8/7/02 Dane County Vandewalle & Associates Strand Associates William O’Connor Roadway Concept Select Link Traffic Modeling August 7, 2002

Upload: bendek

Post on 01-Feb-2016

37 views

Category:

Documents


0 download

DESCRIPTION

Dane County Vandewalle & Associates Strand Associates William O’Connor. Roadway Concept Select Link Traffic Modeling. August 7, 2002. Demand Modeling Review. Projected ADTs. 8,400. 12,300. 12,300. 28,300. 29,200. 50,000. 63,500. Exist. Alt 1. Alt 1A. 70,500. Alt 2. 148,00. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Dane County

Vandewalle & Associates

Strand Associates

William O’Connor

Roadway Concept Select Link Traffic

ModelingAugust 7, 2002

Page 2: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Demand Modeling Review

Page 3: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

112,000

132,000

83,200

33,600

21,300

96,000110,700

128,100

82,200

33,100

34,900

95,000108,300

130,600

80,600

41,100

42,000

91,000106,300

133,000

82,000

30,300

42,900

94,600109,000

137,800

79,200

30,200

63,700

90,300106,200

138,100

79,000

29,900

73,300

89,000

104,700

67,600

49,100

29,000

14,800

68,200

109,500108,600103,900108,300104,000105,100

94,400

148,00148,600142,300141,600141,800143,200

70,500

45,600 43,100 41,400 44,400 42,700 41,700

~30,000

12,30012,30028,30029,20050,00063,500

8,400

Alt 1Alt 1A

Alt 2Alt 3Alt 4Alt 5

Exist

System Effects ~Year 2050

Projected ADTs

Page 4: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

37,00045,60045,50045,40047,60046,700

28,900

33,60033,10041,00030,30030,20031,300

29,000

13,10012,50011,80012,60013,10016,800

--

21,20034,90042,00042,90063,70069,600

14,800

12,30011,40028,30029,20050,00056,100

8,400

8,50010,50010,10010,0006,2005,700

--

8,1008,6008,0008,2009,4008,700

--

2,4002,4002,4002,2002,6002,600

--

4,8005,9004,500

23,7001,1001,400

--9,40010,1008,3005,500

44,60045,600

7,800

Alt 1Alt 1A

Alt 2Alt 3Alt 4Alt 5

Exist

10,1008,6006,5006,6001,6003,800

--

8,7007,4007,7007,3006,3006,300

--5,2002,3003,2003,0004,0002,200

--

13,60014,20026,20012,80012,40011,600

--

Oncken Rd.

ST

H 1

13C

TH

Q

CT

H M

STH 19

Northport Dr.

Phe

asan

t B

ranc

h R

d.

CTH K

Woodland Dr.

River Rd.

CT

H I

Schneider Rd.

15,90014,10013,50013,80013,30013,600

13,200

Projected ADTs

Northern Effects ~Year 2050

Page 5: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Key Conclusions - Demand Modeling

• All roadways will need to be upgraded (expanded shoulders, wider cross sections, and access control) to safely handle future traffic demands, no matter which alternative is implemented.

• The interstate will experience substantially greater traffic demands no matter which alternative is implemented.

• Freeway alternatives will draw small traffic amounts (5 to 10 percent) off of the isthmus and the south beltline. Therefore congestion remains.

• Freeway capacity will be fully used no matter which alternative is implemented.

Page 6: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Key Conclusions - Demand Modeling

• Different land use development patterns (compact vs existing trends) do not alter traffic volumes enough to reduce the need for roadway improvements (3 to 7%). Different land use development patterns do make transit options and alternate modes more viable/feasible.

• Excess capacity provided to Century Ave by some alternatives will be absorbed by local growth. Traffic volumes will remain similar to what exists today.

• Relief provided to any local collectors by the alternatives will be absorbed by local growth.

Page 7: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Key Conclusions - Demand Modeling

• The CTH M section from STH 113 to CTH Q is the greatest capacity constraint in the corridor. The largest traffic moving capabilities are observed when capacity is added to this segment

• Low build alternatives have heavy intersection volumes that will require higher level intersection improvements

Page 8: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link Analysis• Select Link Analysis shows where the traffic is

coming from and where it is going to on a selected link.– Useful in understanding travel patterns

• Select link analysis does not present total volumes on other roadways feeding or being fed by the link.

• For North Mendota Parkway, all select link information has been normalized to percentages.– Reduces chance of misinterpretation

• West to East is shown, yet East to West information is essentially identical.

• All information is ~2050

Page 9: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1 No Build

Land Use Scenario 1CTH M (STH 113 to CTH K)

West to East - Normalized to Percentage~2050

22%

40%

20% 15%

85%

Page 10: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1A

No Build w/ Enhancements Land Use Scenario 1

CTH M (STH 113 to CTH K)West to East - Normalized to Percentage

~2050

27%

34%

16% 12%

88%

12%

Page 11: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 3

Onken Balzer Connection Land Use Scenario 1

CTH M (STH 113 to CTH K)West to East - Normalized to Percentage

~2050

16%

38%

13% 28%

60%

20%

12%

Page 12: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 5

4-Lane Freeway Off-Alignment Land Use Scenario 1

CTH M (STH 113 to CTH K)West to East - Normalized to Percentage

~2050

65%

8% 53%

47%

17%

11%

34%9%

Page 13: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Observations - CTH M

East side

• Alt 1A improvements to CTH M between STH 113 and CTH K primarily influence travel patterns on Northport.

