  • 8/10/2019 Danish Frigate Program brief_May 2014

    1/24

    Frigate Program

    The Danish Frigate Program

    Briefer: Cdr. S.g. Per HesselbergProject Manager Danish Frigate Program

  • 8/10/2019 Danish Frigate Program brief_May 2014

    2/24

    Frigate Program

    Key figures

    Cost of one frigate approx 313 million $

    Design based on the best principles fromthe Navy tradition and civiliancontainership experience

    Diesel propulsion, speed 29+ Knots

    Endurance 9.300 NM at 18 knots

    Crew size 116

    Pre investment in future upgrades Reuse of modulated and containerized

    weapon systems

    Same AAW suite as the Germans and

    Dutch Frigates

  • 8/10/2019 Danish Frigate Program brief_May 2014

    3/24

    Frigate Program

    Key figures

    Platform build at Odense Steel Ship yardfrom June 2008 to January 2012.

    Military installation, test and certification

    by DALO from January 2011 to December2014.

    Maximum project manning 100engineers, officers and skilled workers in

    2012 and 2013 all in all.

  • 8/10/2019 Danish Frigate Program brief_May 2014

    4/24

    Frigate Program

    Total available Budget for theProgram

    46 %

    PLATFORM

    48%

    OTHER

    3%WEAPONS/ELEKTRONIC

    13%

    AIR DEFENSE

    35%

    656 mio. Euro/940 mio. $4.928 bil DKK

    Reused equipment157 mio. Euro/209 mio. $1.179 bil DKK

  • 8/10/2019 Danish Frigate Program brief_May 2014

    5/24

    Frigate Program

    Procurement & design

    Reuse of containerized weapons

    Of design elements from the ABSALON-CLASS

    Gained experience from ABSALON -CLASS

    Design to Cost

    The safe option

  • 8/10/2019 Danish Frigate Program brief_May 2014

    6/24

    Frigate Program

    Development ofThe new Danish Navy

    From technical specifications to functional demands.Use of Flex concept in all ships design since the millennium.Use of DNV, NAVAL standards.Reuse design elements between different ship classes.Use of civilian standards whenever possible especially withIT.

    Redundant passive fiber network for multi purposes.Same Combat Management System in all lager units.Standard Racks for all weapon, sensor, communication andIT systems in all lager units.

    Same Integrated Platform Management System in Frigatesand Flexible Support Ships.

  • 8/10/2019 Danish Frigate Program brief_May 2014

    7/24

    Frigate Program

    Corporation with theindustry

    Private/public Partnership indesigning and specifyingphases.

    Corporation during ship build

    Design to cost

    Better solutions

    Flexible Contracts

    Cost saving/sharing

  • 8/10/2019 Danish Frigate Program brief_May 2014

    8/24

    Frigate Program

    Sensor systems

    AIR WARNING RADAR/IFF

    THALES SMART-L

    NAV-RADAR

    FURUNO

    FLIR

    SEA STAR

    ESM

    EDO

    HMSATLAS

    MULTI FUNCTION RADAR

    THALES APARHELO approach

  • 8/10/2019 Danish Frigate Program brief_May 2014

    9/24

    Frigate Program

    Weapon systems

    ASWTORPEDOEurotorp

    MU90

    SAM (SR)Raytheon

    ESSM

    SSM (LR)McDonald-Douglas

    Harpoon

    CIWSOerlikon Contraves

    35 mm

    GunOto Melare

    76 mm

    MULTI-MISSILE LAUNCHERLockheed Martin Mk41

    DECOYS, GPMG

    Gun

    Oto Melare76 mm

  • 8/10/2019 Danish Frigate Program brief_May 2014

    10/24

    Frigate Program

    Capacity

    SMART-L, range APAR, range, fire control numbers

    MK41, 32 cells.

    MK56, 24 ESSM. Harpoon, 16 missiles Block 2

    Oto Melara 3.

    Millenium 35 mm. MU90, numbers.

  • 8/10/2019 Danish Frigate Program brief_May 2014

    11/24

    Frigate Program

    Comparison Main Data

    Sachsen-KL GE LCF, NL IVER-cl.

