daniel quiñones garcia -...

16
Daniel Quiñones Garcia Operation Manager

Upload: phamthu

Post on 12-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Daniel Quiñones GarciaOperation Manager

2

SPAIN

CORDOBA

CSP LA AFRICANA

3

55 MW STEAM TURBINE

168 LOOPS SOLAR FIELD

950 MWht MOLTEN SALTS STORAGE

45 MWt ON 3 GAS BOILERS

LOW WATER DEMAND RATIO (<6m3/MWh)

UP TO 180 GWhe GENERATED YEAR

54 DAYS OF 24H CONTINUOUS OPERATION LAST YEAR

4

• MOLTEN SALTS MAKES THE DIFERENCE

• 24H OPERATION ENLARGES LIFE CYCLE OF THE PLANT

PRODUCTION PERSPECTIVE

• USE PREDICTIVE MAINTENANCE

• CLEAN MIRRORS ON DEMAND

• USE STATE OF THE ART TECHNOLOGIES

MAINTENANCE PERSPECTIVE

5

PRODUCTION PERSPECTIVE

6

7

MANAGE ENERGY DISPATCH

COVER CLOUDS DNI FALLS

OPTIMIZE ECONOMIC INCOME

ALLOWDS 24H CONTINUOUS OPERATION

8

9

12/06/2017 13/06/2017

10

11

MAINTENANCE PERSPECTIVE

12

THERMAL IMAGES

ANALISYS

VIBRATIONS FRECCUENCY SPECTRUM ANALISYS

OIL CHEMICAL PARAMETERS

ANALISYS

ULTRASOUNDS ANALISYS

VIDEOSCOPE INSPECTIONS

MIRRORS REFLECTIVITY

13

14

15

16