CCFC Regional Workshops Breaking the Mold of Traditional Construction Delivery: Successfully Using Lease-Leaseback and Design-Build Wednesday, May 7, 2014 San Mateo CCD San Mateo, California COMMUNITY COLLEGE FACILITY COALITION 1130 K Street, Suite 210 Sacramento, CA 95814 Phone (916) 446-3042 Fax: (916) 441-3893 www.caccfc.org Handout materials are available online after the workshop. To download the materials, visit www.caccfc.org/events and click on the link labeled “Workshop Handouts.” 2014 DBIA Awards – Trends and Current Best Practices David Hunt gkkworks

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: David Hunt gkkworksNaval Hospital at Camp Pendleton Clark/McCarthy, A Joint Venture HKS, Inc. and HDR Architecture Utilization of Design-Build • 2014 Award Submittals • 28 Submittals

CCFC Regional Workshops

Breaking the Mold of Traditional Construction Delivery: Successfully Using Lease-Leaseback and Design-Build

Wednesday, May 7, 2014

San Mateo CCD San Mateo, California

COMMUNITY COLLEGE FACILITY COALITION 1130 K Street, Suite 210 Sacramento, CA 95814 Phone (916) 446-3042 Fax: (916) 441-3893 www.caccfc.org

Handout materials are available online after the workshop. To download the materials, visit www.caccfc.org/events and click on the link labeled “Workshop Handouts.”

2014 DBIA Awards – Trends and Current Best Practices

David Hunt gkkworks

Page 2: David Hunt gkkworksNaval Hospital at Camp Pendleton Clark/McCarthy, A Joint Venture HKS, Inc. and HDR Architecture Utilization of Design-Build • 2014 Award Submittals • 28 Submittals

5/7/2014

1

Current Trends and Best Practices in Design-Build Delivery

• Utilization of Design Build

• Trends

• Best Practices

• Design Excellence

Naval Hospital at Camp PendletonClark/McCarthy, A Joint VentureHKS, Inc. and HDR Architecture

Utilization of Design-Build

• 2014 Award Submittals

• 28 Submittals (32 in 2013)

• $3.8 Billion in Construction Value

• Predominately Public Clients (25 of 28)

• Predominately Contractor Led

Page 3: David Hunt gkkworksNaval Hospital at Camp Pendleton Clark/McCarthy, A Joint Venture HKS, Inc. and HDR Architecture Utilization of Design-Build • 2014 Award Submittals • 28 Submittals

5/7/2014

2

Utilization of Design-Build

• 2014 Award Submittals Healthcare - 6

Civic/Governmental – 13 Courts

Parks

Offices

Housing

Transportation – 3

Corrections – 2

Education – 3 (9 in 2013)

1 Community College Classroom Bldg (5 in 2013)

1 UC Housing Project

1 CSU Student Services Building

CSU San MarcosPCL – Hornberger/Worstell

Trends

• Range in Complexity and Scale• $4.6 Mil to $895 Mil

• Large Scale Complex Projects

• Projects on Active Campuses:

• San Diego Airport Terminal

• St Jude Hospital

• Consumnes River College

• Large Stakeholder Groups

• Cost and Schedule Control Remains Stated Objectives

Consumnes River CollegeDPR ‐ Lionakis

Page 4: David Hunt gkkworksNaval Hospital at Camp Pendleton Clark/McCarthy, A Joint Venture HKS, Inc. and HDR Architecture Utilization of Design-Build • 2014 Award Submittals • 28 Submittals

5/7/2014

3

BEST PRACTICES

Goal SettingFaster … Better …. Cheaper

• Quality Metrics• Performance Metrics• Common

Understanding and Buy-in to Owner Goals

……Goal Setting

DPR‐Turner HMC Architects

BEST PRACTICES

Budget and Schedule Control

Faster … Cheaper

• Average of 3% Over Budget – Includes all Change Orders such as Equipment Adds

• 5% Over Schedule –1.2 months on a 24 month schedule

…… Performance

East Valley Water DistrictPCL – Ruhnau Ruhnau Clarke Architects

Page 5: David Hunt gkkworksNaval Hospital at Camp Pendleton Clark/McCarthy, A Joint Venture HKS, Inc. and HDR Architecture Utilization of Design-Build • 2014 Award Submittals • 28 Submittals

5/7/2014

4

BEST PRACTICES

Design Build is a Delivery Method

• LEAN PracticesReduce Redundancy and WasteLast Planner – Pull PlanningShared Incentives

• BIM A Baseline for Current Practice

• Communication / TechnologyWeb Project Portals, Web Cams, Paperless CA, Permit Submittals, Co-Location, “Big Room”, Virtual Teaming

…… Delivery

East Valley Water DistrictPCL – Ruhnau Ruhnau Clarke Architects

BEST PRACTICES

Design Build Delivers Quality

• Sustainability – 27 of 28 Projects Submitted Targeted LEED Silver or Better

• Award Winning Architecture Firms –

• Several Potential Design Award Candidates

…… Quality

Sacramento Municipal Utility DistrictLEED Platinum Turner – Stantec – RNL Architects