    Length 143,0 m 144,3 m 138,7 m

    Beam 17,4 m 18,8 m 19,8 m

    Draft 5,0 m 5,2 m 5,79 m

    Displacement 5600 t 6048 t 6649 t

    Speed 29+ kn 28,5 kn 28+ kn

    Crew 225/255 168/227 116/165+

    Endurance 4000 nm

    @ 18 kn

    5000 nm

    @ 18 kn

    9300nm

    @ 18 kn

    Organic air 2 medium

    helo

    1 mediumhelo

    1 mediumhelo and 1

    UAV

  • 8/10/2019 Danish Frigate Program brief_May 2014

    12/24

    Frigate Program

    Dual air defense system

    76 MM GUN

    Operator

    Operator

    CIWS

    SSIU

    CEROS

    FWD

    C

    WI

    CEROS

    AFT

    C

    W

    I

    SSIU

    SSIUSSIU

    AAW

    Interface

    Unit

    SSIU

    AAW

    Gateway

    MIC-

    MK41

    APAR

    MK41

    Launcher

    C-Flex

    ConsoleC-Flex

    ConsoleC-Flex

    Console

    C-Flex LAN

    SMART-L

    SSIU

    Operator

    CEROS

    Director

    CEROS

    Director

    76 MM GUN

    MK56Launcher

    MK56

    Launcher

  • 8/10/2019 Danish Frigate Program brief_May 2014

    13/24

    Frigate Program

    Network philosophy

    The Passive 4 node fiber network Maximum flexibility and security

    You design whatever network you need

    144 pairs

    72 pairs

    Combat Intelligence CenterApparatus room

    4 pairs Cabin

    3 classified networks, ie.FIINNSWANCENTRIX

    1 fiber & 4 CU networksTelephone

    MediaInternetSpare

  • 8/10/2019 Danish Frigate Program brief_May 2014

    14/24

    Frigate Program

    The system is divided into layers

    Common layer:

    Application layer:

    C-Flex software architecture

    Common functionality

    Database

    Operating System

    API

    Application

    1

    MMI

    API

    Application

    2

    MMI

    API

    Application

    3

    MMI

    API

    Application

    4

    MMI

    API

    Application

    n

    MMICommon MMI Style:

    Interface:

    CMS SystemC-FLEX

    Weapon Management System

  • 8/10/2019 Danish Frigate Program brief_May 2014

    15/24

    Frigate Program

    Integrated Platform Management system

    sensor

    sCCTV

    Switch

    I/O

    I/O

    Switch

    I/O

    I/O

    Switch

    I/O

    I/O Switch

    I/O

    I/O

    Switch

    I/O

    I/O

    Switch

    I/O

    I/

    O Switch

    I/O

    I/O

    Damagezone

    Switch

    I/O

    I/O

    Switch

    PLCPLCPLC

    DisplayDisplay

    cDisplay

    PCPC

  • 8/10/2019 Danish Frigate Program brief_May 2014

    16/24

    Frigate Program

    CIC-layout

  • 8/10/2019 Danish Frigate Program brief_May 2014

    17/24

    Frigate Program

    Infrastructure Frigates

    Standard racksPowerSurvellianceCooling FWPatch panels

    Add on armour

  • 8/10/2019 Danish Frigate Program brief_May 2014

    18/24

    Frigate Program

    Propulsion

    4 x MTU 8000: 4 x 8200 kWTotal kW 32800

    2 RENK gear, transmission 1 : 6,085

    MAN B&W, Propeller shaft

    C.P.P. propeller diameter 4,3 meter

  • 8/10/2019 Danish Frigate Program brief_May 2014

    19/24

    Frigate Program

    construction & build 1st Frigate

    RDN use

    2008 2009 2010 2011 2012 2013 2014 2015

    RDN use

    Military restinstallation

    & Test

    RDN use

    RDN final use

    Danish Frigate Program main plan

    Military Installation reducedconfiguration & Test 1st Frigate

    construction & build 2nd Frigate

    construction & build 3rd Frigate

    Military Installation & Test 3rd Frigate

    Project plan

    Military Installation & Test 2nd Frigate

  • 8/10/2019 Danish Frigate Program brief_May 2014

    20/24

    Frigate Program

    Strengths

    Endurance Flexibility

    Automation, 6.000 sensor points inIPMS

    Infrastructure Growth margin

    Time between overhaul and docking

    Automated maintains schedule from

    SAP/R3 ashore

    Corporation with Germany andHolland concerning AAWS

  • 8/10/2019 Danish Frigate Program brief_May 2014

    21/24

    Frigate Program

    Weaknesses

    Crew size

    Only one Helicopter

    No full Area Defense yet

    Only 32 Cells in MK41, butadditional launchers for ESSM

    No active self protection/decoy

    Only Sea Gnat

    Limited NGS capacity

  • 8/10/2019 Danish Frigate Program brief_May 2014

    22/24

    Frigate Program

    Expansion possibilities

  • 8/10/2019 Danish Frigate Program brief_May 2014

    23/24

    Frigate Program

    ESSMRaytheon Mk56

    SSM 2x8Harpoon

    Gun 3

    Oto Melare

    Gun 3Oto Melare

    MULTI-MISSILE LAUNCHERLockheed Martin Mk41

    DECOYS, GPMG

    CIWSMillenium

    ASWTORPEDO

    MU90

    Gun 5CIWS

    Prepared for:UUV

    UAVVDS/ATAS

    AIR WARNING RADAR/IFF

    THALES SMART-LMULTI FUNCTION RADAR

    THALES APAR

    Expansion possibilities

  • 8/10/2019 Danish Frigate Program brief_May 2014

    24/24

    Frigate Program

    External interest

    Briefing of the European Union, Defense workingcomity, modularity, January 2013

    Briefing at ASNE and NAVSEA in Washington ,February 2013.

    Briefing Canadian Navy July 2013 and February

    2014. Visit at German Ministry of Defense October 2013.

    Visit from German Defense Procurement (BWB) inFebruary 2014.

    Briefing of USN in Washington 1st and 2ndMay2014.

    Briefing of Foreign Comparative test team, OSD inDenmark 5thMay 2014.

    Visit of RADM D. Lewis, USN 12thand 13thMAY2014 in Denmark.