  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    1/20

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    2/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    1

    Project Background

    National Energy PolicyNational Energy Mix 2025

    1To increase the use of renewable

    energy by total 23% of national energyin 2025, including the solar energy for

    power plant

    Decree of Ministry of Energy and Mineral Resources

    No. 17 / 2013

    2Feed in tariff for solar power plant.

    Maximum at USD 25 cents per kWh with

    additional incentive USD 5 cents forlocal solar module application

    Decree of Director General of New and Renewable Energyand Energy Conservation No. 979 K/29/DJE/2013

    3Capacity Quota for Solar Power Plant

    80 Sites,140 MWp.Kupang 5 MW was included in the 7 first

    sites to be tendered

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    3/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    2

    Capacity Quota for PV Power Plant (2013)

    80 LOCATIONS OF CAPACITY QUOTA FOR PV POWER PLANT2013

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    4/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    3

    Why Len ?

    PT Len Industri (Persero)  is an Indonesian state owned company which develops business and products in electronics for industry andinfrastructure. As the highly competition in electronic technology based business, Len takes focus on 5 ( five) sectors : Railway Transportation,

    ICT, Renewable Energy, Defense Electronics, and Navigation System. As for the solar energy business, Len is the most experienced company in

    Indonesia with many success stories, both in manufacturing and EPC business.

    2 x 1 MW On Grid PV Plant

    Bali

    Solar Street Lighting

    Toll Road of Purbaleunyi

    Airport BIPV/Rooftop

     Lampung, Southern Sumatera

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    5/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    4

    The First PPA in Solar Energy

    MEMR designated Len as the winner for IPP PV Plant in Kupang 5 MW

    (February 2014)1

    Power Purchase Agreement (PPA) between Len and PLN 9th of January 20152Electricity Price

    USD 0.25/kWh during20 years period

    The PPA Agreement was signed by General Manager PLN of East Nusa Tenggara Area Richard Safkaur

    and President Director of Len Abraham Mose,

    in headquarter of PLN, Jakarta

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    6/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    5

    Site Location

    Location

    CoordinateAvg. ESH

    Desa Oelpuah, Kupang Regency, East Nusa Tenggara

    123o 44’55” E | 10o8’58” S 6.38, lowest at 5.52 (kWh/m2/day)

    Summer Season Approximately 8 months / year 

    Area Above 75.000 m2

    ESH : Equivalent Sun HourENT : East Nusa Tenggara

    Electrification Ratio of ENT 58.91%, the second lowest level in Indonesia

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    7/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    6

    Site Position to the Grid (nearest feeder point)

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    8/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    7

    Site Survey

    Main Substation NaibonatThe Site

    Some parts are plantation areas

    Main Substation Maulafa

    Middle voltage line near site

    Express Feeder power lines on Jl.Timor RayaSite, forest

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    9/20

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    10/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    9

    Construction Schedule

    DecNovOctSep AugJulJunMay AprMarFebJan

    Financial Closing

    Procurement & Logistics

    Land Clearing & Civil Works

    Concrete Works

    Metal Support Inst.

    Water & Drainage System

    Control Room

    Road Works

    CCTV

    Solar Module Installation

    Combiner & Inverter

    Monitoring & Weather Inst.

    Transformer & Switch Gear

    Commissioning Certificate

    COD

    civil

    mechanical & electrical

    2015

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    11/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    10

    General Block Diagram

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    12/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    11

    General PV Arrays Design

    PV Module

    Tilt /Azimuth Orientation 10o/0o

     Number of PV Modules 21.840

     Nb. in series 21 modules

     Nb. in parallel 1.040 strings

    Unit Nominal Power 230 Wp

    Module Area 36.614 m2

    Inverter

     Number of Inverter 260

    Unit Nominal Power 17.0 kW

    Operating Voltage 430 –  900 V 

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    13/20

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    14/20

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    15/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    14

    Pictures from Kupang

    Metal Support Inst.

    Water & Drainage System

    Control Room

    Road Works

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    16/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    15

    Pictures from Kupang

    Solar Module Installation

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    17/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    16

    Pictures from Kupang

    Combiner & Inverter

    Monitoring & Weather Inst.

    Transformer & Switch Gear

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    18/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    17

    Pictures from Kupang

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    19/20

    PT Len Industri (Persero)

    Competitive Technological Independence

    www.len.co.id

    18

    Pictures from Kupang

  • 8/18/2019 Day 2 Solar 2 Developing the First Grid Connected Solar PV in Indonesia Abraham Mose

    20/20

    PT Len Industri (Persero)

    Competitive Technological Independence19

    Pictures from Kupang