date 01/02/2006 slide 1 - npl.co.uk · date 01/02/2006 slide 4 role of the nuclear decommissioning...

25
Slide 1 Date 01/02/2006

Upload: truongminh

Post on 22-Nov-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 1Date 01/02/2006

Page 2: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 2Date 01/02/2006

Decommissioning a Magnox

Power Station

Neutron Users Club

6 October 2005

H Madog Jones

Trawsfynydd Decommissioning Site

Page 3: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 3Date 01/02/2006

Trawsfynydd Power Station

• Role of the Nuclear

Decommissioning Authority

• Generic Magnox decommissioning

strategy

• Trawsfynydd Site decommissioning

strategy

• Decommissioning progress

• Future developments.

Page 4: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 4Date 01/02/2006

Role of the Nuclear Decommissioning Authority

• NDA established under the Energy Act 2004

• April 2005 NDA assumed ownership and responsibility for 20

civil public sector nuclear sites

• Objective: To decommission the sites safely,securely,cost

effectively and in ways that protect the environment for this and future generations.

• Introduce an element of market competition to the

management and decommissioning of nuclear sites.

Page 5: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 5Date 01/02/2006

Role of the Nuclear Decommissioning Authority

• British Nuclear Group currently operate and decommission

the Magnox site under contract to the NDA

• August 2005: Draft strategy issued for consultation which

“seeks to accelerate significantly the decommissioning ofMagnox stations” Objective - site clearance within 25 yrs.

• Government target for NDA of competing 50% of O&M and

decommissioning contracts by 2008

• 30 Sept 05 : BNFL announce the intent to sell British Nuclear

Group to a private bidder.

Page 6: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 6Date 01/02/2006

Chapelcross

Calder Hall

Wylfa

OldburyHinkley Point A

Sizewell A

Bradwell

Dungeness A

operational sites

Magnox reactor sites in the UK

decommissioning

sites

Berkeley

Hunterston A

Trawsfynydd

Page 7: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 7Date 01/02/2006

Trawsfynydd Power Station

Page 8: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 8Date 01/02/2006

The Magnox Generic Decommissioning Strategy

• Deferred Reactor Dismantling (60 Co - irradiated plant)

• Dismantling of Cooling Ponds and Waste storage plant

(137 Cs contaminated plant)

• Dismantling of conventional plant and buildings

• Retrieval and packaging of operational ILW wastes

• Disposal of LLW wastes

• Long term in-situ storage of reactors and on site storage of

packaged ILW

• Safestore strategy

Page 9: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 9Date 01/02/2006

Decommissioning Strategy

• Defuelling (~2 years)

• Care and Maintenance

preparations (~15 years)

• waste management activities

• construction of a store for ILW

• refurbishment of reactor

buildings

• dismantling of all other plant

and buildings

• Care and Maintenance

(until ~ 100 years from CoG)

• Site clearance (~8 years)

Page 10: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 10Date 01/02/2006

Trawsfynydd Power Station Life Cycle

• Construction 1959 - 1964

• Operation 1965 - 1993

• Closure 1993

• De-fuelling 1993 - 1995

• Preparations for Care 1995 - 2012

and Maintenance

• Care and Maintenance 2012 - 2088

period

• Site clearance 2088 - 2096

Page 11: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 11Date 01/02/2006

Progress to date -

Decommissioning

principal

work areas

Page 12: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 12Date 01/02/2006

Progress to date -

Waste management

• intermediate level wastes (ILW)

• fuel element debris

• resins

• miscellaneous active components

• sludges

• other ILW

• low level wastes (LLW)

• solids disposals

• liquids discharges

• gaseous discharges

ILW

LLW

Page 13: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 13Date 01/02/2006

Recovery of

Miscellaneous Active

Components

Page 14: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 14Date 01/02/2006

storage of packaged ILW

Page 15: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 15Date 01/02/2006

The Trawsfynydd Reactor

Page 16: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 16Date 01/02/2006

Reactor buildings and plant

• All gas circulators and charge machines dismantled and removed

• Progressively removing other redundant plant

• Cleared and cleaned chargefaces

• Progressing reduction in height of primary circuits

Page 17: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 17Date 01/02/2006

Lowering of reactor roofs

Page 18: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 18Date 01/02/2006

Spent fuel route

• fuel chutes

• Removed

• cooling ponds

• Drained, desludged and deplanted

(Phase 1)

• Refurbished/replaced existing

ventilation system

• Decontamination of the ‘wetted’

pond structure - Scabbling (Phase

2)

• Building decontamination-

demolition (Phase 3)

Page 19: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 19Date 01/02/2006

Conventional Plant

• Turbine Hall

• steam and feed pipework

removed

• removed turbine/alternator

units and auxiliary plant

• demolished

• other plant and systems

• diesel generators

• electrical overlay system

• other ...

Page 20: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 20Date 01/02/2006

The next steps

• Continue with ILW recovery and encapsulation work

• Progress plant decommissioning and removal

(Pond complex and waste storage facilities)

• Demolition of redundant buildings

• Construction of ILW store 2005- 07

• Reactor Safestore construction 2007 - 10 (subject to change)

Page 21: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 21Date 01/02/2006

summary

• one of UK’s first commercial nuclear power stations to be built and decommissioned

• Inland site in a National Park

• Decommissioning strategy subject to a Public Inquiry

• Leader in processing and packaging ILW

Page 22: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 22Date 01/02/2006

Trawsfynydd Power Station

Page 23: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 23Date 01/02/2006

Trawsfynydd Power Station

Page 24: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 24Date 01/02/2006

Reduction in height of the primary circuits

• Enabling project to allow reduction in height of reactor buildings

• Dismantling and movement of large components

• Contamination control

• Storage of components within building enclosure

Page 25: Date 01/02/2006 Slide 1 - npl.co.uk · Date 01/02/2006 Slide 4 Role of the Nuclear Decommissioning Authority • NDA established under the Energy Act 2004 • April 2005 NDA assumed

Slide 25Date 01/02/2006

Trawsfynydd Power Station

Basic Technical Data

• Reactors 2off - 800 MW thermal

• Type Magnox, Steel Pressure Vessel

• Fuel Natural Uranium (33,660)

• Moderator Graphite

• Cooling Carbon Dioxide

• Heat Exchangers 6 off - conventional steam

• Turbines 4 off - 145 MW

• Electrical Output 400 MW

• Cooling Water Trawsfynydd Lake