• Currently most CTH M traffic is oriented to Northport. The low build alternatives maintain this orientation. (85% to 15% split)

• With each successive improvement, more traffic is oriented towards STH 19 to the north. In alternative 3 the split is 60% to 40% and with alternatives 4 and 5 the split evens to 50% to 50%.

• With the higher build alternatives, traffic is attracted to CTH M from greater distances.

Page 14: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Observations - CTH M Select LinkWest side• In the low build alternatives, a greater proportion of the

CTH M traffic is drawn from the Century Ave corridor than CTH K or STH 19

• With the higher build alternatives, Century Ave volumes remain constant. The additional build corridor provides a greater proportion of CTH M traffic.

• The higher build alternatives draw more traffic from outside arterials.

• With the low build alternatives there is more regional and less local traffic on Century.

• With the high build alternatives there is more local and less regional traffic on Century.

• Century volumes remain constant in both cases.

Page 15: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1 - No Build

Land Use Scenario 1Century Ave (CTH Q to Allen)

West to East - Normalized to Percentage~2050

47%42%

58%

42%

Page 16: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1A

No Build w/ Enhancements Land Use Scenario 1

Century Ave (CTH Q to Allen)West to East - Normalized to Percentage

~2050

46%44%

63%

33%

Page 17: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 3

Onken-Balzer Connection

Land Use Scenario 1

Century Ave (CTH Q to Allen)West to East - Normalized to Percentage

~2050

46%44%

64%

26%

Page 18: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 5

4-Lane Freeway Off Alignment Land Use Scenario 1

Century Ave (CTH Q to Allen)West to East - Normalized to Percentage

~2050

46% 44%

70%

26%

Page 19: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Observations - Century Ave Select Link

• Distribution remains relatively constant with all alternatives

• Higher build alternatives draw traffic from further east than lower build alternatives

Page 20: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1- No Build

Land Use Scenario 1Northport (CTH M to Knutson Dr)

West to East - Normalized to Percentage~2050

48%

10%

56%

41%

18%

10%

Page 21: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1A

No Build w/ Enhancements Land Use Scenario 1

Northport (CTH M to Knutson Dr)West to East - Normalized to Percentage

~2050

12%

50%

70%

20%

3%

27%

Page 22: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 3

Onken-Balzer Connection Land Use Scenario 1

Northport (CTH M to Knutson Dr)West to East - Normalized to Percentage

~2050

49%

57%

21%

3%

39%

9%

Page 23: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 5

4-Lane Freeway Off Alignment Land Use Scenario 1

Northport (CTH M to Knutson Dr)West to East - Normalized to Percentage

~2050

48%

74%

22%

26%

8%

Page 24: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Observations - Northport Select Link Analysis

• Distribution to the east remains relatively constant with all alternatives.

• In the low build alternatives, a moderate to high proportion of Northport traffic is drawn from the Waunakee area.

• In the higher build alternatives, Northport draws a greater proportion of its traffic (regional traffic) from farther west, generally along the build corridor.

Page 25: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1 - No Build

Land Use Scenario 1STH 19/Main (CTH Q and Endries Rd)

West to East - Normalized to Percentage~2050

44%

50% 55%

5%

18%

Page 26: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 1A

No Build w/ Enhancements Land Use Scenario 1

STH 19/Main (CTH Q and Endries Rd)West to East - Normalized to Percentage

~2050

47%54%

22%

47%

Page 27: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 3

Onken-Balzer Connection Land Use Scenario 1

STH 19/Main (CTH Q and Endries Rd)West to East - Normalized to Percentage

~2050

46% 47%

19%

48%7%

Page 28: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link AnalysisAlternative 5

4-Lane Freeway Off Alignment Land Use Scenario 1

STH 19/Main (CTH Q and Endries Rd)West to East - Normalized to Percentage

~2050

50% 44%23%

45%

5%

Page 29: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Observations - Main St Select Link

• Distribution remains relatively constant with all alternatives

• Main Street tends to draw a slightly higher percentage of its traffic from the build corridor.

Page 30: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Select Link Also Performed for:

• Main Street - CTH Q and Endres

• South Beltline - Yahara Bridge

• USH 12

Page 31: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Next Steps1. Preliminary transportation recommendations

(selection & sequence of improvements) 2. Roadway and community character issues,

techniques and recommendations3. Preservation issues, techniques and

recommendations4. Intergovernmental relations issues, techniques and

recommendations5. Final transportation recommendations6. Comprehensive Implementation Package Strategy7. Project Report and, Report Adoption, Project

Completion

Page 32: Dane County Vandewalle & Associates Strand Associates William O’Connor

8/7/02

Dane County

Vandewalle & Associates

Strand Associates

William O’Connor

Roadway Concept Select Link Traffic

ModelingAugust 7, 2002