable is connected to

    the GPS port on the USCU. When the BBU3900 is not configured with a USCU, the GPS

    clock signal cable is connected to the GPS port on the BMPT.

    ProtectSurge

    When the BBU is installed in a 19-inch cabinet, ground the surge protector. The

    grounding cable should not be longer than 300 mm, and the cross-sectional area of thegrounding cable is 6 mm2. The grounding cable is terminated with OT terminals on both

    ends.

    GPS antenna

    GLONASS

    antenna

    SMA male connector

    N-type connector

    f Installing the Monitoring Signal Cable Betweenthe BBU3900 and the EMUA

    GPS clock signal cable

    Monitoring signal cable

    GPS clock signal cable

    g

    EMUA

    MON1

    BBU3900

    Lightning arrester

  • 8/12/2019 Dbs3900 Quick Installation Guide

    19/2418

    MON1

    Monitoring signal cable

    g Installing the Monitoring Signal Cable Between the BBU3900 and the PMU

    Label1 to Label4 are marked

    RX-, RX+, TX-and TX+

    APM200

    E1/T1E1/T1Installing the RRU3702 Cables

    a Installing the PGND Cable of the RRU3702

    PGND cable of the RRU

    The PGND cable of the RRU is yellow-green

    or green. The PGND cable is connected to

    the RRU through a two-hole OT terminal (M6)

    and to the grounding bar through an OT

    terminal. The PGND cable of the BBU should

    be created at the site.

    16 mm2 (6 AWG)

    Two-hole OT terminalOT terminal

  • 8/12/2019 Dbs3900 Quick Installation Guide

    20/2419

    Grounding point for the shielding layer

    of the power cable

    bb Installing the Power Cable of the RRU3702

    DCDU-03C

    RRU power cable

    Connect the RRU to the DCDU-03C.

    Connect the RRU to the APM200.APM200

    When the RRUs are powered by the DCDU-03C, connect the RRUs in sequence to portsLOAD0 through LOAD4 on the DCDU-03C.

    When not more than three RRUs are usedand the RRUs are powered by the APM200,connect the RRUs in sequence to No.4 wirepost of LOAD2, No.6 wire post of LOAD3, and

    No.8 wire post of LOAD4. If not more than sixRRUs are used and the RRUs are powered bythe APM200, connect the RRUs in sequence toNo.4 wire post of LOAD2, No.6 wire post ofLOAD3, No.8 wire post of LOAD4, No.5 wirepost of LOAD2, No.7 wire post of LOAD3, andNo.9 wire post of LOAD4.

    Installing the CPRI Optical Cable Between the BBU and the RRU

    For details , see " Installing the CPRI Optical Cable Between the BBU and

    the RRU" on Page 13.

    c

    Do not remove thewaterproof filler on thecabling trough on which nocables are routed when

    closing the cabling cavity.

    Waterpr-

    oof filter

    Close the

    cabling cavity.

  • 8/12/2019 Dbs3900 Quick Installation Guide

    21/2420

    d Installing the RF Jumper of the RRU3702

    Wrap a layer of insulating tape

    Wrap three layers of waterproof tape

    Wrap three layers of insulating tape

    Fix the connector to the port using a wrench (Torque: 1Nm),and wrap

    the insulating tape and waterproof tape

    RF jumper

    Before installing the RF jumper,

    measure the VSWR of the antenna

    system. For details, see "Measuring

    the VSWR of the Antenna System"

    on P21.

    You need take

    insulation and

    waterproof

    measures only for

    the RF jumpers

    connected to an

    outdoor RRU.

    Connection Relation between the 4T4R RRU and Four-port Antenna

    Identify the RF ports with their silkscreens,

    and connect the jumpers according to the

    connection relation shown in the figure

    above.

    Installing the RF Jumper

  • 8/12/2019 Dbs3900 Quick Installation Guide

    22/2421

    Installing the Outdoor Cable Transfer Box

    Measuring the VSWR of the Antenna System

    When the distance between the RRU and the DCDU-03C orAPM200 ranges from 60 m to 180 m, install an outdoor cabletransfer box at the RRU.

    The length of the cable which between the outdoor cabletransfer box and the RRU is 3 m to 5 m.

    Measure the VSWR of the antenna system using theBroadband Site Master.

    Measure the VSWR in the position where the antennasystem is connected to the RF port of the RRU.

    Never connect an antenna system with a VSWR of1.5 or higher to the RRU.

    -48 V DC RRU3702

    NEG (-)

    RTN (+)

    Grounding

    10 mm2 (7 AWG) 3.3 mm2 (12 AWG)

  • 8/12/2019 Dbs3900 Quick Installation Guide

    23/2422

    Reference

    Hoist the RRU and other installation parts onto the tower.

    Tie the installation parts with a rope at one end and tie the RRU with

    the other end

    Traction rope

    Lifting rope

    Do not lift only the handle.

    Installers A climb onto the tower and

    fixes the crown block onto the support of

    the tower platform and puts the hoist

    thread through the crown block.

    Installer C uses the lifting rope to tie the

    RRU and the installation parts according tothe figure and uses the traction rope to tie

    a knot at the handle of the RRU.

    Installer B pulls down the hoist thread,

    and installer C pulls the leading thread

    outwards to prevent the RRU and the

    installation parts from colliding the tower.4.

    Installers A and B hold the RRU and the

    installation parts and loosen the knot.

    When hoisting the RRU, prevent it from

    colliding with the tower.

    Lifting rope

    Traction

    rope

    Crown block

    A

    BC

    Hoisting the RRU and Parts onto the Towera

  • 8/12/2019 Dbs3900 Quick Installation Guide

    24/24

    HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang

    Shenzhen 518129

    Peoples Republic of China

    www huawei com