date project plan to develop a learning & development strategic plan for prepared by: 1 ©2012...
DESCRIPTION
3 ©2012 RAY SVENSON CONSULTING, INC. BACKGROUND AND RATIONALETRANSCRIPT
DATE
PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN
FOR
Prepared by:
1
©20
12 R
AY S
VENS
ON C
ONSU
LTIN
G, IN
C.
RAY SVENSON CONSULTING, INC. • 112 Two Mile Bridge Road • Roberts • MT • 59070www.raysvensonconsulting.com • e-mail: [email protected] phone: 406-446-1861 • Mobile phone: 406-425-4013
2©2012 RAY SVENSON CONSULTING, INC.
PROJECT PURPOSEThe purpose of this project is to
3©2012 RAY SVENSON CONSULTING, INC.
BACKGROUND AND RATIONALE
4©2012 RAY SVENSON CONSULTING, INC.
SCOPE
5©2012 RAY SVENSON CONSULTING, INC.
DELIVERABLES Analysis findings and conclusions
Future L&D System Architecture
Implementation Plan
6©2012 RAY SVENSON CONSULTING, INC.
KEY ROLES AND RESPONSIBILITIES Project Leader
Project Manager
Design Team
7©2012 RAY SVENSON CONSULTING, INC.
KEY ROLES AND RESPONSIBILITIES (cont.) Sponsors
Executive Steering Team
Consultant
8©2012 RAY SVENSON CONSULTING, INC.
CRITICAL INTERFACES
9©2012 RAY SVENSON CONSULTING, INC.
PROJECT APPROACH
Phase 4:Future L&D
System Architecture
Phase 5:Implementation
Plan
DevelopSpecifications
and Design Details
Phase 2: Data Collection
Phase 1:Project
Planning
Executive
Review
ExecutiveReview
Executive
Review
ProjectPlan
BusinessRequirements
AssessTechnological
Readiness
AssessCurrent
Capabilities
Analysis Findings
andConclusions
Design High-Level
Learning & Development
System Architecture
3-5 Year Implemen-
tationPlanand
BusinessCase
Phase 3:Analysis
Phase 6:Business Case
10©2012 RAY SVENSON CONSULTING, INC.
PROJECT APPROACH (cont.) Business Needs Analysis
Assess Current L&D Capabilities
Research Best Practices and Competitors’ L&D Practices
11©2012 RAY SVENSON CONSULTING, INC.
PROJECT APPROACH (cont.) Develop Population Forecast
Analysis Findings and Conclusions
12©2012 RAY SVENSON CONSULTING, INC.
PROJECT APPROACH (cont.) Design High-level L&D System Architecture
Develop Specifications and Design Details
13©2012 RAY SVENSON CONSULTING, INC.
PROJECT APPROACH (cont.) 3-5 Year Implementation Plan and Business Case
14©2012 RAY SVENSON CONSULTING, INC.
BUSINESS CASE TO GO FORWARD